FORM- 5B

FORM- 5B Break-up of Capital Cost for New Coal/Lignite based projects Name of the Petitioner _____________________________________ Name of the Generating Station _____________________________________ (Amount in Rs. Lakh) S. No. Break Down As per Original Estimates as per Investment Actual Capital Expenditure as on COD/anticipated COD Liabilities/ Provisions Variation Specific Reasons for Variation Estimated Capital expenditure upto Cut-off date . Approval (1) (2) (3) (4) (5) (3-4- 5) (6) (7) (8) Actual Amount Cost of Land & Site 1 Development 1.1 Land* Rehabilitation & 1.2 Resettlement (R&R) Preliminary 1.3 Investigation & Site Development Total Land & Site Development 2 Plant & Equipment Steam Generator 2.1 Island Turbine 2.2 Generator Island 2.3 BOP Mechanical 2.3.1 External water 104 DELHI GAZETTE : EXTRAORDINARY [PART III] As per Original Estimates as per Investment Approval(3) Actual Capital Expenditure as on COD/anticipated COD (4) Actual Amount Estimated Capital expenditure upto Cut-off date (8) Sl. No. (1) Liabilities/ Variation (3-4- 5) (6) Specific Reasons Break Down (2) Provisions (5) for Variation (7) supply system 2.3.2 CW system 2.3.3 DM water Plant 2.3.4 Clarification plant Chlorination 2.3.5 Plant Fuel Handling & 2.3.6 Storage system Ash Handling 2.3.7 System Coal Handling 2.3.8 Plant Rolling Stock and 2.3.9 Locomotives 2.3.10MGR Air Compressor 2.3.11System Air Condition & Ventilation 2.3.12System Fire fighting 2.3.13System 2.3.14HP/LP Piping 2.3.15 FGD system, if any 2.3.16De-salination plant for sea- water intake [PART III] DELHI GAZETTE : EXTRAORDINARY 105 As per Original Actual Capital Estimated Sl. Estimates as per Expenditure as on Liabilities/ Variation (3-4- Specific Reasons Capital No. Break Down (2) Investment COD/anticipated COD expenditure upto (1) Approval(3) (4) Provisions (5) 5) (6) for Variation (7) Cut-off date (8) Actual Amount 2.3.17External coal handling in Jetty, if any Total BOP Mechanical 2.4 BOP Electrical Switch Yard 2.4.1 Package Transformers 2.4.2 Package Switch gear 2.4.3 Package Cables, Cable facilities & 2.4.4 grounding 2.4.5 Lighting Emergency D.G. 2.4.6 set Total BOP Electrical Control & Instrumentation 2.5 (C & I) Package Total Plant & Equipment excluding taxes & Duties 2.6 Taxes & Duties 106 DELHI GAZETTE : EXTRAORDINARY [PART III] As per Original Actual Capital Estimated Sl. Estimates as per Expenditure as on Liabilities/ Variation (3-4- Specific Reasons Capital No. Break Down (2) Investment COD/anticipated COD expenditure upto (1) Approval(3) (4) Provisions (5) 5) (6) for Variation (7) Cut-off date (8) Actual Amount 3 Initial Spares 4 Civil Works Main plant/Adm. 4.1 Building 4.2 CW system 4.3 Cooling Towers 4.4 DM water Plant 4.5 Clarification plant Chlorination 4.6 plant Fuel handling & 4.7 Storage system Coal Handling 4.8 Plant MGR &Marshalling 4.9 Yard Ash Handling 4.10 System Ash disposal area 4.11 development Fire fighting 4.12 System Township & 4.13 Colony 4.14 Temp. [PART III] DELHI GAZETTE : EXTRAORDINARY 107 As per Original Actual Capital Estimated Sl. Estimates as per Expenditure as on Liabilities/ Variation (3-4- Specific Reasons Capital No. Break Down (2) Investment COD/anticipated COD expenditure upto (1) Approval(3) (4) Provisions (5) 5) (6) for Variation (7) Cut-off date (8) Actual Amount construction & enabling works 4.15 Road & Drainage Total Civil works 5 Construction & Pre- Commissioning Expenses Erection Testing and 5.1 commissioning 5.2 Site supervision Operator's 5.3 Training Construction 5.4 Insurance 5.5 Tools & Plant 5.6 Start up fuel Total Construction & Pre- Commissioning Expenses 6 Overheads 6.1 Establishment Design & 6.2 Engineering 108 DELHI GAZETTE : EXTRAORDINARY [PART III] As per Original Actual Capital Estimated Sl. Estimates as per Expenditure as on Liabilities/ Variation (3-4- Specific Reasons Capital No. Break Down (2) Investment COD/anticipated COD expenditure upto (1) Approval(3) (4) Provisions (5) 5) (6) for Variation (7) Cut-off date (8) Actual Amount 6.3 Audit & Accounts 6.4 Contingency Total Overheads Total Capital cost excluding 7 IDC & FC IDC, FC, FERV 8 &Hedging Cost Interest During Construction 8.1 (IDC) Financing 8.2 Charges (FC) Foreign Exchange Rate Variation 8.3 (FERV) 8.4 Hedging Coat Total of IDC, FC,FERV & Hedging Cost Capital cost including IDC, FC, FERV & 9 Hedging Cost *Provide details of Freehold land and Lease hold land separately Note: [PART III] DELHI GAZETTE : EXTRAORDINARY 109 1. In case of cost variation, a detailed note giving reasons of such variation should be submitted clearly indicating whether such cost over-run was beyond the control of the generating company. 2. In case of both time & cost overrun, a detailed note giving reasons of such time and cost over-run should be submitted clearly bringing out the agency responsible and whether such time and cost overrun was beyond the control of the generating company. 3. The implication on cost due to time over run, if any shall be submitted separately giving details of increase in prices in different packages from scheduled COD to Actual COD/anticipated COD, increase in IEDC from scheduled COD to actual COD/anticipated COD and increase of IDC from scheduled COD to actual anticipated COD. 4. Impact on account of each reason for Time over run on Cost of project should be quantified and substantiated with necessary documents and supporting workings. 5. A list of balance work assets/work wise including initial spare on original scope of works along with estimate shall be furnished positively. (Petitioner) 110 DELHI GAZETTE : EXTRAORDINARY [PART III]

Previous and next

All provisions of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017

Questions people ask

Is form 5B of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 still in force?

No repeal of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 is recorded.