Regulation 45, Indian Boiler Regulations, 1950.: (a) Additional tests before rejection
Indian Boiler Regulations, 1950. - Regulation 45
Text of regulation 45
(a) Additional tests before rejection
45. (a) Additional tests before rejection.— Should tube suleettd for testing pur-
poses show definite signs of failure in any one OJ more of 1he tests specified in Bogu-
lations 44(a), 44(b) and 44(c) 1 wo further tests of the same kind may be made at the
option of the manufacturer from tw o additional tubeH selected fi om the same batch.
(b) If the repeat tests are satisfactory the tubes shall be aooepted provided
that in all other respeots they fulfil the condition* of this Standard. Should eiiher
of the tubes fail in any test, the batch of tubes represented may bo re-heat-treated
in aooordanoe with Regulation 43(b) and then re-tested in aocordanoe with Regu-
lations 44(a), 44(b) and44(c) but employing twice the number of test pieces. If these
second repeat tests are satisfactory, the tubes shall bo aooepted provided that in all
other respects they fulfil the conditions of this Standard; but if definite defeots are
again shown, the batch of tubes which the tests pieoes represent shall be rejeoted.