TEmNG PROCEDURES FOR
DISCONTINUOUSTOTALIZING
AUTOMATIC WEIGHING INSTRUMENTS
(Mandatory)
Meaning of symbols :
I = Indication
L= Load
f. L= Additional load to next changeover point
P= I+ 0.5d -t.L = Indication prior to rounding
E= P - L = error
Eo: Error calculated at zero
Ee= Corrected error
rnpe= Maximum permissible error
EUT = Equipment under test
1. Documentation [Paragraph 5(1)(1)]
Review the documentation that Is submitted,
Including necessary photographs, drawings,
diagrams, general software information, relevant
technical and functional description of main
components, devices etc. to determine If it. is
adequate and correct. Consider the operational
manual.
2. Comparing construction with docu-,
mentation {Paragraph 5(1)(/)J
Examine the various devices of the instrument
to ensure compllance with the documentation.
3. Initial examination
(1) Metrological characteristics
Note metrological characteristics
according to the test report format.
(2) Descriptive markings [Paragraph 3(7)}
Check the descriptive markings according
to the checklist given in the test report
format.
(3) Sealingand verification marks [Paragraph
3(6) and Paragraph 3(8)}
Check the arrangements for sealing and
verification. marks according to the
checklist given in the test report format.
4. General
(1) General requirements for electronic
instruments under test (EUT)
(i) Power supply
Energize the EUT. for a time period equal
to or greater than the warm-up time
specified by the manufacturer and
maintain it energized for the duration of
the test.
·
( ii) Zero-setting
Adjust the EUT as closely as practicable
to zero prior to each test, and do not
readjust it at any time during the test,
except to reset it if a significant fault has
been indicated.
(iii) Temperature
The tests shall be performed at a steady
ambient temperature, usually normal
room temperature unless otherwise
specified.
The temperature Is deemed to be steady
when the difference between the extreme
temperatures noted during the test does
not exceed one-fi?h of the temperature
range of the instrument without being
greater than s0c and the· rate of change
does not exceed soc per hour.
The handling of the Instrument shall be
such that no condensation of water occurs
on the instrument.
(2) Control instrument and test standards [Paragraph
6(1)}
(i) Control instruments
A control instrument. meeting the
requirements of clause Paragraph 6(1)
shall be used for conduct of material tests.
Where necessary, standard weights may
be used to assess the rounding error.
(Ii) Use of standard weights to assess
rounding error
For instruments with digital indication
having scale interval d, changeover points
may be used to interpolate between scale
intervals i.e. to determine the indication
of the instrument, prior to rounding, as
follows.
At a certain load, L, the indicated value,
I, is noted. Additional weights of for
example 0.1 dare successively added until
the indication of the instrument Is
increased unambiguously by one scale
Interval (I + d). The additional load t. L
added to the load receptor gives the
--· ··------ . --
_J_.
_
492 THE GAZETTE OF INDIA: EXTRAORDINARY fPART II-SEC. 3(i)]
indication, P,"priorto rounding:by using the
followingformula :-
P = I,+ O,S d • til
The errcr.pnor. to,rounding Is :
E = P -t,
thus E = (1"+"0,Sd • t, L) • l
The corrected error prior to rounding Is :
Ec=E·Eo
Where Eo'Is the error calculated at zero.
Example: an Instrument with a scale interval, d, ·
of 1 kg is loaded,wlth 100 ·kg and thereby indicates
100 kg. After adding .successtve weights of 0.1 kg,
the Indication changes from 100 kg to 101 kg at an
additional load of ,0:3 kg. Inserted In the above
formula these observations give :
P = (100 + 0:5 • 0.3) kg = 100.2 kg
Thus the true Indication prior to rounding is
100.2 kg, and theerror is :
E = (100.2 - :100) kg =0.2
If the error prlor to rounding as calculated above
was E0 =+0.4 kg, the corrected error Is :
Ee 7 0.2 kg • {+0.4 kg) = 0.2 kg
5. Test program
(1) Pattern evaluation [Paragraph 5(1)}
All tests In sections Paragraph 6 to Paragraph
9 of this Annex shall normally be applied for pattern
evaluation.
Paragraph 6(1) of this Annex may be omitted if
the integral instrument Is not to be used as the control
indicating device for material testing.
Tests in Paragraph 7(1), Paragraph 8(3)(11),
Paragraph 8(3)(ill) (AC supply), Paragraph 8(3)(iv)
(DC supply) and Paragraph 8(4)(i) to Paragraph
8(4)(iv) of this Annex apply only for instruments that
have an electrical power supply.
(2) Initial verification [Paragraph 5(2)}
Only paragraph 6 of this Annexure 'Metrological
performance tests' is normally required for initial
verification tests.
6. Metrologlcal performance test:s
Metrologlcal performance tests shall be applied
to the complete Instrument under normal operating
conditions, except when the size and/or configuration
of the instrument does not lend itself to testing as a
unit. In such cases, the separate electronic devices
shall be subjected to testing.
(1) Zero-setting device [Paragraph 3(2)(vi)]
(i) General
Zero-setting may be by more than one
mode, for example :
(a) Non-automatic or semi-automatic zero;
(b) Automatic zero at switch-on;
(c) Automatic zero at start of automatic
operation;
(d) Automatic zero as part of weighing cycle.
It is normally only necessary to test the range
and accuracy of zero-setting In one mode. If zero is
set as part of the automatic weighing cycle then this
mode shall be tested. To test automatic zero it is
necessary to allow the instrument to operate through
the appropriate part of the automatic cycle and then
to halt the instrument before testing.
(ii) Range of zero-setting
Non-automatic and semi-automatic zero
setting
Positive range
With the load receptor empty, set the
instrument to zero. Place a test load on the load
receptor and use the zero-setting device. Continue
to increment the.test load until the device fails to re·
zero. The maximum load that can be re-zeroed Is
the positive portion of the zero-setting range.
Negative range
Steps:
(a) Remove any load from the load
receptor and set the instrument to
zero. Then, if possible remove non
essential components of the load
receptor, such that the instrument
, cannot be re-zeroed by use of the
zero setting device. (If this is not
possible then any mass that can be
removed without disabling the zero
function may be considered as tlie
negative portion of the zero-setting
range).
(b) Add weights to the load receptor
until the instrument indicates zero
again.
(c) Then remove weights and, after
each weight Is removed, use the
zero-setting device. The maximum
load that can be removed while the
instrument can still be re-zeroed by
the zero-setting device, is the
negative portion of the zero-setting
range.
(d) Alternatively, and if it is not possible
to test the negative range of zero
setting by removing parts of the
['WT Il--:"&1163(i)] 493
Instrument, then the instrument may
be temporarily recalibrated with a
test load applied before proceeding
to step (c) above. (The test load
applied for the temporary
recalibration should be greater than
the permissible negative zero-setting
range which can be calculated from
the result of the positive range test.
(e) If it Is not possible to test the
negative zero-setting range by these
methods then only the positive part
of the zero-setting range need be
considered.
(ii) Reassemble or recalibrate the instrument .
for normal use after the above tests
The zero-setting range is the sum of the
positive and negative portions.
(iii) Accuracy of zero-setting
(a) Set the instrument to zero.
(b) Add weights to the load receptor to
determine the additional load at
which the indication changes from
zero to one scale interval above zero.
(c) Calculate the error at zero according
to the description in Paragraph 4(2)
of this Annex.
(2) Material tests [Paragraph S(l}(iii)(b) and
Paragraph 5(2}(i)(b)}
(i) Mater/al test requirements
Material tests shall be conducted with the
material, test load, requirements and
methods in:
(a) Paragraph S(l)(iii)(b) for pattern
examination;
(b) Paragraph 5(2)(i)(b) for initial
verification and in-service
inspection;
(c) Paragraph 6(2)(ii) or 6(2)(111)of this
Annex (using one of the methods
therein).
(ii) Separate verification method
For this method a separate control
instrument Is used to weigh the material
either before or after it is weighed on the
discontinuous totalizing automatic
weighting Instrument.
(iii) Integral verification method
For this method the integral control
instrument is used for static weighting of
material test loads by use of a special
facility to interrupt operation during the
automatic process:
(a) Integral verification method
weighing test
The weighing performance may be
determined as follows, prior to the
material tests, when the integral
verification method is to be used for
determ in Ing the errors in material
testing.
Apply test loads from zero up to and
including Max, and similarly remove
the test loads back to zero. When
determining the Initial intrinsic error,
at least 10 different test loads shall
be selected, and for other weighing
tests at least 5 shall be selected. The
test loads selected shall include Max
and Min so that the errors may be
determined for the nominal hopper
loads that will be used in the
material tests.
Determine the error at each test load
using the procedure in Paragraph
4(2)(ii) of this Annex if necessary to
obtain the accuracy requirements of
Paragraph 4(2)(i) of this Annex.
It should be noted that when loading
or unloading weights the load shall
be progressively increased or
decreased.
Errors of indication shall be recorded
and taken Into account when
determining the errors in material
testing.
(b) Substitution material
Apply test loads from zero up to and
including the maximum portion of
standard weights.
Determine the error [Paragraph 4(2)
of this Annex] and then remove the
weights so that the no-load
indication is reached.
Substitute the previous weights with
substitution material until the same
changeover point as used for the
determination of the error Is
reached. Repeat the above
procedure until Max of the
instrument is reached.
494 THE GAZETTE OF INDIA: EXTRAORDINARY [PARTII-SEC. 3(i)]
Unload ln·reverse order to zero, i.e.
unload the weights and determine
the changeover point. Load the
weights back on and remove the
substitution material until the same
changeover point is reached. Repeat
this procedure until no-load
indication is .reached.
Similar .equivalent procedures may
be applied.
(c) Method
(c-t) Automatic gross weighing
Automatic operation Is Interrupted
after the filling of the weigh hopper
and completion of the automatic
gross weighing but before discharge
of the hopper. Thus the hopper
remains loaded.
(c-2) Static gross indication
Then, all surrounding equipments
such as dust extractors shall be
stopped. When the system has come
to a complete rest such that the
conditions are identica I to those for
non-automatic testing, the static
control weighing indication shall be
obtained.
lf necessary, standard weights may
be used to interpolate between scale
Intervals. The static control
indication shall be corrected for the
errors determine in Paragraph
6(2)(111){a) of this Annex (for
Increasing loads)
(c-3) All surrounding equipment is started
up again.
(c-4) Automatic tare weighing
Automatic operation Is Interrupted
after the discharge of the weigh
hopper and completion of the
automatic tare weighing but before
the hopper is loaded again.
(c-5) Static tare indication
Repeat stage (2) with an empty
hopper. The static indication shall be
corrected for the errors determined
In Paragraph 6(2)(111)(a) of this
Annex (for decreasing loads).
(c-6) The complete system Is started up
again and stages (1) through (5) are
repeated.
(c-7) The net weight of the material
delivered at each cycle is determined
by subtracting the corrected
indication obtained at (5) from the
corrected indication obtained at (2).
(c-s) The conventional true value of the
mass of the total test load is
determined by summation of the net
weights obtained at each cycle.
If the instrument Is installed in an alr
enclosed system, the moving mass of
material causes air turbulence that can
affect the weighing results. To ensure that
such an instrument Is tested in normal
conditions of use, the automatic operation
.
shall not be interrupted during consecutive
weighing cycles. In this case it is necessary
for the automatic weighingmade at stages
(2) and (4) to be displayed or recorded
so that a separate total may be derived
for the automatic weighing which has also
been carried out under static conditions.
(Iv) Material test procedure [Paragraph
S(J)(iii}{a) and Paragraph 5(2)(i)(b)J
The test procedure shall be as follows :-
(a) Start up the automatic weighing
system, including the surrounding
equipment which is normally in use
when the Instrument is itself in use.
(b) Run the system for five weigh cycles
(or more if necessary) to ensure
normal working conditions.
(c) Halt the automatic weighing system
and record the indication of totallzed
weight.
(d) Run the weighing system for a
number of weighing cycles as
specified for each test in Paragraph
6(2)(i) of this Annex, ensuring that
the processed material can be
weighed on the control instrument
(integral or separate) in accordance
with one of the alternative methods
of Paragraph 6(2)(ii) of this Annex
or 6(2)(iii) of this Annex.
(e) Halt the weighing system, and
record the final Indication of totalized
weight.
(f) Determine the indicated totallzed
weight for the test from the
difference between the indication at
start (3) and finish (5).
-- -
-------------
-------
[ "flTT II - "\liUs 3 ( i) ] 495
(g) Repeat the above procedure for
further tests as specified in
Paragraph 6(2)(i)(d) of this Annex.
(h) Determine the material test error
from the difference between the
Indicated totalized weight as
determined in (6) and the total
weight of material determined using
the control instrument as in (4).
(v) cetcutetton of material test error
[Paragraph S(l}(iii)(a) and Paragraph
5{2)(lj(b)]
When calculating the error It is necessary
to consider the scale interval of the control
indicating device and the number of sub
divisions of the test load.
Separate verification method [Paragraph
6(2))
The weight value(s) on the separate
control instrument is noted.
Integral verification method [Paragraph 6(3)}
A The weight values obtained under static
conditions on the control indicatingdevice
or those values obtained by balancing with
·
standard weights are noted and totalized.
For each weighing cycle, the net value is
the difference between the values
obtained In stages (2) and (5) in
Paragraph 6(2)(1ii)(c).
B The weight values obtained automatically
on the principal totalizatlon Indicating
device are noted and totallzed. For each
weighing cycle, the net value is the
difference between the values obtained
in (1) and (4) in Paragraph 6(2)(111)(c).
For each method, the difference between the
values obtained from the totalization indication and
'from the separate control instrument or between
procedures A and B in the integral verification
method, represents the automatic weighing error.
This is the value that shall be used for comparison
with the appropriate maximum permissible error for
automatic weighing in Paragraph 2(2)(1).
7. Additional functionality
(1) werm-op time test [Paragraph 4(3)(v)J
(i) Disconnect the instrument from the supply
for a period of at least 8 hours prior to
the test.
(ii) Reconnect the instrument and switch on
while observing the control indicating
device (if present) and the totalization
indlcator(s}. Verify that it is not possible
to Initiate automatic weighing or printout
until all indicators have stabilized, or until
completion of the warm-up time if this Is
specified by the manufacturer.
(iii) As soon as the indication of the control
indicating device (if present) has
stabilized, set the Instrument to zero and
determine the error of zero setting
according to Paragraph 6(1)(iii) of this
Annex.
{iv) Apply a load close to Max. Determine the
error by the method in Paragraph 4(2) of
this Annex.
(v) Repeat stages (3) and (4) after 5, 15 and
.
30 minutes:
(2) Agreement between Indicating and printing
devices [Paragraph 2(6)}
During the course of the tests verify that for
the same load, the difference between any two
indicating devices having the same scale interval Is
as follows:-
• Zero for digital indicating or printing devices;
• Not greater than the maximum permissible
error for analogue devices.
(3) Autometic mode interlocks [Paragraph 3(2)(iv)]
Verifythat it is not possible to make operating
adjustments nor to reset the Indicating devices during
an automatic weighing operation.
(4) Printer Interlocks [Paragraph 3(4)}
If the instrument is equipped with a printing
device, verify that :
(i) The principle totalization device cannot be
reset to zero unless the printing device
automatically records the total. Test by
disabling the printer and attempting to
reset the principle totalization indicator;
(ii} An automatic printout of the total is
generated if the automatic operation is
Interrupted.
(5) Battery power supply Interlocks [Paragraph
4(3){viil)}
Reduce power supply voltage until the
instrument ceases to operate or ceases to give a
weight Indication. Verify that no malfunction or
significant fault occurs before the instrument is thus
put out of service. Measure and record the voltage
value when the instrument ceases to operate or
ceases to give a weight indication and compare this
measured value with the manufacturer's specified
value.
496 Tl'HE <GA.ZEff:T,E <OF .INDIA: EXTRAORDINARY [PARTII-SEC. 3(i)]
(6) Retention of totaff!fterpowettfaflure![f'sragraph
4(3}(vii)J
·
Switch off power, to the.Jnstturnent -while the
principle totelizatlonodevke is, indicating a· •total of
not less than •min:,,Verlfy.that:this•total •is retained
for at least 24 hours.
(7) Zero offset interlockrtparag1qph 3(2J(vi)J
(i) Positive offset
Set thesnstrurnentto zero by the method
used for,the:.tests .in ,Paragraph 6(1)(ii)
and 6q)(iil)·of<this1Annex.Add a load to
the loai:heceptonof:> ,!'It,for instruments
with an·automaticzero-setting device, or
> 0.5 ,d,t,,for ,instruments without an
automatic zero-setting device. Confirm
that automatic operation is no longer
possible.
(ii) Negstillt!,offset
Add a :load ,to the load receptor of > dt
for instruments with an automatic zero
settlng·delllce, or> 0.5 dt for instruments
without an automatic zero-setting device.
Set the lr1Strument to zero by the method
used for the tests in paragraph 6(1)(ii)
and 6(1)(iil) of this annex. Remove the
test weights and confirm that automatic
operation Is no longer possible.
8. Influence factor and disturbance tests
(1) General
It is generally not possible to apply the influence
factors or disturbances to an instrument which is
processing material automatically. The instrument
shall therefore be subjected to the influence factors
or disturbances under static conditions or simulated
operation as defined herein. The minimum
requirements for simulators are listed under the test
equipment heading for each test. The permissible
effects of the influence factors or disturbances, under
these conditions, are specified for each case. Where
It Is possible to conduct the tests on a complete
instrument under normal operation then this is the
preferred option.
After each test the instrument shall be allowed
to recover sufficiently before the following test.
The operational status of the instrument or
simulator shall be recorded for each test.
Simulators shall be defined in terms of hardware
and functionality by reference to the instrument under
test, and by any other documentation necessary to
ensure reproducible test conditions and this
Information shall be attached to or traceable from
the test report.
(2) Simulator requirements
(I) General
Simulators shall be designed to enable
verification of the accuracy of the weighing
function an the Integrity of the totalization
storage and indicating function. The
automatic process control and data
processing functions should be verified
where possible.
Where possible the simulator should
Include all electronic elements of the
weighing and weight processing system.
It should also include the load cell and a
means to apply standard test loads.
Where this is not possible, e.g. for high
ca pa city instruments, then a load 'cell
simulator may be used or alternatively
the load cell interface may be modified to
Incorporate a scaling factor to give the
design output for a small test load.
Repeatability and stability of a load cell
simulator should make it possible to
determine the performance of the
Instrument with at least the same
accuracy as and when the instrument Is
tested with weights.
(ii) Weighing function
The weighing function may be verified by
observation of the control indicating
device, if available, during application of
the influence factors or disturbances.
Alternativelythe totallzation indicator may
be observed while the total is being
incremented by continually adding the
result of weighing a static load during
application of the Influence factors or
disturbances. This may be achieved by
special test software or by manual
intervention or combinations thereof.
Other methods which enable the weighing
function to be verified may be used as
appropriate. The maximum permissible
errors, in terms of mass, will be the same
regardless of the method used.
(iii) Totalization storage and indication
function
The simulator must display a recorded
total of not less than the minimum
totalized load, •min. It must be ·verified
that the recorded total is retained during
and after application of influence factors
or disturbances. Transient errors that are
['WT l[-¥J;s J(i)J 49
(i) Static temperature lnftuence factor mpe(*)
(ii) Damp heat, steady Influence factor mpe
Number of test cycles :
state Weighing test :
{Iii) Mains power supply Influence factor mpe
voltage variation (AC)
(iv) Battery power supply Influence factor mpe
voltage vartation (DC)
TABLE4
Environmental phenomena Test specification
Specified high temper,
ture;
Specified low tempera
ture;
0
A temperature of 5 C;
Reference temperature c
20°C
At least one cycle.
Adjust the EUT as clos,
to zero indication a
practicable prior to th,
test ( if an automatl:
zero-tracking device i:
connected, adjust it to ,
value near zero). Thi
EUT shall not b1
readjusted at any tlrm
during the test.
The EUT shall display ,
recorded total not tes:
than the minimurr
to ta Iized load, Lmin.
After stabilization at th,
reference temperature
and again at eacr
specified temperature,
apply at least ftve
different test loads 01
simulated loads anc
record:
(a) date and time;
(b) temperature;
(c) relative humidity;
(d) test load;
(e) indications (as appll
cable);
(f) errors;
(g) functional performance.
Maximum allowable All functions shall operate
variations : as designed.
All errors shall be within
the maximum
permissible errors
specified in Table 2.
(ii)Damp heat, steady state [paragraph 4(3){iii)J
Damp heat, steady state tests are carried out
accordingto basic standard according to Table s given
below:-
Sixteen hours.
Normal power supplied
and "on" for a time period
equal to or greater than
the warm-up time
specified by the
manufacturer. Power is to
be "on" for the duration
of test.
Two hours at each
temperature under "free
air" conditions.
As specified in paragraph
2(7)(i) .
Reference temperature of
0
20 C;
Characteristic Conditions applied
under test
Test
record and temporary failure of indication
when disturbances are applied are
acceptable.
(3) Influence factor tests
SUMMARY OF TESTS
Temperature Reference of 20°C
Specified high for 2 hours
Specified low for 2 hours
5°C
Reference of20°C
(') mpe : maximum permissible error
(i)Static temperature tests [Paragraph 2(7)(i)]
Static temperature tests are carried out according
to Table 4.
To verify compliance with
the provisions in
paragraph 2(7)(1) under
conditions of dry heat
(non condensing) and
cold.
Test procedures In brief:
Object of the test :
SUPPLEMENTARY INFORMATION TO THE TEST
PROCEDURES
Precondition :
Condition of the EUT :
Stabilization :
Temperature :
. ,
Temperature sequence :
498 .THE :GAZETTE OF INDIA : EXTRAORDINARY [PART11_:_SEC.3(i)]
SUPPLEMENTARY INFORMATION TO THE TEST
PROCEDURES
Dampheat,steadystateUpper .limit tern-
, perature and
relative humidity of
.,,., 85'%for2 days (48
hours)
TABLES
Environmental phenomena
Object of the test.:
Precondition :
Condition of the fUT :
Test specification
To verify
-compllance with
the provisions in
paragraph 4(3}(iii)
under conditions bf
high humidity and
constant
temperature.
None required.
Normal power
supplied and "on"
for a time period
equal to or greater
than the warm-up
time specified by
the manufacturer.
Power Is to be "on"
for the duration of
the test.
Adjust the EUT as
close to zero
indication as
practicable prior to
the test (if an
automatic zero
tracking device is
connected, adjust it
to a value near
zero).
The EUT shall not
be readjusted at
any time during the
test.
The EUT shall
display a recorded
total not less than
the rrurumum
totallzed load,
?min·
The handling of the
EUT shall be such
that no
condensation of
Stabilization :
Temperature :
Relative humidity :
Temperature-humidity
sequence:
Number of test cycles :
Weighingtest and ,test
sequence:
water occurs on the
ElJT.
Three hours at
reference.
temperature and
50% humidity
.
Two days (48
hours) at the upper
limit temperature
as specified In
paragraph 2(7)(1).
Reference tern·
0
perature of 20 C
and at the upper
limit as specified in
paragraph 2(7)(1).
50% at reference
temperature.
85% at upper limit
temperature.
Reference temp·
erature of 20°C at
50% humidity.
The upper limit
temperature at
85% humidity;
Reference tem
perature of 20°Cat
.
50% humidity.
At least one cycle.
After stabilization of
EUT at reference
temperature and
50% humidity,
apply at least five
different test loads
or simulated loads
and record :
(a) date and time;
(b) temperature;
(c) r e I a t i v e
humidity;
(d) test load;
(e) indications (as
applicable);
(f) errors;
(g) functional
performance.
Increase the
temperature in the
===============c,;;1:+:,,.
..
,.'.i\!,·,0,-._,,,.j,.j,,
. .,._?,,?---· - ...
,.::..:::.:..
•.• _J.::.L,::::r.Ji ...... ,_£
__
£
__ -···- ·--
t:
['ll'T l]-1g11s 3(i)] 499
SUPPLEMENTARY INFORMATION TO THE TEST
PROCEDURES
(Iii) Mains power supply voltage variation (AC}
[paragraph 2(7)(11)]
Power voltage variation tests are carried out
according to Table 6 given below :-
Object of the test : To verify compliance
with the provisions in
paragraph 2(7)(ii)
under conditions of
voltage variations.
Test procedures In brief:
chamber to the
upper limit and
increase the
relative humidity to
85%. Maintain the
EUT at no load for
a period of two
days (48 hours).
Following the two
days, apply at least
five test loads and
record the data as
indicated above.
Allow full recover of
the EUT before any
other tests are
performed.
Maximum allowable variations: All errors shall be
within the
maximum per-
missible errors
specified in Table 2
Power is to be "on" for
the duration of the test.
Adjust the EUT as close
to zero indication as
practicable prior to the
test. If it has an
automatic zero-setting
function then the
Instrument should be
set to zero after
applying each level of
voltage.
The EUT shall display
a recorded total not
less than the minimum
totalized load, *min.
At least one cycle.
The EUT shall be
tested at no load and
with one test load or
simulated load
between 50% and
maximum capacity of
the EUT.
Stabilize the power
supply at the reference
voltage within the
defined limits and
record.
(a) date and time;
(b) temperature;
(c) r e I a t i v e
humidity;
(d) power supply
voltage;
(e) test loads;
(f) Indications (as
applicable);
(g) errors;
(h) f u n ct i o n a I
performance.
Repeat the test
weighing for each of
the voltages (nothing
the need in certain
cases to repeat the test
weighing at both ends
of the voltage range)
and record the
indications.
Number of test cycles :
Weighing test :
Test sequence :
Test specification
Reference voltage
Reference voltage
Reference voltage
+10°/o
Reference voltage ? 15°/o
None required.
Normal power supplied
and "on" for a time
period equal to or
greater than the wanm
up time specified by
the manufacturer.
TABLE 6
Environmental phenomena
Voltage variation
Precondition :
Condition of the EUT :
------·- ·----
I
___J_?--
---
----------------
500 ''THE•.GAZETPE "0F IINDIA: EXTRAORDINARY [PARTIF-SEC. 3(i)]
None required.
Variable DC power
source;
calibrated voltmeter;
Load cell simulator, if
·
applicable.
Normal power supplied
and "on" for a time
period equal to or
greater than the warm·
up time specified by
the manufacturer.
Adjust the EUT as close
to zero indication as
practicable prior to the
test. If it has an
automatic zero-setting
function as part of the
automatic weighing
process, then the
instrument should be
set to zero after
applying each level of
voltage.
