Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017
Regulations made under THE ELECTRICITY ACT 2003
- Made under: THE ELECTRICITY ACT 2003
Contents
- Regulation 1 - Short title, extent and commencement
- Regulation 2 - Definitions
- Regulation 3 - Interpretations
- Regulation 4 - System of Supply
- Regulation 5 - Safety of electrical installations
- Regulation 6 - Classification and Categorization of Supply
- Regulation 7 - Wiring in the premises of the consumer
- Regulation 8 - Harmonics dumping
- Regulation 9 - Distribution of electricity through franchisee
- Regulation 10 - New and Existing Connections
- Regulation 11 - New Electricity Connection
- Regulation 13 - Conversion of single point connection to individual connection
- Regulation 14 - Procedure for full conversion of single point connection into individual connection
- Regulation 15 - Procedure for partial conversion of single point connection into individual connection
- Regulation 16 - Temporary Connection
- Regulation 17 - Existing connections
- Regulation 18 - Agreement
- Regulation 19 - Termination of Agreement
- Regulation 20 - Security Deposit
- Regulation 21 - Service-Line-cum Development (SLD)
- Regulation 22 - Space for installation of grid substation, transformers, service line, meter and other equipment
- Regulation 23 - The safe custody of the meter and other equipment of the Licensee
- Regulation 24 - Procedure for shifting electric line or electrical plant of the Licensee
- Regulation 25 - Procedure for shifting of meter or service line within the premises of the consumer
- Regulation 27 - Requirement of meters
- Regulation 28 - Option of the applicant/consumer to purchase the meter
- Regulation 29 - Supply and installation of meters and circuit breakers
- Regulation 30 - Reading of meters
- Regulation 31 - Consequence of making the meter inaccessible for reading
- Regulation 32 - Testing of meter
- Regulation 33 - Stolen Meter
- Regulation 34 - Replacement of Defective Meters/Burnt Meters/Stolen Meters
- Regulation 35 - Replacement of Meters in Bulk
- Regulation 36 - Cost of Meters
- Regulation 37 - Adoption of new technologies for metering
- Regulation 39 - Billing in case of defective or damaged meter
- Regulation 40 - Billing in case of burnt meter
- Regulation 41 - Billing in case of stolen meter
- Regulation 42 - Recovery of Arrears
- Regulation 43 - Payment on self assessment by the consumer
- Regulation 44 - Advance payment of anticipated bills by consumer
- Regulation 45 - Disputed bills
- Regulation 46 - Payment of bills and charges for delayed payments
- Regulation 47 - Receipt for the payment of the bill
- Regulation 48 - Appropriation of the amount received
- Regulation 49 - Installment facility and incentive for early payment
- Regulation 50 - Grounds for disconnection
- Regulation 51 - Procedure for Disconnection
- Regulation 52 - Prevention from Unauthorized Reconnection
- Regulation 53 - Disconnection on Consumer’s request
- Regulation 54 - Reconnection
- Regulation 55 - General
- Regulation 56 - Inspections of the premises and electrical installations by Assessing Officer
- Regulation 57 - Preparation of Report by Assessing officer
- Regulation 58 - Procedure for dealing the case of Unauthorized Use of Electricity (UUE)
- Regulation 59 - Appeal before Appellate Authority under Section 127 of the Act
- Regulation 60 - Inspections of the premises and electrical installations by Authorized officer
- Regulation 61 - Preparation of Report by Authorized officer
- Regulation 62 - Procedure for prosecution for Theft of Electricity
- Regulation 63 - Assessment Bill for theft of electricity
- Regulation 64 - Suspected Theft
- Regulation 65 - Compounding of the offence under section 152 of the Act
- Regulation 66 - Restoration of supply disconnected on account of theft of electricity
- Regulation 67 - Voluntary disclosure of tampered meter
- Regulation 68 - General
- Regulation 69 - Procedure for lodging complaint
- Regulation 70 - Procedure for redressal of complaint on no current/failure of power supply
- Regulation 71 - Procedure for redressal of complaint on low/high voltage
- Regulation 72 - Redressal of Grievances by Forum and Ombudsman
- Regulation 73 - Guaranteed standards of performance
- Regulation 74 - Determination of Compensation
- Regulation 75 - Penalty
- Regulation 76 - Procedure for Determination and payment of compensation amount
- Regulation 77 - Information on Standards of Performance
- Regulation 78 - Notice to the Consumer
- Regulation 79 - Accident at the installation of the consumer
- Regulation 80 - Demand Side Management
- Regulation 81 - Applicants/Consumers covered under Delhi Electricity Regulatory Commission (Net Metering for Renewable Energy) Regulations, 2014
- Regulation 82 - Applicants/Consumers covered under Delhi Electricity Regulatory Commission (Terms and Conditions of Open Access) Regulations, 2005
- Regulation 83 - Exemption
- Regulation 84 - Issue of Order(s) and Practice Directions
- Regulation 85 - Power of relaxation and power to remove difficulties
- Regulation 86 - Saving of Inherent Powers of the Commission
- Regulation 87 - Power to Amend