Annexure V, Indian Railways (Open Lines) General and Subsidiary Rules: ANNEXURE-V
Indian Railways (Open Lines) General and Subsidiary Rules - Annexure V
Text of annexure V
ANNEXURE-V
ANNEXURE-V
ENGINEERING LEVEL CROSSING GATES NON-INTERLOCKED, PROVIDED WITH TELEPHONE.
WITH NORMAL POSITION "CLOSED TO ROAD TRAFFIC"
(General Instructions are common for all types of Manned Level Crossing Gates)
1. MODE OF OPERATION - Detailed mode of operation for opening and closing the level crossing gate
shall be provided in the respective Station Working Rules and Gate Working Instructions incorporating
local operational requirements. When level crossing gate is required to be opened for passage of road
traffic, the Gateman must first open the gate farthest away from approaching road traffic and then open
thegateonthesidenearesttheapproachingroad traffic.
2. EXCHANGE OF PRIVATE NUMBERS -
(i) Gateman must seek permission from Station Master/Cabinmaster/Cabin man for opening the
gate.
(ii) If the gate is required to be opened to pass the road traffic the Gateman shall exchange private
number with the Station Master and confirm that the train has passed completely from his gate.
thereafter the Station Master may allow the Gateman to open the gate. In such a situation the
Station Master before dispatching or giving Line Clear for any other train in the block section in
question shall ensure that the level crossing gate is closed for road traffic and assurance of the
Gatemanis taken through exchange of private number.
(iii) Suitable entries shall be made by the Station Master/Cabinmaster/Cabin man in the Train Signal
Register,PrivateNumberBookandLogBookinredlink.
(iv) After passage of road traffic, Gateman shall close the gate and confirm this to Station
Master/Cabinmaster/Cabinman,underexchangeofprivatenumber.
(v) Before any train is allowed to enter the block section, again, the Station
Master/Cabinmaster/Cabinman must ensure that Private Number from the Gateman has been
exchanged.
(vi) Gate once closed can be opened by the Gateman, after passage of train/trains or change in
planning of train movement etc, with the permission of Station Master as the need of opening is
known to Gateman according to road traffic to be cleared. Obviously it can be done only after
exchanging private number with the controlling Station Master who will ensure that there is no
trainmovementtowardsthelevelcrossing.
3. FAILUREOFTELEPHONICCOMMUNICATION-WhenTelephonicCommunicationfailsoritdoes
not get any response from the Gateman despite 2 or 3 attempts, the following procedure should be
adopted-
(i) StationMasteratthedispatchingendshallissueacautionordertotheLocoPilotofthedeparting
train.
(ii) The caution order shall advise the Loco Pilot to whistle continuously and approach the gate
cautiously.
298
(iii) ^ % ^ ^ ^ T ^ ^ ^ ^ ^ ^ f ^ R ^ ^ ^ ^ ^ ^ W m W ^ ^ ^ ^
(iv) 3 ^ ^ ^ % W 3 ^ W ^ ^ f ^ % ^ W ^ W t e ^ 3 ^ ^
% 3 ^ d ^ d ^ f % ^ ^ d 1 ^ H P ^ d ^ T C T f |
(v) TOHil^RTOWl4t«wWtt^cttw^
(vi) W H W ^ / ^ ^ W ^ ^ ^ T O O T ^ ^ t ^ ^ f l
(vii) W 3 ^ ^ ^ ^ # W * ^ # ^ ^ W ^ ^ / ^ % f d ^ ^ ^ l
(viii) T ^ T T ^ ^ ^ r e ^ ^ # ^ ^ 1 ^ a 1 k y : ^ ^ / f ^ ^ ^ % ^ ^ ^ M ^ M H
(i) ^ f M ^ ^ 3 q W # ^ ^ f ^ ^ % ™ ^ ^ f ^ ^ ™ ? t # ^
^ ^ ^7Rfe ̂ R 1 J # [ W V % f a * T «# W f e ^ K % 3 ^ - * ^ % 3T^fw
(ii) ^ ^ ^ f ^ % W T ^ ^ ^ ^ 3 1 k w % W T ^ ^ f ^ ^ f ^ T 3 k ^ ^ ^ #
(iii) ^ ^ W M % f ^ ^ ^ ^ 3 i k ^ W ^ ^ ^ I
(iv) ^ ^ ^ W M % t e ^ ^ % ^ ^ f ^ % W T ^ ^ t 3 i k w % W T
(v) * ^ R T O ^ # ^ ^ W W 3 ^ ^ ^ I
(vi) W W R f t ^ ^ W ^ M ^ W ^ ^ ^ ^ W ^ t
(vii) ^^Hi^^^^^w^^rdr^ifev^^^^w^^/i^tg
(viii) ^^w^^rdr^ifev#^^^w^^%^^:#to/ffe^t^%
(i) *fe *te * s * W T m m ^ ?t *ira # &> *t ̂ K ( w ) ^ w ?t awn ^
(ii) ^ k ^ ^ d ^ i d 4,i4<d ̂ H w v ^ w v ^ r ^ ^ i # / a B » f ^ ^ i f
^ 4 . 3 T ^ - ^ % 3 ^ d ^ ^ l
(iii) î4<d ̂ H H i t f ^ i g ^ ^ f l p w f e i r ^ i r f e a M / i W H , feif^
(iv) ^ 2 - 3 ™ % ^ ^ ^ ^ / ^ W V % f ^ ^ ^ ™ ^ t a d ^ ^
299
Appendix-'A' RULES FOR WORKING LEVEL CROSSING
(iii) The Loco Pilot shall be instructed to pass the gate cautiously, on being hand signalled by the
Gateman. If hand signal is not seen, Loco Pilot should be prepared to stop short of the gate and
depute his Assistant Loco Pilot to see the condition of the gate. If the gate is closed, the Assistant
Loco PilotwillgivetheAllRightSignalandifthegateisnotclosedtheAssistant Loco Pilotmust
close the gate and then give All Right Signal. In the absence of the Assistant Loco Pilot, the Loco
PilotmaytaketheassistanceoftheGuard.