Stabilize the power
supply at nominal
battery voltage ±2%
and record the
following data at no
load and with one load
or simulated load
between 50% and
maximum capacity of
the EUT:
(a) date andnrne:
(b) temperature;
(c) relative humidity;
(d) power supply
voltage;
(e) test load;
(f) indications (as
applicable);
(g) errors;
(h) functional per·
formance.
Reduce the power
supply to the EUT until
the equipment clearly
ceases to function and
Condition of the EUT :
Test sequence :
Conduct of the test :
Precondition :
Test equipment :
Supply voltage : lower
limit, the voltage at
which the EUT clearly
ceases to function (or
is automatically put out
of service) +2%ofthis
voltage.
At least one cycle.
,All .functions :shall
operate as.designed.
,oAII .errors shall .be
.within .the maximum
permissible -errors
.specfiedm Table 2.
Maximum allowabJe
variations :
(Iv) Battery powersupply .voltage variation {DC)
[{)i1ragraph2(1)(/li)]
Test method : 'Yariation in DC power
supply. Where the EUT
continues to operate
'below the stated
battery voltage, the
following test shall be
conducted using an
equivalent variable DC
power source.
To verify compliance
with the provisions in
paragraph 2(7)(iii)
under conditions of
varying DC power
supply. The
requirements shall be
met either by use of an
equivalent variable DC
·
power source or by
allowing the battery
voltage to fall by use.
No reference -to
international standards
can be given at the
present time.
The test consists of
subjecting the EUT to
DC power variations
when the former is
operating under
normal atmospheric
· conditions with one
test load or simulated
load between 50% and
maximum capacity of
the EUT.
Object of the test::
Reference to standard :
Test procedures In brief :
Number of test cycles :
Test severity :'
[ '111l!. Il-<',lls 3 ( i)] 501
TABLE 7
None required.
Normal power supplied
and "on" for a time
period equal to or
greater than the warm
up time specified by
the manufacturer.
Adjust the EUT as close
to zero indication as
practicable prior to the
test. The EUT shall not
be readjusted at any
time during the test
except to reset if a
significant fault has
been indicated.
At least one cycle.
Stabilize all factors at
nominal reference
conditions. Apply one
load or simulated load
between 50% and
maximum capacity of
the EUT and record :
s.(a) date and time;
(b) temperature;
(c) relative humidity;
(d) power supply
voltage;
(e) test load;
(f) indications (as
applicable);
(g) errors;
These mains voltage
.
interruptions shall be
repeated ten times
with a time interval of
at least 10 seconds
SUPPLEMENTARY INFORMATION TO THE TEST
PROCEDURES
Object of the test To verify compliance
with the provisions in
paragraph 4(1)(ii)
.under conditions of
short time mains
voltage interruptions
and reductions.
Test procedures in brief:
Precondition :
Condition of the EUT :
Number of test cycles :
Weighing test and test
sequence:
sf
sf(*)
sf
Conditions
applied
Test specification
Interruption from
reference voltage to
zero voltage for one
half cycle.
Interruption from
reference voltage to
50% of reference
voltage for two half
cycles
Disturbance
transients/burst
Test Characteristic
under test
Maximum allowable
variations :
note the voltage. Switch
the EUT "off" an
increase the· power
supply voltage to
nominal battery
voltage ±2%. Switch
the EUT "on" and
reduce the power
supply voltage to the
above noted voltage
(out of service voltage)
+2% of the noted
voltage.
Record the data
indicate above.
All functions shall
operated as designed.
All errors shall be
within the maximum
permissible errors
specified in Table 2.
(4) Disturbance tests [paragraph 4(1)(11)and 4(3)(iv)]
SUMMARY OF TESTS
immunity
(iii) Electrostatic
discharge
(iv) Electromagnetic Disturbance sf
Susceptibility
(*)sf: value of the significant fault [see
paragraph 4(2)(v) of Part I]
(i) Voltage dips and short interruptions
Short time power reduction (voltage dips and
short interruptions) tests are carried out according
to Table 7 given below :-
Environmental phenomena
Voltage dips and short
Interruptions
·
(I) Voltage dips and Disturbance
short interruptions
(ii) Electrical fast Disturbance
502 · THECGAZElffE OF :INDIA: EXTRAORDINARY [PART11-SEc. 3(i)]
Fast transient common mode 0.5 kV (peak)
5/50 ns T 1ff h
5 kHz rep. frequency
Note: Applicable only to ports or Interfacing
with cables whose total length may exceed 3m
according to the manufacturers' functional
specification.
Electrical fast transients/burst immunity tests
are carried out for 2 minutes with a positive polarity
and for 2 minutes with a negative polarity and
according to Tables 8.1, 8.2 and 8.3 given below:--
TABLE 8.1
PORTS FOR SIGNAL LINES AND CONTROL LINES
None required.
Normal power supplied
and "on" for a time
period equal to or
greater than the warm
up time specified by
the manufacturer. ·
Adjust the EUT as close
to zero indication as
practicable prior to the
test. The EUT shall not
be readjusted at any
time during the test
except to reset if a
significant fault has
been indicated.
Before any test
stabilize the EUT under
constant environ
mental conditions.
Stabilize all factors at
nominal reference ·
conditions. Apply one
To verify compliance
with the provisions in
paragraph 4(1)(ii)
under conditions where
fast transients are
superimposed on the
mains voltage.
Stabilization :
Weighing test :
Test procedures in brief:
Precond ltion :
Condition of the EUT :
Object of the test :
TABLE 8.2
INPUT AND OUTPUT DC POWER PORTS
Note : Not applicable to battery operated
appliances that cannot be connected to the mains
while in use.
Environmental phenomena Test speaticstion
A coupling/decoupling network shall be applied
for testing AC power ports.
SUPPLEMENTARY INFORMATION TO THE TEST
PROCEDURES
TABLE 8.3
INPUT AND OUTPUT AC POWER PORTS
Environmental phenomena Test specification
Fast transient common mode 0.5 kV (peak)
5/50 ns T 1ffh
5 kHz rep. frequency
Fast transient common mode 0.5 kV (peak)
5/50 ns T 1ff h
5 kHz rep. frequency
Test specificationEnvironmental phenomena
''(h)ffunctronal .per-
formance.
Interrupt the .power
supply to zero voltage
fora-period-equal to
..
one, half .cvcle and
-conduct .the test.
.
During -tnterruptton
observe -the .effect on
.the EUT an record as
.approprtate,
Reduce the power
.supplv to 50% of
-nomlnal voltage for a
.perlod equal to two
half cycles and conduct
the test. During
reductions observe the
effect on the EUT and
record, as appropriate.
The difference
between the weight
indicatlon due to the
_disturbance and the
indication without the
disturbance and the
indication without the
disturbance either shall
not exceed the values
given in paragraph
4(2)(v) of part I, or the
EUT shall detect and
act upon a significant
fault.
(ii) Electrical fast transients/burst immunity
Maximum allowable
variations :
["!T'T11-= 3(i)] 503
Electrostatic discharge tests are carried out as
given in Table 9 given below :-
TABLE 9
load or simulated load
between 50% and
maximum capacity of
the EUT and record
the following with
and without the
transients :-
To verify compliance
with the provisions in
paragraph 4(1)(ii)
under conditions where
electrostatic dis
charges are applied.
Object of the test :
Test procedures in brief:
Precondition :
Condition of the EUT :
Stabilization :
SUPPLEMENTARY INFORMATION TO THE TEST
PROCEDURES
Weighing test :
None required.
Normal power supplied
and "on" for a time
period equal to or
greater than the warm
up time specified by
the manufacturer.
Adjust the EUT as close
to zero indication as
practicable prior to the
test. The EUT shall not
be readjusted at any
time during the test
except to reset if a
significant fault has
been indicated.
Before any test
stabilize the EUT under
constant environ
mental conditions.
Stabilize all factors at
nominal reference
conditions. Apply one
load or simulated load
between 50% and
maximum capacity of
the EUT and record the
following with and
without electrostatic
discharge :
(a) date and time;
(b) temperature;
(c) relative humidity;
(d) test load;
(e) indications (as
applicable);
(f) errors;
(g) functional per
formance.
Maximum allowable variations: The difference
between the weight
indication due to the
(a) date and time;
(b) temperature;
(c) relative humi-
dity;
(d) test load;
(e) indications (as
applicable);
(f) errors;
(g) functional per;
formance.
Test specification
8 kV air discharge 6 kV
contact discharge
The difference
between the weight
indication due to the
disturbance and the
indication without· the
disturbance either shall
not exceed the value
given in Paragraph
4(2)(v) of part I or the
instrument shall detect
and act upon a
significant fault.
(iii)Electrostatic discharge
Maximum allowable
variations :
Environmental phenomena
Electrostatic discharge
Note : The 6 kV contact discharge shall be
applied to accessible conductive parts. Metallic
contacts e.g. in battery compartments or In socket
outlets are excluded from this requirement.
Contact discharge is the preferred test method.
20 discharges (10 with positive and 10 with negative
polarity) shall be applied on each accessible metal
part of the enclosure. The time interval between
successive discharges shall be at least 10 seconds.
In the case of a non-conductive enclosure, discharges
shall be applied on the horizontal or vertical coupling
planes. Air discharges shall be used where contact
discharges cannot be applied. Tests with other (lower)
voltages than those given in Table 9 are not required.
504 THE iGAZEJT,E OF 'INDIA: EXTRAORDINARY [PART!l--SEC. 3(i)]
Test severities :
- disturbance and the
indication without the
disturbance either shall
not ,exceed the value
given in paragraph
4(2)(.v)ofPart I or the
instrumentshall detect
and act upon a
significant fault.
9, Span stab/1/ty;test[paragraph 4( 4)(iii)J
SUMMARY OF TEST
Test Characteristic .unoe: test
Condition applied
Span stability Stability 1/2 absolute mpe (*)
(*) mpe : maximum permissible error on initial
verification in paragraph 2(2)(ii).
Table 2.
Note: the maximum permissible error for the
zero point shall also be taken into consideration.
Test method : Span stability.
Object of test: To verify compliance
with the provisions in
paragraph 4(4)(iii)
after the EUT has been
subjected to the
performance tests.
Reference to standard : No reference to
international standards
can be given at the
present time.
Test procedures in brief : The test consists of
observing the
variations of the error
of the EUT or simulator
under sufficiently
constant ambient
conditions (reasonable
constant conditions in
a normal laboratory
environment) at
various intervals :
before, du ring, and
after the EUT has been
subjected to perform
ance tests.
The performance tests
shall include the
temperature test and,
if applicable, the damp
_
heat test; an endurance
test shall not be
included. Other per
formance tests listed in
this Annex may be
performed.
The EUT shall be
disconnected twice
from the mains power
supply ( or battery
supply where fitted) for
at least eight hours
during the period of the
test. The number of
disconnections may be
increased if so
specified by the
manufacturer or at the
discretion of the
approval authority in
the absence of any
specification.
In the conduct of this
test, the operating
instructions for the
instrument as supplied
by the manufacturer
shall be considered.
The EUT shall be
stabilized at sufficiently
constant ambient
conditions after switch
on for at least five
hours, and at least
sixteen hours after the
temperature and damp
heat tests have been
performed.
Test duration : Twenty
eight days or the time
period necessary to
conduct the
performance tests,
whichever is less.
Time (t) between tests
(days) : 0.5 st s 10.
Test load : near
maximum capacity
(Max); the same test
weights shall be used
throughout the test.
Maximum allowable variations :The variation in the
errors of indication shall
not exceed half the
absolute value of the
['WT 11-= 3(i)] 505
Precondition :
Test sequence :
Test equipment :
Condition of the EUT :
scale interval on the
load receptor. Note the
indication at zero (!0).
Either by use of an
indicator with a
suitable higher
resolution scale
interval or using the
change point weight
method specified In
paragraph 4(2)(ii) of
this Annex (noting the
total addition change
point weight • L0)
determine and record
the initial zero error
(Eo),
2. Determine the error
at near Max capacity
(EL)
Carefully remove the
change point weights
(if used) and apply the
test load (or simulated
load) and note the
indication (IL)·
Either by use of an
indicator with a
suitable higher
resolution scale
interval or using the
change point weight
method specified in
paragraph 4(2)(ii) of
this Annex (nothing the
total addition change
point weight ti. L)
determine and record
the error at near Max
capacity (EL)·
Record:
(a) date and time;
(b) temperature;
(c) barometric pressure;
(d) relative humidity;
(e) value of 0.1 d;
(f) test load;
(g) total of added change
point weights at zero
load •Lo;
(h) total of added change
maximum permissible
error in paragraph
2(2)(ii) Table 2 for the
test load applied on any
of the n measurements.
At least eight except
where the difference of
the results indicates a
trend more than half
the allowable variation
specified, the
measurements shall be
continued until the
trend comes to rest or
reverses itself, or until
the error exceeds the
maximum allowable
variation.
None required.
Verified mass
standards or simulated
load.
Normal power supplied
and "on" for a time
period equal to or
greater than the warm
up time specified by
the manufacturer.
Stabilize all factors at
nominal reference
conditions.
Adjust the EUT as close
to zero as possible.
Automatic zero
tracking shall be made
inoperative and
automatic built-in span
adjustment device
shall be made
operative.
lnitial measurement
Determine the .span
error using the
following method :-
1. Determine the initial
zero error (E0)
lf necessary disable
any automatic zero
setting or zero-tracking
devices by placing a
"zero weigW of for
example lb times.!pe
wr» t; fJ11- {2_ 7 l
Number of tests (n) :
506 .THE GAZETTE OF INDIA: EXTRAORDINARY [PARTII-SEC. 3(i)]
, point,welghts :at ·test
load •L;
(i) the following
indications :
• indication at zero (I0);
• indication ·of test load
(IL);
U) calculate:
•
.
initial zero error E0;
• .error at test load (EL);
,:(k) ,change In location
.and apply all necessary
corrections resulting
from variations of
temperature, pressure,
etc. between the
various measure
ments.
Immediately repeat
steps 1 and 2 four
more times and
determine and record
the average value of
the error for the five
tests.
Subsequent
measurements
After observing the
time between
measurements
requirement repeat the
test sequence 1 to 2
once recording the
data above unless :
(a) either the result is
outside the maximum
allowable variation; or
(b) the range of the
five readings of the
initial measurement is
more than 0.1 d, in
which case continue
four more times
repeating steps 1 and
2 recording the data
above and determine
and record the average
value of the error of the
five tests.
The measurements
shall continue until
there are at least 8
measurements except
where the difference of
the results indicates a
trend more than half
the allowable variation
specified, the
measurements shall be
continued until the
trend comes to rest or
reverses itself, or until
the error exceeds the
maximum allowable
variation.
EIGHTH SCHEDULE
SPECIFICATIONS FOR MEASURING
INSTRUMENTS
[See Rule 13]
General requirements
(a) A measuring instrument shall be of such
material, design and construction as to
ensure, under normal working conditions,
the following requirements :-
(i) accuracy is maintained,
(ii) operating parts continue functioning
satisfactorily, and
(iii) adjustment remains reasonably
permanent.
(b) A measuring instrument shall not be
stamped unless it is complete with all
parts and attachments concerned with the
operation of measurement and delivery.
(c) Wherean instrument has interchangeable
or reversible parts, their interchange
ability or reversal shall not affect the
accuracy of the instrument.
(d) Every measuring instrument of fixed type
shall be so installed that the viewer can
readily obtain a clear and unobstructed
view of the indication of measurement and
delivery.
(e) The design and construction of measuring
instrument shall be such as would prevent,
as far as possible tampering with the
accuracy of the instrument either by
inadvertent use or otherwise.
PART I
VOLUMETRIC CONTAINER FILLING
MACHINES
1. Description
(a) A volumetric container fillingmachine shall
consist of a basin or basins, the capacity
of each of which shall depend on the
['WI Il-1§!U6 3(i)] 507
1., General
4. Maximum permissible error
PART II
BULKMffiRS
[a) This Part deals with the accuracy
requirements for bulk meters used in
petroleum trade.
Error in excess only
0.1 per cent
0.2 per centbe low 10 litres
Capacity
10 litres and above
(d) The check measure shall be tested, for
accuracy, against a working standard
capacity measure of appropriate capacity
and accuracy.
(e) The procedure for testing the accuracy of
volumetric container fillingmachines shall
be as follows :-
(i) The machine shall be filled to the
full capacity.
(ii) The contents of each container of
the machine shall be measured with
a check measure/measures and the
quantity so measured will indicate
whether the capacity is within or
beyond the maximum permissible
error.
(iii) If the capacity is beyond the
maximum permissible error, the
container shall be adjusted until the
errors are brought within the
permissible limits; and the test shall
be repeated until the fillingmachines
give two consecutive deliveries
within the maximum permissible
error.
5. Sealing
The volumetric container fillingmachines shall
be provided by the manufacturer with a plug/plugs
or stud/studs of such soft metal to receive the stamp
or seal of the verifying authority, Such plug/plugs or
stud/studs shall be provided in a conspicuous part of
the machine and shall be made in such a manner as
to prevent its removal without obliterating the seal/
seals. The adjusting device also shall be properly
sealed so as to avoid any tampering of capacity.
capacity of the containers, which is
intended to be filled. The operation shall
consist of first filling the machine to the
required level and then emptying out the
contents into the container or containers.
(f) The walls of the basin shall be strong
enough as not to cause any appreciable
deflection due to the pressure of the liquid.
3, Tests
(a) A volumetric container filling machine shall
be tested under the actual working
conditions with a suitable liquid preferably
the one which the instrument is intended
to deliver.
(b) Before checking a volumetric container
filling machine, the inside of the basin or
basins and the discharge hose and pipe
shall be wetted by fillingthe machine and
emptying.
(c) For testing volumetric container filling
machines check measure of appropriate
capacity shall be used.
(b) The machine shall have any one or more
of the following capacities :-
1, 2, 5, 10, 15, 20, SO, 100 and 200 litres.
2, General requirements
(a) The design of the fillingmachine shall be
such that the measured quantity shall be
entirely drained out on opening of the
delivery valve.
(b) The basin shall be provided with adequate
sight glasses, observation windows, cut
off valve or other means indicating clearly
that the basin or basins are properly filled.
(c) The basin shall be provided with a suitable
device such as a displacer to enable
adjustment of the capacity of the basin.
(d) Every flexible hose for .discharging liquid
from the basin together with the rigid
delivery pipe which empties itself on
discharge, shall be so arranged as to
provide for ready and adequate drainage
of the liquid.
(e) The filling machine shall be rigidly fitted
on a stand.
508 THE GAZETTE OF INDIA: EXTRAORDINARY [PARTII-SEC. J(i)]
(b) Bulk meters shall not have a capacity below
100 litres.
2, Definitions
(a) Pressure drop- The difference between the
Inlet and outlet pressures of the meter is
the pressure ·required to force liquid
through tne .rneter and overcome its
resistance:to movement.
(b) Hydraulic.slip or slippage-That quantity
of liquld;whichpasses through the meter
without,causing.any registration.
(c) Flow:range-That portion of the meter's
total:flow capacity in which it operates to
meet\the required degree of accuracy in
measurement.
3. Types and construction
(a) Bulk meters used for measuring liquid
· petroleum products shall be positive
· displacement meters in which the liquid
under a positive pressure head causes the
measuring elements in the meter to
rotate, reciprocate or otherwise move
through and defined volumetric
displacement before the liquid passes
from the meter. This movement is
interpreted through a train of gears on a
register as a measure of liquid volume.
(b) Meters differ widely in construction, but
in general they may be divided into the
following two main classes :
(i) Capillary seal meter-Capillary seal
meters which may either be of
reciprocating, rotary or other types
are sealed with a thin film of the
liquid being measured and are
usually characterized by a relatively
low pressure-drop.
{ii) Packed or mechanical seal meter
'Packed or mechanical seal meters'
which are always of the reciprocating
piston type are sealed by a suitably
designed piston ring or washer to
prevent 'slip' or leakage. They have
a higher pressure-drop than capillary
seal meters.
(c) Capillaryseal meters are generally preferable
for installation where gravity discharge is
essential. Both 'packed' and capillary seal
meters are suitable for pressure discharge.
(d) Meters are usually constructed of aluminium,
aluminium alloys, bronze, brass or gun
metal and stainless steel or special steels
for certain small components. Carbon
bearings and carbon vanes are also used
since they operate satisfactorily without
lubrication.
(e) Meters are sometimes fitted with
automatically or manually operated
temperature compensating devices.
These devices correct the expansion or
contraction of the liquid being measured
with change of temperature and directly
indicate the volume which the liquidwould
occupy at a standard temperature. The
devices are satisfactory when the liquid
temperature remains substantially.
constant; but when marked fiuctuations
in temperature occur, they should be used
for accurate measurement only when their
response to temperature change is very
rapid.
4. Meter Installation
The installation of the bulk meter has a direct
bearing upon its operation and such characteristics
as the rate of flow and accuracy may be seriously
affected If it is not correctly installed. It is, therefore,
essential that where possible the layout be based on
the follow! ng :
(I) Meter;shall be protected by a strainer or
filter and an air eliminator fitted as close
to the inlet as possible so as to remove
all particles which are injurious to the
meter and which might impair its accuracy.
They shall not be at a lower level.
(ii) The pipe work shall be so arranged that
the strainer, air separator and meter
cannot be accidentally drained.
(Iii) All pipe work and fittings shall be cleaned
and flushed out to remove scale and
foreign matter before installing the meter.
(iv) The meter shall be mounted securely on
a horizontal base using rubber mounting
·
pads to reduce shock and vibration where
these are likely to occur.
(v) Inlet and outlet pipe work shall not exercise
strain on the meter body. Acute bends,
toes and elbows shall be avoided as far as
[ '11'1 Il-191'5 3(i)] 509
possible.
(vi) The layout shall be so designed as to
facilitate removal of the meter without
unnecessarilydisturbing the pipe work and
sufficient space shall be provided to allow
for meter calibration, cleaning and small
servicing requirements.
(vii) If pipe jointing compounds are used, these
shall be applied to the male parts not to
female. It is vital not to allow any
compound to enter the meter.
(viii) The meter shall be located so that the
register Is clearly readable by the operator
from the control poirit.
(ix) Flow control valves, when fitted, shall be
installed adjacent to the outlet of the
meter. If a valve is installed on the inlet
side, It shall be located at a sufficient
distance on the upstream side to ensure
a uniform steady flow through the meter
when the valve is throttled.
(x) Pulsating flow, such as that caused by
piston pumps, shall be avoided, if this is
not possible to achieve, a surge tank or
alleviator should be installed upstream of
the meter( s).
(xi) Meters shall not be installed on the
function side of pumps.
s. Tests
(a) All meters shall be tested under conditions
which duplicate normal operating
conditions as closely as possible
particularly In respect of rates of flow and
the product Involved.
(b) Before commencing checking of a meter,
the meter shall be run for several minutes
to ensure that all units are functioning
smoothly.
(c) For testing of meters, a proving tank shall
be used. The capacity of the proving tank
shall be sufficient in size to contain at least
one minute's flow through the meter at
its normal operating rate when used for
bu!k loading. The proving tank sha!I be
tested against the working standard
capacity measure of appropriate capacity.
(d) The procedure for testing shall be as follows
( i) After a IIconnections have been made
fill the provlnq'tank once with the full
quantity in order to wet all surfaces,
to fill the discharge hose and to·
ascertain that there are no leaks in
the connection;
(ii) Empty the proving tank and close the
outlet va Ive after it is completely
drained;
(iii) Set the meter dial to zero reading;
(iv) Fill the proving tank through the
meter to a point where the meter
dial records the capacity of the
proving tank. If the meter is fitted
with an automatic presetting device,
set this to deliver the capacity of the
proving tank;
(v) Note the reading on the graduated
gauge glass of the proving tank,
which would show that the meter
is, within or beyond the maximum
permissible error;
·
(vi) If it is beyond the maximum
permissible error, adjust the meter
until the errors are brought within
the permisfi__t_llelimits;
(vii) Repeat steps (ii), (iii), (iv) and (v)
until the meter gives two consecutive
deliveries within the maximum
permissible error.
(viii) If the meter has been found to give
accurate measure in the initial test
itself, make at least one more test
to check the accuracy recorded.
6. Maximum permissible error
(a) The errors shall not exceed ±0.1 per cent
for any quantity discharged.
(b) The bulk meter shall be complete with all
parts and attachments concerned with the
operation of measurement and delivery.
7. Marking
(a) Every bulk meter shall be conspicuously,
clearly and prominently marked with the
following indications :-
-
?- ----
?--
-? -
510 THE GAZE!fTE OF JND!A: EXTRAORDINARY [PART11-SEC. 3(i))
(i) registering·rapacity; ··
(ii) name or registered trade mark of the
manufacturer;
(iii) lderrtfflcetionnurnber;
(b) The bulk meter shall :be provlded with a
plate fastened in a .prorninent place to
receive the markings .mentioned in (a)
above and to receive the stamp of the
Legal Metrology Officer's seal.
8. Sealing
Every bulk meter shall be provided with a
suitable sealing arrangement to receive the stamp
or sea I of the verification authority.
PART III.
WAT£R METERS {DOMESTIC TYPE)
!. General
This Part applies to water meters Intended for
metering potable cold water with threaded end
connections and of nominal sizes upto and including
50 mm. The part applies to both wet dial and dry
dial meters.
2, Terminology
(i) Nominal pressure
The Internal pressure, expressed in MPa
corresponding to the maximum
permissible working pressure.
(ii) Flow rate
The volume of water passing through the
water meter per unit of time; the volume
being expressed in litre and the time in
hours, minutes or seconds.
(iii) Flow delivered
The total volume of water which has
passed through meter in a given time.
(iv) Maximum flow rate, qmex
The highest flow rate at which the meter
can function over limited periods without
damage and without exceeding the
maximum permissible errors and the
maximum permissible value for loss of
pressures, expressed in kl/h.
(v) Nominal flow rate, On
Half the maximum flow rate, Qmax;
expressed in kl/h. At the nominal flow rate
Qn, the meter should be able to function
in normal use, I.e. in continuous and
intermittent operating conditions, without
exceeding the maximum permissible error.
(vi) Minimum flow rate, Omin
The lowest flow rate at which the meter
is required to give indications within the
prescribed maximum permissible error. It
is determined in terms of Qn.
(vii) Flow rate range
The range limited by the maximum and
the minimum flow rates (Qmax and
Qminl·The range is divided into two zones
called upper and lower zones, separated
by the transitional flow rate Qt,
(viii) Transitional now rate, <;\
The flow rate which divides the upper and
lower regions of the flow range and the
rate at which the maximum permissible
errors become discontinuous.
