LawGrids logoLAWGRIDS.ORG

Regulation 45, Indian Boiler Regulations, 1950: (a) Additional tests before rejection

Indian Boiler Regulations, 1950 - Regulation 45

Text of regulation 45

(a) Additional tests before rejection

45. (a) Additional tests before rejection.— Should tube suleettd for testing pur- poses show definite signs of failure in any one OJ more of 1he tests specified in Bogu- lations 44(a), 44(b) and 44(c) 1 wo further tests of the same kind may be made at the option of the manufacturer from tw o additional tubeH selected fi om the same batch. (b) If the repeat tests are satisfactory the tubes shall be aooepted provided that in all other respeots they fulfil the condition* of this Standard. Should eiiher of the tubes fail in any test, the batch of tubes represented may bo re-heat-treated in aooordanoe with Regulation 43(b) and then re-tested in aocordanoe with Regu- lations 44(a), 44(b) and44(c) but employing twice the number of test pieces. If these second repeat tests are satisfactory, the tubes shall bo aooepted provided that in all other respects they fulfil the conditions of this Standard; but if definite defeots are again shown, the batch of tubes which the tests pieoes represent shall be rejeoted.

Previous and next

All provisions of Indian Boiler Regulations, 1950

Questions people ask

Is regulation 45 of Indian Boiler Regulations, 1950 still in force?

No repeal of Indian Boiler Regulations, 1950 is recorded.