Form 5B, Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017: FORM- 5B
Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 - Form 5B
Text of form 5B
FORM- 5B
FORM- 5B
Break-up of Capital Cost for New Coal/Lignite based
projects
Name of the
Petitioner _____________________________________
Name of the
Generating Station _____________________________________
(Amount in
Rs. Lakh)
S. No. Break Down As per Original
Estimates as per
Investment
Actual Capital
Expenditure as
on
COD/anticipated
COD
Liabilities/
Provisions
Variation Specific
Reasons
for
Variation
Estimated
Capital
expenditure
upto Cut-off
date
. Approval
(1) (2) (3) (4) (5) (3-4-
5) (6)
(7) (8)
Actual Amount
Cost of Land &
Site
1 Development
1.1 Land*
Rehabilitation &
1.2 Resettlement
(R&R)
Preliminary
1.3 Investigation &
Site
Development
Total Land &
Site
Development
2
Plant &
Equipment
Steam
Generator
2.1 Island
Turbine
2.2
Generator
Island
2.3 BOP Mechanical
2.3.1 External water
104 DELHI GAZETTE : EXTRAORDINARY [PART III]
As per
Original
Estimates as
per
Investment
Approval(3)
Actual Capital
Expenditure as on
COD/anticipated
COD
(4)
Actual Amount
Estimated
Capital
expenditure
upto
Cut-off date
(8)
Sl.
No.
(1)
Liabilities/
Variation
(3-4-
5) (6)
Specific
Reasons
Break Down
(2)
Provisions
(5)
for Variation
(7)
supply system
2.3.2 CW system
2.3.3
DM water
Plant
2.3.4
Clarification
plant
Chlorination
2.3.5 Plant
Fuel Handling
&
2.3.6
Storage
system
Ash Handling
2.3.7 System
Coal Handling
2.3.8 Plant
Rolling Stock
and
2.3.9 Locomotives
2.3.10MGR
Air
Compressor
2.3.11System
Air Condition
&
Ventilation
2.3.12System
Fire fighting
2.3.13System
2.3.14HP/LP Piping
2.3.15
FGD system,
if
any
2.3.16De-salination
plant for sea-
water intake
[PART III] DELHI GAZETTE : EXTRAORDINARY 105
As per
Original Actual Capital Estimated
Sl.
Estimates as
per Expenditure as on
Liabilities/
Variation
(3-4-
Specific
Reasons
Capital
No. Break Down (2) Investment
COD/anticipated
COD
expenditure
upto
(1)
Approval(3) (4)
Provisions
(5) 5) (6)
for
Variation
(7)
Cut-off date
(8)
Actual Amount
2.3.17External coal
handling in
Jetty,
if any
Total BOP
Mechanical
2.4 BOP Electrical
Switch Yard
2.4.1 Package
Transformers
2.4.2 Package
Switch gear
2.4.3 Package
Cables, Cable
facilities &
2.4.4 grounding
2.4.5 Lighting
Emergency D.G.
2.4.6 set
Total BOP
Electrical
Control &
Instrumentation
2.5 (C & I) Package
Total Plant &
Equipment
excluding taxes
&
Duties
2.6 Taxes & Duties
106 DELHI GAZETTE : EXTRAORDINARY [PART III]
As per
Original Actual Capital Estimated
Sl.
Estimates as
per Expenditure as on
Liabilities/
Variation
(3-4-
Specific
Reasons
Capital
No.
Break Down
(2) Investment COD/anticipated COD
expenditure
upto
(1)
Approval(3) (4)
Provisions
(5) 5) (6)
for Variation
(7)
Cut-off date
(8)
Actual Amount
3 Initial Spares
4 Civil Works
Main
plant/Adm.
4.1 Building
4.2 CW system
4.3
Cooling
Towers
4.4
DM water
Plant
4.5
Clarification
plant
Chlorination
4.6 plant
Fuel handling
&
4.7
Storage
system
Coal Handling
4.8 Plant
MGR
&Marshalling
4.9 Yard
Ash Handling
4.10 System
Ash disposal
area
4.11 development
Fire fighting
4.12 System
Township &
4.13 Colony
4.14 Temp.
[PART III] DELHI GAZETTE : EXTRAORDINARY 107
As per
Original Actual Capital Estimated
Sl.
Estimates as
per Expenditure as on
Liabilities/
Variation
(3-4-
Specific
Reasons
Capital
No. Break Down (2) Investment COD/anticipated COD
expenditure
upto
(1)
Approval(3) (4)
Provisions
(5) 5) (6)
for Variation
(7)
Cut-off date
(8)
Actual Amount
construction &
enabling works
4.15
Road &
Drainage
Total Civil
works
5
Construction
&
Pre-
Commissioning
Expenses
Erection
Testing
and
5.1 commissioning
5.2
Site
supervision
Operator's
5.3 Training
Construction
5.4 Insurance
5.5 Tools & Plant
5.6 Start up fuel
Total
Construction &
Pre-
Commissioning
Expenses
6 Overheads
6.1 Establishment
Design &
6.2 Engineering
108 DELHI GAZETTE : EXTRAORDINARY [PART III]
As per
Original Actual Capital Estimated
Sl.
Estimates as
per Expenditure as on
Liabilities/
Variation
(3-4-
Specific
Reasons
Capital
No.
Break Down
(2) Investment COD/anticipated COD
expenditure
upto
(1)
Approval(3) (4)
Provisions
(5) 5) (6)
for Variation
(7)
Cut-off date
(8)
Actual Amount
6.3
Audit &
Accounts
6.4 Contingency
Total
Overheads
Total Capital
cost excluding
7 IDC & FC
IDC, FC, FERV
8
&Hedging
Cost
Interest
During
Construction
8.1 (IDC)
Financing
8.2 Charges (FC)
Foreign
Exchange
Rate Variation
8.3 (FERV)
8.4 Hedging Coat
Total of IDC,
FC,FERV &
Hedging Cost
Capital cost
including IDC,
FC, FERV &
9 Hedging Cost
*Provide details of Freehold land and Lease hold land separately
Note:
[PART III] DELHI GAZETTE : EXTRAORDINARY 109
1. In case of cost variation, a detailed note giving reasons of such variation should be submitted clearly
indicating whether such cost over-run was beyond the control of the generating company.
2. In case of both time & cost overrun, a detailed note giving reasons of such time and cost over-run
should be submitted clearly bringing out the agency responsible and whether such time and cost
overrun was beyond the control of the generating company.
3. The implication on cost due to time over run, if any shall be submitted separately giving details of
increase in prices in different packages from scheduled COD to Actual COD/anticipated COD, increase
in IEDC from scheduled COD to actual COD/anticipated COD and increase of IDC from scheduled COD
to actual anticipated COD.
4. Impact on account of each reason for Time over run on Cost of project should be quantified and
substantiated with necessary documents and supporting workings.
5. A list of balance work assets/work wise including initial spare on original scope of works along with
estimate shall be furnished positively.
(Petitioner)
110 DELHI GAZETTE : EXTRAORDINARY [PART III]
Previous and next
Questions people ask
Is form 5B of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 still in force?
No repeal of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 is recorded.