(ix) Pressure loss
The pressure loss caused due to the
presence. of the water meter in the pipe
line. '
(x) Water Meter-Dry Dial
Meter in which the counter mechanism Is
isolated from water flowing through the
meter.
(xi) Water Meter, Wet-Dial Type
Meter in which the complete counter unit
is in contact with water flowing through
the meter.
3. Nominal Sizes
Water meters shall be of tne following nominal
sizes:
15 mm, 20 mm, 25 mm, 40 mm and SO mm.
The nominal size of the water meter shall be denoted
by the nominal bore of its end connections.
n,? - />, · • ·" • .J'. ·" • " ·n,-, 1 • "l"t"'""''"" hl,t··• ..,. ·r-·fff>· ,..f,f---t?· ? ,. ?· >··>'•· .\. ,-1,1,..,,. I ,,.,.;,_ ..
jj,, r...,.....,, .. ???.:
. .- .•. -•··
1
--· ·--
L
[ 'lT'1 JI 1§!U6 3( i)] 511
4. Classes of Water Meters
The water meters are classified as Class A and
Class B
.
based on the maximum verification scale
interval and metrological characteristics.
S. Materials and Manufacture
(1) General :
Water meters and their parts, especially
parts coming in continuous contact with
water shall be made of materials resistant
to corrosion and shall be non-toxic and
non-tainting. Use of dissimilar metals in
contact under water shall be avoided as
far as possible in order to minimize
electrolytic corrosion.
(2) Construction :
The meters shall be constructed in such a
way as to-
(i) give long service and guarantee
against any fraud or tampering; and
(ii) conform with the provisions of these
rules.
(3) Body:
The body shall be free from all
manufacturing and processing defects,
such as blow-holes and spongy structure
and shall not be repaired by plugging,
welding or by the addition. of materials.
The internal shape of the body shall
ensure smooth flow of water and easy
dismantling.
(4) Registration Box :
The registration box of dry-dial water
meters shall be provided with one or two
escape holes for minimizing the
accumulation of condensed water. In the
case of magnetic driven type or where
the registration box and cap are integral
with the body, no escape hole shall be
provided.
(5) Cap:
Where the cap and registration box are
integral, the material for cap shall be the
same as used for registration box. The cap
shall be so designed and fixed to the
registration box as to avoid entry of water
and dirt. The transparent window which
covers the dial shall be inserted from the
inside into the cap. The protective lid shall
be secured by a robust hinge or other
suitable method of robust construction.
Cap ring where applicable should be of
the same material as of the cap.
(6) For dry type water meters, the transparent
window covering the dial shall be provided
with a wiper on the inner side for wiping
off condensed water,
(7) Connections:
The meter casing shall be fitted in the pipe
line by means of two cylindricalnipples or
tail pieces with connecting nuts which shall
be provided with each meter. The internal
diameter of the nipple where it connects
the pipeline shall be equal to that
corresponding to the nominal size of the
meter.
(8) Strainers :
Water meters shall be provided with
strainers. Strainers shall be of a material
which is not susceptible to electrolytic
corrosion. They shall be of corrosion
resistant materials. They shall be rigid,
easy to remove and clean and shall be
fitted on the inlet side of the water meter.
It shall be possible to remove and clean
the strainer in such a way as not to permit
disturbing the registration box or
tampering with it. The strainer shall have
a total area of holes not less than twice
the area of the nominal inlet bore of the
pipe to which the meter is connected.
However in the case of meters provided
with internal strainer, involving opening
of the registration box for cleaning, an
additional external strainer shall be fitted
on the inlet side satisfying the above
requirements.
(9) Impellers and pistons:
Impeller and impeller shaft assembly shall
rest on a self-lubricating, lubricating with
low frictional resistance.
(10) Rotary or oscillating pistons in the case
of semi-positive type meters shall be of
non-absorbent material, such as vulcanite
or ebonite. Pistons shall be accurately
finished and shall operate freely.
512 THE GAZETTE OF INDIA: EXTRAORDINARY [PART11--SEC. 3(i)]
(11) Impeller or Measuring-Chamber:
The Impeller or measuring -chamber shall
be of a corrosion resistant material and
shall be rigidand shallnot change its form
as a result of Internal stresses or with use.
(12) Gears and pinions:
Gears and pinions shall be so constructed
properly and smoothly mesh with each
other and shall 'be firmly fitted on their
shafts.
(13) Besrinqs:
Impellerbearings shall be suitably ground
and polished. The shape of the impeller
bearing shall be such as to prevent the
penetration of particles of sand and to
preclude the deposit of anything in
solution or suspension in water and to
facilitate the washing way of such deposits
by the water flow. The shafts of the gears
shall revolve freely in their bearings. The
length of the bearings shall ensure their
effective operation.
(14) Counter:
The non-reversible counter shall be of the
circular multi-pointer pattern with all
pointers reading clockwise or straight
reading cyclometer type or a combination
of pointer and cyclometer. The rollers of
the counters shall be made of specially
suitable for the purpose and shall be self
lubrlcating. The pointers made of suitable
materials shall be soldered to the spindle.
(15) Dial:
The dial shall be of vitreous enamel
powder coated on copper or plastics
ensuring indestructible marking and good
legiblllty.
{16) Regulator:
Every meter shall be provided with a
regulator. The regulator accessible from
outside shall be operated by a key without
dismantling the meter and not without
breaking the seal. The internal regulating
device shall not be accessible from
outside.
(17) Location of Serial Number :
The serial number of the meter shall be
clearly Indicated on the screw cap or in
any other suitable place.
{18) Frost Protection Device:
Meters liable to be damaged by frost when
so ordered by the purchaser shall be
protected with suitable frost protection
device.
6. Indicating device
(1) Indicating device shal! be able to record
9999 kl (minimum) for meter size of 15,
20, and 25 mm and 99999 kl (minimum)
for size 40 and 50 mm and shall thereafter
indicate zero.
(2) The indicator shall allow, by simple
juxtaposition of its various constituent
elements, a reliable, easy and
unambiguous reading of the volume of
water measured, expressed in litres. The
volume is indicated by one of the following
systems:-
(i) the position of one or more pointers
or circular scales;
(ii) reading of a row of in-line·
consecutive digits in one or more
apertures;
(iii) a combination of these two systems.
(3) The kilolitres and its multiples shall be
indicted in black and sub-multiples of the
kilolitres in red. This colour coding applies
to the pointers on circulars scale type
lndicflngdevices and to the drum in
in-line digit indicting devices. The actual
or apparent height of the digits on the
drums shall not be less than 4 mm.
(4) For digital indicators the visible
displacement of all digits shall be upward
In value. The advance of any given digital
unit shall be completed while the digit of
the immediately next lower value
describes the last tenth of its travel.
(SJ The drum showing the digits of lowest
value may move continuously. The whole
number of kilo-litres shall be clearly
indicated.
(6) Indicators with pointer shall be non
reversible and rotate in. a clockwise
direction. The value in litres for each
scale division shall be expressed as
!On, wherein n is a positive or
----.------------
['WT [!?1¥& 3(i)J 513
negative whole number ?r zero,
thereby establishing a system of
consecutive decades, Each scale shall
be elther-
(i) graduated in values expressed in
litres, or
(ii) accompanied by a multiplying factor
(x.001, x.01, x0.1, xi, xlO, xlOOO,
etc.)
(7) In both cases (dial and digital indicators)-
(i) the unit symbol 'KILO-LITRES' shall.
appear either on the dial or in the
Immediate vicinity of the digital
indication;
(ii) fastest-moving visible graduated
element, the control element, the
scale Interval of which is known as
the "scale interval", shall move
continuously.
(8) The length of scale interval shall be not
less than 1 mm and not more than 5 mm.
The scale shall consist-
(i) either of lines of equal thickness not
exceeding one quarter of the
d lsta nee between the axes of two
consecutive lines and differing only
In length, or
(Ii) of contrasting bands of a constant
width equal to the length of the scale
division.
(9) The width of the pointer index tip shall
not exceed one quarter of the distance
between two scale divisions, and in no
case shall it be greater than 0.5 mm.
(10) Value of Scale Division
(I) Value of scale interval for Class 'A'
and oass 'B' meters shall be as given
In Table 1.
TABLE 1
VALUE OF SCALE INTERVAL
Maximum Value of Scale Interval m
litre
(ii)AcceleratingDevice
The use of an acceleration device for increasing
the speed of the meter below Qm,,is prohibited.
7. Technical characteristics
(1) Pressure tightness
A meter shall be able to withstand
constantly without defects in its
functioning, leakage, seepage through the
walls or permanent deformation, the
continuous water pressures of (i) 1.6 MPa
for 15 minutes, and (II)2 MPa for 1 minute,
when tested In accordance with the
procedure described In Annexure A.
(2) Loss of pressure
loss of pressure through the meter when
determined in accordance with the
procedure described in Annex. A shall not
exceed 0.025 MPa at the nominal flow rate
Qn and 0.1 MPa atthe maximum flow rate,
Q"",'
Note: Nominal flow rete.Q, shall be taken as
per Table 2 and maximum flow rate Qma,
as twice the nominal flow rate.
(3) Temperature suitability
This test shall be carried out in accordance
with the procedure described in Annexure
A. This test is to be carried out for Model
approval only.
8. Metrological characteristics
(1) Metering accuracy
The maximum permissible error in the
metering accuracy, when determining as
per the procedure described in Annexure
A shall be as under :-
(i) In the lower region of flow, Qmin
(inclusive) to Qt (exclusive) ± 5%
(ii) In the upper region of now, Qt (inclusive)
to Qmax (inclusive) ± 2%
Note : Value of Qmin, Qt and Qmax for the three
classes of water meters are giver, in Table 2.
(2) Minimum starting now
The minimum now at which the meter
starts registering shall be as given in Table
2.0
1.040 2.0
50 2.0
Class B
0.2
0.2
0.5
Class A
0.2
0.5
1.0
Meter Size
15
20
25
514 THE GAZETTE OF INDIA: EXTRAORDINARY !PARTII-SEC. 3(i)]
TABLE 2
NOMINAL FLOW,MINIMUM STARTING FLOW RATl:,TRANSillONAL FLOW RATE AND MAXIMUM FLOW RATE
VALUES
Meter Size Nominal Minimum Starting Flow Transitional Flow rate Qt Maximum
Flow rate Qn rate Qmin 1/h in 1/h for Flow rate
kl/h Qmax kl/h
Class A ClassB Class A aess s
(1) (2) (3) (4) (S) (6) (7)
15 1.5 60 30
-···--
150 120 3
20 2.5 100 50 250 200 s
25 3:5 140 70 350 280 7
40 10 400 200 1000 800 20
50 1'5 600 300 1500 1200 30
--·-··--···· ... ____ .... _ ······-- .. ·?- ...... ___
2 for the two classes of water meters. The
test shall be carried out in accordance with
the procedure described in Annexure A.
(3) Tests during verification
(I) Loss of pressure
(ii) Metering accuracy
(4)
.
Model approval tests
In addition to all tests mentioned for
verification,the following additional tests
shall be carried out :-
Constructional details, Pressure tightness,
Life test (Accelerated Endurance test,
Temperature suitability test) and
temperature suitability test. It shall be
carried out in accordance with the
procedure described in the Annex. A.
(5) After the meter has undergone the life
test, they shall again be subjected to
metering accuracy test and pressure
tightness test and the meter shall be
deemed satisfactory only when their
performance fulfils the requirements.
9. Harking
Each water meter shall be marked with the
following information :-
9(i) Manufacturer's name or trademark,
9(ii) Nominal size of the meter,
9(iii) Direction of flow of water on both sides
of the meter,
9(iv) Accuracy class,
9(v) Serial number,
9(vi) Model approval number, and
9(vii)Year of manufacture.
JO. Sealing
Sealing holes shall be provided with a suitable
sealing arrangement to receive the seal of the
verification authority and the meter shall be sealed
in such a manner as to render it impossible to obtain
access to the measuring unit without breaking the
seals. The sealing wire shall be rust-proof.
ANNEXURE 'A'
FLOW TESTS
J. Metering Accuracy Test
(1) After preliminaryrunning and setting, allow
the water to pass through the meter in such
a way that flow rates corresponding to the
values given In
Table 2 for Qmax, Qt, Qmin and Qn are
achieved. This may be accomplished by
manipulating the inlet valve or outlet valve
for finer adjustment. For each of the flow
rate the reading on the meter(s) shall be
compared with the volume collected in the
measuring tank. The test shall be carried
out at least at three intermediate rates,
coverihg the above ranges.
(2) The error shall then be computed as
under:-
V,-Ve
Percent error= --'--?'--X 100
Ve
Where
Vi =Volume of water collected in the water tank,
and
Ve = Volume of water indicated on individual
meter.
Metering accuracy shall also be calculated
and reported separately for the following
discharges :-
(i) Qmax,
(ii) Qt, and
(iii) Qmin
Notes:
1. The metering accuracy test at Qn may be
done if required by the purchaser.
2. Recording of volume of water in the meter
at Qmin shall be deemed as meter complying
with the 'minimum starting flow test'.
, r· t,,
------·
I.-------
['WT 11-= 3(i)J 515
2. Loss of Pressure Test at Qn and Qmax
This test may be carried out concurrently with
the metering accuracy test at Qn and Qmax·
The meter shall be tested for loss of pressure
within the meter at nominal flow rate Qn and
maximum flow rate Qmax. The loss of pressure
should not exceed 0.025 MPa and 0.1 MPa
respectively at the above two stages. (For value of
Qn and Qmaxl·
The pressure loss within the meter may be
measured with the help of manometer or differential
pressure gauge or pressure gauges provided each
at up-stream and down-stream.
While the meter(s) are being tested for accuracy
at Qn and Qmax,the readings between the up-stream
and down-stream in the pressure gauges P1and P2
or manometers shall be taken for the purpose of
computing the value of loss of pressure within the
meter. In case one meter is being tested the
difference between the pressure gauge reading of
Pl and P2 or the differential pressure shown by the
differential pressure gauge/manometer shall be the
loss of pressure within the meter.
In case loss of pressure is being measured for
more than one meter at a time, the difference
between the readings of P, and P2 be divided by
number of meters to obtain the loss of pressure in
an individual meter. This, however, shall contain the
line loss(es) contributed by the connecting pieces
between the two meters. For an accurate approach
line loss(es) may be measured by joining the up and
down-stream spacers/pipe faces together in the
absence of the meter/s (carefully avoiding protrusion
into the pipe bore or misalignment of the two faces),
and measuring the pipe pressure loss/line losses of
the measuring section for each test at appropriate
flow rates.
While computing loss of pressure, across 1 or
N number of meters tested in series, the loss
registered by spacers/pipes in line losses be
subtracted from the total value of pressure loss
registered by difference between the readings of
pressure gauge at up-stream and down-stream to
obtain the value of loss of pressure across 1 or N
number of meters.
3. Pressure Tightness Test
The meter(s) shall be subjected to hydrostatic
continuous water pressure of-
(1) 1.6 MPa for 15 minutes, and
(2) 2.0 MPa for 1 minute.
Note : Only when the meter has qualified for
(1) above, it should be subjected for the test for (2)
above.
After mounting the meter( s) on the test bench,
the pump or the pumping medium should be switched
on to let the water flow through the meter(s) and
the air is purged out of the system. The down-stream
valve should then be closed. The pressure shall then
start building up and should be maintained at the
above value for the given time. The meter should
withstand constantly the above pressure without
defects in its function, leakage, seepage or
permanent deformation.
Note: The meter(s) may be tested individually
or in series.
4. Test equipment for Temperature Suitability
Test
For carrying out the temperature suitability test,
a container of appropriate dimensions fitted with
heating elements, and temperature control device
to maintain temperature at 45°C± 1°c shall be used.
5. Temperature Suitability Test
As a genera I rule, at least one meter shall be
put to temperature suitability test every three months
and records maintained. The meter for test may be
selected at random.
The meter which has qualified the technical and
metrological characteristics, shall be taken and placed
In-tbe test equipment meant for temperature
suitability test maintained at 45°C ± 1°c. It should
be kept there for 10 hours. While the meter Is
immersed in water dust cap or device stopping entry
of water inside wet chamber of the meter be
removed.
After 10 hours of continuous immersion at 45°C
± ·1°C the meter shall be taken out and kept for
some time in the open to acclimatize it at the ambient
temperature. It shall then be rested again for flow
test and pressure tightness test. They shall 'be
deemed satisfactory if their performance after the.
temperature suitability test satisfies the above
requirements.
Note : In case any material/design changes
are carried out, this test shall be performed and
checked for satisfactory performance before
introducing the change(s) on mass scale production.
6. Test equipment for Life Test
The test equipment shall consist of the
following:-
(a) A centrifugal pump along with regulating
valves capable of delivering water at the
rate of Qn through two water meters in
series,
(b) A suitable horizontal test bench, and
(c) A pressure gauge of appropriate range.
7. Life Test (Accelerated Endurance Test)
Two unopened meters in each size and class, selected
at random shall be subjected to the life test every
six months, in accordance with the requirements
specified in Table.
Note : Meter(s) may be tested individually or in
series.
---------?dj
?--- -?·
516 THE GAZETTE OF INDIA : EXTRAORDINARY [PARTII-SEC. 3(i)]
TABLE 1
LIFE TEST REQUIREMENTS
Nominal Test Flow Type of Test No. of Duration of Period of Duration of
Flow Rate Rate Interruptions Pauses Operation at Startup and
Test Run Down
Qn s s
Kl/h
(1) (2) (3) (4) (5) (6) (7)
:'> 10 .Qn Dis- 100 ODO 15 15 s 0.15(Qn)*
continuous with a
minimum
of 1 s
2Qn Continuous 100 h
>10 Qn Continuous BOO h
2Qn Continuous 200h
* Qn is the number equal to the value of Qn expressed in kl/h.
After the meters having undergone the life test,
they shall again be subjected to flow tests and
pressure tightness test. They shall be deemed
satisfactory if their performance after the life test
satisfies the above requirements.
One of the meter which has undergone the life
test (preferably the one that has shown greater
deterioration in Its performance under the flow test)
·
shall be dismantled completely and examined with a
view to ensuring that there is no undue wear or
distortion. Particular attention shall be paid during
examination to the wear of the actuating unit
comprising vane wheel or piston, the impeller and
measuring chamber, bearings, gears and pistons, pivots
and the gland packing.
PART IV
MEASURING SYSTEM FOR UQUIDSOlliER 1liAN
WATER
PART-1
TERMINOLOGY
1, Measuring system and its constituents
(1) Meter for volumes of liquids
An Instrument intended to measure
continuously, memorize and display the
volume of liquid passing through the
measurement transducer at metering
conditions.
·
Note: A meter includes at least a
measurement transducer, a calculator (Including
adjustment or correction devices if present) and an
indicating device.
(2) Measurement transducer
A part of the meter which transforms the
flow or the volume of the liquid to be
measured into signals which are passed to
the calculator. It may be autonomous or
use an external power source.
Note: For the purposes of this specification,
the measurement transducer includes the flow or
volume sensor.
(3) Calculator
A part of the meter that receives the output
signals from the transducer{s) and, possibly,
from associated measuring instruments,
transforms them and, if appropriate, stores
In memory the results until they are used.
In addition, the calculator may be capable
of communicating both ways with
peripheral equipment.
(4) Indicating device
A part of the meter which displays
continuously the measurement results.
Note : A printing device which provides an
indication at the end of the measurement is not an
indicating device.
(5) Ancillary device
A device intended to perform a particular
function, directly involved in elaborating,
transmitting or displaying measurement
results.
----- -------?---------
[ <ifl1 II "&Us 3 ( i) ] 517
Main ancillary devices are:
(i) zero setting device;
(ii) repeating indicating device;
(iii) printing device;
(Iv) memory device;
(v) price Indicating device;
(vi) totalizing indicating device;
(vii) conversion device;
(viii) pre-setting device; and
(ix) self-service device.
(6) Additional device
A part or a device, other than an ancillary
device, required to ensure correct
measurement or intended to facilitate the
measuring operations, or which could in any
way affect the measurement.
Main additional devices are:-
(i) gas elimination device;
(ii) gas Indicator;
(iii) sight glass;
(iv) filter, pump;
(v) device used for the transfer point;
(vi) anti-swirl device;
(vii) branches or bypasses; and
(viii) valves, hoses.
(7) Measuring system
A system which comprises the meter itself
and all the ancillary devices and additional
devices.
(8) Pre-setting device
A device which permits the selection of the
quantity to be measured and which
automatically stops the flow of the liquid
at the end of the measurement of the
selected quantity.
Note: The pre-set quantity may be the volume,
the mass or the related price to pay.
(9) Adjustment device
A device Incorporated in the meter, that only
allows shifting of the error curve generally
parallel to itself, with a view to bringing
errors within the maximum permissible
errors.
(10) Associated measuring instruments
Instruments connected to the calculator, the
correction device or the conversion device,
for measuring certain quantities which are
characteristics of the llquld, with a view to
making a correction or a conversion or both.
(11) Correction device
( i) A device connected to or incorporated
in the meter for automatically
correcting the volume at metering
conditions, by taking Into account the
flowrate or the characteristics of the
liquid to be measured (viscosity,
temperature and pressure) and the
pre-established calibration curves or
both.
(ii) The characteristics of the liquid may
either be measured using associated
measuring Instruments, or stored in
a memory In the Instrument.
(12) Conversion device
(i) A device which automatically converts
the volume measured at metering
conditions Into a volume at base
conditions, or into a mass, by taking
account of the characteristics of the
liquid(temperature, pressure, density,
relative density ) measured using
associated measuring instruments, or
stored in amernorv,
(Ii) The quotient of the volume at base
conditlons.'or of the mass, to the
volume at metering conditions Is
referred to as "conversion factor". ,
(13) Metering conditions
The conditions of the liquid of which the
volume is to be measured, at the point of
measurement (example: temperature and
pressure of the measured liquid).
(14) Bilse conditions
The specified conditions to which the
measured volume of liquid is converted
(example: base temperature and base
pressure).,
Notes (I) Metering and base conditions (which refer
only to the volume of liquid to be measured
or indicated) should not be confused with
the "rated operating conditions" and
"reference conditions" which apply to
influence quantities.
(ii) The values chosen as base conditions should
preferably be 15°C or 20°C, and
101 325 Pa.
518 THE GAZETTE OF INDIA: EXTRAORDINARY [PARTII-SEC. 3(i)]
(15) Transfer point
A point at which the liquid is deftnec.as being
delivered or received.
(16) Gas separator
A device used for continuously separating,
and removlng,,a?y air or gases contained
in the liquid.
Note : In general, devices defined from
paragraphs'1(16):to 1(19) are called gas
elimtnetlon-devices.
(17) Gas earsaor
A device .used to extract air or gases
accumulated:ln.thesupply line of the meter
in the form of pockets that are no more
than slightly mixed with the liquid.
(18) Special gas .extrector
A device which., like the gas separator but
under less ,stringent operating conditions,
continuously separates any air or gases
contained in the liquid, and which
automaticallystops the flow of liquid if there
is a risk of air or gases, accumulated in the
form of pockets no more than slightly mixed
with the liquid, entering the meter.
(19) Condenser tank
In pressurized liquefied gas measuring
systems, a closed tank used to collect the
gases contained in the liquid to be
measured and to condense them before
measuring.
(20) Gas Indicator
A device allowing easy detection of any air
or gas bubbles which may be present in
the liquid flow.
(21) Sight glass
A device for checking, before start-up and
after shut-down, that all or part of the
measuring system is filled completely with
liquid.
2. SJJecifictypes of measuring systems
(1) Fuel dispenser
A measuring system intended for the
refuell!ngof motor vehicles, small boats and
small aircraft.
(2) Measuring system on a pipeline
A measuring system which in principle is
installed on a fixed pipeline connecting two
or more fixed tanks.
(
Note : This pipeline is characterized by a
flowrate of the liquid to be measured which,
in general, either does not change or
changes little during a prolonged period.
(3) Aircraft refuelling tanker measuring system
A tanker mounted measuring system
intended for refuelling aircraft, supplied
from a tank mounted on the vehicle.
(4) Aircraft hydrant measuring system
A mobile measuring system intended for
refuelling aircraft, supplied from hydrant
pits.
(5) Blend dispenser
A fuel dispenser providing mixtures of
various grades of gasoline (multigrade
dispenser) or mixtures of gasoline and
lubricating oil (gasoline-oil-dispenser)
through a single nozzle.
(6) Self-service arrangement
An arrangement that allows the customer
to use a measuring system for the purpose
of obtaining liquid for his own purchase.
(7) Self-service device
A specific device that is part of a self-service
arrangement and which allows one or more
measuring systems to perform in this self
service arrangement.
Note : The self-service device includes all
the elements and constituents that are
mendetorv so that a measuring system
performs in a self-service arrangement.
(8) Attended service mode
An operating mode of a self-service
arrangement in which the supplier Is
present and controls the authorization for
the delivery.
Notes : (i) In attended service mode, the
settlement of the transaction takes
place before the customer leaves the
site of the delivery.
(ii) A transaction is settled when the
parties interested in the transaction
have made their agreement known
(explicitly or implicitly) as regards the
amount of the transaction. This may
be a payment, signing a credit card
voucher, signing a delivery order, etc.
(iii) The parties interested in a
transaction may be the parties
['11'1 Il-1ll"s J(i)] 519
themselves or their representatives
(for example: the employee in a filling
station, the driver of a truck).
(iv) In attended service mode the
measurement operation ends at the
moment settlement of the
transaction takes place.
(9) Unattended service mode
An operating mode of a self-service
arrangement In which the self-service
arrangement controls the authorization for
the delivery, based on an action of the
customer.
Note : In unattended service mode, the
end of the measurement operation is the
end of the registration (printing or
memorizing) of information concerning the
measurement operation.
(10) Pre-payment
A type of payment in attended or
unattended service mode requiring
payment for a quantity of liquid before the
delivery commences.
(11) Attended post-payment (or post-payment)
A type of payment in attended service mode
requiring payment for the delivered quantity
after the delivery but before the customer
leaves the site of the delivery.
(12) Unattended post-payment (or delayed
payment)
A type of payment in unattended service
mode In which payment for the delivered
quantity Is required after the delivery, but
in which the transaction is not settled when
the customer leaves the site, following an
implicit agreement with the supplier.
(13) Authorization of a measuring system
An operation that brings the measuring
system Into a condition suitable for the
commencement of the delivery.
(14) Direct selltng to the public
A transaction (selling or buying) of
quantities of liquids whose settlement is
associated with indications provided by a
measuring system, any of the parties having
access to the place of measurement and
one of them being a consumer.
