ANNEXURE-V

ANNEXURE-V ENGINEERING LEVEL CROSSING GATES NON-INTERLOCKED, PROVIDED WITH TELEPHONE. WITH NORMAL POSITION "CLOSED TO ROAD TRAFFIC" (General Instructions are common for all types of Manned Level Crossing Gates) 1. MODE OF OPERATION - Detailed mode of operation for opening and closing the level crossing gate shall be provided in the respective Station Working Rules and Gate Working Instructions incorporating local operational requirements. When level crossing gate is required to be opened for passage of road traffic, the Gateman must first open the gate farthest away from approaching road traffic and then open thegateonthesidenearesttheapproachingroad traffic. 2. EXCHANGE OF PRIVATE NUMBERS - (i) Gateman must seek permission from Station Master/Cabinmaster/Cabin man for opening the gate. (ii) If the gate is required to be opened to pass the road traffic the Gateman shall exchange private number with the Station Master and confirm that the train has passed completely from his gate. thereafter the Station Master may allow the Gateman to open the gate. In such a situation the Station Master before dispatching or giving Line Clear for any other train in the block section in question shall ensure that the level crossing gate is closed for road traffic and assurance of the Gatemanis taken through exchange of private number. (iii) Suitable entries shall be made by the Station Master/Cabinmaster/Cabin man in the Train Signal Register,PrivateNumberBookandLogBookinredlink. (iv) After passage of road traffic, Gateman shall close the gate and confirm this to Station Master/Cabinmaster/Cabinman,underexchangeofprivatenumber. (v) Before any train is allowed to enter the block section, again, the Station Master/Cabinmaster/Cabinman must ensure that Private Number from the Gateman has been exchanged. (vi) Gate once closed can be opened by the Gateman, after passage of train/trains or change in planning of train movement etc, with the permission of Station Master as the need of opening is known to Gateman according to road traffic to be cleared. Obviously it can be done only after exchanging private number with the controlling Station Master who will ensure that there is no trainmovementtowardsthelevelcrossing. 3. FAILUREOFTELEPHONICCOMMUNICATION-WhenTelephonicCommunicationfailsoritdoes not get any response from the Gateman despite 2 or 3 attempts, the following procedure should be adopted- (i) StationMasteratthedispatchingendshallissueacautionordertotheLocoPilotofthedeparting train. (ii) The caution order shall advise the Loco Pilot to whistle continuously and approach the gate cautiously. 298 (iii) ^ % ^ ^ ^ T ^ ^ ^ ^ ^ ^ f ^ R ^ ^ ^ ^ ^ ^ W m W ^ ^ ^ ^ (iv) 3 ^ ^ ^ % W 3 ^ W ^ ^ f ^ % ^ W ^ W t e ^ 3 ^ ^ % 3 ^ d ^ d ^ f % ^ ^ d 1 ^ H P ^ d ^ T C T f | (v) TOHil^RTOWl4t«wWtt^cttw^ (vi) W H W ^ / ^ ^ W ^ ^ ^ T O O T ^ ^ t ^ ^ f l (vii) W 3 ^ ^ ^ ^ # W * ^ # ^ ^ W ^ ^ / ^ % f d ^ ^ ^ l (viii) T ^ T T ^ ^ ^ r e ^ ^ # ^ ^ 1 ^ a 1 k y : ^ ^ / f ^ ^ ^ % ^ ^ ^ M ^ M H (i) ^ f M ^ ^ 3 q W # ^ ^ f ^ ^ % ™ ^ ^ f ^ ^ ™ ? t # ^ ^ ^ ^7Rfe ̂ R 1 J # [ W V % f a * T «# W f e ^ K % 3 ^ - * ^ % 3T^fw (ii) ^ ^ ^ f ^ % W T ^ ^ ^ ^ 3 1 k w % W T ^ ^ f ^ ^ f ^ T 3 k ^ ^ ^ # (iii) ^ ^ W M % f ^ ^ ^ ^ 3 i k ^ W ^ ^ ^ I (iv) ^ ^ ^ W M % t e ^ ^ % ^ ^ f ^ % W T ^ ^ t 3 i k w % W T (v) * ^ R T O ^ # ^ ^ W W 3 ^ ^ ^ I (vi) W W R f t ^ ^ W ^ M ^ W ^ ^ ^ ^ W ^ t (vii) ^^Hi^^^^^w^^rdr^ifev^^^^w^^/i^tg (viii) ^^w^^rdr^ifev#^^^w^^%^^:#to/ffe^t^% (i) *fe *te * s * W T m m ^ ?t *ira # &> *t ̂ K ( w ) ^ w ?t awn ^ (ii) ^ k ^ ^ d ^ i d 4,i4<d ̂ H w v ^ w v ^ r ^ ^ i # / a B » f ^ ^ i f ^ 4 . 