ENGINEERING LEVEL CROSSING GATE NON-INTERLOCKED PROVIDED WITH TELEPHONE.
WITH NORMAL POSITION "OPEN TO ROAD TRAFFIC"
(General Instructions are common for all types of Manned Level Crossing Gates)
1. MODE OF OPERATION- Detailed mode of operation for opening and closing the level crossing gate
shall be provided in the respective Station Working Rules and Gate Working Instructions incorporating
local operational requirements. When level crossing gate is required to be opened for passage of road
traffic, the Gateman must first open the gate farthest away from approaching road traffic and then open
thegateonthesidenearesttheapproachingroad traffic.
295
TftftlB-V W l ^ ^ T O t o
2. m^^ti^^-^-
(i) W I f tq* ^ W V % I ^ W V % I ^ ^ ^ ^ ^ , f ^ 3fa fc iR
(ii) ^ ^ ^ f * ™ 3 f f q ^ 3 ^ ^ T ^ ^ ^ ^ ^ ^ ^
(iii) ^ ^ f ^ ^ ^ W T ^ ^ 3 ^ ^ ^ ^ t e ^ 3 T ^ - ^ %
(iv) ^ W V % ^ W V % f ^ ^ f t F R ^ ^ ^ ^ ^ f ^ ^ % ^
(V) ^ « t a W « ^ / « ^ # ^ W ^ t ^ ^ ^ ^
(i) ^ R M K̂ ^ R wv%to w v » i * r ^ afc % $w\ wv%fcr
(ii) ^ ^ ^ f ^ R W ^ ^ ^ ^ ^ I
(iii) 3 m ftft TR ^ R WV%f^ W V ^ ^ T ^ ^ m ^ k ^ Wte ^ R
(iv) ^4H W ^ ^ 3 f c ^ ^ 3 T W ^ ^ ^ ^ / ^ ^ / % f l H ^
*t*ITI
(V) rt^^^^WV^W^^TOt^^W/^
(vi) ^ ^ W M ^ ^ t a M ^ M ^ ^ ^ ^ ^ ^ ^
(i) W F ^ ^ ^ R T O ^ A ^ W W ^ ^ ^ W ^ W W
(ii) ^ M O T ^ ^ ^ T O ^ C ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^
(iii) ^^^w^it^iwmf^^^wm^wMi^m^^
(iv) ^ # ^ ^ ^ W W ( M i ^ W W ( ^ ^ W W W ^
(V) M R M ^ ^ H W ^ ^ ^ ^ ^ ^ ^ ^ e t t T O ^ ^ ™
(Vi) ^ ^ , ^ M ^ 3 T ^ W # ^ % ^ < T O ^ ^ ^ ^ ^ f %
296
Appendix-'A' RULES FOR WORKING LEVEL CROSSING
2. EXCHANGE OF PRIVATENUMBE -
(a) When Gate is connected with the Station atthe Despatching End -
(i) Station Master/Cabinmaster/Cabin man at the dispatching end shall advise the Gateman.
No., description, direction and expected time of passage of train at the gate under
exchangeofprivatenumber.
(ii) Such advise shall be given before taking 'Off departure signals or giving an authority to
proceedtotheLoco Pilot.
(iii) The Gateman on receipt of the advice shall close the gate well in time and confirm the
same,underexchangeofPrivateNumber.
(iv) Station Master/Cabinmaster/Cabin man will 'take off the departure signals after getting
thePrivateNumberoftheGateman.
(v) Gate once closed can be opened by the Gateman, after passage of train/trains or change in
planning of train movement etc, with the permission of Station Master as the need of
opening is known to Gateman according to road traffic to be cleared. Obviously it can be
done only after exchanging private Number with the control Station Master who will
ensure thatthere is no trainmovementtowards the level crossing.
"On a single line the gateman shall be authorise to open the level crossing gate after
completepassageoftrainfromthegatebyobservingTailBoard/TailLamp".
(b) When Gate is connected with the Station at the Receiving End -
(i) Station Master/Cabinmaster/Cabin man at the despatching end shall advise the Station
Master/Cabinmaster/Cabin man at the other end, the number, description, direction and
expected time of passage of the train at the Gate under exchange of Private Number.
(ii) SuchadviceshallbegivenbeforeobtainingLineClear.
(iii) TheStationMaster/Cabinmaster/CabinmanattheReceivingEndshallinturnconveythe
sameadvicetotheGatemanunderexchangeofPrivateNumber.
(iv) The Gateman shall close the gate and thereafter give his Private Number to the Station
Master/Cabinmaster/Cabinman.
