Form 5C, Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017: FORM- 5C

Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 - Form 5C

Text of form 5C

FORM- 5C

FORM- 5C Break-up of Capital Cost for Gas/Liquid fuel based projects Name of the Petitioner _____________________________________ _ Name of the Generating Station _____________________________________ _ (Amoun t in Rs. Lakh) As per Actual/Estimated Original Actual Specific Capital Estimates Liabilities/ Expenditure upto Sl. Capital Variation Reasons for No. Break Down (2) as per Expenditure Provisions (3-4-5) (6) Variation* Cut-off date (8) (1) Investment (4) (5) (7) Approval (3) 1 Cost of Land & Site Development 1.1 Land* 1.2 Rehabilitation & Resettlement (R&R) 1.3 Preliminary Investigation & Site Development Total Land & Site Development 2 Plant & Equipment 2.1 Steam Generator Island 2.2 Turbine Generator Island 2.3 WHRB Island 2.4 BOP Mechanical 2.4.1 Fuel Handling & Storage system 2.4.2 External water supply system 2.4.3 CW system 2.4.4 Cooling Towers 2.4.5 DM water Plant 2.4.6 Clarification plant [PART III] DELHI GAZETTE : EXTRAORDINARY 111 As per Actual/Estimated Original Actual Specific Capital Estimates Liabilities/ Expenditure upto Sl. Capital Variation Reasons for No. Break Down (2) as per Expenditure Provisions (3-4-5) (6) Variation* Cut-off date (8) (1) Investment (4) (5) (7) Approval (3) 2.4.7 Chlorination Plant 2.4.8 Air Condition & Ventilation System 2.4.9 Fire fighting System 2.4.10 HP/LP Piping Total BOP Mechanical 2.5 BOP Electrical 2.5.1 Switch Yard Package 2.5.2 Transformers Package 2.5.3 Switch gear Package 2.5.4 Cables, Cable facilities & grounding 2.5.5 Lighting 2.5.6 Emergency D.G. set Total BOP Electrical Control & Instrumentation (C & I) 2.6 Package Total Plant & Equipment excluding taxes & Duties 2.7 Taxes & Duties 3 Initial Spares 4 Civil Works 4.1 Main plant/Adm. Building 112 DELHI GAZETTE : EXTRAORDINARY [PART III] As per Actual/Estimated Original Actual Specific Capital Estimates Liabilities/ Expenditure upto Sl. Capital Variation Reasons for No. Break Down (2) as per Expenditure Provisions (3-4-5) (6) Variation* Cut-off date (8) (1) Investment (4) (5) (7) Approval (3) 4.2 External Water Supply System 4.3 CW system 4.4 Cooling Towers 4.5 DM water Plant 4.6 Clarification plant 4.7 Fuel handling & Storage system 4.8 Township & Colony Temp. construction & enabling 4.9 works 4.10 Road & Drainage 4.11 Fire fighting System Total Civil works 5 Construction & Pre- Commissioning Expenses 5.1 Erection Testing and commissioning 5.2 Site supervision 5.3 Operator's Training 5.4 Construction Insurance 5.5 Tools & Plant 5.6 Start up fuel Total Construction & Pre- Commissioning Expenses 6 Overheads [PART III] DELHI GAZETTE : EXTRAORDINARY 113 As per Actual/Estimated Original Actual Specific Capital Estimates Liabilities/ Expenditure upto Sl. Capital Variation Reasons for No. Break Down (2) as per Expenditure Provisions (3-4-5) (6) Variation* Cut-off date (8) (1) Investment (4) (5) (7) Approval (3) 6.1 Establishment 6.2 Design & Engineering 6.3 Audit & Accounts 6.4 Contingency Total Overheads 7 Capital cost excluding IDC & FC 8 IDC, FC, FERV &Hedging Cost 8.1 Interest During Construction (IDC) 8.2 Financing Charges (FC) Foreign Exchange Rate Variation 8.3 (FERV) 8.4 Hedging Coat Total of IDC, FC,FERV & Hedging Cost Capital cost including IDC, FC, 9 FERV & Hedging Cost *Provide details of Freehold land and Lease hold land separately Note: 1. In case of cost variation , a detailed note giving reasons of such variation should be submitted clearly indicating whether such cost over-run was beyond the control of the generating company. 2. In case of time & cost overrun, a detailed note giving reasons of such time and cost over-run should be submitted clearly bringing out the agency responsible and whether such time and cost overrun was beyond the control of the generating company. 3. The implication on cost due to time over run, if any shall be submitted separately giving details of increase in prices in different packages from scheduled COD to Actual COD/anticipated COD, increase in IEDC from scheduled COD to actual COD/anticipated COD and increase of IDC from scheduled COD to actual anticipated COD. 4. Impact on account of each reason for Time over run on Cost of project should be quantified and substantiated with necessary documents and supporting workings. A list of balance work assets/work wise including initial spare on original scope of works along with estimate shall be furnished positively. 114 DELHI GAZETTE : EXTRAORDINARY [PART III]

Previous and next

All provisions of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017

Questions people ask

Is form 5C of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 still in force?

No repeal of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 is recorded.