Regulation 7, Joint Electricity Regulatory Commission” (Distribution Code) Regulations, 2010.: Distribution lines

Joint Electricity Regulatory Commission” (Distribution Code) Regulations, 2010. - Regulation 7

Text of regulation 7

Distribution lines

7. Distribution lines: - All the 33 kV, 22 kV and 11 kV lines at Connection Points / Interface Points shall be provided with a minimum of over current and earth fault relays as follows: a) Plain radial feeders: Non-directional time lag over current and earth fault relays with suitable settings to obtain discrimination between adjacent relay settings. b) Parallel/ring feeders: Directional time lag over current and earth fault relay. 6.6 FIRE PROTECTION: All adequate precaution shall be taken and protection shall be provided against fire hazards to all apparatus in the System conforming to the relevant Indian Standard Specifications and/or provisions of under other relevant rules as amended from time to time. 29 | P a g e Chapter - 7 CROSS BOUNDARY SAFETY CODE 7.1 OBJECTIVE: The objective of this section is to achieve an agreement on the principles of safety when working across a control boundary between the Distribution Licensee and the Users. This chapter specifies the requirements for safe working practices for maintenance of equipment associated with cross boundary operations and lays down the procedure to be followed when the work is carried out on electrical equipment connected to another User's System. User may mean another Licensee so that this Code applies for safety across the boundary between two Licensees also, by substituting “another Licensee” for User. 7.2 CONTROL PERSONS AND THEIR RESPONSIBILITY: The Distribution Licensee and all the Users (comprising Generation Companies, Transmission Licensees and consumers having load above 1MW or dedicated line) shall nominate suitably authorized and technically qualified persons to be responsible for the co-ordination of safety across their boundary. These persons shall be referred to as "Control Persons". 7.3 PROCEDURE: 1. The Distribution Licensee shall issue a list of Control Persons with their names, designations, addresses and telephone numbers, to all the Users having direct control boundary with him. This list shall be updated promptly whenever there is any change of name, designation or telephone number of any Control Person named in the list. 2. All the Users such as mentioned in 8.3.1 having a direct control boundary with the Distribution Licensee shall issue a similar list of their Control Persons to the Licensee. This list shall be updated promptly whenever there is any change of name, designation or telephone number of any Control Person named in the list. 3. Whenever any work across a cross boundary is to be carried out by the User or the Distribution Licensee, the Control Person of the User or the Licensee as the case may be, who has to carry out the work, shall directly contact his counterpart. Code words shall be agreed to at the time of work to ensure correct identification of both the parties. Contact between Control Persons shall normally be made by direct telephone. 4. If the work extends beyond one shift, the Control Person shall hand over charge to 31 | P a g e the relief Control Person and fully brief him on the nature of work and the code words in the operation. 5. The Control Persons shall co-operate to establish and maintain the precautions necessary to be taken for carrying out the required work in a safe manner. Both the established isolation and the established earth shall be kept in the locked positions wherever such facilities exist, and these shall be clearly identified. 6. The Control Person in charge of the work shall satisfy himself that all the safety precautions to be taken are established before commencing the work. He should issue the safety documentation to the working party to allow the work to commence. 7. After the completion of the work, the Control Person in charge of the work being carried out should satisfy himself that the safety precautions taken are no longer required, and shall make a direct contact with his counterpart Control Person and request removal of the safety precautions. The equipment shall be declared as suitable for return to service only after confirmation of removal of all the safety precautions, by direct communication, using the code word contact between the two Control Persons, and the return of agreed safety documentation from the working party. 8. The Distribution Licensee shall develop an agreed written procedure for Cross Boundary Safety and continuously update the same. 9. Any dispute concerning Cross Boundary Safety shall be resolved at the level of transmission licencee, if transmission licencee is not a party. In case where transmission licencee is a party, the dispute shall be referred to the Commission for resolution of the dispute. 7.4 SPECIAL CONSIDERATIONS: 1. All the equipment on Cross Boundary Circuits, which may be used for the purpose of safety co-ordination and establishment of isolation and earthing, shall be permanently and clearly marked with an identification number or name being unique to the particular sub-station. These equipments shall be regularly inspected and maintained in accordance with the manufacturer's specifications. 