Notes: (I)The consumer can be any person.
Generally the consumer is the
buyer but he can also be the
seller.
(ii) Main measuring systems used for
direct selling to the public are :
fuel dispensers,
measuring systems on road tankers
for the transport and delivery of
domestic fuel oil.
3. Metrologicaf characteristics
(1) Primary indication
An indication (displayed, printed or
memorized) which Is subject to legal
metrology control.
·
Note : Indications other than primary
· indications are commonly referred to as
secondary indications.
(2) Absolute error of measurement
The result of a measurement minus the
(conventional} true value of the measurand.
(3) Relative error
The absolute error of measurement divided
by the (conventional) true value of the
measurand.
(4) Maximum permissible errors
The extreme values permitted by the
specification for an error.
Notes: (i) Maximum permissible errors are ,
stated as relative errors or absolute
errors.
(ii) Where the comparison of a volume
(for instance: difference between a
result obtained at some specified
conditions and a result obtained at
reference conditions) with maximum
permissible error is involved then, It
is obvious that it is the absolute
maximum permissible error,
associated with the relative
maximum permissible error, which
applies.
(SJ Minimum measured quantity of a measuring
system
The smallest volume of liquid for which the
measurement is metrologically acceptable
for that system.
(6) Minimum specified volume deviation
The absolute value of the maximum
permissible error for the minimum
measured quantity of a measuring system.
(7) Minimum specified price deviation
The price to pay corresponding to the
minimum specified volume deviation.
520 THE GAZETTE OF INDIA: EXTRAORDINARY [PART!I-SEC. 3(i)]
(8) Repeatability error
For the purposes of this Recommendation,
the difference between the largestand the
smallest results of successive measure
ments of the same quantity carried out
under the same conditions.
(9) Intrinsic error
The error of -a measuring system used
under reference conditions.
(10) Initial Intrinsic.error
The intrlnsic·error·of a measuring system
as determined .ptior to all performance
tests.
(11) Fault
The difference between the error of
indication ,and the intrinsic error of a
measuring system.
{12) Signlficantfautt
A fault the magnitude of which is greater
than the larger of these two values:-
(i) one.fifth of the magnitude of the
maximum permissible error for the
measured volume;
(II) the minimum specified volume
deviation.
The following are not considered to be
significant faults, namely:-
(1) faults arising from simultaneous and·
mutually Independent causes in the
measuring instrument itself or in its
checking facilities;
(ii) transitory faults being momentary
variations in the indication, which
cannot be interpreted, memorized or
transmitted as a measurement
result; and
(iii) faults Implying the impossibility of
performing any measurement.
(13) Durability
The capability of the measuring system to
keep Its performance characteristics over
a period of use.
(14) Interruptible or non-interruptible measuring
system
A measuring system is considered as
interruptible or non-Interruptible
respectivelywhen the liquid flow can or, as
the case may be, cannot be stopped easily
and ra pldly.
{15) Cyclic volume
The volume of liquid corresponding to the
working cycle of the measurement
transducer, i.e. the sequence of movements
at the end of which all the internal moving
parts of this transducer return, for the first
time, to their initial positions.
(16) Periodic variation
The maximum difference, during one
working cycle, between the volume
produced by the displacement of the
measuring parts and the corresponding
volume as shown by the Indicating device,
the latter being connected without play or
slip to the measuring device and in such a
way that it indicates at the end of the cycle,
and for this cycle, a volume equal to the
cyclicvolume; this variation may be reduced
In some cases by the incorporation of a
suitable correction device.
Note : The effect of the correction device
is included when the periodic variation Is
determined.
(17) First element of an indicating device
Element which, in an indicating device
comprising several elements, carries the
graduated scale with the smallest scale
Interval.
4. Test conditions
(1) Influence quantity
A quantitywhich is not the subject of the
measurement but which influences the
value of the measurand or the indication
of the measuring system.
(2) Influence factor ·
An influence quantity having a value within
the rated operating conditions of the
measuring system, as specified in this
specification.
(3) Disturbance
An influence quantity having a value within
the limits specified but outside the specified
rated operating conditions of the measuring
system.
Note : An influence quantity is a
disturbance if for that influence quantity
the rated operating conditions are not
specified.
(4) Rated operating conditions
Conditions of use, giving the range of values
of Influence quantities for which the
['ll'l Il-"l§IUG 3(i)J 521
metrological characteristics are Intended to
be within the maximum permissible errors.
(5) Reference conditions
A set of specified values of influence factors
fixed to ensure valid inter-comparison of
results of measurements.
(6) Petformance test
A test Intended to verify whether the
measuring system under test (Equipment
Under Test) is capable of accomplishing its
intended functions.
(7) Endurance test
A test intended to verify whether the meter
or the measuring system is able to maintain
its performance characteristics over a
period of use.
(8) Uncertainty of the determination of an error
An estimate characterizing the range of
values within which the true value of an
error lies, Including components due to the
standard and Its use, and components due
to the verified or calibrated instrument itself.
Note : Components due to a verified or
calibrated meter are notably linked to the
resolution of its indicating device and to
the periodic variation.
5. Electronic or electrical equipment
(1) Electronic device
A device employing electronic sub
assemblies and performing a specific
function. Electronic devices are usually
manufactured as separate units and are
capable of being tested independently.
Note: Electronic devices, as defined above,
may be complete measuring systems or
part of measuring systems, in particular
such as those mentioned in paragraph 1(1)
to 1(5).
(2) Electronic sub-assembly
A part of an electronic device, employing
electronic components and having a
recognizable function of its own.
(3) Electronic component
The smallest physical entity which uses
electron or hole conduction in semi
conductors, gases, or in a vacuum.
(4) Checking facility
A facility which is incorporated in a
measuring system and which enables
significant faults to be detected and acted
upon.
Note: The checkingof a transmission device
aims at verifying that all the information
which is transmitted [and only that
information) is fullyreceived by the receiving
equipment.
(5) Automatic checking facility
A checking facility operating without the
intervention of an operator.
(6) Permanent automatic checking facility
(typeP)
.
An automatic checking facility operating
during the entire measurement operation.
(7) Intermittent automatic checking facility
(type-I)
An automatic checking facility operating at
least once, either at the beginning or at
the end of each measurement operation.
(8) Non-automatic checking facility (type N}
A checking facility which requires the
intervention of an operator.
(9) Power supply device
A device which provides the electronic
devices with the required electrical energy,
using one or several sources of a.c. or d.c,
PART·2
MEASURING SYSTEM FOR LIQUIDS OTHER
THAN WATER
1. Field of application
(1) Scope
This Specification provides the metrologlcal
and technical requirements applicable to
dynamic measuring systems for quantities
of liquids other than water subject to legal
metrology controls. It also provides
requirements for the approval of parts of
the measuring systems (meter, etc.).
In principle, this Specification applies to all
measuring systems fitted with a meter as
defined under paragraph 1(1) of Part 1-
Terminology (continuous measurement),
whatever be the measuring principle of the
meters or their application, except-
(!) drum meters for alcohol;
(II) measuring systems for cryogenic
liquids;
(iii) direct mass measuring systems,
the provisions of paragraph 4 shall
•
522
- THE G·AZETTE OF ,IND!A: EXTRAORDINARY [PARTII-SEC. 3(i)]
applyto electronic measuring-systems
for alcohol and for cryqgenic liquids.
This· Specification also ·applies to
systems
· in which volume
measurements .are .converted to
mass Indication.
Moreover,,specific provisions could be
developed for measuring systems
equipped with e.q, ultrasontc or
vortex .meters. It will then be
appropriate,to,decide whether such
meters should be included In the
scope of .this ·Specification.
This Specification is not intended to
prevent the development of new
technologies.
(2) Liquids to be measured
Measuring s_Y5temsthat are covered by this
Specification may be used for the following
liquids, namely :-
(i) liquid petroleum and related
products : crude oil, liquid
hydrocarbons, liquefied petroleum
gas (LPG), liquid fuel, lubricants,
industrial oils, etc.;
(ii) liquid food : dairy products (milk,
cream, etc.), beer and brewer's
worth, wine and musts (cider, etc.),
alcoholic beverages (liquor, whisky,
etc.) non-alcoholic carbonated and
not carbonated beverages, Juices
and concentrates, vegetable oils
(Soya-bean-oil, palm-oil, etc.);
(Iii) alcohol: pure ethanol (ethyl alcohol)
and mixtures of only ethanol and
water (except drum meters for
alcohol);
(iv) chemical products in liquidstate: HCI,
H2S0,,ammonia water etc: and
(v) other liquids: all other liquids except
cold potable water and hot water;
examples: distilled water and
deionised water, liquids used for
calibration of tanks.
2. General requirements
(1) Constituents of a measuring system
A meter Itself is not a measuring system.
The smallest possible measuring system
indudes+
{i) a meter,
(ii) a transfer point,
(iii) a hydraulic circuit with particular
characteristics which must be taken
into account,
(iv) a gas elimination device,
(v) a filter device,
(vi) a pumping device,
(vii) correction devices related to
temperature, viscosity, etc.
The measuring system may be provided
with other ancillary and additional devices.
If several meters are intended for a single
measuring operation, the meters are
considered to form a single measuring
system.
If several meters intended for separate
measuring operations have common
· elements (calculator, filter, gas elimination
device, conversion devices, etc.) each
meter is considered to form, with the
common elements, a measuring system.
(2) Ancillary devices
( i) Ancillary devices may be a part of
the calculator or of the meter, or may
be peripheral equipment, connected
through an interface to the calculator.
(11)In addition these devices shall bear
a legend which is clearly visible to
the user to indicate that they are not
controlled when they display a
measurement result visible to the
user. Such a legend will be present
on each print out likely to be made
available to the consumer.
(J} Field of operation
(i) The field of operation of a measuring
system is determined by the
following characteristics, namely:-
(a) minimum measured quantity,
(b) measuring range limited by the
minimum flowrate, Qm"' and the
maximum flowrate, Qm"'
(c) maximum pressure of the liquid,P
ma,'
(d) minimum pressure of the liquid P
m1a'
(e) nature of the liquid(s) to be
measured and the limits of kinematic
or dynamic viscosity when an
indication of the nature of the liquids
alone is not sufficient to characterize
their viscosity,
[ "lT'1 II -"&Us 3( i ) ] 523
1.0
(f) maximum temperature of the liquid,
T
rmix'
(g) minimum temperature of the liquid,
Tmtn'and
(h) environmental class.
(ii) The minimum measured quantity of
a measuring system shall have the
form 1 x 10", 2 x 10" or 5 x 10"
authorized units of volume, where
n Is a positive or negative whole
number, or zero.
The minimum measured quantity
shall satisfy the conditions of use of
the measuring system; except in
exceptional cases, the measuring
system sha II not be used for
measuring quantities less than this
minimum measured quantity.
The minimum measured quantity of
a measuring system shall be not less
than the largest minimum measured
quantity of any one of its constituent
elements (meter(s), gas extractor(s),
special gas extractor(s), etc.).
However, for gas elimination devices
this provision does not need to be
fulfilled if it is demonstrated
(Including tests) that It Is not
necessary.
(iii) The measuring range shall satisfy the
conditions of use of the measuring
system; the latter shall be designed
so that the flowrate Is between the
minimum flowrate and the maximum
flowrate, except at the beginning and
at the end of the measurement or
during Interruptions.
The measuring range of a measuring
system shall be within the measuring
range of each of its elements.
Except in the case of specific
provisions of certain types of
measuring systems, the maximum
flowrate of the. measuring system
shall normally be equal to at least
four times the minimum flowrate of
the meter or the sum of the minimum
flowrates of the meters with which
it is fitted. In some particular cases
the ratio may be two.
(iv) A measuring system shall exclusively
be used for measuring liquids having
characteristics within its field of
operation, as specified in the pattern
approval certificate. The field of
operation of a measuring system
shall be within the fields of
measurement of each of its
constituent elements (metres, gas
elimination devices).
When two or more meters a re
mounted in parallel in the same
measuring system, the limiting
flowrates (Q
... ,, Q"",)of the various
metres are taken Into consideration,
especially the sum of the limiting
flowrates, to verify if the measuring
system meets the provision above.
(4) Accuracy classes
Taking into consideration their field
of application, measuring systems
are classified into four accuracy
classes according to Tablet.
TABLE 1
Class Field of application
0.3 Measuring systems on pipeline
[see paragraph 5.(6)]
All measuring systems if not differently
stated elsewhere in this table; Iii
particular:
• fuel dispensers for motor vehicles
(other than LPG dispensers) (see
paragraph 5.(1) and 5.(9)]
0.5 • measuring systems on road tankers
for liquids of low viscosity [see
paragraph 5.(2)]
• measuring systems for the unloading
of ships' tanks and rail and road
tankers [see paragraph 5.(3))
• measuring systems for milk [see
paragraph 5.(5)]
• measuring systems for loading ships
(see paragraph 5.(6))
• measuring systems for refuelling
aircraft [see paragraph 5.(8)].
Measuring systems (other than
LPG dispensers) for liquefied
gases under pressure measured at a
temperature equal to or above - 10°C
[see paragraph 5.(4)]
524 . THE GAZETTE ,of INDIA: EXTRAORDINARY [PARTII-Sec. J(i)]
1.5.
• LPGdisper15e!Sformotorwenides'[see
paragraph S.(7)J
• Measuring systems normally in class
0.3 .or 0.5 but usedfor liquids:
• whose temperature is .less than
- 10°c or greater than ·50°C, or
• whose dynamic viscosity is higher
than 1000 MPa,s, or
• whose maximum volumetric flowrate
Is not.higheNhan 20 L/h
Measuringsystems for liquefied carbon
dioxlde'[Paragraph 5(4)(x)]
• Measuring systems (other than LPG
dispenser} for liquefied gases under
pressure measured at a temperature
below - 10°c [Paragraph 5(4)]
(iii) However, whatever the measured
quantity may be, the magnitude of
the maximum permissible error is
given by the greater of the following
two values:
(a) absolute value of the maximum
permissible error given in Table 2
or Table 3,
(b) minimum specified volume
deviation.
For minimum measured quantities
greater than or equal to two litres,
the minimum specified volume
deviation (Emi,lis given by the
formula:
Em,.; (2 Vm,,)X (A/100)
(5) Maximumpermiss1ble errors
(i) For volumes not smaller than two
litres, and without prejudice to
paragraph 2(5)(iii) the maximum
permissible relative errors, positive
or negative, on volume indications
are specified in Table 2.
TABLE 2
For volumes smaller than two litres,
and without prejudice to paragraph
2.(5)(111),the maximum permissible
errors, positive or negative, on
volume Indications are specified in
Table 3.
TABLE 3
From 0.1 to 0.2 L
Measured quantity
V
rnfn
is the minimum measured
quantity,
A is the numerical value specified in
line A of Table 2 for the relevant
accuracy class.
For minimum measured quantities less
than two litres, the minimum specified
volume deviation is twice the value specified
in Table 3, and related to line A of Table 2.
Note : The minimum specified volume
deviation is an absolute maximum
permissible error.
(6) CondltlonsJor applying maximum
permissible errors
Provisions in this sub-clause apply to volume
indications at metering conditions [see Paragraph
2(7) for converted indications].
(i) Maximum permissible errors in line A of
Table 2 apply to complete measuring
systems, for all liquids, all temperatures and
all pressures of the liquids,and all flowrates
for which the system is intended to be, or
has been approved, without any adjustment
between the various tests, for:
(a) pattern approval,
(bl initial verification in one stage or the
second stage of a two-stage initial
verification,
(c) subsequent verifications.
(ii) Explanation: An adjustment is allowed for
each liquid, but in this case the pattern
approval certificate provides information on
where
1.0%
1.5
1.5%
1.0
1.0%
0.6%
Maximum permissible
errors
Value fixed in Table 2,
applied to 2 L
Twice the value fixed in
Table 2
twice the value fixed in
Table 2, applied to 0.4 L
quadruple the value fixed
in Table 2
quadruple the value fixed
in Table 2, applied to
0.1 L
0.3%
0.5
0.5%
Accuracy dasses
(II)
0.2%
0.3
0.3%
B
A
Less than 0.1 L
0.2 to 0.4 L
From 1 to 2 L
From 0.4 to 1 L
['WI II w,,;- 3(i)] 525
but verified with another liquid.
(7) Provisions for converted Indications
(i) Maximum permissible errors an conversion
devices
When a conversion device for converting
into a volume at base conditions or into a
mass (including all Its components and
associated measuring Instruments) is
verified separately, maximum permissible
errors on converted Indications due to the
conversion device, positive or negative, are
equal to± (A - B), A and B being the values
specified in Table 2. However, the
magnitude of the maximum permissible
error shall not be less than the greater of
the two following values:-
(a) one-half scale Interval of the
indicating device for converted
indications,
(b) half of the value corresponding to
the minimum specified volume
deviation.
(ii) Accuracy of associated measuring
instruments
When verified separately, associated
measuring instruments shall exhibit an
accuracy at least as good as the values in
Table 4.
· ··
These values apply to the indications of
associated measuring Instruments taken
Into account for the calculation of the
converted quantity (they include errors
mentioned in Paragraph 2(7)(iii).
the capability of the meter to measure all
the liquids without particular precautions.
For example, the meter may be allowed
only for measuring one liquid In normal
use, or an automatic device that provides
an adaptation to each liquid may be
necessary.
When stated in the pattern approval
certificate, a one-stage initial verification
or the second stage of a two-stage Initial
verification of a measuring system Intended
to measure two or more liquids may be
carried out with one liquid only or with a
liquid different from the intended liquids.
In this case and if necessary, the pattern
approval certificate provides a smaller
range or a shift for maximum permissible
errors, so that Paragraph 2(6)(1) Is fulfilled
by the measuring system for all intended
liquids.
When stated in the pattern approval
certificate, the Initial verification of a meter
of a measuring system intended to measure
two or more liquids may be carried out with
one liquidonly or with a liquid different from
the Intended liquids. In this case and If
necessary, the pattern approval certificate
provides a smaller range or a shift for
maximum permissible errors, so that
Paragraph 2(6)(ii) is fulfilled by the meter
for all Intended liquids.
The above considerations may be extended
to the case of a measuring system or a
meter Intended to measure only one liquid
TABLE 4
(iii)
Maximum permissible
errors on measuring
Accuracy classes of the measuring system
0.3 0.5 1.0 1.5
Temperature +0.3°C ±0,5°C ±o.s•c ±0,5°C
Pressure less than 1 MPa : ± 50 kPa
between 1 and 4 MPa : ± 5%
more than 4MPa: ± 200 kPa
Density + 1 kg/m3 ± 1 kg/m3 ±2 kg/m3 ±2 kg/m3
Density
(iii) Accuracy for calculation of
characteristic quantities of the liquid
When the calculating function of a
conversion device Is verified
separately, the maximum permissible
error for the calculation of each
characteristic quantity of the liquid,
positive or negative, is equal to two
fifths of the value fixed in paragraph
2(7)(ii). However, the magnitude of
the maximum permissible error shall
not be less than one-half scale
interval of the indicating device for
converted indications
.
•
526 THE ·GAZETTE or INDIA: EXTRAORDINARY [PARTII-SEC. 3(i)]
(iv) Direct verifu:ation.of.a.converted,mass
Indication
When a ·conversion device is only
associated with (or included in) a
meter and when the converted mass
Indication is verified directly by
comparison to.mass standards (e.g.
using a weighing machine) the
maximum permissible errors (MPE)
on the converted indication, positive
or negativ.e, are given by the
formula:
MPE = ± [82 + (A - B)' ]'h
where A and B are the values
specified in Table 2.
When a conversion device is included
In a measuring system, maximum
permissible errors of line A of Table
·
2 apply to the converted mass
·1ndlcatlon. However, in any case, the
magnltude of maximum permissible
errors shall not be less than the mass
corresponding to the minimum
specified volume deviation.
(v) Direct verification of. a converted
volume indication
Standards delivering directly the true
value of converted volume
Indications are not available for
general uses. Such standards only
exist for a given liquid or for very
similar liquids. When such standards
are available, provisions in paragraph
2(7)(1v) can be applied by analogy.
(8) Maximum permissible errors on calculators
Maximum permissible errors on quantities
of liquid Indications applicable to
calculators, positive or negative, when they
are tested separately, are equal to one
tenth of the maximum permissible error
defined In line A of Table 2. However, the
magnitude of the maximum permissible
error shall not be less than one-half scale
interval of the measuring system in which
the calculator is intended to be included.
(9) Indications
(i) The volume indication shall be made
In cubic centimetres or millilitres, in
cubic decimetres or litres, or in cubic
metres. The symbolor the name of
the unit shall appear In the
immediate vicinity of the Indication
.
. ' . 1·-.
Mass may only be indicated in tonnes,
kilograms or grams. The symbol or
the name of the unit shall appear In
the immediate vicinity of the
indication.
(ii) Measuring systems shall be provided
with an indicating device giving the
volume of liquid measured at
metering conditions.
Without prejudice to the provisions
in paragraph 2(9)(iii) when a
measuring system is fitted with a
conversion device, it shall be fitted
(in addition to the device indicating
volumes at metering conditions) with
a device Indicating the volume at
base conditions or the mass.
Provisions applicable to devices
which indicate the volume at
metering conditions apply to devices
which indicate the volume at base
conditions and by analogy to devices
which indicate the mass.
(iii) The use of the same display for the
indications of volume at metering
conditions and of volume at base
conditions or of mass is authorized
provided that the nature of the
displayed quantity is clear and that
these indications are available on
request.
(Iv) A measuring system may have
severat devices Indicating the same
quantity. Each shall meet the
requirements of this specification.
The scale intervals of the various
indications may be different.
(v) For any measured quantity relating
to the same measurement, the
indications provided by various
devices sha II not deviate one from
another by more than one scale
interval or the greatest of the two
scale intervals if they differ, except
otherwise provided in clause 5 (see
paragraph 5 (lO)(i)(c)).
(vi) Subject to specific provisions for
certain types of measuring systems,
use of the same indicating device for
the indications of several measuring
systems (which then have a common
indicating device) is authorized
provided that one of the following
conditions is met:-
[ 'lT'I II - e.l11s 3 ( i ) ] 527
(a) it Is impossible to use any two of
these measuring systems
simultaneously,
(b) the indications relating to a given
measuring system are accompanied
by a clear identification of that
measuring system and the user may
obtain the indication corresponding
to any of the measuring systems
concerned, using a simple command.
(10) Elimination of air or gases
(i) General requirements
Measuring systems shall be constructed and
installed so that during normal operation,
neither air intake nor gas release will occur
in the liquid upstream of the meter. If there
is a risk that this requirement may not be
met, the measuring systems shall
incorporate a gas elimination device
permitting the proper elimination of any air
or undissolved gases which may be
contained In the liquid before ft enters the
meter.
The gas elimination device shall be suitable
for the supply conditions and be arranged in
such a way that the effect due to the
influence of the air or gases on the
measuring result does not exceed-
(a) 0.5% of the quantity measured for
liquidsother than potable liquidsand
for liquids of a viscosity not exceeding
1 MPa.s,
(b) 1% of the quantity measured for
potable liquids and for liquids of a
viscosity exceeding 1 MPa.s.
However, it is not necessary for this
effect to be less than 1 % of the
minimum measured quantity.
The values specified in this paragraph
apply to the gas elimination device
when It Is subject to separate control,
e.g. for pattern approval.
In this case, they apply to the
differences between:
• the meter errors with air Intake or
with gas, and
• the meter errors without air intake
or gas.
(ii) Pumped flow
A gas separator shall be provided when,
subject to the provisions In paragraph
2(10) (iv), the pressure at the pump Inlet
may, even momentarily, fall below either the
atmospheric pressure or the saturated
vapour pressure of the liquid.
No gas elimination device is required when
the pressure at the pump inlet is always
greater than the atmospheric pressure and
the saturated vapour pressure of the liquid,
and if any gaseous fo nmation liable to have
a specific effect greater than 1% of the
· minimum measured quantity cannot form or
enter the inlet pipe work of the meter,
whatever be the conditions of use.
A gas elimination device Is required when
the pressure at the pump inlet is always
greater than the atmospheric pressure and
the saturated vapour pressure of the liquid,
but gaseous formations liable to have a
specific effect greater than 1% of the
minimum measured quantity can occur.
When applying this provision, it is necessary
to consider, in particular-
(a) gaseous fonmations likely to occur
owing to thermal contraction during
shutdown periods; if gaseous
fonmation is possible, a gas extractor
is required.
(b) air pockets likelyto be introduced Into
the pipework when the supply tank Is
completely empty; in case there Is a
possibility of gaseous formation, a
special gas extractor isrequired,
The gas elimination device shall be
installed downstream of the pump or
be combined with the pump.
If the gas elimination device is
installed below the level of the meter,
a non-return valve fitted, if necessary,
with a pressure limiting device shall
be incorporated to prevent the
pipework
.
between the two
components from emptying.
The loss of pressure caused by the
flow of liquid between the gas
elimination device and the meter shall
be as small as possible.
If the pipework upstream of the meter
incorporates several high points, it
may be necessary to provide one or
•
\!
528 THE GAZETTE OF INDIA : EXTRAORDINARY [PARTII-SEC. J(i)]
more automatic or manual evacuation
devices.
(iii) Non-pumped flow
When a meter is supplied by gravity without
use of a pump, and if the pressure of the
liquid in all parts of the·pipework upstream
of the meter and in the meter Itself is
greater than.the saturated vapourpressure
of the llqu!d,and the atmospheric pressure
at measuring conditions, a gas elimination
device lsmotnecessarv, However, after the
measuring system has been put into
service, an ,arrangement is required to
ensure that It remains correctly filled.
If the pressure of the liquid is likely to be
lower than the atmospheric pressure while
remaining greater than the saturated
vapour pressure, an appropriate device
shall prevent entry of air into the meter.
If a meter ls supplied under gas pressure,
the measuring system shall be so·
constructed that separation of air or gas is
avoided. An appropriate device shall
prevent entry of gas into the meter.
In all circumstances, the pressure of the
liquid between the meter and the transfer
point shall be greater than the saturated
vapour pressure of the liquid.
(iv) Viscous liquids
Since the effectiveness of gas separators
and gas extractors decreases as the
viscosity of the liquids increases, these
devices may be dispensed with for liquids
with a dynamic viscosity of more than 20
mPa.s at 20°C.
In this case, It is necessary to make
provisions to prevent entry of air. The pump
shall be so arranged that the inlet pressure
is always greater than the atmospheric
pressure.
If it Is not always possible to meet this
condition, a device shall be provided to stop
the flow of llquld automatically as soon as
the Inlet pressure falls below the
atmospheric pressure. A' pressure gauge
shall be used to monitor this pressure.