3 T ^ - ^ % 3 ^ d ^ ^ l (iii) î4<d ̂ H H i t f ^ i g ^ ^ f l p w f e i r ^ i r f e a M / i W H , feif^ (iv) ^ 2 - 3 ™ % ^ ^ ^ ^ / ^ W V % f ^ ^ ^ ™ ^ t a d ^ ^ 299 Appendix-'A' RULES FOR WORKING LEVEL CROSSING (iii) The Loco Pilot shall be instructed to pass the gate cautiously, on being hand signalled by the Gateman. If hand signal is not seen, Loco Pilot should be prepared to stop short of the gate and depute his Assistant Loco Pilot to see the condition of the gate. If the gate is closed, the Assistant Loco PilotwillgivetheAllRightSignalandifthegateisnotclosedtheAssistant Loco Pilotmust close the gate and then give All Right Signal. In the absence of the Assistant Loco Pilot, the Loco PilotmaytaketheassistanceoftheGuard. (iv) In case of an approaching train, the Station Master shall advise, to the Station Master at the dispatching end, under exchange ofprivate number, that the telephone at the gates has failed. (v) TheStationMasteratthedispatchingendshallthenissueaCautionOrdertotheLocoPilotbefore dispatching atrain in the Block Section fromhis end. (vi) The Station Master shall also advise the Gateman through Gangman/Patrolman or Loco Pilot of thefirsttrainthatthetelephonehadbecomedefective. (vii) The Station Master should also advise S&T staff, responsible for maintenance of the telephone to rectifythesamedefectattheearhest. (viii) Normal working will be resumed only after S&T staff rectify the telephone and issue reconnection/fitmemoforthesame. 4. FAILUREOFLIFTINGBARRIERSORLEAFGATES- (i) When the gate cannot be closed due to failure of lifting barriers/leaf gates, the Gateman will immediately inform the Station Master on duty, under exchange ofprivate number, and ensure thatliftingbarriersofleafgatesdonotfoulthetrack. (ii) Heshallimmediatelyfixredbannerflagbydayandredflashinghghtbynightonthepostatthat endfirstfromwhichthetrainis approaching and then at the other end. (iii) Gatemanshallsecurethegateagainstroadtrafficbymeansofsafetychainsandpadlocks. (iv) After securing the Gate against road traffic, Gateman shall show green hand signal flag by day andgreenhghtbynighttotheLocoPilotoftheapproachingtrain. (v) StationMasterondutyshallissueaCautionOrdertotheLocoPilotofadepartingtrain. (vi) He shall also advise the Station Master at the dispatching end, under exchange ofprivate number. tosimilarlyissueaCautionOrdertotheLocoPilotbeforedispatchingatrainintheblocksection fromhis end. (vii) The Station Master shall also advise maintenance staff responsible for maintenance of lifting barriers/leaf gates to rectify the same at the earliest. (viii) Normal working will resumed only after maintenance staff rectify the lifting barriers/leaf gates andissuereconnection/fitmemo forthe same. 5. OBSTRUCTIONATTHELEVELCROSSINGGATE- (i) If the gate is broken by a road vehicle which is fouling the track, or if lifting barriers/leaf gates or anyotherpartofthegatefoulthetrack,orifthereisanyotherobstructionatthegate,theGateman shall immediately fix Red Banner flag by day and Red flashing Lamp by night on posts provided atbothendsofthegate,forthispurpose. (ii) Immediately after this, the Gateman shall advise the Station Master/Cabinmaster/Cabin man on duty,regardingthedefects/obstructionatthegate,underexchangeofprivatenumber. (iii) Station Master/Cabinmaster/Cabin man on duty shall be advised to put the reception/departure signalsbackto'ON'position, if taken 'OFF'for atrain. (iv) If there is no response from the Station Master/Cabinmaster/Cabin man after two or three attempts, he shall first protect the gate and then inform on phone. 