LawGrids logoLAWGRIDS.ORG

Regulation 29, Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017: Technology specific parameters for Solar Thermal Power Project. I. Technology Aspects

Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 - Regulation 29

Text of regulation 29

Technology specific parameters for Solar Thermal Power Project. I. Technology Aspects

29. Technology specific parameters for Solar Thermal Power Project. I. Technology Aspects.—Norms for Solar thermal power under these Regulations shall be applicable for Concentrated solar power (CSP) technologies viz. line focusing or point focusing, as may be approved by MNRE, and uses direct sunlight, concentrating it several times to reach higher energy densities and thus higher temperatures whereby the heat generated is used to operate a conventional power cycle to generate electricity. II. Capital Cost.—The capital cost for Solar Thermal Projects shall be Rs 1200 Lakh/MW for FY 2017-18. The above capital cost shall remain valid during the entire control period unless reviewed earlier by the Commission. III. Capacity Utilisation Factor (CUF).—The Capacity Utilisation Factor shall be 23%. Provided that the Commission may deviate from the above norm in case of project specific tariff determination in pursuance of Regulation 7 and Regulation 8. IV. Operation and Maintenance Expenses (1) The O&M expenses shall be Rs 19.81 Lakhs/MW for Solar Thermal project. (2) Normative O&M expenses allowed at the commencement of the Control Period (i.e. FY 2017-18) under these Regulations shall be escalated at the rate of 5.72% per annum over the Tariff Period. The above cost shall remain valid during the control period unless reviewed earlier by the Commission. V. Auxiliary Consumption.— The auxiliary consumption shall be 10%. Provided that the Commission may deviate from the above norm in case of project specific tariff determination in pursuance of Regulation 7 and Regulation 8. 15 BIHAR GAZETTE (EXTRA), 24TH OCTOBER 2017

Previous and next

All provisions of Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017

Questions people ask

Is regulation 29 of Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 still in force?

No repeal of Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 is recorded.