(iv) In case of an approaching train, the Station Master shall advise, to the Station Master at the
dispatching end, under exchange ofprivate number, that the telephone at the gates has failed.
(v) TheStationMasteratthedispatchingendshallthenissueaCautionOrdertotheLocoPilotbefore
dispatching atrain in the Block Section fromhis end.
(vi) The Station Master shall also advise the Gateman through Gangman/Patrolman or Loco Pilot of
thefirsttrainthatthetelephonehadbecomedefective.
(vii) The Station Master should also advise S&T staff, responsible for maintenance of the telephone to
rectifythesamedefectattheearhest.
(viii) Normal working will be resumed only after S&T staff rectify the telephone and issue
reconnection/fitmemoforthesame.
4. FAILUREOFLIFTINGBARRIERSORLEAFGATES-
(i) When the gate cannot be closed due to failure of lifting barriers/leaf gates, the Gateman will
immediately inform the Station Master on duty, under exchange ofprivate number, and ensure
thatliftingbarriersofleafgatesdonotfoulthetrack.
(ii) Heshallimmediatelyfixredbannerflagbydayandredflashinghghtbynightonthepostatthat
endfirstfromwhichthetrainis approaching and then at the other end.
(iii) Gatemanshallsecurethegateagainstroadtrafficbymeansofsafetychainsandpadlocks.
(iv) After securing the Gate against road traffic, Gateman shall show green hand signal flag by day
andgreenhghtbynighttotheLocoPilotoftheapproachingtrain.
(v) StationMasterondutyshallissueaCautionOrdertotheLocoPilotofadepartingtrain.
(vi) He shall also advise the Station Master at the dispatching end, under exchange ofprivate number.
tosimilarlyissueaCautionOrdertotheLocoPilotbeforedispatchingatrainintheblocksection
fromhis end.
(vii) The Station Master shall also advise maintenance staff responsible for maintenance of lifting
barriers/leaf gates to rectify the same at the earliest.
(viii) Normal working will resumed only after maintenance staff rectify the lifting barriers/leaf gates
andissuereconnection/fitmemo forthe same.
5. OBSTRUCTIONATTHELEVELCROSSINGGATE-
(i) If the gate is broken by a road vehicle which is fouling the track, or if lifting barriers/leaf gates or
anyotherpartofthegatefoulthetrack,orifthereisanyotherobstructionatthegate,theGateman
shall immediately fix Red Banner flag by day and Red flashing Lamp by night on posts provided
atbothendsofthegate,forthispurpose.
(ii) Immediately after this, the Gateman shall advise the Station Master/Cabinmaster/Cabin man on
duty,regardingthedefects/obstructionatthegate,underexchangeofprivatenumber.
(iii) Station Master/Cabinmaster/Cabin man on duty shall be advised to put the reception/departure
signalsbackto'ON'position, if taken 'OFF'for atrain.
(iv) If there is no response from the Station Master/Cabinmaster/Cabin man after two or three
attempts, he shall first protect the gate and then inform on phone.
299
(V) M ^ ^ 3 f c f ^ % W T ^ ^ ^ T O % W T ^ < T ^ ^ ^ * f H ^
(Vi) OT%^^^fif^^^™^l
(vii) ^ ^ T O % f ^ , ^ , * n f ^ ^ ™ ^ ^ ™ ^ w v ^ w v ^
(viii) ^ R T O T O R i l ^ T O ^ ^ ^ t W - W ^ w f e ^ ^ f ^
(ix) ^ 3 ^ ^ ^ ^ % ^ ^ ^ ^ . 3 ^ - ^ % 3 ^ ^ W V % f t R
(x) ^ ^ ^ W t , 1 ^ ^ 5 i t M ^ T O # l M I M w i
(Xi) ^ ^ ^ t o ^ ^ ^ l ^ ^ 3 f c ^ ^ ^ 3 ^ ^ f | ^ ^
(xii) ^^w^^^^^w^^rdr^i4r^v^^^w^%f^^w^
(xiii) ^ # ^ O T a w f ^ t w * i ^ f ^ ^ ^ ^ / t e ^ ^ ^
OSSO
300
Appendix-'A' RULES FOR WORKING LEVEL CROSSING
(v) Gatemanshallthenrushwithdetonatorsandredflagbydayandredflashinghandsignallampby
night in the direction of the approaching train and protect the gate as stipulated in General
InstructionfordutiesofGatemanunderitemNo. 1.5 (5).