These provisions are not necessary if
devices are provided which ensure that no
air can enter through the Joints in the
sections of the pipework under reduced
pressure and if themeasurinq system is so
arranged that no air or dissolved gases will
be released.
(v) Removal of gases
The gas removal pipe of a gas elimination
device shall not Include a manually
controlled valve if closure of this valve
prevents the operation of the gas
elimination device. However, if such a
closing element is required for safety
reasons, it shall be possible to ensure by
means of a sealing device that it remains
in the open position, unless closure of the
valve automatically prevents further
measurement.
(vi) Anti-swirl device
If the supply tank of a measuring system Is
normally to be completely emptied, the
outlet of the tank shall be fitted with an
anti-swirl device, unless the measuring
system incorporates a gas separator.
(vii) General provisions for gas elimination
devices
(a) In principle, the gas separated in a
·
gas elimination device is evacuated
automatically. However, the
.
automatic operation is not necessary
if a device is provided which
automatically either stops or
sufficiently reduces the flow of liquid
,
when there is a risk of air or gases
·
entering the meter. In the case of
shutdown, no measurement shall be
possible unless the air or gases are
automatically or manually
eliminated.
(b) The operational limits of a gas
elimination device are as follows:-
(aa) the maximum flowrate(s) for one or
more specified liquids,
(bb) the maximum pressure (with no flow
running) and minimum pressure
(with liquid and without air intake
while the pump is running at
maximum flowrate) compatible with
the correct operation of the gas
elimination device,
(cc) the minimum measured quantity for
which it is designed.
(viii) Special provisions applicable to gas
separators
['ll'T ll-191's J{i)] 529
(a) Within the error limits specified in
paragraph 2(10)(i), a gas separator
fitted In a measuring system that
does not Incorporate a gas Indicator
as specified in paragraph 2( 11) shall
ensure the elimination of air or gases
mixed with the liquid to be measured
under the followingtest conditions :-
·
(aa) without air or gases the measuring.
system operates at the maximum
flow rate and at the minimum
pressure specified for the gas
separator,
(bb) then air is introduced or gases are
created as long as the measuring
system operates. Any proportion by
volume of air or gases relative to the
liquid is permitted If the gas.
separator is designed for a maximum
flowrate lower than or equal to 20
m'/h; It Is limited to 30% if the gas
separator is designed for a maxim um
flowrate higher than 20 m3/h (the
volumes of air or gases are measured
at atmospheric pressure in
determining their percentages). The
percentage is considered only when
the meter is running.
Furthermore, when provided, the
automatic gas removal device must
continue to operate correctly at the
maximum pressure fixed for these
gas separators.
(b) Within the error limits specified in
paragraph 2(10)(i), a gas separator
fitted In a measuring system that
Incorporates a gas indicator shall
ensure the elimination of air or gases
mixed with the liquid to be measured
under the following conditions :
(aa) without air or gases the measuring
system operates at the maximum
flowrate and at the minimum
pressure specified for the measuring
system,
(bb) then air is introduced or gases are
. created as long as the measuring
system operates. The proportion by
volume of air or gases relative to the
liquid does not exceed-
20% for liquids of a viscosity not
exceeding 1 MPa.s, other than
potable liquids,
t,71..( ?t0,1-/J?J
10% for potable liquidsand for liquids
of a viscosity exceeding
1 MPa.s.
·
The percentages are considered only when
the meter is running.
When the proportion by volume of air or
gases relative to the liquid.is greater than
the a bovementioned percentages and when
the gas separator does not meet the
requirements with respect to the maximum
permissibleerrors, the gas indicator must
clearly reveal the presence of air or gas
bubbles.
(ix) Special provisions applicable to gas
extractors
A gas extractor or special gas extractor
shall, at the maximum flowrate of the
· measuring system, ensure that elimination
of an air or gas pocket of a volume
(measured at atmospheric pressure) at
least equal to the minimum measured
quantity with no resulting additional effect
greater than 1 % of the minimum measured
quantity.
Moreover, a special gas extractor shall also
be capable of separating continuously a
volume of air or gas mixed with the liquid
equal to 5%. of the volume of liquid
delivered at the maximum flowrate without
the resulting additional effect exceeding the
limits fixed in paragraph 2(10)(i).
Notes:
(i) A special gas extractor is used mainly In
measuring systems mounted on road
tankers.
(ii) Installing a special gas extractor is subject
to feeding conditions. Therefore, no
performance is required for proportions
greater than 5%.
{11} Gas Indicator
The gas indicator shall be designed so as to
provide a satisfactory indication of the presence of
air or gases in the liquid.
The gas Indicator shall be Installed downstream
of the meter. In empty hose measuring systems,
the gas Indicator may be in the form of a weir-type
sight glass and may also be used as the transfer
point.
The gas indicator may be fitted with a bleed
screw or with any other venting device when it forms
...... ._ ---------- ----
530 THE GAZETTE OF INDIA: EXTRAORDINARY [PARTII-SEC. 3(i)]
a high point of the pipe work. No pipe must be
connected to the venting device
..
F.low Indicating
devices (e.g. spinners) may be incorporated in gas
indicators provided that such devices do not prevent
observation of any gaseous formations which could
be present in the liquid.
(12) Transfer point
(i) Measuring systems shall incorporate a
transfer point. This transfer pointls located
downstream .of -the meter in delivery
systems ,and ,upstream of the meter in
recelvlr'!Qsystems.
(ii) Measuring systems :may be of two types:
"empty hose" systems and "full hose"
systems::the term "hose" includesrigid pipe
work.
(a) 'Empty,hose systems are, in the case
of J:lellvery equipment, measuring
s}'Sl:ems in which the transfer point
is 'located upstream of the delivery
hose. This transfer point may be in
the form of either a weir type sight
glass, or a closing device combined,
In each case, with a system which
ensures the emptying of the delivery
hose after each measuring operation.
(b) Full hose systems, In the case of
delivery equipment, are measuring
systems in which the transfer point
consists of a closing device located
In the delivery line. When the delivery
line has a free end, the closingdevice
must be installed as close as possible
.
to this end.
(c) In the case of receiving equipment,
the same provisions apply by analogy
to the reception pipe work upstream
of the meter.
(13) Complete fl/ling of the measuring system
(i) The meter and the pipe work between the
meter and the transfer point shall be kept
full of liquid during measurement and
during shutdown periods.
When this condition is not met, especially
in the case of permanent installations, the
complete filling of the measuring system
up to the transfer point shall be effected
manually and monitored during
measurement and shutdowns. To ensure
complete elimination of air and gases from
the measuring system, venting devices
fitted with small sight glasses whenever
possible shall be placed in appropriate
positions.
(ii) The additional effect of the pipe work
between the meter and the transfer point
shall not be greater than 1 % of the
minimum measured quantity due to
variations in .temperature, equal to--
• 10°C for exposed pipes,
• 2°C for insulated or underground pipes.
To calculate this additional effect the
coefficient of thermal expansion for the
liquid shall be rounded to 1.10-1 per degree
Celsius.
(iii) Subject to the provisions in paragraph
2(10)(iii), a pressure maintaining device
shall, If necessary, be Installed downstream
of the meter to ensure that the pressure In
the gas elimination device and in the meter
Is always greater than both the atmospheric
pressure and the saturated vapour pressure
of the liquid.
(Iv) A measuring system In which the liquid
could flow in the opposite direction to that
of normal flow when the 'pump is stopped
shall be provided with a non-return valve,
fitted with a pressure limiting device, If
necessary, when reversal of the fiow could
result in errors greater than the minimum
specified volume deviation.
'
(v) In empty hose measuring systems, the
pipework downstream of the meter and, If
necessary, the pipework upstream of the
meter shall have a high point so that all
parts of the measuring system always
remain full.
(vi) In full hose measuring systems which are
used for measuring liquids other than
liquefied gases, the free end of the hose
shall incorporate a device which prevents
the draining of the hose during shutdown
periods.
r
·
When a closing device is installed
downstream of this device, the volume of
the space between them shall be as small
as possible and, in all cases, be less than
the minimum specified volume deviation.
(vii) If the hose comprises several components,
these shall be assembled either by means
of a special connector which keeps the hose
['ll'1 ll 1'!U6 3(i)] 531
full,or by a connection system which is either
sealed or requires the use of a special tool
to be disconnected.
(14}Draining
(i) In empty hose measuring systems, draining
of the delivery hose referred to In paragraph
2(12)(11)(a) is ensured by a venting valve.
In some cases, this valve may be replaced
by special devices, e.g. an auxiliary pump
or a compressed gas Injector.
In measuring systems Intended for
minimum measured quantities of less than
10 m', these draining devices shall operate
automatically.
However, when it is not possible, for duly
established technical or safety reasons, to
deliver (or to receive) the measured volume
contained in hoses of an empty hose
measuring system (for example, when
measuring liquefied carbon dioxide), this
volume shall be smaller than or equa I to
half the minimum specified volume
deviation.
(ii) In full hose measuring systems, particularly
those Intended for measuring viscous
liquids, the nozzle shall be so designed that
it cannot retain a volume of liquidexceeding
D.4 times the minimum specified volume
deviation.
(15) Variations In the internal volume of full
hoses
For full hoses In a measuring system provided
with a hose reef, the increase in internal volume due
to the change from the coiled hose position when
not under pressure to the uncoiled hose position when
under pressure without any flow of liquid, shall not
exceed twice the minimum specified volume
deviation.
If the measuring system is not provided with a
hose reel, the Increase In internal volume shall not
exceed the minimum specified volume deviation.
(16) Branches and bypasses
(i) In measuring systems intended to deliver
liquids, no means shall be provided by
which any measured liquid can be diverted
downstream of the meter. However, two or
more delivery outlets may be permanently
installed and operated simultaneously or
alternatively provided so that any diversion
of flow to other than the Intended receiving
receptacle(s) cannot be readily
accomplished or ls readily apparent. Such
means include, tor example, physical
barriers, visible valves or indications that
make it clear which outlets are in operation,
and explanatory signs, If necessary.
For measuring systems Intended to receive
liquids, such provisions apply by analogy.
A manually controJJed outlet may be
· available for purging or draining the
.
measuring system. Effective means shall
be provided to prevent the passage of liquid
through any such outlet during normal
operation of the measuring system.
(ii) In measuring systems which may operate
either with an empty hose or with a full
hose and which are equipped with flexible
pipes, a non-return valve shall, if necessary,
be incorporated in the rigid pipework,
leading to the full hose immediately
downstream from the selector valve. In
addition, the selector valve shall not, in any
position, permit connection of the discharge
hose, operating as an empty hose to the
pipework leading to the full hose.
(iii) Any connections which may be provided for
bypassing the meter shall be closed by
means of blanking flanges. However, if the
operating requirements make such a bypass
necessary, it shall be closed either by means
of a closing disc or a double closing device
with a monitoring valve in between. It shall
be possible to ensure closure by means of
seals, or there shall be an automatic
monitoring of the double block-and-bleed
valve in the bypass giving an alarm signal
In case of leakage in this valve.
(17} Control and closing mechanisms
(i) If there is a risk that the supply conditions
can overload the meter, a flow limiting
device shall be provided. This device shall
be Installed downstream of the meter. It
shall be possible to seal it.
(ii) The various positions of the controls of
multi-way valves shall be easily visible and
located by notches, stops or other fixing
devices. Deviations from this requirement
are permissible when the adjacent positions
of the controls form an angle of 90° or
more.
(18) Various provisions
(i) If provided, filters shall not disturb the
measuring operation.
- -
_J
_
532 THE GAZETTE OF INDIA: EXTRAORDINARY [PARTII-SEC. 3(i)]
(ii) In the case of measuring liquid petroleum
products, means for vapour recovery shall
not Influence the accuracy of
measurements such that the maximum
permissible error is exceeded.
(19) Markings
(i) Each measuring system, component or sub·
system for which pattern approval has been
granted shall bear, placed together legibly
and Indelibly either on the dial of the
indicating device or on a special data plate,
the following Information :-
(a) pattern approval sign
(b) manufacturer's identification mark or
trademark
(c) designation selected by the
manufacturer, if appropriate
(d) serial number and year of
manufacture
(e) characteristics as defined in
paragraphs 2(3)(1), 3(1)(1)(a),
2(10){vli){b), or 3(1)(vll)(a).
{f) accuracy class, if other than 0.5.
Note: The Indicated characteristics should be
the actual characteristics of use, if they are known
when the plate Is affixed. When they are not known,
the indicated characteristics are those allowed by
the pattern approval certificate.
However, the minimum and the maximum
temperatures of the liquids shall appear on the data
plate only when they differ from - 10°C and + S0°C
respectively.
The minimum measured quantity of the
measuring system shall in all cases be
clearly visible on the dial of any Indicating
device visible to the user during the
measurement.
If several meters operate in a single system
using common components, the marking
required for each part of the system may
be combined on a single plate.
When a measuring system can be
transported without being dismantled, the
markings required for each component may
also be combined on a single plate.
(ii) Any Information, markings or diagrams
specified by this Recommendation or
possibly by the pattern approval certificate,
shall be clearly visible on the dial of the
indicating device or within proximity to it.
The markings on the dial of the indicating
device of a meter forming a part of a
measuring system shall not contravene
those on the data plate of the measuring
system.
(111)When volume at base conditions is
Indicated, these base conditions shall be
clearly mentioned In the vicinityof the result
of measurement, In the form :
T,= °C(orK)
P, = MPa (or kPa or Pa or bar) -.
(20) Sea/Ing devices and stamping plate
(I) General
Sealing is preferably carried out by means
of lead seals. However, other types of
sealing are permitted on fragile instruments
· or when these seals provide sufficient
integrity, electronic seals for instance.
The seals shall, In all cases, be easily
accessible.
.
Sealing should be provided on all parts of
the measuring system which cannot be
.
materially protected in any other way
against operations liable to affect the
measurement accuracy.
It must be prohibited to change parameters
which participate In the determination of
the results of measurement (parameters
for correction and conversion in particular)
by mJans of sealing devices.
Except for direct selling to the public, it may
be acceptable that the nature of the
measured liquid or Its viscosity be manually
entered into the calculator at the beginning
of the measurement operation [see
paragraph 3(1)(v)], even when this datum
participates in the correction. This datum
and a note explaining that this quantity has
been entered manually shall then be printed
at the same time as the measurement
results.
A plate, referred to as the stamping plate, ·
aimed at receiving the control marks, shall
be sealed or permanently attached on a
support of the measuring system. It may
be combined with the data plate of the
measuring system referred to in paragraph
2(19).
In the case of a measuring system used
for potable liquids, sealing shall be applied
['WT u-= J(i)J 533
such that the equipment may be dismantled
for cleaning purposes.
(ii) Electronic sealing devices
(a) When access to parameters that
participate in the determination of
results of measurement is not
protected by mechanical sealing
devices, the protection shall fulfil the
.fol/owingprovisions (except In cases
related to the 5th paragraph of
paragraph 2(20)(1):-
(aa) access shall only be allowed to
authorized people, e.g. by means of
a code (key-word) or of a special
device (hard key, etc.); the code
must be changeable; access by
means of only a code is not allowed
In the case of direct selling to the
public;
(bb) It shall be possible for at least the
last Intervention to be memorized;
the record shall include the date and
a characteristic element Identifying
the authorized person making the
Intervention [see (a) above]; the
traceabllfty of the last Intervention
shall be assured for at least two
years, If It is not over-written on the
occasion of a further intervention; if
It Is possible to memorize more than
one Intervention, and if deletion of a
previous Intervention must occur to
permit a new record, the oldest
record shall be deleted.
(b) For measuring systems with parts
which may be disconnected one from
another by the user and which are
Interchangeable, the following
provisions shall be fulfilled:-
(aa) It shall not be possible to access
parameters that participate in the
determination of results of
measurements through disconnected
points unless the provisions in
2(20)(1i)(a) are fulfilled;
(bb) Interposing any device which may
Influence the accuracy shall be
prevented by means of electronic
and data processing securities or, if
not possible, by mechanical means.
(c) For measuring systems with parts
which may be disconnected one from
a nether by the user and which are
not interchangeable, the provisions
in 2.20.2.2 apply. Moreover, these
measuring systems shall be provided
with devices which do not allow them
to operate If the various parts are
not .assocleted according to the
·
manufacturer's configuration.
Note: Disconnections which are not
a /lowed to the user may be
prevented, for example by means of
a device that prevents any
measurement after disconnecting
and reconnecting.
3. Requirements for meters and ancillary
devices of a measuring system
(J) Meter
The meter(s) of a measuring system shall meet
the following requirements, whether or not it (they)
is (are) subject to a separate pattern approval:-
(!) Field of operation
(a) The field of operation of a meter Is
determined at least by the following
characteristics:-
(aa) minimum measured quantity;
(bb) measuring range limited by the
minimum flowrate, Qm;,•and the
maximum flowrate, Q
• max,
(cc) maximum pressure of the liquid,
p
max'
(dd) nature of the liquid(s) to be
measured and limits of kinematic
or dynamic viscosity when the
indication of the nature of the
liquid alone is not sufficient for
characterizing its viscosity,
(ee) maximum temperature of the
liquid, T0.,,
(ff) minimum temperature of the
liquid, T
nan'
(b) The value of the minimum measured
quantity shall be in the form 1 x 10',
2 x 10' or S x 10' authorisec units of
volume, n being a positive or
negative whole number, or zero.
(c) In general, the ratio between the
maximum and the minimum flowrate
of the meter sha II be:-
( i) at least equal to ten for meters
\
_
J
_
I
534 THE GAZETTE OF INDIA: EXTRAORDINARY [PARTII-SEC. 3(i)]
for liquids having a viscosity less
· than 20 MPa.s at measurement
temperature, other.than liquefied
. gases,
(II) at least equal to five for meters
for. liquidshaving a viscosity equal
to or greater than 20 MPa.s and
for meters for liquefied gases.
'However, when the requirements
applicable to a particular
: measuring system specify a lower
,ratio for that system or lts meter,
the ratio for the meter may be less
than specified above, without
being lower than two in
application of 2.3(111).
(ii) Metrological requirements
(a) The maximum permissible errors
for a meter, within its field of
eperatlon, are equal to those
specified in line B of Table 2.
(b) for any quantity equal to or
greater than five times the
minimum measured quantity, the
repeatability error of the meter
shall not be higher than two-fifths
of the value specified In line A of
Table 2.
(c) Fora given liquid within their fields
of operation, meter shall present
a magnitude of the difference
between the initial intrinsic error
and the error after the endurance
test equal to or less than the value
specified in line B in Table 2.
( iii) Connections between the flow sensor
and the indicating device
In the text, the expression "flow
sensor" also means "volume sensor".
The connections between the flow
sensor and the indicating device shall
be reliable and, for electronic
devices, durable, in accordance with
paragraphs 4(1)(iii) and 4(3)(11).
This provision also applies to
connections between primary and
secondary devices for
electromagnetic meters.
(iv) Adjustment device
Meters may be provided with an
adjustment device which permits
modification of the ratio between the
indicated volume and the actual
volume of liquid passing through the
meter, by a simple command
.
When this adjustment device
modifies this ratio in a discontinuous
manner, the consecutive values of
the ratio shall not differ by more than
0.0005 for meters Intended to equip
measuring systems of class 0.3, and
0.001 for other meters.
Adjustment by means of a bypass of
the meter is prohibited.
(v) Correction device
Meters may be fitted with correction
devices; such devices are always
considered as an Integral part of the
meter. The whole of the
requirements which apply to the
meter, in particular the maximum
permissible errors specified In
paragraph 3(1)(11)(a), are therefore
applicable to the corrected volume
(at metering conditions).
In normal operation, non-corrected
volume shall not be displayed.
The aim of a correction device is to
reduce the errors as close to zero as
possible.
,
All the parameters which are not
·
measured and which are necessary
for correcting shall be contained in
the calculator at the beginning of the
measurement operation.
The correction device shall not allow
the correction of a pre-estimated
draft in relation to time or volume
flow, for example.
Associated measuring instruments
shall be fitted with checking devices,
as specified in paragraph 4(3)(vi).
(vi) Measuring systems equipped with
volumetric meters
The periodic variation of a volumetric
meter shall be less than half the
minimum specified volume deviation.
When a volumetric meter is approved
separately, the pattern approval
certificate shall indicate the value
of its cyclic volume.
['WT ll-19Us 3(i)] 535
{vii) Measuring systems equipped with
turbine meters
(a} The pressure downstream of the
meter shall satisfy the
manufacturer's specification. The
minimum pressure shall be
indicated on the data plate of the
meter.
(b) Measuring systems equipped with
turbine meters shall be fitted with
flow straightening devices for
preventing, as far as possible, the
liquid from any possible rotation
and for.regulating the flow at the
inlet of the meter. These are
straight pipes, or flow
straighteners, or a combination of
straight pipes and a flow
straightener.
The flow straightening device shall
be placed immediately upstream
of the meter and Its internal
diameter shall be equal to the
diameter of the inlet of the meter.
The length of the necessary
straight pipes and the
characteristics of the flow
straighteners are specified by the
pattern approval of turbine
meters.
(c) Each turbine meter shall be
followed by a straight pipe having
an Internal diameter equal to the
outlet diameter of the meter and
a length of at least five times this
diameter.
(viii) Measuring systems equipped with
electromagnetic meters
(a) Measuring systems equipped with
electromagnetic meters shall be
fitted with a straight pipe
upstream of the meter and with a
straight pipe downstream of the
meter.
The upstream pipe shall have an
internal diameter equal to the inlet
diameter of the meter and a
length of at least ten times this
diameter.
The downstream pipe shall have
an internal diameter equal to the
outlet diameter of the meter and
a length of at least five times this
diameter.
r
(b) The time necessary for determining
the rnlnmurn measured quantity at
maximum flow rate, must be at
least twenty times the duration of
one complete cycle for meters
using a.c. or pulsed d.c. field
excitation.
(c) The maximum permissible cable
length between primary and
secondary devices, shall be not
more Ulan 100 metres or not more
than the· value L expressed In
metres according to the following
formula, whichever is smaller:
L = (kx c)/(fx C)
Where:
k = 2 X 10 - 5m
c is the conductivity of the liquid,
in 5/m
fis the field frequency during the
measuring cycle, in Hz
C is the effective cable
capacitance per metre, in F/m
(2) Indicating device
(i) General provisions
(a) Reading of the indications shall be
precise, easy and non-ambiguous
whatever position the indicating
device comes to rest; if the device
comprises several elements, it shall
be arranged in such a way that the
reading of the measured volume can
be made by simple juxtaposition of
the indications of the different
elements. The decimal sign shall
appear distinctly.
(b) The scale interval of indication shall
be in the form 1 x 10", 2 x 10° or
5 x 10" authorized units of volume,
where n is a positive or negative
whole number, or zero.
(c) Non-significant scale intervals should
be avoided. This does not apply to
price indications.
(d) The minimum specified volume
deviation shall be equal to or greater
than the following value:-
(i) for continuous indicating devices,
the volume corresponding to 2mm
.
536 THE ,GAZETTE OF INDIA: EXTRAORDINARY [PARTII-SEC. 3(i)]
. on the scale or to one-fifth of the
scale interval (ofttie first element
· for, mechenical.indicatmq devices),
.
whichever is greater,
(Ii) .for .discontinuous indicating
.
device,the volume corresponding
totwo scale intervals.
(ii) Mechanlcal.Jndicating device
(a) .when the graduation of an element
: Is entirely visible, the value of one
,revolution of that element shall be
'In the form 10" authorized units of
volume: this rule however, does not
·apply to the element corresponding
to the maximum range of the
:indicating device.
(b) On an indicating device having
several elements, the value of each
revolution of an element whose
· .graduation is entirely visible must
correspond to the .scale Interval of
the following element.
(c) An element of the indicating device
may have continuous or
discontinuous movement, but when
elements other than the first have
only part of their scales visible
through the windows, these
elements shall have discontinuous
movement.
(d) Toe advance by one figure of any
element having discontinuous
movement shall occur and be
completed when the preceding
element passes from 9 to O.
·
(e) When the first element has only a
part of its scale visible through a
window and has a continuous
movement, the. dimension of that
window shall be at least equal to 1.5
times the distance between two
consecutive graduated scale marks.
(f) All scale marks shall have the same
width, constant along the line and
not exceeding one quarter of the
scale spacing. The apparent scale
spacing shall be equal to or greater
than 2 mm. The apparent height of
the figures shall be equal to or
greater than 4 mm, unless otherwise
specified in the requirements for
particular measuring systems.
(iii) Electronic indicating device
Toe continuous display of volume during the
period of measurement is only mandatory
in the case of direct selling to the public.
However, if interrupting the displayof volume
interrupts the action of some checking
facilities that are mandatory or necessary
to ensure correct measurement, the volume
passing through the meter during each
interruption shall be smaller than or equal
to the minimum measured quantity.
(iv) Zero setting device for volume indicating
device
(a) A volume indicating device may be
provided with a device for setting the
indication to zero either by manual
operation or by means of an
automatic system.
(b) The zero setting device shall not permit
any alteration of the measurement
result shown by the volume indicating
device (other than bymaking the result
disappear and displaying zeros).
(c) Once the zeroing operation has begun
it shall be impossible for the volume
indicating device to show a result
different from that of the
measurement which has just been
made, until the zeroing operation has
been completed.
Indicating devices on fuel dispensers
and electronic measuring systems
shall not be capable of being reset to
zero during measurement. On other
measuring systems, either this
provision shall be fulfilled or a clearly
visible notice shall be provided on the
indicating device stating that this
operation is prohibited.
(d) On continuous indicating devices, the
residual indication after return to zero
shall not be. more than half the
minimum specified volume deviation.
(e) On discontinuous indicating devices,
the indication after return to zero shall
not _bezero without any ambiguity.
(3) Price indicating device
(i) A volume indicating device with aligned
figures and zero setting may be
/
[ 'll1l II - = 3 (i ) ] 537
complemented with a price indicating device,
also with aligned figures and zero setting.
(Ii) The selected unit price shall be displayed by
an indicating device before the start of the
measurement. The unit price shall be
.
adjustable; changing the unit price may be
carried out either directly on the measuring
system or through peripheral equipment.
The Indicated unit price at the start of a
measurement operation shall be valid for
the whole transaction. A new unit price shall
only be effective at the moment a new
measurement operation may start.
A time of at least 5 s. shall elapse between
indicating a new unit price and before the
next measurement operation can start, if
the unit price is set from peripheral
equipment.
(iii) The provisions in paragraph 3.(2) relating
to volume indicating devices apply also, by
analogy, to the price indicating devices.
