Regulation 9, Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017: Tariff Structure

Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 - Regulation 9

Text of regulation 9

Tariff Structure

9. Tariff Structure.—The tariff for renewable energy technologies shall be single part tariff consisting of the following fixed cost components: (a) Return on equity; (b) Interest on loan capital; (c) Depreciation; (d) Interest on working capital; (e) Operation and maintenance expenses; Provided that for renewable energy technologies having fuel cost component, like RDF fuel based Waste to Energy projects, biomass power projects and non-fossil fuel based cogeneration, Biomass gasifier projects, single part tariff with two components, fixed cost component and fuel cost component, shall be determined. 10. Tariff Design (1) The generic tariff shall be determined on levellised basis for the Tariff Period. Provided that for renewable energy technologies having single part tariff with two components, tariff shall be determined on levellised basis considering the year of commissioning of the project for fixed cost component while the fuel cost component shall be specified on year of operation basis. (2) For the purpose of levellised tariff computation, the discount factor equivalent to Post Tax weighted average cost of capital shall be considered. (3) Levellisation shall be carried out for the ‘useful life’ of the Renewable Energy project while Tariff shall be specified for the period equivalent to ‘Tariff Period’. 11. Despatch principles for electricity generated from Renewable Energy Sources: (1) All renewable energy power plants except for biomass power plants with installed capacity of 10 MW and above, and non- 8 BIHAR GAZETTE (EXTRA) 24TH OCTOBER 2017 fossil fuel based cogeneration plants shall be treated as ‘MUST RUN’ power plants and shall not be subjected to ‘merit order despatch’ principles. (2) The biomass power generating station with an installed capacity of 10 MW and above and non-fossil fuel based co-generation projects shall be subjected to scheduling and despatch code as specified under Indian Electricity Grid Code (IEGC) and Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2014 including amendments thereto. (3) Scheduling of wind and solar energy shall be governed as per the aforesaid provisions of Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Third Amendment) Regulations, 2015 and Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) (Second Amendment) Regulations, 2015 as amended from time to time.”

Previous and next

All provisions of Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017

Questions people ask

Is regulation 9 of Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 still in force?

No repeal of Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 is recorded.