2. Each Control Person shall maintain a legibly written safety log, in chronological order, of all operations and messages relating to the safety co-ordination sent and received by him. All these safety logs shall be retained for a period of not less than ten years. 3. As far as possible each of the Distribution Licensees shall maintain an updated map of his system pertaining to the area fed by each substation. Otherwise the schematic diagram of the system for 11kV and above shall be maintained and exhibited in the concerned area offices of the Distribution Licensee. 32 | P a g e Chapter - 8 INCIDENT/ACCIDENT REPORTING 8.1 OBJECTIVE This Chapter covers procedure of major incident / accident reporting (which occur in Distribution System) by User to Licensee and Licensee to User and Commission. 8.2 MAJOR INCIDENT OR ACCIDENT REPORTING: 1. The Distribution Licensee shall send a preliminary report to Commission all the significant Incidents in the Licensee's Area of Supply, which results in interruption to service, substantial damage to equipment or loss of life or significant injury to human beings within one week of its occurrence followed by a detailed report within one month. 2. The Distribution Licensee and the Users shall establish a format and procedure for exchange of information. 3. The Users shall furnish information to the Distribution Licensee regarding any major incident occurring in their Systems promptly. 8.3 REPORTING PROCEDURE 1. All reportable incidents occurring in the lines and equipments of 11 kV and above substations shall be promptly reported orally by the Licensee whose equipment has experienced the incident, to all other significantly affected Users identified by the Distribution Licensee and the Transmission Licensee. The reporting Distribution Licensee should submit a written report to the Transmission Licensee within one hour of such oral report. If the reporting incident is of major nature, the written report shall be submitted within two hours duly followed by a comprehensive report within 48 hours of the submission of the initial written report. In other cases, the reporting Distribution Licensee shall submit a report within five working days to the Transmission Licensee. 2. The Transmission Licensee shall call for a report from any Distribution Licensee on any reportable incident affecting other Users and particularly in case such User whose equipment might have been a source of the reportable incident does not report the same. However this shall not relieve any User from the obligation to report Events in accordance with Rules framed under relevant provision made under Electricity Act, 2003. The format for such a report shall be as per the approval of the Distribution Code Review Panel and shall typically contain the following: a) Location of the incident, b) Date and time of the incident, c) Plant or Equipment involved, 33 | P a g e d) Supplies interrupted and the duration wherever applicable, e) Amount of Generation lost, wherever applicable, f) System Parameters before and after the incident, (Voltage, Frequency, Load, Generation, etc.) g) Network configuration before the incident, h) Relay indications and performance of protection, i) Brief description of the incident, j) Estimated time of return to service, k) Any other relevant information, l) Recommendations for future improvement, m) Name and designation of the reporting person. 3. The report shall contain sufficient detail to describe the event to enable the recipient to assess the implications and risks arising out of the same. The recipient may ask for clarifications and additional information wherever necessary and it is obligatory that the reporting User shall put his best efforts and provide all the necessary and reasonable information. 4. In case of a request by either party, the oral report shall be written down by the sender and dictated by way of a telephone message or sent by Fax/e-mail to the recipient. In case of an emergency the report can be given only orally and followed by written confirmation. 5. Reporting of accidents shall be in accordance with the rules framed under relevant provision made under Electricity Act, 2003 or other applicable rules. Till such rules are made, the Distribution Licensee shall follow reporting of accidents as mentioned in Power System Safety Standard (Indian Electricity Rule 1956) as per Annexure 4 to these regulations. 34 | P a g e ATTACHMENT - 1 DISTRIBUTION SYSTEM PLANNING AND SECURITY STANDARD 1. OBJECTIVE 1 The Distribution System Planning and Security Standard specifies the guidelines for planning methodology of the Distribution System. The scope of this standard covers: (a) Quality of power supply (b) Load forecast (c) Planning procedure. (d) Service area of a distribution network. (e) Planning standards. (f) Reliability analysis. (g) Standardisation of design of distribution transformer (h) Standardisation of substation layouts (i) Reactive Compensation (j) Service Mains (k) Metering Cubicles (l) Security Standards 2. QUALITY OF POWER SUPPLY 1. Frequency: The rated frequency shall be 50 Hz. All the constituents of the Power System shall make all possible efforts to ensure that the grid frequency remains within the bandwidth of 49.0 -50.5 Hz. 2. Voltage: - The voltage at any point of the system under normal operating conditions shall not depart from the declared voltage by more than the values specified under IS Specification. 