Regulation 17, Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017: Existing connections
Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017 - Regulation 17
Text of regulation 17
Existing connections
17. Existing connections:-
(1) Transfer of connection
[PART III DELHI GAZETTE : EXTRAORDINARY 75
(i) If any applicant wants transfer of connection due to any reason such as change of consumer’s
name due to change in ownership or occupancy of property, transfer to legal heir, etc. he shall
apply to the Licensee in the prescribed format as notified in the Commission’s Orders.
(ii) Any deficiency in the application shall be intimated in writing. The application shall be accepted
only on removal of such deficiencies.
(iii) The request for transfer of connection shall not be accepted unless all recoverable dues in respect
of the concerned connection are fully paid:
Provided that once connection is transferred, no dues / arrears shall be recovered from the
new consumer.
(iv) The change of applicant’s name shall be effected within two billing cycles, after acceptance of
application or clearing of dues whichever is later.
(v) If the change of applicant’s name is not effected within two billing cycles, the consumer shall be
entitled to seek and the Licensee shall be liable to pay the compensation as specified in Schedule-I
of the Regulations.
(2) Load Enhancement on the request of consumer:-
(i) The applicant shall apply for load enhancement in the format notified in the Commission’s Orders.
(ii) The procedure as laid down in Regulation 11 for release of electricity connection shall be
followed.
(iii) If the effective date of load enhancement falls between the billing cycles, the Licensee shall raise
the bill on pro-rata basis during that billing cycle.
(3) Load Reduction on the request of consumer:-
(i) The Application for load reduction shall be accepted only after six months from original
energisation for connections up to 100 KW, and 1 (one) year from original energisation for
connections above 100 KW. Subsequent application for load reduction shall be accepted once in
six-months or after lock-in period of 6 (six) months pursuant to Regulation 17(4)(vii), as the case
may be.
(ii) The applicant shall apply for load reduction to the Licensee in the format prescribed in the
Commission’s Orders.
(iii) The Licensee, after verification, shall sanction the reduced load within 10 (ten) days from the date
of acceptance of such application.
(iv) The load reduction shall be reflected from next billing cycle.
(v) If the effective date of load reduction falls between the billing cycles, the Licensee shall raise the
bill on pro-rata basis during that billing cycle.
(vi) The reduction of load shall be limited to the highest of average of any 4 (four) consecutive months
maximum demand readings of last 12 (twelve) months.
(vii) If the load reduction is not sanctioned within the said period, the consumer shall be entitled to seek
and the Licensee shall be liable to pay the compensation as specified in Schedule-I of the
Regulations.
(4) Review of sanctioned load/contract demand by the Licensee:-
(i) For revision of sanctioned load or contract demand as the case may be, the Licensee shall take the
highest of average of Maximum Demand readings recorded as per billing cycle covering any four
consecutive calendar months in the preceding financial year i.e. from 1st April to 31st March,
rounded off to the lower integer as described in the illustration:
Provided that the period for billing cycle shall not exceed the period specified in these
Regulations:
Provided further that the minimum sanctioned load shall be 1kW.
Illustration (a):-
- Sanctioned load in preceding financial year : 4kW
- Highest of Average of MD readings : > 4kW and < 5 kW
- Rounding off for revised sanctioned load : 4 kW
76 DELHI GAZETTE : EXTRAORDINARY PART III]
Illustration (b): -
- Sanctioned load in preceding financial year : 4kW
- Highest of Average of MD readings : > 6kW and < 7 kW
- Rounding off for revised sanctioned load : 6 kW
Illustration (c): -
- Sanctioned load in preceding financial year : 4kW
- Highest of Average of MD readings : > 3kW and < 4 kW
- Rounding off for revised sanctioned load : 3 kW
(ii) If the computed revised load pursuant to sub-clause (i) above exceeds the sanctioned load or
contract demand as the case may be, the Licensee shall issue a separate notice to the consumer
about the proposed increase in sanctioned load or contract demand. The notice shall contain the
details of the exact readings in the consecutive billing cycle(s) taken into consideration along with
details of enhanced security deposit and the differential Service Line cum Development (SLD)
charges in case of change of service line, if any, for such increase in sanctioned load or the
contract demand, as the case may be, in accordance with the Act to be deposited by the consumer
within 30 (thirty) days from the date of receipt of notice.
