Form 5C, Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017: FORM- 5C
Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 - Form 5C
Text of form 5C
FORM- 5C
FORM- 5C
Break-up of Capital Cost for Gas/Liquid fuel based
projects
Name of the
Petitioner
_____________________________________
_
Name of the
Generating Station
_____________________________________
_
(Amoun
t in Rs.
Lakh)
As per Actual/Estimated
Original
Actual
Specific
Capital
Estimates Liabilities/
Expenditure upto
Sl. Capital Variation Reasons for
No. Break Down (2) as per Expenditure Provisions (3-4-5) (6) Variation* Cut-off date (8)
(1)
Investment
(4)
(5)
(7)
Approval
(3)
1
Cost of Land & Site
Development
1.1 Land*
1.2
Rehabilitation &
Resettlement (R&R)
1.3
Preliminary
Investigation &
Site
Development
Total Land & Site
Development
2 Plant & Equipment
2.1
Steam Generator
Island
2.2
Turbine Generator
Island
2.3 WHRB Island
2.4 BOP Mechanical
2.4.1
Fuel Handling &
Storage system
2.4.2
External water
supply system
2.4.3 CW system
2.4.4 Cooling Towers
2.4.5 DM water Plant
2.4.6 Clarification plant
[PART III] DELHI GAZETTE : EXTRAORDINARY 111
As per Actual/Estimated
Original
Actual
Specific
Capital
Estimates Liabilities/
Expenditure upto
Sl. Capital Variation Reasons for
No. Break Down (2) as per Expenditure Provisions (3-4-5) (6) Variation* Cut-off date (8)
(1)
Investment
(4)
(5)
(7)
Approval
(3)
2.4.7 Chlorination Plant
2.4.8 Air Condition & Ventilation System
2.4.9 Fire fighting System
2.4.10 HP/LP Piping
Total BOP Mechanical
2.5 BOP Electrical
2.5.1 Switch Yard Package
2.5.2 Transformers Package
2.5.3 Switch gear Package
2.5.4 Cables, Cable facilities & grounding
2.5.5 Lighting
2.5.6 Emergency D.G. set
Total BOP Electrical
Control & Instrumentation (C & I)
2.6 Package
Total Plant & Equipment excluding
taxes & Duties
2.7 Taxes & Duties
3 Initial Spares
4 Civil Works
4.1 Main plant/Adm. Building
112 DELHI GAZETTE : EXTRAORDINARY [PART III]
As per Actual/Estimated
Original
Actual
Specific
Capital
Estimates Liabilities/
Expenditure upto
Sl. Capital Variation Reasons for
No. Break Down (2) as per Expenditure Provisions (3-4-5) (6) Variation* Cut-off date (8)
(1)
Investment
(4)
(5)
(7)
Approval
(3)
4.2 External Water Supply System
4.3 CW system
4.4 Cooling Towers
4.5 DM water Plant
4.6 Clarification plant
4.7 Fuel handling & Storage system
4.8 Township & Colony
Temp. construction & enabling
4.9 works
4.10 Road & Drainage
4.11 Fire fighting System
Total Civil works
5 Construction & Pre-
Commissioning Expenses
5.1 Erection Testing and commissioning
5.2 Site supervision
5.3 Operator's Training
5.4 Construction Insurance
5.5 Tools & Plant
5.6 Start up fuel
Total Construction & Pre-
Commissioning Expenses
6 Overheads
[PART III] DELHI GAZETTE : EXTRAORDINARY 113
As per Actual/Estimated
Original
Actual
Specific
Capital
Estimates Liabilities/
Expenditure upto
Sl. Capital Variation
Reasons
for
No. Break Down (2) as per Expenditure Provisions
(3-4-5)
(6) Variation* Cut-off date (8)
(1)
Investment
(4)
(5)
(7)
Approval
(3)
6.1 Establishment
6.2 Design & Engineering
6.3 Audit & Accounts
6.4 Contingency
Total Overheads
7 Capital cost excluding IDC & FC
8 IDC, FC, FERV &Hedging Cost
8.1 Interest During Construction (IDC)
8.2 Financing Charges (FC)
Foreign Exchange Rate Variation
8.3 (FERV)
8.4 Hedging Coat
Total of IDC, FC,FERV & Hedging
Cost
Capital cost including IDC, FC,
9 FERV & Hedging Cost
*Provide details of Freehold land and Lease hold land separately
Note:
1. In case of cost variation , a detailed note giving reasons of such variation should be submitted
clearly indicating whether such cost over-run was beyond the control of the generating company.
2. In case of time & cost overrun, a detailed note giving reasons of such time and cost over-run should
be submitted clearly bringing out the agency responsible and whether such time and cost overrun
was beyond the control of the generating company.
3. The implication on cost due to time over run, if any shall be submitted separately giving
details of increase in prices in different packages from scheduled COD to Actual COD/anticipated
COD, increase in IEDC from scheduled COD to actual COD/anticipated COD and increase of
IDC from scheduled COD to actual anticipated COD.
4. Impact on account of each reason for Time over run on Cost of project should be quantified
and substantiated with necessary documents and supporting workings.
A list of balance work assets/work wise including initial spare on original scope of works along with estimate
shall be furnished positively.
114 DELHI GAZETTE : EXTRAORDINARY [PART III]
Previous and next
Questions people ask
Is form 5C of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 still in force?
No repeal of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 is recorded.