(iv) The monetary unit used, or its symbol, shall
appear In the immediate vicinity of the
indication.
(v) The zero setting devices of the -price
indicating device and of the volume
indicatingdevice shall be designed in such
a way that zeroing either indicating device
automatically Involves zeroing the other.
(vi) The minimum specified price deviation shall
be greater than or equal to the following
value:-
' for continuous indicating devices, the
price correspondingto 2 mm on the scale
or to one-fifth of the scale interval (of
the first element for mechanical
indicating devices), whichever is greater,
• for discontinuous indicating devices, the
price corresponding to two scale
intervals.
·
However, the interval of one-flfth of the
scale interval or of 2 mm in the case of the
first hyphen or the scale interval in the case
of the second hyphen needs not correspond
to a value less than that of the smallest
coin in circulation in the country in which
the equipment is used.
(vii) The difference between the indicated price
and the price calculated from the unit price
and the indicated volume shall not exceed
the minimum specified price deviation.
t, 7 tr '1 oJ;,
- I.Ji;-'
However, this difference need not be less
than the smallest monetary value as defined
in paragraph 3(3)(vi).
·
Moreover, this requirement does not apply
when the unit price has been changed
between two measurements.
(viii) On continuous Indicating devices, the
residual indication after zeroing .shall not
exceed half the minim um specified price
deviation. However, this indication need not
be less than the smallest monetary value
as defined in paragraph 3(3)(vi).
·
(ix) On discontinuous i?dicatingdevices, the
indication after zeroing stiall be zero without
any ambiguity.
(4} Printing device
(i) The printed scale interval shall be in the
form of 1 x 10", 2 x 10" or 5 x ion authorized
units of volume, n being a positive or
negative whole number, or zero, and shall
not be greater than the minimum specified
volume deviation.
The printed scale interval shall not be
smaller than the smallest scale interval of
the indicating devlces.
;
(ii) The volume printed shall be expressed in
one of the units authorized for the indication
of volume.
The figures, the unit used or its symbol and
the decimal sign, if any, shall be printed on
the ticket by the device.
· ·
(iii) The printing device may also print
information identifying the measurement
such as: sequence number, date,
identification of the dispenser, type of liquid,
etc.
If the printing device is connected to more
than one measuring system, it must print
the identification of the relevant system.
(iv) If a printing device allows repetition of the
printing before a new delivery has started,
copies shall be clearly marked as such, for
example by printing, "duplicate".
(v) If the volume is determined by the
difference between two printed values,
even if one is expressed in zeros, it shall
be impossible to withdraw the ticket from
the prlntinq.devlce during measurement.
(vi) Where .the printing device and volume
indicating device each have a zeroing
.538
.
THE GAZETTE OF INDIA: EXTRAORDINARY [PARTII-SEC, 3(i)]
, that resetting one of them to zero also resets
•the other.
(vii) The printing device may print, in addition to
the measured quantity, either the
corresponding price or this price and the
unitprlce.
.In the case of"direct selling to the public"
· it may. also print only the price to be paid
(without the volume) when it is connected
to a volume Indicating device and to a price
indicating device both of which are visible
to the purchaser.
The figures, the monetary unit used or its
symbol.and the decimal sign, If any, shall
be. prlnted by the device.
(viii) The printed price scale Interval shall be in
the form 1 x 10', 2 x 10' or 5 x 10° monetary
· units; n being a positive or negative whole
number, or zero; it shall not exceed the
minimum specified price deviation.
.
However, it need not be less than the
smallest monetary value specified in
paragraph 3(3)(vi).
(ix) If the volume indicating device Is not fitted
with a price Indicating device, the difference
between the printed price and the price
calculated on the basis of the Indicated
· volume and the unit price shall comply with
.the requirements in paragraph 3(3)(vii).
(x) Electronic printing devices are also subject
to the requirements in paragraph 4(3)(v).
(5) Memorydevice
{i) Measuring systems may be fitted with a
memory device to store measurement
results until their use or to keep a trace of
commercial transactions, providing proof in
case of a
· dispute. Devices used to read
stored Information are considered as
included In the memory devices.
(ii) The medium on which data are stored must
have sufficient permanency to ensure that
the data are not corrupted under normal
storage conditions. There shall be sufficient
· memory storage for any particular
application.
(iii) When the storage is full, it Is permitted to
· delete ·memorized data when both the
·
followingconditions are met:
• ,data are deleted in the. same order
asthe recording order and the rules
.establtshed for the particular
appllcatlon are respected,
••deletion is carried out after a special
manual operation.
(iv) Memorization shall be such that it is
, Impossible in normal use to modify stored
.vatues.
(v)' Memory·devices shall be fitted with
checking facilities according to paragraph
'4(3)(v). The aim of the checking facility is
.
to ensure that stored data correspond to
· the data provided by the calculator and that
... restored data correspond to stored data.
(6)' Pre-setting device
(i). The selected quantity is pre-set by
. operating a device provided with scales and
scale marks or a numerical device which
indicates that quantity. The preset quantity
.
.shall be indicated before the start of the
measurement.
(ii) Where pre-setting Is effected by means of
several controls which are independent of
each other, the scale interval corresponding
.
to one control shall be equal to the pre·
setting range of the control of the next
lower order.
(iii) · Pre-setting devices may be so arranged that
the repetition of a selected quantity does
· not require a new setting of the controls.
(iv) Where it is possible to view simultaneously
the figures of the display device of the pre
setting device and those of the volume
. Indicatingdevice, the former shall be clearly
distinguishable from the latter.
. (v): ·Indication of the selected quantity may,
:during measurement, either remain
unaltered or return progressively to zero.
-However, for an electronic pre-setting
device it is acceptable to indicate the
present value on the indicating device for
volume or price by means of a special
operation with the restriction that this value
shall be replaced by the zero indication for
volume or price. before the measurement
operation can start.
·
.
(vi) In the case of a prepaid orpre-ordered
delivery, the difference found under norm a I
operating conditions, between' the pre-set
:quantity and the quantity showri by the
·.··volume or price indicating device at the end
.
of'the measurement operation,.!shall not
- exceed the minimum specified volume or
,
price deviation.
-,-- ·--- ------------------.-----------
['WI ]l-1§!1ls 3(i)] 539
· (vii}The pre-set quantities and the quantities
shown by the volume indicating device shall
be expressed in the same unit. This unit
(or its symbol) shaube marked on the pre
setting mechanism.
(viii) The scale Interval of the pre-setting device
shall not be less than the scale interval of
the indicating device.
(ix) Pre-setting devices may incorporate a
device to permit the flow of liquid to be
stopped quicklywhen necessary.
(x) Measuring systems with a price indicating
device may also be fitted with a price pre·
setting device which stops the flow of the
liquid when the quantity delivered
corresponds to the pre-set price. The
requirements in paragraph 3(6)(1) to
3(6)(ix) apply by analogy.
(7) Conversion device
(i) Measuring systems may be fitted with a
conversion device as defined in paragraph
1(12) of Part 1. The provisions of the
paragraph 3(7) mainly apply to electronic
conversion devices in which conversion
calculations are made numerically by an
electronic computer. Analogous provisions
could apply by analogy to mechanical
conversion devices.
(ii) The calculation of the conversion factor
shall be made according to these
specifications.
(iii) As a rule, the parameters which
characterize the measured liquid and which
intervene In the conversion formula shall
be measured using associated measuring
instruments. However, some of these
parameters may be not measured; or
associated measuring instruments may be
not subject to control when their Influence
on the conversion factor is negligible (less
than one-tenth of the maximum permissible
error as specified in paragraph 2(5)(1).
For example, in many cases it is possible
to make a conversion to volume in· base
conditions by measuring temperature only,
when pressure and density vary little.
(iv) Associated measuring instruments shall
comply with applicable International
Recommendations and Standards. In
.addition, maximum permissible errors for
these instruments are those specified 'in
paragraph 2(7)(11).
(v) Associated measuring instruments shall be
installed near the meter so as to determine
therelevant quantities as they exist in the
meter in a sufficiently accurate way.
The changes in Indication due to the
location of the measuring points shall not
exceed 0.2 times the maximum permissible
error for the mec1surin9 system. Subject
to fulfilment of this requirement, the same
associated measuring instruments may be
used for making conversions ·(and
corrections) for several meters.
These instruments shall not affect the
correct functioning of the meter(s).
Note : These requirements are checked
by calculation.
(vi) All the parameters which are not measured
and which are necessary for the conversion
shall be present in the calculator at the
beginning of the measurement operation.
It must be possible to print or to indicate
them from the calculator.
For a mechanical conversion device that
cannot print or indicate these values, a seal
must be broken to change any setting.
·
(vii) ln addition to the volume at metering
conditions and the volume in base
conditions or the mass, which shall be
displayed according to paragraph 2(9)(11)
the values of other measured quantities
(density, pressure, temperature) shall be
accessible for each test measurement.
Scale intervals for density, pressureand
temperature shall be smaller than or equal
to one quarter of the maximum permissible
errors fixed in paragraph 2(7)(ii)' for
associated measuring instruments.
(8) Calculator
All parameters necessary for the
elaboration of indications that are subject
to legal metrology control, such as unit
price, calculation table, correction
polynomial, etc. shall be presentin 'the
calculator at the beginning of the
measurement operation.
'
The calculator may be provided with
interfaces permitting the coupling of
peripheral equipment. When .these
540 THE GAZETTE OF INDIA: EXTRAORDINARY [PARTIl?SEC. J(i)]
interfaces are used, the instrument shall
continue to function correctly and its
metrological functions shall not be capable
of being affected.
·
4. Measuring systems equipped with electronic
devices
(1) General requirements
(i) Electronic measuring systems shall
be designed and manufactured such
that their errors do not exceed the
maximum permissible errors as
defined in paragraph 2(5) under
rated operating conditions.
(a) Interruptible electronic measuring
systems shall be designed and
manufactured such that, when
they are exposed to the
disturbances specified in
paragraph 4 of Annexure A.
• either (a) significant faults do not
occur,
• or (b) significant faults are
detected and acted upon by
means of checking facilities.
This provision may apply separately
to:
• each individual cause of significant
fault and/or
• each part of the measuring
system.
(b) Non-interruptible measuring
systems shall be designed and
manufactured in such a way that
no significant faults occur when
they a re exposed to the
disturbances specified in
paragraph 4 of Annexure A.
(ii} It is the responsibility of the
manufacturer to decide whether a
given pattern of measuring system
Is Interruptible or not, taking 'mto
account the applicable rules. of
security. However, measuring
systems for direct selling to the public
shall be Interruptible.
When, at the time of pattern
approval, it is not possible to specify
the future utilization of the
Instrument, the requirements in
paragraph 4(1)(i)(b) apply.
(iii) The requirements in paragraph 4(1)(i)
shall be met durably. Forth is purpose
electronic measuring systems shall be
provided with the checking facilities
specified in 4(3).
(iv} A pattern of a measuring system is
presumed to comply with the
requirements In paragraph 4(1)(i}
and paragraph 4(1)(iii) if it passes
the inspection and tests specified in
paragraph 6(1)(xi)(a) and paragraph
6(1)(xi)(b).
(v) Measuring systems shall permit the
retrieval of the information relating
to the measured volume contained
within the Instrument when a
significant fault occurred and was
detected by checking facilities.
(2) Power supply device
(I) When the flow is not interrupted
during the failure of the principal
power supply device, the measuring
system shall be provided with an
emergency power supply device to
safeguard all measuring functions
during that failure.
(II) When the flow IS Interrupted during
the failure of the principal power
supply device, the provisions in
paragraph 4(2)(ii) shall be met, or
data contained at the moment of the
failure shall be saved and displayable
on an indicating device subject to
legal metrology control for sufficient
time to permit the conclusion of the
current transaction.
The absolute value of the maximum
permissible error for the indicated
volume in this case is increased by
5% of the minimum measured
quantity.
.
(3) Checking facilities
(I) Action of checking facilities
The detection by the checking
facilities of significant faults shall
result in the following actions,
according to the type:.
(a) Checking facilities of type N: a
visible or audible alarm for the
attention of the operator.
(b) Checking facilities of type I or P:
(aa} for non-interruptible measuring
systems:
['lT'T I!-? 3(i)] 541
• automatic correction of the fault,
or
• stopping only the faulty device
when the measuring system
without that device continues to
comply with the regulations, or
• a visible or audible alarm for the
operator; this alarm shall continue
until the cause of the alarm is
suppressed. In addition, when the
measuring system transmits data
to peripheral equipment, the
transmission shall be accom
panied by a message indicating
the presence of a fault.
Note : The third hyphen is not
applicable for the disturbances
specified in Para 4 of Annexure A.
In addition, the instrument may
be provided with devices to
estimate the amount of liquid
having passed through the
installation during the occurrence
of the fault. The result of this
estimate shall not be capable of
being mistaken for a valid
Indication.
(bb) for Interruptible measuring
systems, in particular for fuel
dispensers:
• automatic correction of the fault,
or
• stopping only the faulty device,
when the measuring system
without that device continues to
comply with the regulations, or
• stopping the flow.
(ii) Checking facilities for the
measurement transducer
The objective of these checking
facilities is to verify the presence of
the transducer, its correct operation
and the correctness of data
transmission.
(a) When the signals generated by
the flow sensor are In the form of
pulses, each pulse representing
an elementary volume, at least
security level B defined by ISO
6551 Cabled transmission of
electric and/or electronic pulsed
data Is required.
These checking facilities shall be
of type P and the checking shall
occur at time intervals not
exceeding the duration of the
measurement of an amount of
liquid equal to the minimum
specifiedvolume deviation.
It shall be possible during pattern
approval and initial verification to
check that these checking facilities
function correctly:
(aa) by disconnecting the
transducer, or
(bb) by interrupting one of the
sensor's pulse generators, or
(cc) by Interrupting the electrical
supply of the transducer.
(b) For electromagnetic meters only,
where the amplitude of the signals
generated by the measurement
transducer is proportional to the
flowrate, the following procedure
may be used:
A simulated signal with a shape
similar to that of the
measurement signai is fed into the
input of the secondary device,
representing a flowrate between
the minimum and maximum
flowrate of the meter. The
checking facility shall check the
primary and the secondary device.
The equivalent digital value Is
checked to verify that it is within
predetermined limits given by the
manufacturer and consistent with
the maximum permissible errors.
This checking facility shall be of
type P or I. In the latter case, the
checking shall occur at least every
five minutes.
Note : Following this procedure,
additional checking facilities (more
than two electrodes, double signal
transmission etc.) are not
required.
(c) For other technologies checking
facilities providing equivalent
levels of security remain to be
developed.
-- -
_j
·-- -
·---·-·--------
542 THE GAZETTE OF INDIA : EXTRAORDINARY [PARTll-SEC. 3(i)]
(ill) Checkingfacilities for the calculator
The objective of these checking
,facilities is· to verify that the
calculator .svstern 'functions
correctly and to .ensure the validity
of the calculations made.
There .are no special •means
. required for indicating.thatthese
..
checking· facilities Junction
ccorrectlv,
(a) Tile checking of the..functioning of
the-calcutatlon .svstem ·shall be of
type;P. orI. .Jn 'the latter .case, the
checking shall occur at teast every
flve·minutes, .except 'in .the case of
fJJel dispensers, for which it shall
occur-at each delivery. The-Objective
of:the.checking is to verify that:
r(aa) the values of all
' ·
permanently memorized
Instructions and data are
"correct, by such means as-
• summing up ail instructions
and data codes and
comparing the sum with a
fixed value,
• line and column parity bits
(LRCand VRC),
cyclic redundancy check
(CRC 16),
• double independent
storage of data,
• storage of data In "safe
coding", for example
protected by checksum, line
and column parity bits,
(bb) all procedures of internal
transfer and storage of data
relevant to the measure
ment result are performed
correctly, by such means
as:
· • write-read routine,
• conversion and re-
conversion of codes,
• use of "safe coding" (check
sum, parity bit),
• double storage.
(b) The checking of the validity of
calculations shall be of type P. This
consists of checking the correct value
of all data related to the
measurement whenever these data
are Internally stored or transmitted
to peripheral equipment through an
Interface; this check may be carried
out by such means as parity bit,
check sum or double storage. In
addition, the calculation system shall
be provided with a means of
controlling the continuity of the
calculation program .
(iv) Checking facility for the Indicating device
The objective of this checking facility is to
verify that the primary Indications are
displayed and that they correspond to the
data provided by the calculator. In addition,
it aims at verifying the presence of the
indicating devices, when they are
removable. These
·
checking facilities shall
either have the form as defined in
paragraph 4(3)(iv)(a) or the form as
defined in paragraph 4(3)(iv)(b).
(a) The checking facilityof the indicating
device is of type P; however, it may
be of type I If a primary indication is
.
provided by another device of the
measuring system, or if the indication
may be easi!ydetermined from other
primary indications (for example, In
the case of a fuel dispenser It Is
possible to determine the price to
pay from the volume and the unit
price).
· Means may include, for example:
(aa) for indicating devices using
incandescent filaments or LEDs,
measuring the current in the
filaments,
(bb) for indicating devices using
fluorescent tubes, measuring
the grid voltage,
(cc) for indicating devices using
electromagnetic shutters,
checking the impact of each
shutter,
(dd) for indicating devices using
multiplexed liquid crystals,
output checking of the control
voltage of segment lines and
of common electrodes, so as to
detect any disconnection or
short circuit between control
circuits.
(b) The checking facility for the
indicating device shall include type I
or type P checking of the electronic
circuits used for the indicatingdevice
(except the driving circuits of the
['11'1 u-= 3(i)J 543
display itself); this checking shall
meet the requirements in paragraph
4(3)(1)(a).
It shall also provide visual checking
of the entire display which shall meet
the following description:-
(aa) for fuel dispensers:
• displaying all the elements
("eights" test)
• blanking all the elements ("blank"
test)
• displaying "zeros"
• Each step of the sequence shall
last at least 0.75 second.
(bb) for all other measuring systems, the
test sequence as described under (a)
or any other automatic test cycle
which Indicates all possible states for
each element of the display.
This visual checking facility shall be
of type I for fuel dispensers and of
type N for other measuring systems,
but It is not mandatory for a
malfunction to result In the actions
described in paragraph 4(3)(i).
(c) It shall be possible during verification
to determine that the checking
facility of the indicating device is
working, either:
·• by disconnecting all or part of the
indicating device, or
• by an action which simulates a
failure in the display, such as using
a test button.
(v) Checking facilities for ancillary devices
An ancillary device (repeating device,
printing device, self-service device, memory
device, etc.) with primary indications shall
include a checking facility of type I or P.
The object of this checking facility is to
verify the presence of the ancillary device,
when It is a necessary device, and to verify
the correct transmission of data from the
calculator to the ancillary device.
In particular,the checking of a printing
device alms at ensuring that the printing
controls correspond to the data transmitted
by the calculator. At least the followingshall
be checked:
• presence of paper,
• the electronic control circuits (except
the driving circuits of the printing
mechanism Itself).
·
It shall be possible during pattern approval
and other verifications to check that the
checking facility of the printing device is
functioning by an action. simulating a
printing fault, such es using a test-button.
Where the action of the,checking facility Is
a warning, this shall be given on or by the
ancillary device concerned.
(vi) Checking facilities for the associated
measuring instruments
Associated measuring instruments shall
include a checking facility of type P. The
aim of this checkingfacilityis to ensure that
the signal given by these associated
Instruments is inside a pre-determined
measuring range,
Examples:
• four wire transmission for resistive
sensors,
• frequency filters for density meters,
• control of the driving current for
4-20 mA pressure sensors.
5. Requirements spedflc to certain types of
measuring systems
(1) Fuel dispensers
Except where otherwise specified, 'the
requirements In this sub-clause do not apply to LPG
dispensers.
(i) By design, the ratio between the maximum
flowrate and the minimum flowrate for
these systems shall be at least ten; on site,
this ratio may be smaller provided that it Is
not less than five.
(ii) When the measuring system includes Its
own pump, a gas elimination device shall
.
be installed, immediately upstream of th,e
·
meter inlet. Where a gas indicator is fitted,
It shall not have a venting device as
mentioned in paragraph 2(11).
(iii) When the measuring system is intended
for installation in a centrally pumped
system, or for a remote pump, the general
provisions in paragraph 2(10) shall be
applied.
If It is not intended to install a gas
elimination device the manufacturer or
544 THE 'GAZETTE DF INDIA: EXTRAORDINARY [!'ARTII-SEC 3(i)]
installer has to prove thatthere 'Is no 'risk
for air Intake or gas release. In this case
the minimum level in the storage tank.must
be automatically securedand.any leakage
shall be ·.checked \[see .also ,paragraph
2(10)(11)].
(iv) Fuel dispensers shall be .equipped with a
device for resetting the volume indicating
device to:zero.
The minimum heiqhttorthe figures of the
resettable volume.mdicetoris 10 mm.
If these systems .also include a price
indicatingdevke.fhts indicatingdevice shall
be fitted with ·a zero resetting device. The
minimum height for the price indicator
remalns-4 mm [paragraph 3(2)(11)(f)].
(v) When only one nozzle can be used during
a deliver,y,and after the nozzle has been
replaced, the next delivery shall be inhibited
until the ;Indicating device has been reset
to zero.
When two or more nozzles can be used
simultaneously or alternately, and after the
·utilized nozzles have been replaced, the
next delivery shall be inhibited until the
indicating·device has been reset to zero.
Moreover, by design, the provisions in the
first paragraph of paragraph 2(16)(1) shall
be fulfilled.'
The above requirements do not apply when
an auxiliary hand pump is used.
(vi) Measuring systems having a maximum
flowrate not greater than 3.6 m1/h shall
have a minimum delivery not exceeding
5 L.
(vii) When the measuring system is fitted with
a ticket printing device which is subject to
control, this printing device shall comply
with the relevant requirements in 3.4. In
addition, any printing operation shall
prevent the continuation of the delivery until
a reset to zero has been performed. ·
However, the printing operation shall not
change the quantity indicated on the
indicating device.
(viii) fuel dispensers shall be interruptible.
(ix) In addition to requirements in paragraph
4(2)(il), electronic fuel dispensers shall be
such that the minimum duration of
operation of the display shall be either-
(a) at least 15 min continuously and
automatically after the failure of the
principal electrical supply, or
(b) a total of at least 5 min in one or
several periods controlled manually
during one hour after the failure.
Note : If a test during pattern approval is
necessary to verify that the fuel
dispenser fulfils this requirement, the
instrument has to be supplied with
electric power normally for the 12
hours which preceded the test.
Before this supply the battery (If
provided) may be unloaded.
In addition, fuel dispensers shall be
designed so that an interrupted
delivery cannot be continued after
the power supply device has been
re-established if the power failure
has lasted more than 15 s.
·
(x) Electronic fuel dispensers shall be
such that the delay time between the
measurement value and the
corresponding indicated value shall
not exceed 500 ms.
Several fuel dispensers may have a
common indicatingdevice if and only
if the first provision in paragraph
2(9)(vi) is met.
(xi) The checking of the operation of the
calculator, as described in paragraph
4(3)(iii)(a}, shall be performed at
least once for each delivery.
(xii), It is not required to display volumes,
·
and prices if applicable, that
correspond to a small number of
scale intervals at the beginning of
the delivery, and to start the display
with that volume and the
corresponding price.
The volume thus hidden shall not
be greater than two times the
minimum specified volume
deviation. The hidden price shall
not be greater than the price
corresponding to that volume.
(2) Measuring systems on road tankers for the
transport and delivery of liquids of low
viscosity (S. 20 MPa.s) and stored at
atmospheric pressure with the exception
of potable liquids
(i) The provisions hereafter apply to
measuring systems mounted on road
tankers or transportable tanks.
["IT'l 11-= 3(i)] 545
(ii) Tanks equipped with measuring
systems may comprise one or more
compartments. I
(iii) The compartments of road tankers
shall be fitted with an anti-s?1ir\
device, except when the rneasurlnq
system is fitted with a gas separator
which complies with paragraph
2(10)(viii). I
(iv) When a tank comprises more than
'
one compartment, each compart-
ment shall be provided withlan
individual (manual or automatic)
closing device in each outlet line.
(v) In conformity with natio?al
regulations on their use, each
measuring system shall be allocated
to a specific product or to a raneeof
products for which the meter rbeen approved.
The pipework shall, as far1as
possible, be designed so that
products cannot become mixed in
the measuring system. I
(vi) Subject to the requirements in
paragraph 2(16), a measufing
I
system mounted on a road tanker
I
may Include empty or full hoses or
both. Where several hoses Iare
intended to operate alternatively; the
changing of the delivery path shall
be impossible during a measurement
operation. To this end, the chance
of the delivery path may be lir\ked
to the resetting to zero of the volume
Indicating device. I
(vii) The volume indicating device shall
Include a zero resetting device
complying with paragraph 3(2)(iv).
I
When the measuring system is fitted
with a ticket printing device, Iany
printing operation shall prevent the
continuation of the delivery urltila
I
reset to zero has been performed,
except for printing devices
determining the delivered volumeby
means of two consecu'tive
indications. I ·
(viii) Measuring systems mounted on road
tankers may be designed to operate
by pump only, or by gravity only, or
with the choice of either pump or
gravity, or by gas pressure. !
'
(a) Measuring systems fed by pump
only may operate either empty
hose or full hose.
(b) If there is a risk that the
requirements in paragraph
2(10)(ii) related to the absence
of air or gas cannot be compiled
with, the meter shall have one of
the following gas elimination
devices upstream of it:
• a suitable gas separator
conforming to paragraph
2(10)(viii),
• a special gas extractor,
conforming to paragraph
2(10)(ix),
• a gas extractor, conforming
to paragraph 23(10)(1x).
When, in a measuring system, the
pressure at the outlet of the meter
can be lower than the
atmospheric pressure while
remaining higher than the
saturated vapour pressure of the
measured product, the above
devices shall be combined with an
automatic system for slowing
down and stopping the flow to
prevent any air from entering the
meter.
When the pressure at the outlet
of the meter cannot be lower than
atmospheric pressure (this Is
especially the case for systems
operating solely full hose), the use
of automatic devices for slowing
down and stopping the flow Is not
required.
(c) The special gas extractor shall be
fitted with a sight glass.
(d) Measuring systems operating
solely by gravity shall comply with
the following requirements.
(e) The equipment shall be so
constructed that the total contents
of the compartment(s) can be
measured at a flowrate greater
than or equal to the minimum
flow rate of the measuring system.