3. Harmonic content: - As per IEEE recommendations, the total harmonic content in the supply voltage for sensitive loads shall not exceed 5 percent, with any single harmonic content not exceeding 3 percent. The respective User responsible for generating harmonics and affect the distribution system shall be responsible for corrective action. 3. LOAD FORECAST: 1 The Distribution Licensee shall prepare a rolling short - term load forecast annually for a period of five years in his Area of Supply duly estimating the probable load growth and the consumption pattern of the Consumers. The forecast thus made shall be updated every year depending on the actual load that has come in that year and the changes in assumption, if any, required for the next years. 2 Preliminary Load Estimation/Assessment: 1. Domestic and Commercial Loads: The consumption in domestic and commercial sectors shall be estimated on the basis of the number of Consumers and their 35 | P a g e specific consumption. The past growth rate in the number of Consumers in the area shall be studied. In cases where power shortages have been experienced in the recent past, the growth rate to be adopted shall take into consideration the appropriate demand making due allowance in the growth rate to account for increased tempo of household electrification envisaged in the future. The higher level of electrification planned in the area should be kept in view. Energy consumption per Consumer shall be estimated after studying the past trends and taking into account the anticipated improvements in the standard of living. (a) Public Lighting and Water Works: The estimates of electricity consumption in public lighting and water works shall be based on the average consumption per kilowatt of connected load, projected on the basis of trends, keeping in mind the likely increase in public lighting and water supply facilities. The number of hours of operation shall be estimated taking into account the past trends and the power cuts if any effected in the area. (b) Agricultural Loads: The power requirement for irrigation pump sets shall be based on the program of energisation of pump sets in the plan period, available resources and the ultimate ground water potential. The average capacity of pump sets shall be worked out considering the mid-year figures for connected load and the number of pump sets. The consumption per IP set per year shall be estimated by means of representative sample studies till all the IP sets are metered. (c) Industrial Loads: The power requirements for industrial sector shall be estimated under following three categories, viz. (a) L.T. Industries; (b) H.T. Industries with a demand of less than 1 MW; (c) H.T. Industries with a demand of 1 MW & above. The consumption in category (a) & (b) shall be on the basis of historical data duly considering the developments in future. In case of category (c), projection shall be made separately for each industrial unit on the basis of the information furnished by the industrialists and the Department of Industries. 3 Non-industrial Bulk Supply: The available data regarding the consumption of bulk supply to non-industrial Consumers such as research establishments, port trusts, military engineering services, supply to power projects etc., and the probable future developments in these areas, shall be considered for the forecast. 4. Other Loads: For other loads, the projections shall be based on the best Judgment. 4. LOAD FORECAST PROCEDURE 1. Load forecasting methods using the above data and relevant indices by adopting one of the suitable methods applicable to specific locations and prevailing conditions shall be adopted. 36 | P a g e 2. In addition to the above, the effects of demand side management, requirement of power for pending applications, the increase in demand due to improvement in the operating frequency close to 50 Hz shall also be estimated. The Distribution Licensee shall work out Peak Demand for each of the succeeding five years relating to Connection Point/ Interface Point with the Transmission System as well as the annual Energy Demand and Peak Demand for each of the succeeding five years for overall Area of Supply on the basis of Load forecast. However, if the Distribution Licensee receive power at a number of Connection Points / Interface Points in a compact area, which are interconnected in a ring, then such Distribution Licensee shall forward the overall short term Demand forecast at each Connection Point / Interface Point with the variation or tolerance as mutually discussed and agreed upon with the Transmission Utility or SLDC. 3. The diversity factor of each category of Consumers fed in the Area of Supply shall be worked out by installation of load survey meters at selected typical locations. A record of such data shall be maintained and continuously updated. The short-term load forecast for a period of five years, based on these data shall be prepared. 5. PLANNING PROCEDURE The Distribution System shall be planned and developed in such a way that the system should be capable of catering the requirement of all categories of Consumers with a safe, reliable, economical and quality supply of electricity as indicated in clause 2.0 of this section. However the Consumer shall extend full support to the Distribution Licensee to enable the Distribution Licensee for quality supply of electricity. The Distribution System shall conform to the statutory requirements of all the relevant code, standards and acts in force. 