(v) OnlythentheStationMaster/Cabinmaster/CabinmanatthereceivingendshallgrantLine
Clear to the Station Master/Cabinmaster/Cabin man at the despatching end.
(vi) Gateonceclosedforroadtrafficmustonnoaccountbeopenedunlessthisisauthorisedby
theStationMaster/Cabinmaster/Cabinman,underexchangeofPrivateNumber.
3. FAILUREOFTELEPHONICCOMMUNICATION-WhenTelephonicCommunicationfailsoritdoes
not get any response from the Gateman despite 2 or 3 attempts, the following procedure should be
adopted:
(i) Station Master at the dispatching end shall issue a caution order to the Loco Pilot before
dispatchingatrainintheblocksectionfromhisend.
(ii) The Caution Order should advise the Loco Pilot to whistle continuously and approach the gate
cautiously.
(iii) The Loco Pilot shall be instructed to pass the gate cautiously, on being hand signalled by the
Gateman. If hand signal is not seen, Loco Pilot should be prepared to stop short of the gate and
depute his Assistant Loco Pilotto see the condition of the gate. If the gate is closed, the Assistant
Loco Pilot will give the all right signal and if the gate is not closed the Assistant Loco Pilot must
close the gate and then give the All Right Signal. In the absence of the Assistant Loco Pilot, the
LocoPilotmaytaketheassistanceoftheGuardandshallstopclearofthelevelcrossingtopickup
the assistant Loco Pilot who willreopenthe gate forpassage of road traffic.
(iv) In case of an approaching train, the Station Master shall advise the Station Master at the
dispatching end, under exchange of private Number, that the telephone at the gate has failed.
(v) TheStationMasteratthedispatchingendshallthenissueaCautionOrdertotheLocoPilotbefore
dispatchingatrainintheblocksectionfromhisend.
(vi) Station Master shall also advise the Gateman through Gang man /Patrolman or Loco Pilot of the
firsttrainthatthetelephonehasbecomedefective.
