LawGrids logoLAWGRIDS.ORG

Annexure III, The Karnataka Town and Country Planning (Development of Land in areas other than Local Planning Areas) Regulations, 2025.: ANNEXURE-III

The Karnataka Town and Country Planning (Development of Land in areas other than Local Planning Areas) Regulations, 2025. - Annexure III

Text of annexure III

ANNEXURE-III

ANNEXURE-III Restriction to erect Telecommunication Infrastructure Towers. (1) Water Bodies: (i) No Telecommunication Infrastructure Tower shall be allowed in the bed of water bodies like river or nala and in the Full Tank Level (FTL) of any lake, pond, kunta lands. Unless and otherwise stated, the area and the Full Tank Level (FTL) of a Lake or Kunta shall be reckoned as measured and as certified by the Revenue/ Minor Irrigation/ Water Resources Department. ¨sÁUÀ 4J , 19 2025 3347 (ii) The buffer to be maintained from various water bodies including rivers, takns, Kuntas, Canals, Nalas, Storm Water Drains, for installation of Telecommunication Infrastructure Tower shall be as prescribed by Government from time to time. (2) Railways: The distance between the Railway Property Boundary and the Telecommunication Infrastructure Tower shall be 30m as per Indian Railways Works Manual or as per no objection certificate given by the Railway Authorities. (3) Electrical Lines: The Right -of-way widths recommended for Electrical lines of various Transmission Voltage are as indicated in the table below:- (i) Right-of –way (ROW) for Electrical lines.- Sl. No. Transmission voltage Width of the Right-of-way (ROW) in meters 01 11 kV 7.0 02 33 kV 15.0 03 66 kV 18.0 04 110 kV 22.0 05 132 kV 27.0 06 220 kV 35.0 07 400 kV 52.0 (ii) Distance of site from Electric Lines.- No Telecommunication Infrastructure Tower shall be allowed to be erected or re-erected or any additions or alterations made to Telecommunication Infrastructure Tower in a site within the distance quoted below in accordance with the current Electricity Rules and its amendments from time to time between the building and any overhead electric supply line; Vertically in mtrs. Horizontally in mtrs. i Low and medium voltage lines and service lines 2.5 1.2 ii High voltage lines upto and including 33,000 V. 3.7 2.0 iii Extra high voltage lines beyond 33000 V. 3.7 (plus 0.3m for every additional 33,000 V. or part thereof ) 2.0 (plus 0.3m for every additional 33,000 V. or part thereof ) (4) In the reserved forest or forest areas: for erecting the Towers, NOC from the Forest Department shall be submitted. (5) Heritage, Religious and Other Structures: (i) In case of Sites located within the distance up to 100meters from protected monuments as notified 3348 , 19 2025 ¨sÁUÀ 4J under the Ancient Monuments and Archaeological sites and Remains Act 1958 (central Act 24 of 1958) or the Karnataka Ancient and Historical Monuments and Archaeological sites and Remains Act, 1961 (Karnataka Act 7 of 1962) no building or Telecommunication Infrastructure Tower is allowed; (ii) For the Sites located within distance of above 100meters and up to 200meters from the protected monuments, the construction of one Telecommunication Infrastructure Tower is allowed only after obtaining prior permission from the concerned appropriate authority. Provide that CoW/micro sites/IBS/Boosters etc may allowed with prior intimation to the Chief officer/PDO. (iii) In case of Wall Mounted or Pole mounted Antenna, the antenna shall be mounted at least 5 meters above ground level or road level on flyovers.

Previous and next

All provisions of The Karnataka Town and Country Planning (Development of Land in areas other than Local Planning Areas) Regulations, 2025.

Questions people ask

Is annexure III of the Karnataka Town and Country Planning (Development of Land in areas other than Local Planning Areas) Regulations, 2025. still in force?

No repeal of the Karnataka Town and Country Planning (Development of Land in areas other than Local Planning Areas) Regulations, 2025. is recorded.