LawGrids logoLAWGRIDS.ORG

Annexure IV, The Karnataka Town and Country Planning (Development of Land in areas other than Local Planning Areas) Regulations, 2025.: ANNEXURE-IV

The Karnataka Town and Country Planning (Development of Land in areas other than Local Planning Areas) Regulations, 2025. - Annexure IV

Text of annexure IV

ANNEXURE-IV

ANNEXURE-IV Karnataka Energy Conservation Building code (KECBC) Compliance requirements 1. Buildings or building complex that have a connected load of 100KW or greater or a contract demand of 120 KVA or greater and are intended to be used for commercial purposes must comply with the Karnataka Energy Conservation Building Code 2018 (hereinafter referred to as the said code) as modified from time to time: Provided that, the buildings intended for private residential purposes only, are exempted for compliance. 2. Commercial building.- A building is classified as “Commercial”, if it is used for any of the following purposes, namely:- a) Hospitality: All hotels and resorts; b) Educational: School, college, university and other educational Institutions; c) Healthcare: Hospitals, Out-patient units and other health care units; d) Shopping Complex: Shopping Malls, Stand-alone retails, Open- gallery malls and Super markets; e) Business: Day-time use and 24 hour use business units; and f) Assembly: Multiplex, Theatre and buildings used for transport services. 3. The Provisions of the said code shall be applicable to the following building-systems, namely;- a) Building envelope; b) Mechanical systems and equipments, including heating, ventilating air-conditioning and service hot water heating: c) Interior and Exterior lighting: and d) Electric power, motors and renewable energy systems. ¨sÁUÀ 4J , 19 2025 3349 4. The provisions of the said code shall not be applicable to plug loads, equipments and parts of buildings that use energy for manufacturing processes, unless otherwise specified in the said code. 5. The compliance of the energy performance of a building with the code, shall be ensured by the owner by following the mandatory requirements of the code and by following either prescriptive method, Building Envelope Trade-off method or whole building performance method, as specified in the code. 6. The compliance with the code shall be verified in the following stages, namely;- a) Stage-1: at the time obtaining the construction permit from the local bodies; b) Stage-2:at the time of obtaining construction completion or occupancy certificate from the local bodies; and c) Stage-3:at the time of obtaining the electrical connection from DISCOMs 7. No objection Certificate with respect to the compliance with the Code, for electrical installation shall be obtained from the State Electrical inspectorate. Note: This Annexure shall be read with the Karnataka Energy Conservation Building code (KECBC) 2018, as modified from time to time and the Karnataka Energy Conservation Building Code (KECBC) Rules, 2018, as modified from time to time. PR-356 ಮುದÎಕರು ²ಾಗೂ ಪÎ�ಾಶಕರು:- ಸಂಕಲ£ಾĩ�ಾĸಗಳ�, ಕ£ಾ�ಟಕ ªಾಜÍಪತÎ, ಸ�ಾ�ĸ �ೇಂದÎ ಮುದÎ�ಾಲಯ, ¦ೆಂಗಳ�ರು R.N.I. No. KARBIL/2001/47147 POSTAL REGN. No. RNP/KA/BGS/2202/2017-19 Licensed to post without prepayment WPP No. 297 2 Part-4A Land Scape 3 Part -4A 5 Part -4A

Previous and next

All provisions of The Karnataka Town and Country Planning (Development of Land in areas other than Local Planning Areas) Regulations, 2025.

Questions people ask

Is annexure IV of the Karnataka Town and Country Planning (Development of Land in areas other than Local Planning Areas) Regulations, 2025. still in force?

No repeal of the Karnataka Town and Country Planning (Development of Land in areas other than Local Planning Areas) Regulations, 2025. is recorded.