(iii) In case of domestic category consumers, if the computed load pursuant to sub-clause (i) above is
less than the sanctioned load or contract demand as the case may be of the consumer, the Licensee
shall seek the consent of the consumer for load reduction through a separate notice to the
consumer, giving details and information that his maximum demand is less than the sanctioned
load or contract demand:
Provided that for domestic category consumers, having the sanctioned load upto 5kW in the last
billing cycle of preceding financial year, if no communication is received from them within expiry
of 30 (thirty) days from the date of the receipt of notice, the load shall be reduced automatically;
and for domestic consumers having sanctioned load more than 5kW in the last billing cycle of
preceding financial year, the load shall be reduced only on receipt of consent from the consumer.
(iv) A separate notice for upward or downward revision of sanctioned load or contract demand as the
case may be, shall be issued by 31st May of the financial year. No notice for upward revision shall
be issued thereafter during the year.
(v) In case a notice for downward revision pursuant to sub clause (iv) is not issued by 31st May, the
Licensee shall pay compensation to the affected consumer as specified in Schedule – I of the
Regulations, without prejudice to the right of consumer to reduce the load which shall be effective
as per sub clause (vi) below.
(vi) The upward or downward revision of sanctioned load or contract demand as the case may be, shall
be done once in a financial year and shall be made effective from 1st July of the financial year.
(vii) If the load is enhanced by the Licensee pursuant to sub-clause (ii), the request for any load
reduction shall be entertained only after expiry of 6 (six) months from the date of enhancement of
load.
(5) Change of category on the request of consumer:-
(i) The applicant shall apply for change of category in the format prescribed in the Commission’s
Orders.
(ii) The Licensee shall conduct site inspection to verify within 7 (seven) days from the receipt of
application and shall record the meter reading at the time of inspection.
(iii) If on inspection, the request of the consumer for change of category is found genuine, change of
category shall be made effective from the date of inspection and the same shall be reflected in next
billing cycle.
(iv) Arrear or excess charges shall be determined based on the actual period of earlier classification
based on documentary evidence provided by the Licensee or the consumer as the case may be,
limited to a period of 12 (twelve) months and the account of the consumer shall be suitably
adjusted.
(v) In case change to such category is not permitted under any law in force, the Licensee shall inform
the consumer within 7(seven) days from the date of application.
[PART III DELHI GAZETTE : EXTRAORDINARY 77
(vi) If the category is not changed within the said period, the consumer shall be entitled to seek and the
Licensee shall be liable to pay the compensation as specified in Schedule-I of the Regulations.
(6) Suo-motu reclassification of consumer category by the Licensee:-
(i) If it is found that a consumer has been wrongly classified in a particular category or the purpose of
supply as mentioned in the agreement has changed or the consumption of power has exceeded the
limit of that category as per the tariff order of the Commission or the category has changed
consequent to a revision of tariff order, the Licensee shall suo-motu reclassify the consumer under
appropriate category.
(ii) The consumer shall be informed of the proposed reclassification through a notice with a notice
period of 30 (thirty) days to file objections, if any.
(iii) The Licensee after due consideration of the reply of the consumer, if any, may reclassify the
consumer appropriately.
(iv) Arrear or excess charges shall be determined based on the actual period of wrong classification
limited to a period of 12 (twelve) months or a period from the date of last inspection of the
installation of the consumer by the Licensee whichever is shorter and the account of the consumer
shall be suitably adjusted.
(7) Conversion from single phase to three phase LT and from LT to HT; and vice-versa:
(i) All applications for change from single phase to three phase Low Tension and from Low Tension
to High Tension; and vice-versa, as the case may be, shall be dealt as per the procedure laid down
at Regulation 11.
(ii) The consumer shall, in case of increase in load, pay the differential security deposit and Service
Line-cum-Development charges at the prevailing rates, and the Licensee shall, in case of decrease
in load, refund the excess security deposit.
CHAPTER - IV
AGREEMENT AND MISCELLANEOUS CHARGES
Previous and next
Questions people ask
Is regulation 17 of Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017 still in force?
No repeal of Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017 is recorded.