Regulation 29, Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017: Technology specific parameters for Solar Thermal Power Project. I. Technology Aspects
Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 - Regulation 29
Text of regulation 29
Technology specific parameters for Solar Thermal Power Project. I. Technology Aspects
29. Technology specific parameters for Solar Thermal Power Project.
I. Technology Aspects.—Norms for Solar thermal power under
these Regulations shall be applicable for Concentrated solar
power (CSP) technologies viz. line focusing or point focusing, as
may be approved by MNRE, and uses direct sunlight,
concentrating it several times to reach higher energy densities
and thus higher temperatures whereby the heat generated is
used to operate a conventional power cycle to generate
electricity.
II. Capital Cost.—The capital cost for Solar Thermal Projects shall be
Rs 1200 Lakh/MW for FY 2017-18.
The above capital cost shall remain valid during the entire control
period unless reviewed earlier by the Commission.
III. Capacity Utilisation Factor (CUF).—The Capacity Utilisation
Factor shall be 23%.
Provided that the Commission may deviate from the above
norm in case of project specific tariff determination in pursuance
of Regulation 7 and Regulation 8.
IV. Operation and Maintenance Expenses
(1) The O&M expenses shall be Rs 19.81 Lakhs/MW for Solar
Thermal project.
(2) Normative O&M expenses allowed at the commencement
of the Control Period (i.e. FY 2017-18) under these
Regulations shall be escalated at the rate of 5.72% per
annum over the Tariff Period.
The above cost shall remain valid during the control period
unless reviewed earlier by the Commission.
V. Auxiliary Consumption.— The auxiliary consumption shall
be 10%.
Provided that the Commission may deviate from the above
norm in case of project specific tariff determination in
pursuance of Regulation 7 and Regulation 8.
15
BIHAR GAZETTE (EXTRA), 24TH OCTOBER 2017
Previous and next
Questions people ask
Is regulation 29 of Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 still in force?
No repeal of Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 is recorded.