(f) If there are connections with the
gas phase in the tank of the road
546 THE! GAZETTE OF INDIA: EXTRAORDINARY [PARTII-Sec. 3(i)]
tanker, appropriate devices shall
prevent any gas from entering the
meter.
(g) Th? requirements in paragraph
2(10)(iii) concerning non-pumped
flow shall apply.
A pump downstream of the
transfer point for increaslnq the
flowrate may be authorized if the
foregoing provisions are complied
with. This pump shail not cause a
fall in pressure in the meter.
(h) For measuring systems which
include a manual release to the
atmosphere immediately
downstream of the transfer point,
a gas indicator is mandatorv.
(i) Measuring''systemscapable of
being operated either by gravity
or by pump shall comply with the
requirements in paragraph
5(2)(viii)(a) and 5(2)(viii)(b).
(j) Measuring systems operated by
means of gas pressure may
operate empty hose or full hose.
The pipework which links the
meter to the device intended to
prevent any gas from entering the
meter as specified in point
paragraph 2(10)(iii) shall have no
constriction or component likely
to cause a pressure loss which
could generate gas pockets by
releasing the gas dissolved in the
liquid.
These systems shall include a
pressure gauge which indicates
the pressure in the tank. The dial
of this gauge shall indicate the
range of perrnisstble pressures.
(3) Measuring systems for the unt9ading of
ships' tanks and of raH and road tankers using an
intermediate tank
(i) Measuring systems designed to measure
volumes of liquids during the unloading of
ships' tanks and of rail and road tankers
may include an intermediate tank in which
the liquid level determines the transfer
point. This intermediate tank may be
designed to ensure the elimination of gas.
The cross section of the intermediate tank
shall be such that a volume equal to the
.
minimum specified volume deviation
corresponds to a difference in level of at
least 2 mm.
( ii) In the case of road and rail tankers, the
intermediate tank shall automatically
ensure a constant level, visible or
detectable, at the beginning and at the end
of the measurement operation. The level
is considered to be constant when it settles
within a range corresponding to a volume
of no more than the minimum specified
volume deviation.
(iii) In the: case of ships' tanks, it is not
necessary to provide for the automatic
maintenance of a constant level. Where
such a provision is not made, it shall be
possible to measure the contents in the
intermediate tank.
If the ship's tank is unloaded by means of
pumps located in the bottom of the ship,
the intermediate tank may be used only at
the beginning and at the end of the
measurement operation.
(4) Measuring systems for liquefied gases under
pressure (other than LPG dispensers)
(i) Only full hose measuring systems are
authorized.
(ii) A pressure maintaining device, located
downstream of the meter, shall ensure that
the product in the meter remains in a liquid
state during the measurement. The
necessary pressure may be maintained
either at a fixed value or at a value adjusted
to suit the measurement conditions.
(a) When the pressure is maintained at
a fixed value, this value shall be at
least equal to the vapour pressure
of the product at a temperature 15°C
above the highest possible operating
temperature. It shall be possible to
protect the adjustment of the
pressure maintaining device with a
seal.
(b) When the pressure is adjusted to suit
the measurement conditions, this
pressure shall exceed the vapour
pressure of the liquid during the
measurement by at least 100 kPa
( 1 bar). This adjustment shall be
automatic.
(c) For stationary measuring systems for
industrial use, the competent
metrology service may authorize
['1T'f II Bl"6 J(i)J 547
manually-adjustable pressure
maintaining devices. The pressure at
the meter outlet shall then be at least
equal to the Vapour pressure of the
product at a temperature 15°C above ' .:,
.
··' , · ·
the temperature of the measurement.
It is then necessary to attach a
diagram to the measuring system,
giving the vapour pressure of the
measured product as a function of
its temperature. If it is anticipated
that these measuring systems may
have to operate unsupervised over
long periods, the temperature and
pressure shall be registered
continuously by means of
appropriate instruments.
(iii) A gas elimination device shall be
fitted upstream of the meter.
However, if it is demonstrated that
no vapour release will occur during
measurements a gas elimination
device is not mandatory. This
demonstration shall include tests
under the worse conditions.
(a) The gas separator shall comply
with the general requirements in
paragraph 2(10)(i), either for the
liquefied gas itself or for a liquid
of higher viscosity.
However, because of the low
viscosity of liquefied gases and
due to the difficulty of control, it
is accepted that when the length
of the pipework linking the meter
to the feed tank does not exceed
25 rn, a gas separator may be
approved if its useful volume is at
least equal to 1.5% of the volume
delivered in one minute at
maximum flowrate. When the
length of this pipework exceeds
25 m, the useful volume of the
gas separator shall be at least
equal to 3% of the volume
delivered in one minute at
maximum flowrate.
The gas outlet pipe of the
separator may be connected to
the space in the feed tank which
contains the gaseous phase, or to
an independent pressure
maintaining device set to a
pressure from 50 to 100 kPa (0.5
to 1 bar) lower than the pressure
at the meter outlet. This pipe may
incorporate a shut-off valve, which
meets the requirements In
paragraph 2(10)(v).
(b) The volume of the condenser tank
· depends on the volume of the
' pipework between the supply tank
valve and the pressure maintain·
Ing valve, downstream of the
meter. The volume of this
condenser tank shall be at least
equal to twice the reduction In
volume of the liquid which Is likely
to occur between these va Ives If
the temperature drops by a value
conventionally fixed at 10°C for
exposed pipes and 2°C for
insulated or underground pipes.
To calculate the contraction, the
coefficient of thermal expansion
shall be rounded to 3 x 10·3 per
degree Celsius for propane and
propylene and 2 x 10-3 per degree
Celsius for butane and butadlene.
For other products with a high
vapour pressure, the values of the
coefficient to be adopted shall be
specified by the competent
metrology service.
The condenser tank shall be fitted
with a manual blow off valve. It
shall be fitted at the high point In
the pipework of the measuring
system of which it is part.
The volume resulting from the
above calculation may be divided
between several condenser tanks
located at high points in the
pipework.
(iv) A thermometer well or, when this
thermometer well Is not imposed by
specific professional practices,
another means for measuring
temperature, shall be provided close
to the meter. The thermometer used
shall have a scale interval not
exceeding o.s•c and shall be
verified.
Provisions shall be made for fitting a
pressure measuring device between
the meter and the pressure
maintaining device. This measuring
548 THE GAZETTE OF INDlA: EXTRAORDINARY [PART[I-SEC. 3(i)]
device shall be available for
verification. If necessary, provisions
for sealing shall be made.
{v) When the volume is measured using
a system mounted on a road tanker,
any connection between the gaseous
phases of the vehicle's tank and of
the receiving tank is prohibited
unless it is essential for completing
a measurement, in which case a non
return valve is mandatory.
For other measuring systems for
liquefied gas, such connections are
permitted when the volumes of gas
transferred via these connections are
measured by means of suitable
measuring instruments.
(vi) Safety valves may be incorporated
in measuring systems in order to
prevent abnormally high pressures.
If they are located downstream of
the meter, they shall open to the
atmosphere or be connected to the
receiving tank.
In no case shall the safety valves
located upstream of the meter be
connected to the valves located
downstream by pipes which bypass
the meter.
(vii) When the conditions of operation
require the use of detachable hoses,
these hoses shall remain full if their
volumes are greater than the
minimum specified volume deviation.
Detachable full hoses shall be fitted
with special connections for full
hoses, so-called couplers or self
sealing valves. Manually operated
blow-off devices shall be provided at
the ends of these hoses, if necessary.
(viii) The control valve of the double
closing device mentioned in
paragraph 2(1'6)(iii) for pipework
bypassing the meter, if provided, may
be closed for safety reasons. In this
case, any leakage shall be monitored
by a pressure gauge located between
the two shut off valves or by any
other equivalent system.
(ix) For measuring systems mounted on
road tankers the volume indicating
device and its printing device, if
provided, shall comply with the
requirements in paragraph 5(2)(vii).
(x) The provisions in paragraph 5(4) also
apply for measuring systems for
liquefied carbon dioxide with the
following exceptions:
• only empty hose measuring
system [are authorized (see
paragraph 5(4)(i)],
• the connection between the
gaseous phases of the vehicle's
tank and of the receiving tank is
authorized If (i) a device is
installed to allow compensation of
the delivered quantity by an
amount relating to the quantity of
vapour returned in the gas line,
or (ii) compensation is made by
automatic or manual calculation.
However, in both cases, flow from
the delivery tank to the receiving
tank by means of the gas return
line shall be securely prevented
[see paragraph 5(4)(v)],
• the requirements of paragraph
5( 4 )(vii) are not mandatory for
these systems.
(5) Measuring systems for milk
(i) The following requirements apply to
transportable measuring systems which are
mounted on road tankers and used for the
collection of milk, to fixed measuring
systems used for the reception of milk at
the dairy, and to fixed or transportable
measuring systems used for the delivery
of milk.
(ii) The transfer point in reception installations
is defined by a constant level in a tank
upstream of the meter. It must be possible
to check this constant level before and after
each measurement. The level shall be
established automatically.
(a) When the meter is fed by means of
a pump, the constant level tank may
be placed either upstream of the
pump or between the pump and the
meter.
(b) If the constant level tank is placed
upstream of the pump, the tank itself
may be fed by gravity, by emptying
milk churns, by means of an auxiliary
pump or by means of a vacuum
system.
If the milk is introduced by means of
a pump or a vacuum system, a gas
['ll'T 11-= 3(i)] 549
ellmlnatlon device is necessary. This
device may be combined with the
constant level tank.
(c) If the constant level tank is placed
between the pump and the meter,
this tank shall ensure that gas is
ellmlnated.
(d) Notwithstanding the requirements of
paragraph 2(13)(iii), the meter may
be fed by means of a vacuum
system. In this case, the pressure
Inside the pipework connecting the
constant level tank to the meter will
be lower than atmospheric pressure
and the tightness of the Joints of this
connection must be particularly well
ensured. It must be possible to check
the tightness and a notice plate
drawing attention to this checking
shall be provided.
(e) In all Installations for reception, the
pipework upstream of the constant
level device shall empty completely
and automatically under the rated
operating conditions.
(f) The constant level is monitored by
means of a sight glass or a level
Indicating device. The level is
considered to be constant when it
settles within a range defined by two
marks at least 15 mm apart and
corresponding to a difference in
volume of no more than twice the
minimum specified volume deviation.
(g) If, In order to meet the above
condition, devices for reducing the
flowrate are incorporated in the
measuring system, the flowrate
during the period of reduced flowrate
shall be at least equal to the
minimum flowrate of the meter.
(h) If, In a reception installation at a
dairy, the measured llquid flows to a
level lower than that of the meter, a
device shall automatically ensure
that the pressure at the outlet of the
meter remains above atmospheric
pressure.
(i) If a volume of liquid is required to
fill the measuring system prior to the
first measurement, It shall be
indicated on the data plate of the
measuring system so that it can be
taken into account, by calculation, in
the first measurement of a reception
period. The first volume measured by
the measuring system during a
reception period shall be equal to or
greater than the volume which Is
necessary for the complete filling of
the measuring system.
(iii) Measuring systems used for delivery shall
comply with the general requirements in
clause 2 and with those In clause 3.
(iv) Notwithstanding the general requirements
In paragraph 2(10) concerning the
elimination of air or gases, the gas
elimination devices shall comply with the
requirements in paragraph 2( 10)(1) solely
under the conditions of use, i.e. with entry
of air at the beginning and end of each
measuring operation of delivery.
The mounting of delivery installations shall
be such that the pressure of the liquid at
the level of the joint to the supply tank Is
always greater than atmospheric pressure.
(v) The volume indicating device of a
transportable measuring system and Its
printing device, if provided, shall comply
with the requirements in paragraph
5(2)(vii).
(6) Measuring systems on pipeline and systems
for loading ships
(i) The ratio between the maximum flowrate
and the minimum flowrate of the meter of
the measuring system may be less than
the value specified In the relevant
paragraph in paragraph 3(1)(i)(c).
In this case, the measuring system shall
be fitted with an automatic checking device
to verify that the flowrate of the liquid to
be measured is within the restricted
measuring range of the measuring system.
This checking device shall be of type P and
shall meet the requirements in paragraph
4(3)(i}(b).
The maximum and minimum flowrates may
be determined in relation to the liquid to
be measured and manually introduced into
the calculator.
(ii) Prevention of gas flow
The measuring system shall be provided
with a means of eliminating any air or gas
contained in the liquid unless the entry of
air Into the liquid or release of gas from
550 THE GAZETTE OF INDIA: EXTRAORDINARY [PARTII-SEC. 3(i)]
the liquid is prevented by the configuration
of the pipework or by the arrangement and
operation of the pump(s).
(iii) Special conditions of installation
Reserve flow of the liquid to·be measured
in the measuring.system shall be prevented
by a suitable device, unless otherwise
approved.·
(iv) Sampling.device
The measuring system may include a
sampllng·device:intended to determine the
propertles.ot-the liquid to·be measured.
It is not necessary to take into account the
volume of the sample in the results of the
measurement If this sample is less than 0.1
times themaximum permissible error of the
measurlryg system.
(v) Testing devices
Measuring systems in pipelines should be
provided with devices allowing verification
of the systems in situ. However, this
principle may be waived provided that:
• the meters are verified on a control
test station with liquids having the
same characteristics as those to be
measured at the place of installation.
The verification is carried out on the
measurement transducer only,
associated with a compatible and
equivalent indicating device,
provided that all the elements having
a direct mechanical link with the
measurement transducer and being
able to influence the. measurement
are verified at the same time,
• the meters benefiting from this
exemption shall be subject to
periodic calibration controlled and
fixed by the metrology service, and
• to complete the verification, the
measuring systems concerned shall
be subjected to a qualitative check
of function and installation, In situ.
Subject to this exemption, the measuring
systems shall be constructed so that a
standard of appropriate size can be fitted
for testing the meters. When a test can
only be earned out with the pumps running,
which normally does not allow for testing
with the meter stopped at the start and at
;,. the end of the test, the standard shall be
suitable for continuous operation (for
example, volume standard with a flow
diverting mechanism, pipe prover etc.),
Moreover, these capacities shall represent
at least 10,000 scale intervals of the
indicating device of the meter to be verified
or of the auxiliary Indicating device used
for the test or 10,000 electrical pulses of
the measurement transducer. However, a
lower capacity may be permitted if a visual
or automatic interpolation allows one to
ascertain the indication of the meter with
an error. smaller than or equal to one per
ten thousand of this capacity.
Furthermore, it shall be possible to carry
out a metrological test of the associated
measuring instruments which may be
Incorporated and which aim at measuring
density, viscosity, pressure and
temperature, under actual operating
conditions.
(1) Fuel dispensers for liquefied gases under
pressure (LPG dispensers)
(i) Requirements in paragraph S(l){i),
S(l)(iv)) and 5{l)(vii) to S{l)(xii) are
applicable to LPG dispensers for motor
vehicles. However, the ratio between the
maximum flowrate and the minimum
flowrate shall be at least five by design.
(ii) Requirements in paragraph S(4)(i), 5(4)(11),
5(4)(ii)(a}, 5(4)(ii)(b), 5(4)(iii), 5{4){ili)(a)
and ?(4)(iii)(b) are applicable to LPG
dlspehsers for motor vehicles.
(iii) The manufacturer or the owner of the
measuring system shall provide a
thermometer well or an equivalent means
for measuring the temperature close to the
meter. The thermometer used shall have a
scale interval not exceeding 0.5°C and shall
be verified.
(iv) Connection between the gas phases of the
feed tank and of the vehicle's tank Is
prohibited.
(v) When only one nozzle can be used during
a delivery, and after the nozzle has been
replaced, the next delivery shall be inhibited
until the indicating device has been reset
to zero.
When two or more nozzles can be used
simultaneously or alternately, and after the
utilized nozzles have been replaced, the
next delivery shall be inhibited until the
Indicating device has been reset to zero.
["ll'T II-? 3(i)] 551
Moreover, by design, the provisions in the
first paragraph of 2(16)(i) shall be fulfilled.
Moreover, in both cases, when the flow is
stopped by emergency means and a
predetermined delay is exceeded, the
current delivery shall be stopped and the
next delivery shall be preceded by a reset
to zero.
(vi) A non-return valve, located between the
gas ellmlnatlon device and the meter, is
mandatory. The pressure loss caused by it
shall be sufficiently low to be considered
neg IlgIble.
(vii) Hoses shall be fitted with special
connections for full hoses, so-called
couplers or self-sealing valves.
(viii) Safety features shall not affect the
metrologlcal performance.
(ix) When the measuring system is provided
with a conversion device, it shall be possible
to verify separately the indications of
volume at measuring conditions and
associated measuring instruments.
(x) Closing valves in vapour return lines shall
automatically result in stopping the delivery
or preventing the start of the next delivery,
unless these valves have been sealed in
the open position.
(xi) The construction of the nozzle shall be such
that, at the moment of coupling or
uncoupling, the loss of liquid does not
exceed the minimum specified volume
deviation.
(8) Measuring systems intended for the
refuelling of aircraft
.
The requirements of this sub-clause also apply
to the refuellingof helicopters.
(i) General
{a) Measurlng.§ystems Intended for
refuelflng aircraft. are full hose
measuring systems:
(b) The gas elimination device function
may be performed by a rnicrofilter
water elimination device provided
that provisions in paragraph 2(10)
are fulfilled.
·
(c) They shall be interruptible measuring
·
systems.
(ii) Stationary measuring systems
(a) The requirements applicable to fuel
dispensers apply to stationary
measuring systems intended for the
refuelling of aircraft, except those in
paragraph 5(1)(1).
(b) These systems may include their own
pumps or be designed for installation
in a centrally pumped system.
(c) The micro.filter-water elimination
device shall be fitted upstream of the
gas elimination device when these
devices are separate one from
another.
(iii} Mobile measuring systems
(a) General
(b} If more than one transfer point is
provided, interlocks should prevent
the usage of two or more together
unless the arrangement is such that
it would be difficult to use them on
different aircrafts at the same time.
(c) They may be designed for defuelllng
aircraft provided that the connecting
point for defuelling is located
upstream of the gas elimination
device. A weir-type sight glass is not
mandatory.
Interlocks may also be necessary to
prevent bypassing metered liquid
through the return line back to the
supply tank while delivering fuel to
the aircraft.
(d) Where the microfilter-water
elimination device may be used to
perform the function of the gas
elimination device, it may be verified
by an examination of documents only
if provisions In paragraph 2(10) are
fulfilled.
(e) Each installation shall be provided
with or accompanied by-
• instructions for use,
• a liquid circulation plan,
• a description of necessary
operations for use,
• a description of control and
connecting devices positions
related to their use.
(f) Aircraft refuelling tanker measuring
systems
/
552 'THE GAZETTE OF INDIA: EXTRAORDINARY [PART II-SEC. 3(i)J
rhe -requtrements.tn-peraqraphs
5(2)(il), 5(2)(iii), 5(2)(1v),.5(2)(vi),
5(2)(vii) and 5(2)(viii)(a) apply.
Note: For qcodprectice-mthe use
of the. system, when the .aircraft
refuelling tanker· measuring system
Is flttedwith a device used to.perform
the,gas·extractor or special gas
extractor 'function, a :manometer
should be.provided upstream of the
pump· ln.order.to detect.depressions
when .thev .occur, Us ,Indications
should .be easily 11Jslble by the
operator,
(g) Alrcraft,hydrant measuring systems
(h) "fhe.gas elimination device may be
,a,.devlce performing the function of
,a ;as extractor when the under
.gr.ound pipe-
• :ts designed for easy elimination
,cf the air contained In the pipe
with appropriate devices,
• ls fitted with special connecting
devices for full hoses,
• ls supplied so that, in designed
supply conditions, no gaseous
formation can occur or enter the
underground pipe.
( i) When the aircraft hydrant measuring
system is equipped with a device for
froth recovery and re-Injection, it
shall be located upstream of the gas
elimination device and It shall not
permit permanent introduction of gas
Into the meter.
(j) Depressurization valves for the hoses
so that connection and disconnection
can be easily made, shall be
accompanied with interlocks to
prevent metered liquid from being
diverted.
(9) Blend dispensers
(i) The requirements in paragraph 5(1)(1) to
S(l)(lv) and S(l)(vi) to S(l)(xll) are
applicable to both parts of the multigrade
dispenserand to the gasoline part of the
gasoline-oil-dispenser. However, by design,
the ratio between the maximum flowrate
and the minimum fiowrate may be at least
five in the case of multigrade-dispensers.
(ii) When only one nozzle can be used during
a delivery, and after the nozzle has been
replaced, the next delivery shall be inhibited
until the indicating device has been reset
to zero.
When two or more nozzles can be used
simultaneously or alternately, and when the
utilized nozzles have been replaced, the
next delivery shall be Inhibited until the
Indicating device has been reset to zero.
Moreover, by design, the provisions in the
first paragraph of paragraph 2(16)(i) shall
be fulfilled.
(iii) The requirements In paragraph 5(9)(1v)
through paragraph 5(9)(vfli)do not apply
if the designations of the various mixtures
do not allow conclusions to be drawn
concerning the ratio of volumes of the two
components.
Examples for such designations:
• number of stars (2, 3, 4 starts),
• octane-number (92, 95, 98 octane),
• two-stroke-mixture (without designation
such as 5%).
Moreover, the requirement In paragraph 5(9)(Jv)
or 5(9)(v) only applies where the measuring
system provides the Indication of the mixed
volume and the price of the mixture depends on
the blending ratio. It does not apply where the
measuring system provides-
• an Indication of the mixed volume and the
price does not depend on the blending ratio,
or
• a volume indication for each component of
the mixture and does not provide an
indication of the mixed volume.
To permit compliance with the requirement In
paragraph 5(9)(iv) or paragraph 5(9)(v) to be
verified, It is necessary-
• for multigrade-dispensers to measure the
volumes of both components,
• for gasoline-oil-dispensers to measure
either the volumes of oil and gasoline or
the volumes of oil and mixture,
• for both types to make the separate
collection of both components feasible
durl?g verification.
(Iv) The accuracy of the blending ratio for
multlgrade-dispensers shall be as follows:-
['11'111-= 3(i)] 553
The designations of the various mixtures
being Indicated as the ratio of volumes of
the two components (for example 1:1), the
real ratio of the volumes of two components
shall be w_lthinthe limits of ±5%, I.e. the
real ratio k..,, = V ,IV1
of volumes of both
components determined during the
verification shall be equal to the nominal
(indicated) ratio k.om,within the limits:
km,,= k_ -0. 05 k,,.mand ?" = k,,m+ o. 05
koom
Examples:
Designation 3:1 J:J 1:3
Knom 0.333 1.00 3.00
Km1, 0.316 0.95 2.85
K
.. ,
0.350 1.05 3.15
(v) The accuracy of the blending ratio for
gasollne-oll·dispensers shall be as
follows:-
If VI Is the volume of the minority
component in the mixture and v, the
volume of the majority component, the real
volumetric ratio related to the minority
component, expressed as a percentage
[T = 100 x V/(V,+V,)l,shall be equal to the
nominal ratio within a limit of plus or minus:
• 5% in relative value,
• O. 2% absolute, whichever is greater.
In other words, T being the real volumetric
ratio as a percentage, and T00mthe nominal
volumetric ratio as a percentage, the
following must be satisfied:-
1T - TnomI IT
oom
? 0.05.
if the nominal volumetric ratio is at least
4%, and
I T-Tnom I .s 0.02%.
if the nominal volumetric ratio Is less than
4 per cent.
(vi) If the blend dispenser is capable of
delivering more than one mixture with the
same nozzle, the installation of two hoses
and a special blending device close to the
transfer point Is required.
If the blend dispenser can deliver only one
.
mixture per nozzle, the blendingdevice may
be installed inside the dispenser, using a
single hose per nozzle.
(vii) If the blend dispenser Is capable of delivering
one or both singlecomponents (in addition
to the mixtures) with a common nozzle, a
device shall prevent the liquid flow through
the unused part of the blend device.
(viii) The lubricating oil part of a gasoline-oil·
dispenser shall be designed so as to prevent
air bubbles in the oil passing through the
oil measuring device. There shall also be a
device to detect the presence of oil. In the
absence of oil, delivery has to be stopped
by means, e.g. of:
• an intermediate oil reservoir and a device
which stops the delivery when the oll
reservoir is empty,
, a pressure detecting device which stops
the delivery in the case of an oil pressure
drop.
(10) Self-service arrangement with fuel
dispensers
The following requirements apply to measuring
systems covered by paragraph 5(1), 5(7) or 5(9)
when fitted with self-service arrangements.
(i) General requirements
(a) Marking, sealing and connection of
the components are left to
appropriate authority approving the
pattern ..
(b) Where ttie self-service device serves
two or more dispensers, each
dispenser shall be provided with a
dispenser identification number that
shall accompany any primary
indication provided by the self
service device.
(c) The primary indications on indicating
devices and printing devices of the
self-service arrangement shall not
indicate any mutual differences.
The scale intervals of the primary
indication on Indicating devices and
the printing devices and memory
devices of the self-service
arrangement shall be the same.
(d) Printing devices on the self-service
arrangement shall not reproduce the
indications of a dispenser as the
difference between two printed
values.
(e) Indication of information that is not
subject to metrological control is
allowed, provided that it cannot be
I
---?--#----?---
554 THE GAZETTE OF INDIA: EXTRAORDINARY [PARTII-Sec. 3(i)]
confused with metrological
information.
(f) The control device of:the self-service
device should be capable of
Indicating the status of the
dispensers (e.g. running, authorized
or unauthorized)that are connected
to the self-service device and in the
case ·of multi pie modes of service
and/or .type of payment also that
particular status -of the measuring
system,
(g) 'A change of the type of payment
·and/or rnode of operation shall not
be effective before the end of the
·current measurement operation.
(h) The self-service arrangement,
.includingprovisions related to clearly
defined methods of operation, shall
be such that at least one primary
Indication for the benefit of the
customer must be available at least
up to the settlement of the
transaction to enable the delivered
quantity and the price to pay to be
checked.
·
(i) In the case of a self-service
arrangement that totallzes the
delivered volumes for different
registered customers over the course
of time, the minimum measured
quantity is not affected by the scale
Interval used for such totallzations.
(ii) Attended service mode
If the dispenser indicating device provides
the only primary indication, provisions shall
be made to Inform the customer that the
next authorization of a particular dispenser
can only be given by the supplier after
settlement of the current transaction.
(a) Attended post-payment
(b) Where the self-service arrangement
includes a device that provides an
additional primary Indication
(additional to those of the indicating
device of the dispenser), it shall
consist of at least one installation for
the reproduction of the volume and/
or the price indicated by the
dispenser indicating device,
consisting of-
• a printing device for the issue of
a receipt of the customer, or
• an Indicating device for the benefit
of the supplier together with a
display for the benefit of the
customer.
