SOLAR ENERGY UTILIZATION.
1. Roof Top Solar Energy Installations.- Roof top photovoltaic power
station, or rooftop PV system, is a photovoltaic system that has its
electricity-generating solar panels mounted on the rooftop of residential or
commercial buildings. The various components of such a system include
photovoltaic modules, mounting systems, cables, solar inverters and other
electrical accessories. Rooftop PV systems are faster than other types of
renewable power plants. They’re clean, quiet, and visually unobtrusive.
The norms for Roof top Solar PV installation and generation for residential
and non residential buildings exceeding a plot area of 1000 Sqm and
applicable construction area above 2000 sqm shall be as follows and in
compliance with the requirements notified by the Government.
Minimum 5% of the consumed electrical load( excluding the electrical load
required for hot water generation, if applicable) or 7.75W/Sft(derived
@12Sqm per 1KWP as suggested by the Ministry of New and Renewable
energy) for “ available roof space” whichever is less.
The estimated consumed power load (at the time of applying for building
sanction), to derive the required Roof Top Solar installation, may be
calculated as notified by the Government, provided that the owner/
developer submits an affidavit/undertaking that if the actual consumed load
during operation is more than the estimated power load, the owner/
developer shall provide the required additional roof top solar PV installations
as mentioned above. The promoter shall be responsible for the initial five
years of operation and the owner/s shall be responsible for the remaining
period of operation of the building.
Note: ‘Available roof space’ = 70% of total area of roof/terrace, considering
30% area reserved for residents’ amenities.
If solar heating panels are erected on the roof, the same shall be part of the
available roof space and the balance area (after deducting the area covered
by solar water heating panels) shall only be considering for solar PV panels.
2. Installation of solar assisted water heating System in building:- No
new building with plot area and construction area above 250 Sqm in which
3346 , 19 2025 ¨sÁUÀ 4J
there is a system of installation for supplying hot water shall be built unless
the system of the installation is having an auxiliary solar assisted water
heating system. Whenever hot water requirement is continuous, auxiliary
Heating arrangement either with electric elements or oil of adequate capacity
can be provided.
Clearance of plan for the construction of new buildings of the aforesaid
categories shall only be given if they have a provision in the building design
itself for an insulated pipeline from the rooftop in the building to various
distribution points wherever hot water is required. The building should also
have a provision for continuous water supply to the solar water heating
system. The building should also have open space on the rooftop, which
receives direct sunlight. The load bearing capacity of the roof should at least
be 50 kg/sq. All new buildings of above said categories must complete
installation of solar water heating systems before obtaining necessary
licence to commence their business.
The capacity and specifications of the solar assisted water heating systems
shall be as notified by the government.
Energy efficient alternate heating involving heat pumps etc. Or normal
electric geysers may also be permitted for hot water generation, provided
that additional solar PV installation is done in the building for the additional
power consumed for operating such energy efficient hot water generating
system / electric geysers, over and above the solar PV installation required
to be provided as per clause -1 above. If the available roof space is not
sufficient to provide the additional roof top solar PV installation equivalent
to the additional power consumed for hot water generation, the shortfall
shall be substituted through solar PV installations elsewhere in the plot or
through “ off site solar power generation.”
Note: “ off site solar power generation” means the solar power generated
outside the plot by the owner/ developer or purchase of solar power from
third party solar power generators through a power purchase agreement
made between such agency and the owner / developer to purchase solar
power equivalent to the shortfall of solar power generation within the plot.
(required for the additional electric power consumed for hot water
generation)
Previous and next
Questions people ask
Is annexure II. of the Karnataka Town and Country Planning (Development of Land in areas other than Local Planning Areas) Regulations, 2025. still in force?
No repeal of the Karnataka Town and Country Planning (Development of Land in areas other than Local Planning Areas) Regulations, 2025. is recorded.