299 (V) M ^ ^ 3 f c f ^ % W T ^ ^ ^ T O % W T ^ < T ^ ^ ^ * f H ^ (Vi) OT%^^^fif^^^™^l (vii) ^ ^ T O % f ^ , ^ , * n f ^ ^ ™ ^ ^ ™ ^ w v ^ w v ^ (viii) ^ R T O T O R i l ^ T O ^ ^ ^ t W - W ^ w f e ^ ^ f ^ (ix) ^ 3 ^ ^ ^ ^ % ^ ^ ^ ^ . 3 ^ - ^ % 3 ^ ^ W V % f t R (x) ^ ^ ^ W t , 1 ^ ^ 5 i t M ^ T O # l M I M w i (Xi) ^ ^ ^ t o ^ ^ ^ l ^ ^ 3 f c ^ ^ ^ 3 ^ ^ f | ^ ^ (xii) ^^w^^^^^w^^rdr^i4r^v^^^w^%f^^w^ (xiii) ^ # ^ O T a w f ^ t w * i ^ f ^ ^ ^ ^ / t e ^ ^ ^ OSSO 300 Appendix-'A' RULES FOR WORKING LEVEL CROSSING (v) Gatemanshallthenrushwithdetonatorsandredflagbydayandredflashinghandsignallampby night in the direction of the approaching train and protect the gate as stipulated in General InstructionfordutiesofGatemanunderitemNo. 1.5 (5). (vi) Thereafterheshallprotectthegatefromtheotherdirectionalso. (vii) Heshallnotedowntheparticularsoftheroadvehicle,nameoftheDriver,Ownerandrelaythese details to the Station Master who shall not start the train unless he has been ensured by the Gatemanthattheroadvehicleorthehfting barriers/leaf gates are not fouling the track. (viii) The StationMastershall also inform the Station Master at the dispatching end, under exchange of private number, asking him not to dispatch any train in the block section from his end, until the trackhasbeenclearedofallobstruction. (ix) After the track has been cleared of all obstructions the Gateman shall inform the Station Master accordinglyunderexchangeofprivatenumber. (x) Station Master shall then issue a Caution order to Loco Pilots of all trains to proceed cautiously and pass the Gate on green hand signal of the Gateman, if the gate is broken, but is clear of any obstruction. (xi) Gateman shall secure the gate against road traffic by means of safety chains and padlocks and thereafterexhibitgreenhandsignal,ifthegateisnotobstructed. (xii) StationMastershalladvisemaintenancestaffresponsibleformaintainingthehftingbarriers/leaf gates to rectify the same at the earliest. (xiii) Normal working will be resumed only after maintenance staff rectify the defective lifting barriers/leaf gates andissuereconnection/fitmemo for the same. 6. OBSTRUCTION ON THE TRACK NEAR LEVEL CROSSING GATE - If there is a rail fracture or obstructiononthetrackduetofallingofatree,foulingbyRoadVehicleorderailment,whichisvisibleto the Gateman, then the Gateman and Station Master will adopt the procedure given under item no. 5 above. If the obstruction fouls the level crossing gate. Gateman must keep the gates closed against Road traffictillthetrackisclearedoftheobstruction. 300 TftftlB-V W l ^ ^ T O t o (i) ^ ^ ^ ^ M m ^ ^ w m w r a l 3̂R-TTR ta^r ?t ̂ ^ arn̂ T (ii) W M f ^ % W T ^ ^ ^ 3 ^ T O % W T ^ ^ ^ % ^ f 3 k ^ f t f ^ ^ t I I T (iii) M ^ ^ W M ^ ^ % f ^ * M ^ 3 ^ ^ ^ r a ^ : ^ ^ ^ l (iv) M ^ f e ^ M k ^ ^ w i w i M P ^ ^ ^ ^ i (Vi) ^ ^ ^ W ^ ^ ^ ^ H ^ f » ^ O T ^ ^ I (Vii) ^ % ^ ^ 3 ^ ^ t ^ ^ f ^ % W T ^ ^ 3 1 k T O % W T ^ ^ f ^ ^ ^ ^ R - (Viii) ^ ^ W w T t ^ ^ ^ 3 ^ ^ ^ W ^ , ^ ^ % ^ ^ ^ ^ R T 3 ^ % 3 T ^ ^ (*) f^^^^^M^- (x) ^ q # l f ¥ ^ ^ f % M ^ f c ^ # ^ ^ ^ 3 M ^ ( W ) ^ ^ (11) ^ ^ ^ a i k t e N ^ M ^ ^ i (iii) M ^ f ^ % W T ^ ^ ^ ^ 3 ^ T O % W T ^ ^ f ^ ^ ^ % ^ f 3 k w (XV) ^ ^ ^ t w ^ ^ ^ l ^ M ^ ^ I ^ ^ T O r ^ (v) w ^ T O r , ^ f M ^ ™ i ^ ^ i (vi) OT%^^3T^^^^f^%WT^^3kTO%WT^^f^^ (vii) ^ « , / ^ ^ fr 3WH ^ ^ ^ ^ # £ T * I W OT « R T *fe (viii) ^ f e ^ R W ^ ^ M ^ * M ™ 3 ^ ^ ^ t l 301 Appendix-'A' RULES FOR WORKING LEVEL CROSSING

Previous and next

All provisions of Indian Railways (Open Lines) General and Subsidiary Rules

Questions people ask

Is annexure V of Indian Railways (Open Lines) General and Subsidiary Rules still in force?

No repeal of Indian Railways (Open Lines) General and Subsidiary Rules is recorded.