6. PLANNING STANDARDS 6.1 Standardization of Sizes and Ratings: Adequate provision for future load development shall be made while selecting the sizes of power conductors and rating of distribution transformers. The sizes of power conductors, insulators, lightning arresters, transformers, switchgear, etc. used in the Distribution System shall be standardized with the objective of reducing inventory and standard specifications shall be prepared. Design Criteria for Distribution Lines 1. Radial system of distribution can be adopted in rural areas and as far as possible loop system with provision for feeding from at least one alternate source shall be adopted in urban areas. 2. The HT and LT distribution lines shall be any of the following types according to the necessity at the required area. (a) Over-head line with bare conductors; (b) Over-head line with Aerial Bunched Cables; (c) Under-ground Cables. 37 | P a g e 3. In thickly populated cities, in areas having heavy traffic densities, underground cable installation shall be considered to the extent possible. Wherever a number of trees are encountered, either in residential locations or in gardens and forests, over-headlines with aerial bunched cables shall be adopted. In other places over- headlines with bare conductors shall be adopted. The following standards shall be adopted for planning and design purposes: (a) The design and construction of over-headlines with bare conductors shall be generally in accordance with IS 5613 Part I, sections 1 and 2. (b) Vertical configuration of conductors for LT distribution lines, to prevent accidental short circuit due to galloping of conductors, shall preferably be adopted in rural areas since the spans are large in such areas. (c) The maximum length of LT and HT lines shall be maintained within the prescribed limit so as a safe and quality power may be delivered. (d) The design and construction of over-headlines with aerial bunched cables shall be generally in accordance with REC Specifications 32 and IS 14255. (e) The design and construction of under-ground cables shall be generally in accordance with IS 1255. 4. The line supports can be of steel, wood, RCC or PCC. The RCC and PCC poles are preferred over the other two considering their cost and longer life. The choice of the size of conductor for a line shall be made based on the following criteria: (a) Power to be transmitted and the techno-economic studies conducted for selecting the size of conductor according to the cost of loss of power and the interest and depreciation charges on the cost of the conductor thus selected; (b) Length of Line; (c) Line Voltage; (d) Permissible voltage regulation; (e) Mechanical strength; (f) In coastal areas and other areas where severe corrosion is expected due to heavy rainfall and/or salinity in atmosphere and theft prone areas, appropriate conductors only shall be used. 6.2 Standardisation of Design and Rating of Distribution Transformers 1. The design and rating of distribution transformers shall be standardised. As an initial step, the various technical parameters required for the design shall be incorporated in the specifications based on the experience on performance gained among the various designs so far adopted. Later, standard designs of the transformers and their detailed construction drawings shall be evolved based on the performance of these transformers. These shall be adopted for future procurement. This also ensures the inter-changeability of components of similar transformers manufactured by any manufacturer. 2. A good quality assurance plan shall be aimed at the following: 38 | P a g e (a) Good quality of raw materials; (b) Quality control during manufacturing and routine tests; (c) Acceptance tests at the time of taking delivery; (d) Inspection and tests on transformers received at stores on random sampling; (e) Thorough test on one transformer in a lot selected at random. The transformer should be completely dismantled. The qualities of core, coil, insulation etc are physically inspected and samples of insulation and other components used etc., are tested. (f) Ensuring performance guarantee for all distribution transformers for a minimum period of 3 years. 6.3 Standardisation of Sub-Station Layouts The Distribution Licensee shall develop standard layouts following relevant standards, manuals and provisions of Electricity Act, 2003. The Licensee shall also adopt latest technology as well as feedback from the experience gained. 6.4 Reactive Compensation 1 Shunt capacitors un-switched/switched type, shall be installed at the appropriate places in the Distribution System for power factor improvement, maintaining satisfactory voltage profile and reduction of sub-transmission and Distribution losses. The size and location of the capacitor installations shall be determined using an appropriate program, with reliable field data. Suitable precautionary measures, such as automatic switching etc., shall be adopted to avoid over voltages at light load periods. 