Technology specific parameters for Biomass Gasifier Power Projects. I. Technology Aspect

30. Technology specific parameters for Biomass Gasifier Power Projects. I. Technology Aspect.—The norms for tariff determination are specified hereunder for biomass gasifier based power projects: II. Capital Cost.—The normative capital cost for the biomass gasifier power projects based on Rankine cycle shall be Rs. 592.88 Lakh/MW (FY 2017-18 during first year of Control Period) and shall be same for subsequent years unless specifically ordered by the Commission. After taking into account of capital subsidy of Rs 150.00 lakhs/MW, net project cost shall be Rs. 442.88 Lakh/MW for FY 2017-18. III. Plant Load Factor.—Plant Load Factor for determining fixed charge component of Tariff shall be 85%. IV. Auxiliary Consumption.—The auxiliary consumption shall be 10% for the determination of tariff. V. Specific fuel consumption.—Normative specific fuel consumption shall be 1.25 kg per kWh. VI. Operation and Maintenance Expenses (1) Normative O&M expenses for the first year of the Control period (i.e. FY 2017-18) shall be Rs. 52.83 Lakh per MW Normative O&M expenses allowed at the commencement of the Control Period (i.e. FY 2017-18) under these Regulations shall be escalated at the rate of 5.72% per annum. VII. Fuel Mix (1) The Biomass Gasifier based power plant shall be designed in such a way that it uses different types of non-fossil fuels available within the vicinity of biomass power project such as crop residues, agro- industrial residues, forest residues etc. and other biomass fuels as may be approved by MNRE. (2) The Biomass Gasifier based Power Generating Companies shall ensure fuel management plan to ensure adequate availability of fuel to meet the respective project requirements. VIII. Fuel Cost.—Biomass fuel price for the Biomass gasifier based power project applicable for FY 2017-18 shall be the same as for the biomass based power project (Rankine cycle) as mentioned in Regulation 26.

Previous and next

All provisions of Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017

Questions people ask

Is regulation 30 of Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 still in force?

No repeal of Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 is recorded.