Regulation 8, Joint Electricity Regulatory Commission” (Distribution Code) Regulations, 2010.: STANDING COMMITTEE FOR DESIGN, CONSTRUCTION AND MAINTENANCE PRACTICES
Joint Electricity Regulatory Commission” (Distribution Code) Regulations, 2010. - Regulation 8
Text of regulation 8
STANDING COMMITTEE FOR DESIGN, CONSTRUCTION AND MAINTENANCE PRACTICES
8. STANDING COMMITTEE FOR DESIGN, CONSTRUCTION AND
MAINTENANCE PRACTICES.-
1. Standing Committee for design, construction and maintenance practices shall
under the chairmanship of the technical Member/Director of the licensee be
constituted by the licensee, within one month w.e.f. the commencement of this
Code and shall comprise of-
(a) the senior most Engineer (Planning) of the licensee
(b) the senior most Engineer (Materials Management) of the licensee
(c) the senior most Engineer (Design and Planning) of the STU ; and
(d) any other person as the licensee may deem appropriate.
2. The Standing Committee shall be an advisory body having perpetual term and
shall hold its meeting at least once in each quarter. The Standing Committee
shall suggest and make recommendations to the licensee on matters amongst
others in the following areas:-
(a) to review and suggest the latest practices on design and technical
specifications of line materials, meters and metering equipment, service line
41 | P a g e
materials, sub-station equipments like transformers, circuit breakers, CT/PT
sets etc;
(b) to suggest vendor selection and short listing procedures for various
equipments and materials being used in bulk;
(c) to suggest best industry practices and innovative techniques for
construction, operation, maintenance of HT / LT lines and Grid Sub-
stations, Pole mounted and other plinth mounted sub-stations etc;
(d) to recommend and suggest the latest technology up gradation and process
such as IT tools and SCADA and other Control System;
(e) to recommend embargo and restrictions on dangerous, unhygienic practices
and material from point of view of safety, environmental up-keep and
pollution norms.
9. SECURITY STANDARDS
1. The Distribution System shall be planned and maintained so as to fulfill the
following security standards except under Force Majeure conditions beyond the
reasonable control of the Distribution Licensee.
2. The feeders, either HT or LT, feeding important loads such as hospitals,
crematoria, airports, railway stations, and the like shall be planned to have a
selective switching system, so that selective switching can be operated to
transfer the load on to an alternate healthy feeder. Appropriate safety
precautions shall invariably be taken in this regard. In case of failure of the
feeder, these switches shall be operated immediately either manually or
automatically depending on the importance of the load.
3. The feeders connected to important industries which are very sensitive to
interruption of even short duration shall be planned to have automatic
switchover to an alternate healthy feeder in case of failure of supply.
4. Loading in any current carrying component of the Distribution System (e.g.
Conductors, joints, transformers, switchgear, cables and other apparatus) shall
not exceed 75% of their respective thermal limit.
5. The rupturing capacity of the switchgear employed in the system shall have at
least 25% more capacity than the short circuit level computed even considering
the anticipated future development of the system.
6. Provision shall be made for every HT feeder, either primary or secondary, to
manually switch over to the immediately available HT feeder of the same
voltage class available in the vicinity. Provision shall be made in the design
itself for any HT feeder to share at least 50% of the loads in the adjacent feeder
during emergencies.
7. In case of single contingency; failure of any substation equipment controlling
any outgoing 11 kV feeder, the load interrupted shall not generally exceed 50%
of the total demand on the substation. The Distribution Licensee has to bring it
down to 20% within a period of three years.
42 | P a g e
8. There shall be adequate stand by capacity in the system.
9. The design of the Distribution System shall accommodate the arrangements in
such a way that the electricity supply need not be interrupted for more than the
specified duration as per JERC (Standard of Performance) Regulations 2009 of
Licensee in case of breakdown of any distribution transformer. Similarly in case
of failure of 11 kV feeders including terminal equipment, the design shall
accommodate an arrangement for the power supply not to be interrupted to the
extent possible.
Previous and next
All provisions of Joint Electricity Regulatory Commission” (Distribution Code) Regulations, 2010.