2 Optimization studies of shunt compensation shall be conducted by the Distribution Licensee to determine the most appropriate sizes and locations for shunt capacitor installations. 6.5 Service Area of a Distribution Network 1. The service area of a distribution network is an area in which the load is supplied by a substation by one or more number of feeders, as required. The distribution network fed from the distribution transformers and the substations from which the 11 kV feeders emanate shall be initially planned as independent networks within their respective service area. Further, wherever possible, provision shall be made for interconnection with adjacent networks and/or substations for an alternate supply in case of failure. The design of distribution lines shall incorporate features to enable their augmentation in future, with minimum interruption to power supply. The existing right of way shall be fully exploited. 2. The Distribution Licensee shall take suitable measures, sufficiently in advance, to augment the capacity of the feeders in the event the voltage regulation limit is exceeded within the area. 3. Appropriate software to compute the design of the distribution network shall be 39 | P a g e used to obtain lowest possible energy losses for different loading conditions for the following: (a) The location and the capacity of the distribution transformers; (b) Routing of LV and HV networks; (c) The sizes of conductors; (d) The ratio of the lengths of HT and LT distribution lines for the new lines planned shall be optimized and the existing Distribution System shall be modified in a phased manner to reduce the distribution losses. (e) The voltage regulation limits for all loading conditions. 6.6 Service Mains The service mains to Consumers shall be laid in accordance with relevant REC Construction Standards for 230 V single phase and 400 V three phase supply and shall conform to the provisions of Relevant Rules under Electricity Act, 2003. 6.7 Metering Cubicles 1. The metering for 230 V single-phase supply shall be provided on a suitable board, located in such a place protected from sun and rain and shall be in a convenient position for taking readings. The terminals of the meter shall be made tamper-proof and sealed. For 400 Volts three phase supply, the meters and associated metering equipment including connections shall be enclosed in a suitable tamper-proof box. The tamper-proof box shall be of sufficient strength and design with locking and sealing devices and shall have adequate provision for heat dissipation with the required electrical clearances. The design shall permit readings to be taken without access to the meter or its connections. 2. For HT Consumers the meters, maximum demand indicators, and secondary connections, shall be housed in a separate compartment and other secondary apparatus such as instrument transformers and connections required shall be housed in a separate metering compartment, which shall be locked / sealed to prevent tampering. 3. The HT metering cubicle shall be suitable for cable entry on both sides or at least on one side. No fuses are permitted in the secondary circuits of the instrument transformers. The metering cubicle shall be painted with suitable epoxy paint for installation in coastal areas and other areas experiencing heavy rainfall. The instrument transformers shall be of fixed ratio and shall not have any taps. The primary current rating of the current transformers shall match with the normal full load current and the saturation point of the core shall be higher than the maximum current that may occur due to simultaneous full load operation of all the connected equipment and machinery. 40 | P a g e 4. For EHT Consumers, the secondary terminals of the instrument transformers shall be locked and sealed and the secondary wires brought out in a suitable GI conduit pipe upto the metering panel. There shall be no joints in the conduit pipes. The meters shall be as close to the instrument transformers as possible and in no case shall exceed ten (10) meters. The metering panel shall be housed in a weatherproof and tamperproof box and sealed. 7. RELIABILITY ANALYSIS 1. The planning of the extension and improvement to a Distribution System shall also take into consideration the improvement in reliability of power supply to Consumers. The appropriate reliability indices of power supply in the area fed by the Distribution System before and after the implementation of the extension and improvement program shall be estimated. The planning of the distribution system shall also take into consideration the improvement in reliability and efforts should be made to collect the data in this regard. 2. The following factors, which affect reliability indices, shall be considered subject to availability of data: (a) Momentary incoming supply failures (b) Momentary interruptions on 22 and 11 kV feeders (c) Breakdown on LT feeders (d) Prearranged shutdowns on lines and feeders (e) Blowing out of distribution transformer fuses (f) Individual fuse off calls

Previous and next

All provisions of Joint Electricity Regulatory Commission” (Distribution Code) Regulations, 2010.

Questions people ask

Is regulation 7 of Joint Electricity Regulatory Commission” (Distribution Code) Regulations, 2010. still in force?

No repeal of Joint Electricity Regulatory Commission” (Distribution Code) Regulations, 2010. is recorded.