Note: As a consequence of
paragraph 3(4)(vli), the reproduction
of the volume and price is necessary
when the dispenser can be
authorized before the settlement of
the transaction.
(c) For self-service devices with
temporary storage (temporary
storage mode) of measurement data
of dispensers the following
requirements apply:-
(a) temporary storage of
measurement data shall be
restricted to one delivery for each
dispenser,
(b) the primary indication shall be
accompanied by a clear mark
representing the sequence. For
example, the number 1 or 2 or
the letter A or B,
(c) when a primary indication of the
self-service device is out of
service, the self-service
arrangement may continue its
operation provided that it no
longer uses any temporary
storage, and that the dispenser
indicating device remains the
primary indication,
(d) where the mandatory primary
indication for the benefit of the
customer Is provided by a device
in the form of a separate
constructional unit and this unit
becomes uncoupled, or if the
checking facilities detect a
malfunction, the temporary
storage mode shall be prohibited
and the dispenser indicating
device remains the primary
indication,
(e) pre-payment in attended service
mode,
(f) the requirements of paragraph
3(6) are applicable,
(g) a printed or hand-written receipt
of the pre-paid amount shall be
provided.
['lT'l I[ ? 3(i)J 555
(iii) Unattended service mode
(a) General
(b} The self-service arrangement shall
provide additional primary indica
tions by means of-
• a printing device for the issue of
a receipt of the customer, and
• a device (printing or memory
device) on which measurement
data are registered for the benefit
of the supplier.
(c) When the printing devices or
memory device, as required by
paragraph 5(10)(iii)(b), are not able
to provide any indication or become
unserviceable, the customer shall be
clearly warned by automatic means
before the operation commences.
Passing from attended to unattended
service mode shall not be possible
before correct operation of the
.
arrangement is concluded as feasible
by the checking facilities, Including
compliance with the above provision.
(d) Where the self-service arrangement
Is used by registered customers, the
provisions of paragraph 5(10)(iii)(b)
and S(lO)(iii)(c) do not apply to
measurements related to such
customers. An additional individual
volume totalizer is considered to
provide a primary indication.
(e) Micro-processors, which upon
disturbance or interference Influence
the measurement operation, shall be
equipped with means for controlling
the continuity of the processor
programme and for ensuring the
discontinuation of the current
delivery when the continuity of the
processor program is no longer
ensured.
The next effective. acceptance of
notes, cards or other equivalent
mode of payment shall only take
place if the continuity of the
processor programme is re
established.
(f) When a power supply failure occurs,
the delivery data shall be memorized.
The requirements of 5(1)(1x) apply.
(g) Delayed-payment
The printed and/or memorized
indications as mentioned in 5.10.3.1
shall contain sufficient information
for further checking and at least, the
measured quantity, the price to pay
and information to identify the
particular transaction (e.g. the
dispenser number, location, date,
time).
(h) Pre-payment In unattended service
mode.
(i) Following the termination of each
delivery, the printed and/or
memorized indications as intended
in paragraph S(lO)(iii)(a) shall be
made available, clearly indicating the
amount which has been pre-paid and
the price corresponding to the liquid
obtalned,
These printed and/or memorized
indications may be divided into two
parts as follows:-
(a) one part provided prior to the
delivery on which the pre-paid
amount Is shown and
recognizable as such,
(b) one part provided following the
termination of delivery,provided
that it Is clear from the
information provided on both
parts that they are related to
the same delivery.
(j) The requirements of 3(6) are
applicable.
(11) Other self-service arrangements
Measuring systems, especially those for loading
road or rail tankers, may be designed in such a way
that the transaction is not settled when the customer
leaves the loading site, in Implicit agreement with
the supplier.
. In this case, national or international regulations
may prescribe .that the self-service arrangement
provide additional primary Indications by means of-
• a printing device for the issue of a receipt
to the customer, and
• a device (printing or memory device) on
which measurement data 'are registered for
the benefit of the supplier.
The printed and/or memorized indications
shall contain sufficient information for
further checking and at least the. measured
quantity and information to identify the
particular transaction (e.g. the system
number, location, date, time).
556 THE GAZETTE OF INDIA: EXTRAORDINARY [PARTll-SEC. 3(i)]
Moreover, after a delivery, measuring
systems shall not be capable of being reset
to zero and authorized until measurement
data are memorized or printed out.
6, MetrologlC81 control ·
When a test is conducted, the expanded
uncertainty of the determination of errors on
Indications of volume or mass shall be less than one
fihh of the maximum permissible error applicable
for that test on pattern approval and one-third of
the maximum permissible error applicable for that
test on other verifications.
(1) Pattern approval
(i) General
Measuring systems subject to legal
metrology control shall be subject to
pattern approval. In addition, the
constituent elements of a measuring
.
system, mainly those listed below,
and the sub-systems which include
several. of these elements, may be
subjectto separate pattern approval:
-,
• meter,
• transducer,
• gas separator,
•
.
gas.extractor,
f."
• specialgas extractor, ·
J-.'_
• 'electronic calculator (Including the
Indicating device),
• conversion device,
• ancillary devices providing or
memorizing measurements
results,
• pre-setting device,
• densitometer,
• temperature sensor.
The constituent elements of a
measuring system shall comply
with the relevant requirements
even when they have not been
subject to separate pattern
approval (except, of course, In the
case of ancillary devices that are
exempted from the controls).
Unless otherwise specified in this
Recommendation, a measuring
system should fulfil the
requirements without adjustment
of the system or of its devices
during the course of the tests. If
an adjustment is carried out, this
condition shall still be considered
as valid.
(ii) Documentation
(a)The application for pattern
approval of a measuring system
or of a constituent element of a
measuring system shall include
the followlngdocuments :-
• a description giving the
technical characteristics and
the principle of operation,
• a drawing or photograph,
• a list of the components with
a description of their
constituent materials when
this has a metrological
influence,
• an assembly drawing with
identification of different
components,
• for measuringsystems, the
references of the· approval
certificate of the constituent
elements, If any,
• for measuring systems and
meters fitted with correction
devices, a description of how
the correction parametersare
· determined,
• a drawing showing the
location of seals and
verification marks,
• a drawing of regulatory
markings.
(b) In addition, the application for
pattern approval of an electronic
measuring system shall include-
• a functional description of the
various electronic devices,
• a flow diagram of the logic,
showing the functions of the
electronic devices,
• any document or evidence which
shows that the design and
. construction of the electronic
measuring system comply with
the requirements of this
specification in particular
paragraph 4(3).
(c) The applicant shall provide the body
responsible for the evaluation with
an 'instrument representative of the
final pattern.
[ 'WT 11-1'.'i"s 3 ( i)] 557
Other specimens of the pattern
may be considered necessary by the
body responsible for the pattern
evaluation to
.
estimate the
reproducibilityof the measurements.
(iii) Pattern approval certificate
·
The following Information shall appear on
the pattern approval certificate :-
name and address of the recipient
of the approval certificate,
name and address of the
manufacturer, if it is not the recipient,
type and/or commercial designation,
principal metrological and technical
characteristics,
pattern approval mark,
period of validity,
environmental classification, if
applicable,
information on the location of marks
for pattern approval, initial
verification and sealing (e.g. picture
or drawing),
list of documents accompanying the
pattern approval certificate,
specific remarks.
When applicable, the version of the
metrological part of the evaluated
software shall be indicated in the
pattern approval certificate or in its
annexes.
(iv) Modification of an approved pattern
(a) The recipient of the pattern approval
·
shall inform the body responsible for
the approval of any modification or
addition which concerns an approved
pattern.
(b) Modifications and additions shall be
subject to a supplementary pattern
approval when they influence, or are
likelyto Influence, the measurement
results or the instrument's regulatory
conditions of use.
The body having approved the Initial
pattern shalt decide to which extent
the examinations and tests described
below shall be carried out on the
modified pattern in relation with the
nature of the modification.
f.i7tr 4()11-tt,o
(c) When the body having approved the
initial pattern Judges that the
modifications or additions are not
likely to influence the measurement
results, this body allows the modified
instruments to be presented for initial
verification without granting a
supplementary pattern approval.
A new or supplementary pattern
approval must be Issued whenever
the modified pattern no longer fulfils
the provisions of the initial pattern
approval.
(v) Pattern approval or a meter or of a
measurement transducer
(a) A pattern approval may be given for
a complete meter; It may also be
given for the measurement
transducer only when this is intended
to be connected to different types of
calculators.
The followingexaminations and tests
shall be carried out on the meter
alone or on the measurement·
transducer when It is the subject of
a separate application for pattern
approval.They may also be carried
out on the whole measuring system.
Tests are·normally carried out on the
complete meter, fitted with an
indicating device, with all the
ancillary devices and with the
correction device, if any. However,
the meter subject to testing need not
be fitted with its ancillary devices
when the latter are not likely to
influence the accuracy of the meter
and when they have been verified
separately (for example : electronic
printing device). The measurement
transducer may also be tested alone
provided that the computing and
indicating device has been subject
to a separate pattern approval. If this
measurement transducer is intended
to be connected to a calculator fitted
with a correction device, the
correction algorithm as described by.
the manufacturer must be applied to
the output signal of the transducer
to determine its errors.
(b) Accuracy tests
(c) The errors of the meter shall be
determined at a minimum of six
558 THE GAZETTE OF INDIA: EXTRAORDINARY [PARTII-SEC. 3(i)]
.
fJowrates which are distributed over
.
the measuring range at regular
intervals. At each flowrate.the errors
shall be determined. at .least three
.nmes. independently. ,Each error
shall -not be •greater than the
·maximum permissible error (in
.ebsolute value). 'In addition, for
,quantities equal .to.or greater than
.
five .tlrnes the :minimum measured
:?uantlty, the ,repeatability
requirement in.paraqraph .3(1 )(li)(b)
applfes.
(d) .,Tests should .be carried out at the
.limits of the field of operation, t.e, at
the limits of pressure, temperature
and viscosity. However, pressure
tests are not .necessary when the
tedmology of the meter Is such that
it is possible to calculate the Influence
of pressure and to show that it is
negl(glble(for example: meter with
pressure-balanced measuring
chambers).
Note : It is orten unnecessary to
carryout tests with liquids having a
temperature which differs from the
ambient temperature when the
meter Is Intended to measure liquids
having a temperature between
- 10°c and +50°C.
(e) The following tests shall also be
carried out:-
accuracy test at minimum
measured quantity,
determination of the
periodic variation, if appropriate,
tests with flow disturbances,
if appropriate.
For tests with flow disturbances,
the applicable maximum
permissible errors are those fixed
In paragraph 2(5) for the
measuring system and not those
fixed in paragraph 3(1)(ii) for the
meter.
(f) When preliminary verification of the
meter Is planned to be carried out
with a liquid which differs from the
liquid the meter is Intended to
measure, comparative tests with
these two liquids shall also be carried
out to determine the maximum
permissible errors on preliminary
...
verification. It may be necessary to
have several specimen of the pattern
available.
Example: It Is necessary to make a
distinction between a pattern of a
meter intended to measure several
products (in the same measuring
system) and a pattern of a meter of
which different copies may be used
for measuring different products (in
different measuring systems), each
copy being Intended to measure a
given product only.
For exam pie, meter A may be
intended to measure butane and
propane alternatively, whereas meter
B is intended to measure either
butane or propane. Both meters will
be subject to accuracy tests with
butane and with propane at the time
of patternapproval. For meter A, the
error curves for propane and for
butane shall both be within the
maximum permissible errors as
specified in paragraph 3(1)(ii).
For meter B, the error curves for
butane on the one hand, and for
propane on the other hand, shall
satisfy the maximum permissible
errors; unlike meter A, however,
these error curves may be
determined using different copies of
the meter, or alternatively on the
same copy whose adjustment (or
correction parameters) has been
modified between the test with
butane and the test with propane.
Copies of meter A will bear the
mention of butane and propane on
their data plate and they may also
be used to measure mixtures of
butane and ·
propane in any
proportion.
Copies of meter B will bear either
the mention "butane" or the mention
"propane" and shall be used for
measuring the corresponding
product exclusively.
The preliminary verification of
pattern A copies may be carried out
with either butane or propane,
indifferently (with, if appropriate, a
reduction of the maximum
permissible errors range).
['1T'Tll?= 3(i)] 559
In general, the preliminary
verification of pattern B copies will
be carried out with the liquid
Intended to be measured; however,
It may be carried out with the other
liquid provided that the maximum
permissible errors have been shifted.
The value of shifting shall be
determined at the time of pattern
evaluation by evaluating the
deviation between the error curves
determined with butane and with
propane, on the same meter, without
modification of the adjustment. The
deviations shall be reproducible from
one copy of the meter to another. To
check this, it is necessary to carry
out accuracy tests on several
Instruments.
(g) Endurance tests
Endurance tests should be carried out at
the maximum flowrate of the meter using
the liquid the meter is intended to measure
or a liquidwith similar characteristics. When
the meter Is Intended to measure different
liquids, the test should be carried out with
the Jiquld that provides the most severe
conditions.
An accuracy test shall precede the
endurance tests.
In principle the duration of the endurance
test shall be 100 hours in one or several
periods. In specific cases (e.g. new
technologies, new alloys, new liquids) the
duration may be increased up to 200 hours.
The test shall be carried out at a flow rate
between 0.8 x Q and Q .
rrex max
As far as possible, the meter is subjected
to the endurance test on a test bench.
However, It Is accepted that the meter be
temporarily mounted in a measuring system
in normal operation, in which case it is
necessary that the nominal operating
flowrate of the measuring system Is more
than 0.8 x Q.,,.
After the endurance test, the meter Is again
subject to a new accuracy test. The
deviations between the errors determined
before and after the endurance test shall
remain within the limits specified in
paragraph 3(1)(ii)(c) without any changes
of the adjustment or corrections.
(vi) Pattern approval of a gas ellmlnatlon device
As a rule, tests shall be carried out to prove
that the air or gas. eliminating devices
satisfy the requirements In paragraph
2 (lO)(viii) or 2(10)(1x).
It is however acceptable that tests are not
carried out at flowrates greater than 100
m'/h and that the air separating devices
are approved by analogy with devices of
the same design, having smaller
dimensions.
Annexure B describes tests which should
be carried out on these devices. The tests
are given as examples only.
(vii) Pattern approval of an electronic calculator
When an electronic calculator is submitted
to separate pattern approval, pattern
approval tests are conducted on the
calculator alone, simulating differentinputs
with appropriate standards.
(a) Accuracy tests include an accuracy
test on the indications of
measurement results (volume at
metering conditions or price to pay).
For this purpose, the error obtained
on the indication of the result Is
calculated considering the true value.
is the one calculated taking Into
account the value of the simulated
quantities applied to inputs of the
calculator and· using standard
methods for calculation. The
maximum permissible errors are
those fixed in paragraph 2(8),
{b) When the calculator carries out
calculations for a conversion device,
tests specified in paragraph
6(1)(vii)(a) are performed for the
calculation of volume at base
conditions or mass.
Accuracy tests also include an
accuracy test on the measurement
of each characteristic quantity of the
liquid. For this purpose, the error
obtained on the indication of each
of these characteristic quantities
these indications are mandatory
considering paragraph 3(7)(vii) Is
calculated by considering the true
value as that provided by the
standard connected to the inputs of
the calculator and which simulates
the corresponding associated.
measuring instrument. For each of
560 THE. GAZETTE OF INDIA :'EXTRAORDINARY [PARTII-SEC. 3(i)]
:' these quantities, the maximum
. . ,permissible.errors fixed in paragraph
,,2{7)(111)shall be applied.
·
· It IS'then·necessary to perform a test
; to check the presence and.operation
•.oU:hecki?g .facilltles ,relevant to
.
,associated .measunnq : instruments
mentloned in, paragri!ph4(3)(vl).
· (c),.Examinations and'tests.descrtbed in
.?{l)(x,I) for .electronlc 'instruments
,shall·be performed.
(viii) Pattern,approvakofa,conversion device
(a) 'General·case
• It ls,necessary.to verify whether the
,:conversion device connected to all
Its-associated measur.lng Instruments
.complies with provisions In 2(7)(i).
For that purpose, the volume at
metering conditions which Is
.converted is supposed to be without
any?rror.
:It ,may also be verified that the
,provisions in paragraph 2(7)(vi) [and
paragraph 2(7)(v) if applicable] are
futfllled.
In the· case of an electronic
.
conversion device, the tests and
examination described In paragraph
6(l)(ix) shall be performed.
(b) Electronic conversion device
Instead of the procedure in
paragraph 6(1)(viii)(a), it is also
possible-
to verify separately the accuracy
of associated measuring
instruments [see paragraph
2(7)(ii)],
to verify that the provisions in
paragraph 6(l)(vil)(b) are fulfilled,
and
to perform examinations and tests
.
described in paragraph 6(1)(xi).
(ix) Pattern approval of an ancillary device
(a) When an ancillary device that
provides primary Indications is
intended to be approved separately,
its Indications shall be compared with
those provided by an Indicating
device that has already been
approved and which has the same
scale Interval, or a smaller one.
The results shall satisfy the
provisions in paragraph 2(9)(v) .
As far as possible, the necessary
conditions for compatibility with
other devices of a measuring system
are stated in the pattern approval
certificate
.
(b) Electronic devices may be approval
· separately when they are used for
the transmission of primary
indications or other information
necessary for their determination,
e.g. a device which concentrates
information from two or more
calculators and transmits it to a single
printing device.
When at least one of the signals of
this information is analogue, the
device shall be tested in association
with another device whose maximum
permissible errors are provided by
this Recommendation.
When all the signals of this
information are digital, the above
provision may be applied;however,
when the inputs and outputs of the
device are available, the device can
be tested separately, in which case
it shall introduce no error; only errors
due to the testing method may be
found out.
fn both cases and as far as possible,
the necessary conditions for
compatibility with other devices of a
measuring system are stated in the
pattern approval certificate.
(x) Pattern approval of a measuring system
The pattern approval of a measuring system
consists of verifying that the constituent
elements of the system, which have not
been subject to separate pattern approvals,
satisfy the applicable requirements, and
that these constituent elements are
compatible with one another.
Tests for carrying out the pattern approval
of a measuring system shall therefore be
determined on the basis of the pattern
approvals already granted for the
constituent elements of the system.
When none of the constituent elements has
been subject to separate pattern approval,
all the tests provided for in paragraph
···"·· .. --?· .·.··-· ··.··'·'"'-· ? .....
---- ··'-,
[ 'lfll 11-'(l!Us 3 ( i)) 561
6(1)(v), 6(1)(vi) and 6(1)(vii) (in particular)
shall be performed on the complete
measuring system. On the contrary, when
the various constituent elements are all
approved separately, it is possible to replace
pattern approval based on tests by pattern
approval of drawings.
lt is also appropriate to reduce the pattern
evaluation program when the measuring
system Includes constituent elements
identical to those which equip another
measuring system that has already been
approved, and when the operating
conditions of these elements are identical.
For example, It Is not necessary to perform
the expansion test of a hose in a fuel
dispenser when the hose in this measuring
system Is Identical to the hose equipping
another measuring system already
approved with the same minimum
measured quantity.
Note : It Is advisable that constituent
elements be subject to separate pattern
approval when they are intended to equip
several patterns of measuring systems. This
is particularly advisable when the various
measuring systems have different
manufacturers and when the bodies in
charge of pattern approval are different.
(xi) Pattern approval of an electronic device
In addition to the examinations or tests
described In the preceding paragraphs, an
electronic measuring system or an
electronic constituent element of this
system shall been subject to the following
tests and examinations:-
(a) Design Inspection
This examination of documents aims
at verifying that the design of
electronic devices and their checking
facilities comply with the provisions
of this specification, clause 4 in
particular.
It lncludes-
(a) an examination o( the mode of
construction and of the electronic
sub-systems and components
used, to verify their
appropriateness for their intended
use,
(b) consideration of faults likely to
occur, to verify that In all
considered cases these devices
'17i/ (l{J11-/41
comply with the provisions of
paragraph 4(3),
(c) verification of the presence and
effectiveness of the test device(s)
for the checking facilities.
(b) Performance tests
These tests aim at verifyingthat the
measuring system complies with the
provisions of paragraph 4(1)(i) with
regard to Influence quantities. These
tests are specified In Annexure A.
(a) Performance under the effect of
influence factors:
When subjected to the effect of
influence factors as provided for
in Annexure A, the equipment
shall continue to operate
correctly and the errors shall not
exceed the applicable maximum
permissible errors.
(b) Performance under the effect of
disturbances:
When subjected to external
disturbances as provided for In
Annexure A, the equipment shall
either· continue to operate
correctly or detect and indicate
the presence of any significant
faults. Significantfaults shall not
occur on non-interruptible
measuring systems.
(c) Equipment under test (EVT)
Tests are carried out on the
complete measuring system
where size and configuration
permit, except where otherwise
specified in Annexure A.
Where tests are not carried out
on a complete system, they shall
be carried out on a sub-system
comprising at least the following
· devices:-
.·\ measuring transducer,
calculator,
indicating device,
power supply device,
correction device, if
appropriate.
This sub-system shall be included
in a simulation set-up
562 THE GAZETTE OF INDIA: EXTRAORDINARY [PARTII SEC. 3(i)]
representative of the normal
operation of the .measuring
system ..
For example, the
movement ofthe :liquid may be
simulated by an appropriate
device.
'The calculator shall be sn its final
housing.
In all cases, peripheral equipment
may be.tested separately.
(2) Initial verification
(i) General
Initial ·verification of a measuring
system:is carried out in a single stage
when the system can be transported
without .dismantling and when it is
verified under the intended
conditions of use; in all other cases,
.lt;ls carried out in two stages.
The .first stage concerns at least the
measurement transducer, alone or
fitted with associated ancillary
.devices, or possibly included in a sub
svstem. Tests of the first stage may
be carried out on a test bench,
possibly In the factory of the
manufacturer, or on the installed
measuring system. At this stage, the
metrological examinations may be
carried out with different liquids than
those which the system is intended
to measure.
The first stage also concerns the
calculator and the density sensor. If
necessary, the measurement
transducer and the calculator can be
verified separately.
The second stage concerns the
measuring system in actual working
condition. It is carried out at the
place of installation under operating
conditions and with the Intended·
liquid of use. However, the second
stage may be carried out in a place
chosen by the verification body when
the measuring system can be
transported without dismantling and
when the tests can be performed
under the operating conditions
intended for the measuring system.
Initial verification of electronic
systems shall include a procedure for
verifying the presence and correct
operation or checking facilities by the
use of test devices as specified In
paragraph 4(3).
(ii) Tests
(a) When initial verification takes place
in two stages, the first stage shall
include-
an examination for conformityof
the meter, including the
associated ancillary devices
(conformity with the respective
patterns),
-
a metrologlcal examination of the
meter, Including the associated
ancillary devices.
The second stage shall include-
an examination for conformity of
the measuring system, including
the meter and the ancillary and
additional devices,
a metrological examination of the
measuring system; if possible, this
examination is carried out within
the limits of operating conditions
for the system,
an operational test of the gas
elimination device, where
appropriate, with no need to verify
that the maximum errors
applicable to this device and
specified in 2.10 are met,
an inspection of the adjustment
of the prescribed pressure
maintaining devices where
appropriate,
when necessary, a test of the
variations of the internal volume
of the hoses in full hose measuring
systems, e.g. in the case of a hose
reel, an operational test of the
control valve preventing the
emptying of the hose during non·
operating periods, for full hose
measuring systems,
a determination of the residual
quantities In empty hose
measuring systems.
(b) When initial verification takes place
in one stage, all tests In paragraph
6(2)(ii)(a} shall be performed.
['ll'l 11-= 3(i)] 563
- --- ----
---?- ??--- =-=-----=-----=---..:..=::::=-======
Test Nature of the influence quantity Severity level for the class
--··--
8 C I
L Dry heat ln,fluencefactor 2 3 3
2. Cold Influence factor 2 3 3
3, Damp heat, cyclic Influence factor l 2 2
4. Vibration (sinusoidal) Influence factor l
5. Power voltage vartation Influence factor l I
6. Short time power reductions Disturbance la & lb la & lb la & lb
7. Bursts Disturbance 2 2 i
8. Electrostatic discharge Disturbance l l I
9. Electromagnetic susceptibility Disturbance 2, 5, 7 2, 5, 7 2, 5, 7
10. Disturbances on d.c. voltage powered equipment
Ambient temperature
Relative humidity
Atmospheric pressure
Power voltage
Power frequency
: 20°c ± s0c
: 60% ± 15%
: 86 kPa to 106 kPa
: Nominal voltage (Vnom)
: Nominal frequency
(Fnoml
During each test, the temperature and relative
humidity shall not vary by more than 5°C or 10%
respectively within the reference range.
4. Performance tests
The following tests can be carried out in any
order:-
2. Severity levels
For each performance test, typical test
conditions are indicated: they correspond to the
climatic and mechanical environment conditions to
which measuring systems are usually exposed.
Measuring systems are divided into three
classes according to climatic and mechanical
environmental conditions:
Class B for fixed Instruments installed in a
building,
Class C for fixed Instruments installed
outdoors,
Class I for mobile Instruments, in particular
measuring systems on trucks.
However, the applicant for pattern approvalmay
indicate specific environmental conditions in the
documentation supplied to the metrology service,
based on the intended use of the Instrument. In this
case, the metrology service carries out performance
tests at severity levels corresponding to these
environmental conditions. If pattern approval Is
granted, the data plate shall indicate the
corresponding limits of use. Manufacturers shall
inform potential users of the conditions of use for
which the instrument is approved. The metrology
service shall verify-that the conditions of use are met.
3. Reference conditions
(3) Subsequent verification
(i) Subsequent verification of a measuring
system may be identical to initial
verification.
(ii) The preliminary examination of the meter
should only be repeated if the protective
marks on the measuring element of the meter
have been damaged. This examination may
be replaced by a test of the measuring system
if the conditions for the preliminary
examination are met and if the measuring
system can undergo testing with a volume
of liquid corresponding to the minimum
measured quantity. For the detennination of
the error curve, at least 60% of the maximum
flowrate should be reached.
(iii) The ancillary devices shall be considered
as having been subjected to the preliminary
examination if the protective marks are not
damaged. It is sufficient to carry out a
reduced number of measurements during
the simplified examination of the ancillary
devices.
Previous and next
Questions people ask
Is annexure A of Legal Metrology (General) Rule, 2011 still in force?
No repeal of Legal Metrology (General) Rule, 2011 is recorded.