Regulation 5, Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017: Control Period or Review Period
Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 - Regulation 5
Text of regulation 5
Control Period or Review Period
5. Control Period or Review Period.— The Control Period or Review
Period under these Regulations shall be of three (3) years, of which the first year
shall be the financial year 2017-18.
Provided that the tariff determined as per these Regulations for the RE
projects commissioned during the Control Period, shall continue to be
applicable for the entire duration of the Tariff Period as specified in Regulation
6 below.
Provided further that the revision in Regulations for next Control Period
shall be undertaken six months prior to the end of the first Control Period and
in case Regulations for the next Control Period are not notified until
commencement of next Control Period, the tariff norms as per these
Regulations shall continue to remain applicable until notification of the revised
Regulations subject to adjustments as per revised Regulations.
6. Tariff Period
a) The Tariff Period for Renewable Energy power projects will be
same as their Useful Life as defined in Regulation 2 (z) (cc) of
these Regulations.
b) Tariff period under these Regulations shall be considered from
the date of commercial operation of the renewable energy
generating stations.
c) Tariff determined as per these Regulations shall be applicable for
Renewable Energy power projects, for the duration of the Tariff
Period as stipulated under Clause (a) and (b).
7. Project Specific tariff
(a) Project specific tariff, on case to case basis, shall be determined
by the Commission for the following types of projects:
(i) Biogas based projects;
(ii) Hybrid Solar Thermal Power Projects;
(iii) Small Hydro Projects
(iv) Other hybrid projects include renewable–renewable or
renewable–conventional sources, for which renewable
technology is approved by MNRE;
(v) Any other new renewable energy technologies approved by
MNRE.
(vi) Wind Power projects.
(b) Determination of Project specific tariff for generation of electricity
from such renewable energy sources shall be in accordance with
such terms and conditions as stipulated under relevant
Regulations/Orders of BERC/CERC.
Provided that the financial norms as specified under these Regulations,
except for capital cost, shall be ceiling norms while determining the project
specific tariff.
8. Petition and proceedings for determination of tariff
(1) The Commission shall determine the generic tariff on the basis
of suo-motu proceeding at the beginning of each year of the
Control period for the following types of projects, for which
norms have been specified under the Regulations:
(a) Solar PV including Rooftop Solar PV and Solar Thermal.
(b) Biomass Power Projects based on Rankine Cycle
Technologies.
(c) Non-fossil fuel based cogeneration projects.
(d) Biomass gasifier projects.
7
BIHAR GAZETTE (EXTRA), 24TH OCTOBER 2017
(e) MSW/RDF project based on Rankine cycle.
(2) A petition for determination of project specific tariff shall be
accompanied by such fee as may be determined by Regulations
and shall be accompanied by:
a) Information in forms 1.1, 1.2, 2.1 and 2.2 as the case may
be, and as appended in these regulations;
b) Detailed project report outlining technical and operational
details, site specific aspects, premise for capital cost and
financing plan etc.
c) A statement of all applicable terms and conditions and
expected expenditure for the period for which tariff is to be
determined.
d) A statement containing full details of calculation of any
subsidy and incentive received, due or assumed to be due
from the Central Government and/or State Government.
This statement shall also include the proposed tariff
calculated without consideration of the subsidy and
incentive.
e) Any other information that the Commission requires the
petitioner to submit.
(3) The proceedings for determination of tariff shall be in
accordance with the BERC (Conduct of Business) Regulations,
2005.
Previous and next
Questions people ask
Is regulation 5 of Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 still in force?
No repeal of Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 is recorded.