LawGrids logoLAWGRIDS.ORG

Form 5D, Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017: FORM- 5D

Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 - Form 5D

Text of form 5D

FORM- 5D

FORM- 5D Break-up of Construction/Supply/Service packages Name of the Petitioner ______________________________________ Name of the Generating Station ______________________________________ 1 Name/No. of Construction / Supply / Service Package Package A Package B Package C … Total Cost of all packages 2 Scope of works 1 (in line with head of cost break-ups as applicable) 3 Whether awarded through ICB/DCB/ Departmentally/ Deposit Work 4 No. of bids received 5 Date of Award 6 Date of Start of work 7 Date of Completion of Work/Expected date of completion of work 8 Value of Award 2 in (Rs. Lakh) 9 Firm or With Escalation in prices 10 Actual capital expenditure till the completion or up to COD whichever is earlier(Rs.Lakh) 11 Taxes & Duties and IEDC (Rs. Lakh) 12 IDC, FC, FERV & Hedging cost (Rs. Lakh) 13 Sub -total (10+11+12) (Rs. Lakh) Note: 1. The scope of work in any package should be indicated in conformity of Capital cost break-up for the coal/lignite based plants in the FORM-5B to the extent possible. In case of Gas/Liquid fuel based projects, break down in the similar manner in the relevant heads as per FORM-5C. 2. If there is any package, which need to be shown in Indian Rupee and foreign currency(ies), the same should be shown separately along with the currency, the exchange rate and the date. (Petitioner) [PART III] DELHI GAZETTE : EXTRAORDINARY 115

Previous and next

All provisions of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017

Questions people ask

Is form 5D of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 still in force?

No repeal of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 is recorded.