Text of regulation 9
Additional charges for crossing Deviation Volume Limits
9. Additional charges for crossing Deviation Volume Limits.—(1) In addition to charges
for Deviation as stipulated under Regulation 7 of these regulations, additional charge for
Deviation shall be applicable for incremental over-drawal as well as under-injection of
electricity for each slab in respect of each time block in excess of the volume limit specified
in regulation 8 above, when average grid frequency of the time block is
2
[49.85 Hz] and
above but upto 50.05 Hz” at the rates specified in the Table-2 below.
1 Sub. for regulation 8 in sub-regualtion (1) & (2) and provisio for words and figures
“49.70Hz” for vide not. No. HPERC/428 dated 29th June, 2019, published in R.H.P. dated 3rd July, 2019 at p. 3131-
3137.
2 Sub. for regulation 9 in sub-regualtion (1) for words and figures “49.70Hz” for vide not. No.
HPERC/428 dated 29th June, 2019, published in R.H.P. dated 3rd July, 2019 at p. 3131-3137.
14 Compendium of HPERC Regulations, March 2021
Table-2
Additional Charges for Deviation beyond the limits on Deviation Volume
1. For over drawal of electricity by any buyer
in excess of 12% and up to 15% of the
schedule in a time block
Equivalent to 20% of the charge for
Deviation corresponding to average grid
frequency of the time block.
2. For over drawal of electricity by any buyer
in excess of 15 % and upto 20% of the
schedule in a time block
Equivalent to 40% of the charge for
Deviation corresponding to average grid
frequency of the time block.
3. For over drawal of electricity by any buyer
in excess of 20 % of the schedule in a time
block
Equivalent to 100% of the charge for
Deviation corresponding to average grid
frequency of the time block.
4. For under injection of electricity by any
seller in excess of 12% and upto 15%
of the schedule in a time block
Equivalent to 20% of the charge for
Deviation corresponding to average grid
frequency of the time block.
5. For under injection of electricity by any
seller in excess of 15% and upto 20%
of the schedule in a time block
Equivalent to 40% of the charge for
Deviation corresponding to average grid
frequency of the time block.
6. For under injection of electricity by any
seller in excess of 20% of the
schedule in a time block
Equivalent to 100% of the charge for
Deviation corresponding to average grid
frequency of the time block.
Provided that any drawal of power by a generating station prior to COD of a unit for
the start up activities shall be exempted from the levy of additional charges of Deviation.
(2) In addition to the Charges for Deviation as specified under regulation 7 of these
regulations, additional charge for Deviation shall be payable for the over-injection and/or
under drawal of electricity for each time block by a seller and/or buyer, as the case may be,
1
[when grid frequency is “50.10 Hz and above” at the rate of Deviation charges applicable
for the frequency range of 50-50.01 Hz for that day as per the Table-1 under regulation 7.]
(3) In addition to the charges for Deviation as stipulated under regulation 7 of these
regulations, additional charge for Deviation shall be payable for over-drawal and/or under
injection of electricity for each time block by a buyer and/or seller, as the case may be, when
grid frequency is “below
2
[49.85] and the rate for the same shall be equivalent to 100% of
the charge for Deviation corresponding to the grid frequency of “below 49.85 Hz” i.e.
2
[800
Paise/kWh].
3
Previous and next
Questions people ask
Is regulation 9 of the Himachal Pradesh Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2018 still in force?
No repeal of the Himachal Pradesh Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2018 is recorded.