(vi) Thereafterheshallprotectthegatefromtheotherdirectionalso.
(vii) Heshallnotedowntheparticularsoftheroadvehicle,nameoftheDriver,Ownerandrelaythese
details to the Station Master who shall not start the train unless he has been ensured by the
Gatemanthattheroadvehicleorthehfting barriers/leaf gates are not fouling the track.
(viii) The StationMastershall also inform the Station Master at the dispatching end, under exchange of
private number, asking him not to dispatch any train in the block section from his end, until the
trackhasbeenclearedofallobstruction.
(ix) After the track has been cleared of all obstructions the Gateman shall inform the Station Master
accordinglyunderexchangeofprivatenumber.
(x) Station Master shall then issue a Caution order to Loco Pilots of all trains to proceed cautiously
and pass the Gate on green hand signal of the Gateman, if the gate is broken, but is clear of any
obstruction.
(xi) Gateman shall secure the gate against road traffic by means of safety chains and padlocks and
thereafterexhibitgreenhandsignal,ifthegateisnotobstructed.
(xii) StationMastershalladvisemaintenancestaffresponsibleformaintainingthehftingbarriers/leaf
gates to rectify the same at the earliest.
(xiii) Normal working will be resumed only after maintenance staff rectify the defective lifting
barriers/leaf gates andissuereconnection/fitmemo for the same.
6. OBSTRUCTION ON THE TRACK NEAR LEVEL CROSSING GATE - If there is a rail fracture or
obstructiononthetrackduetofallingofatree,foulingbyRoadVehicleorderailment,whichisvisibleto
the Gateman, then the Gateman and Station Master will adopt the procedure given under item no. 5
above. If the obstruction fouls the level crossing gate. Gateman must keep the gates closed against Road
traffictillthetrackisclearedoftheobstruction.
300
TftftlB-V W l ^ ^ T O t o
(i) ^ ^ ^ ^ M m ^ ^ w m w r a l 3̂R-TTR ta^r ?t ̂ ^ arn̂ T
(ii) W M f ^ % W T ^ ^ ^ 3 ^ T O % W T ^ ^ ^ % ^ f 3 k ^ f t f ^ ^ t I I T
(iii) M ^ ^ W M ^ ^ % f ^ * M ^ 3 ^ ^ ^ r a ^ : ^ ^ ^ l
(iv) M ^ f e ^ M k ^ ^ w i w i M P ^ ^ ^ ^ i
(Vi) ^ ^ ^ W ^ ^ ^ ^ H ^ f » ^ O T ^ ^ I
(Vii) ^ % ^ ^ 3 ^ ^ t ^ ^ f ^ % W T ^ ^ 3 1 k T O % W T ^ ^ f ^ ^ ^ ^ R -
(Viii) ^ ^ W w T t ^ ^ ^ 3 ^ ^ ^ W ^ , ^ ^ % ^ ^ ^ ^ R T 3 ^ % 3 T ^ ^
(*) f^^^^^M^-
(x) ^ q # l f ¥ ^ ^ f % M ^ f c ^ # ^ ^ ^ 3 M ^ ( W ) ^ ^
(11) ^ ^ ^ a i k t e N ^ M ^ ^ i
(iii) M ^ f ^ % W T ^ ^ ^ ^ 3 ^ T O % W T ^ ^ f ^ ^ ^ % ^ f 3 k w
(XV) ^ ^ ^ t w ^ ^ ^ l ^ M ^ ^ I ^ ^ T O r ^
(v) w ^ T O r , ^ f M ^ ™ i ^ ^ i
(vi) OT%^^3T^^^^f^%WT^^3kTO%WT^^f^^
(vii) ^ « , / ^ ^ fr 3WH ^ ^ ^ ^ # £ T * I W OT « R T *fe
(viii) ^ f e ^ R W ^ ^ M ^ * M ™ 3 ^ ^ ^ t l
301
Appendix-'A' RULES FOR WORKING LEVEL CROSSING
Previous and next
All provisions of Indian Railways (Open Lines) General and Subsidiary Rules
Questions people ask
Is annexure V of Indian Railways (Open Lines) General and Subsidiary Rules still in force?
No repeal of Indian Railways (Open Lines) General and Subsidiary Rules is recorded.