LawGrids logoLAWGRIDS.ORG

Regulation 31, Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017: Technology specific parameters for power projects using Municipal solid waste/refuse derived fuel and based on Rankine cycle technology. I. Technology Aspect

Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 - Regulation 31

Text of regulation 31

Technology specific parameters for power projects using Municipal solid waste/refuse derived fuel and based on Rankine cycle technology. I. Technology Aspect

31. Technology specific parameters for power projects using Municipal solid waste/refuse derived fuel and based on Rankine cycle technology. I. Technology Aspect.—Norms for tariff determination specified for power projects which use municipal solid waste (MSW) and refuse derived fuel (RDF) and shall be based on Rankine cycle technology application, combustion or incineration, Bio- methanation, Pyrolysis and High end gasifier technologie II. Capital Cost.—The capital cost for the power projects which use MSW based on Rankine Cycle Technology shall be Rs. 1500 Lakhs/MW and for refuse derived fuel based Power Plant shall be Rs. 900 Lakhs/MW. III. Plant Load Factor (1) The Plant Load Factor for determining fixed charge component of tariff for the power projects which use municipal solid waste (MSW) and refuse derived fuel (RDF) shall be as below: 16 BIHAR GAZETTE (EXTRA) 24TH OCTOBER 2017 PLF MSW RDF a) During Stabilisation 65% 65% b) During the remaining period of the first year (after stabilization) 65% 65% c) From 2nd Year onwards 75% 80% (2) The stabilisation period shall not be more than 6 months from the date of commissioning of the project IV. Auxiliary Consumption.—The auxiliary consumption for the power projects which use municipal solid waste and refuse derived fuel shall be 15%. V. Station Heat Rate.—The Station Heat Rate for power projects which use municipal solid waste and refuse derived fuel shall be 4200 kcal/kWh. VI. Operation and Maintenance Expenses 1. The O&M expenses shall be 6% of normative capital cost for the MSW/RDF Projects. 2. Normative O&M expenses allowed at the Commencement of the Control period, shall be escalated at the rate of 5.72% per annum. VII. Calorific Value.—The Calorific Value of the refuse derived fuel (RDF) fuel used for the purpose of determination of tariff shall be at 2500 kcal/kg. VIII. Fuel Cost.—Refuse derived fuel (RDF) price during FY 2017-18 shall be Rs 1,800 per MT. For each subsequent year of the Tariff Period, the normative escalation factor of 5% per annum shall be applicable at the option of the refuse derived fuel (RDF) project developer. No fuel cost shall be considered for determination of tariff for the power projects using municipal solid waste (MSW).

Previous and next

All provisions of Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017

Questions people ask

Is regulation 31 of Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 still in force?

No repeal of Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 is recorded.