Annexure IV, The Karnataka Town and Country Planning (Development of Land in areas other than Local Planning Areas) Regulations, 2025.: ANNEXURE-IV
The Karnataka Town and Country Planning (Development of Land in areas other than Local Planning Areas) Regulations, 2025. - Annexure IV
Text of annexure IV
ANNEXURE-IV
ANNEXURE-IV
Karnataka Energy Conservation Building code (KECBC)
Compliance requirements
1. Buildings or building complex that have a connected load of 100KW or
greater or a contract demand of 120 KVA or greater and are intended to be
used for commercial purposes must comply with the Karnataka Energy
Conservation Building Code 2018 (hereinafter referred to as the said code)
as modified from time to time:
Provided that, the buildings intended for private residential purposes only,
are exempted for compliance.
2. Commercial building.- A building is classified as “Commercial”, if it is
used for any of the following purposes, namely:-
a) Hospitality: All hotels and resorts;
b) Educational: School, college, university and other educational
Institutions;
c) Healthcare: Hospitals, Out-patient units and other health care
units;
d) Shopping Complex: Shopping Malls, Stand-alone retails, Open-
gallery malls and Super markets;
e) Business: Day-time use and 24 hour use business units; and
f) Assembly: Multiplex, Theatre and buildings used for transport
services.
3. The Provisions of the said code shall be applicable to the following
building-systems, namely;-
a) Building envelope;
b) Mechanical systems and equipments, including heating, ventilating
air-conditioning and service hot water heating:
c) Interior and Exterior lighting: and
d) Electric power, motors and renewable energy systems.
¨sÁUÀ 4J , 19 2025 3349
4. The provisions of the said code shall not be applicable to plug loads,
equipments and parts of buildings that use energy for manufacturing
processes, unless otherwise specified in the said code.
5. The compliance of the energy performance of a building with the code,
shall be ensured by the owner by following the mandatory requirements of
the code and by following either prescriptive method, Building Envelope
Trade-off method or whole building performance method, as specified in the
code.
6. The compliance with the code shall be verified in the following stages,
namely;-
a) Stage-1: at the time obtaining the construction permit from the
local bodies;
b) Stage-2:at the time of obtaining construction completion or
occupancy certificate from the local bodies; and
c) Stage-3:at the time of obtaining the electrical connection from
DISCOMs
7. No objection Certificate with respect to the compliance with the Code, for
electrical installation shall be obtained from the State Electrical
inspectorate.
Note: This Annexure shall be read with the Karnataka Energy Conservation
Building code (KECBC) 2018, as modified from time to time and the
Karnataka Energy Conservation Building Code (KECBC) Rules, 2018, as
modified from time to time.
PR-356
ಮುದÎಕರು ²ಾಗೂ ಪÎ�ಾಶಕರು:- ಸಂಕಲ£ಾĩ�ಾĸಗಳ�, ಕ£ಾ�ಟಕ ªಾಜÍಪತÎ, ಸ�ಾ�ĸ �ೇಂದÎ ಮುದÎ�ಾಲಯ, ¦ೆಂಗಳ�ರು
R.N.I. No. KARBIL/2001/47147 POSTAL REGN. No. RNP/KA/BGS/2202/2017-19
Licensed to post without prepayment WPP No. 297
2 Part-4A Land Scape
3 Part -4A
5 Part -4A
Previous and next
Questions people ask
Is annexure IV of the Karnataka Town and Country Planning (Development of Land in areas other than Local Planning Areas) Regulations, 2025. still in force?
No repeal of the Karnataka Town and Country Planning (Development of Land in areas other than Local Planning Areas) Regulations, 2025. is recorded.