Regulation 8, The Himachal Pradesh Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2018: Limits on Deviation Volume
The Himachal Pradesh Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2018 - Regulation 8
Text of regulation 8
Limits on Deviation Volume
8. Limits on Deviation Volume.—(1) The over-drawal/under-drawal of electricity by any
buyer during the time block shall not exceed 12% of its scheduled drawal, when grid
frequency is
1
[49.85Hz] and above” but “below 50.05 Hz”:
Provided that no over-drawal of electricity by any buyer shall be permissible when
grid frequency is “below 1[49.85Hz]” and no under-drawal of electricity by any buyer shall
be permissible when grid frequency is “50.05 Hz and above”.
(2) The under-injection/over-injection of electricity by a seller during a time-block
shall not exceed 12% of the scheduled injection of such seller, when frequency is
1
[49.85Hz]
and above but below 50.05 Hz”:
Provided that no under injection of electricity by a seller shall be permissible when
grid frequency is "below 1[49.85Hz]" and no over injection of electricity by a seller shall be
permissible when grid frequency is "50.05 Hz and above”:
Provided further that any injection of infirm power by a generating station prior to
COD of a unit during testing and commissioning activities shall be exempted from the
volume limit specified above for a period not exceeding 6 months or the extended time
allowed by the Commission:
Provided further that any drawal of power by a generating station prior to COD of a
unit for the start up activities shall be exempted from the volume limit specified above when
grid frequency is “[49.85Hz] and above".
Previous and next
Questions people ask
Is regulation 8 of the Himachal Pradesh Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2018 still in force?
No repeal of the Himachal Pradesh Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2018 is recorded.