296
(vii) W 3 ^ ^ ^ ^ # W ^ M ^ ^ T O ^ / ^ % f d ^ ^ ^ R I
(Viii) T ^ T r u ^ O T ^ M ^ ^ ^ ^ ^ ^ / t e ^ m ^ * ^ * ™
(i) ^ f M ^ ^ 3 ^ # ^ ^ f t w % ™ ^ ^ f ^ ^ M ^ ^
^ ^ 3 * * ^R WV%f*T W V » l * r *t Wte ^ R % 3^R-*SR % 3^fw
(ii) ^ ^ ^ f ^ % W T ^ ^ ^ 3 f c w % W T ^ < T ^ ^ f ^ T 3 ^ ^ 3 r t
(iii) ^ ^ W M % f ^ M ^ ^ 3 i k ^ W ^ ^ ^ I
(iv) ^ ^ ^ W M % t e ^ ^ % ^ ^ f ^ % W T ^ ^ t 3 i k w % W T
^ ^ ^ R ^ ^ ^ c M T O ^ f e ^ ,
(v) * ^ R ^ ^ # ^ ^ W W ^ # ^ I
(vi) W ^ f ^ % W H W < ^ ^ % e M T O ^ 3 ^ a f c ^ ^ W ^ ^ ^
(Vii) ^ H H I ^ ^ ^ | 4 1 ^ ^ W ^ ^ r d r ^ l ^ V # ^ ^ ^ ^ W ^ ^ / l ^ t g
(viii) ^^w^^rd r^ i fev#wte^w^^%^^ :# to / f fe^ t^%
(i) m ̂ *s* ^R m m^ it ̂ # £s «st 3^1^ (w) ^ w ?t aw* ^
(ii) Rg^^^d^id ̂ i4<d ^ H w v ^ w v ^ ^ ^ g # / ^ M ^
* ^ . 3 ^ R - ^ R % 3 ^ ^ ^ |
(iii) ^ f e ^ R TO/^mV^? ^ ^ ftqr ^ T ft anWHWH, ftPHeff ̂
(iv) ^ - S T O S ^ t f ^ W V ^ W V ^ ^ O T ^ ^ f t a ^ ^
^ ^ ^ ^ M ^ R ^ ^ R T ^ I
(V) M ^ ^ 3 f c f ^ % W T ^ ^ ^ W % W T ^ < T d ^ ^ ^ ^ , R ^
3 T R ^ f ^ 3 # ^ t ^ 3 ^ ^ ^ ^ * ^ * ^ 3 ^ % 3 ^ ^ .
1 . 5 ( 5 ) 3 » f ^ R ^ K ^ ™ ^ l
(Vi) ^ ^ W ^ ^ f ^ ^ W ^ I
(Vii) ^ ^ ^ % f ^ , ^ , F ^ ^ R R ^ ^ d ^ ^ W V % f ^ W V % ^ R
(Viii) ^ T O W H M ^ ^ R W ^ # ^ 4 . 3 W - W ^ W f e ^ ^ f e
(ix) ^ 3 ^ T t ^ ^ % ^ R ^ ^ ^ 3 ^ - ^ % 3 ^ ^ W V % f ^
^ / % f ^ ^ d ^ K ^ ^ '
(X) ^ fc ^ W i 1 ^ 3 ^ ^ | M ^ W ^ ^ f % c M T O ^
ftFR^^^I
297
Appendix-'A' RULES FOR WORKING LEVEL CROSSING
(vii) He should also advise S&T staff responsible for maintenance of the telephone to rectify
thedefectattheearliest.
(viii) Normal working will be resumed only after S & T staff rectify the telephone and issue
reconnection/fitmemoforthesame.
4. FAILUREOFLIFTINGBARRIERSORLEAFGATES-
(i) When the gate cannot be closed due to failure of lifting barriers or leaf gates, the Gateman will
immediately inform the Station Master/Cabinmaster/Cabin man on duty under exchange of
privatenumber,andensurethatliftingbarriersorleafgatesdonotfoulthetrack.
(ii) The Gateman shall immediately fix red banner flag by day and red flashing light by night on the
postatthatendfirstfromwhichthetrainis approaching and then at the other end.
(iii) Gatemanshallsecurethegateagainstroadtrafficbymeansofsafetychainsandpadlocks.
(iv) After securing the Gate against road traffic, Gateman shall show green hand signal flag by day
andgreenlightbynighttotheLocoPilotoftheapproaching train.
(v) StationMasterondutyshallissueacautionordertotheLocoPilotofadepartingtrain.
(vi) The Station Master shall also advise the Station Master at the dispatching end, under exchange of
private number, to similarly issue a Caution Order to the Loco Pilot before dispatching a train in
theblocksectionfromhisend.
(vii) The Station Master shall also advise maintenance staff responsible for maintenance of lifting
barriers /leaf gatestorectifythedefectattheearliest.
(viii) Normal working will be resumed only after maintenance staff rectify the lifting barriers/leaf
gates andissuereconnection/fitmemo forthe same.
5. OBSTRUCTIONATTHELEVELCROSSINGGATE-
(i) If the gate is broken by a road vehicle which is fouling the track, or if lifting barriers/leaf gates or
any other part of the gate fouled the track, or if there is any other obstruction at the gate, the
Gateman shall immediate fix Red Banner flag by day and Red Signal Lamp by night on posts
providedatbothendsofthegate,forthispurpose.
(ii) Immediately after this, the Gateman shall advise the Station Master/Cabinmaster/Cabin man on
duty,regardingthedefect/obstructionatthegate,underexchangeofprivatenumber.
(iii) Station Master/Cabinmaster/Cabin man on duty shall be advised to put the reception/departure
signalsbackto'ON'position, if taken 'OFF'for a train.
(iv) If there is no response from the Station Master/Cabinmaster/Cabin man after two or three
attempts, he shall first protect the gate and then inform on phone.
(v) Gatemanshallthenrushwithdetonatorsandredflagbydayandredflashinghandsignallampby
night in the direction of the approaching train and protect the gate as stipulated in General
InstructionfordutiesofGatemanunderitemNo. 1.5 (5).
(vi) Thereafterheshallprotectthegatefromtheotherdirectionalso.
(vii) He shall note down the particulars of the road vehicle, name of the Driver, owner and relay these
details to the Station Master who shall not start the train unless he has been ensured by the
Gateman that the road vehicle or the lifting barriers/leafgates are not fouling the track.
(viii) The Station Master shall also inform the Station Master at the dispatching end, under exchange of
private number, asking him not to dispatch any train in the block section from his end, until the
trackhasbeenclearedofallobstruction.
(ix) After the track has been cleared of all obstructions the Gateman shall inform the Station Master
accordinglyunderexchangeofprivatenumber.
(x) Station Master shall then issue a Caution order to Loco Pilots of all trains to proceed cautiously,
andpassongreenhandsignaloftheGateman,ifthegateisbroken,butisclearofanyobstruction.
297
TftftlB-V W l ^ ^ T O t o
(xi) ^ ^ ^ t o ^ ^ ^ ^ ^ 3 f c ^ ^ ^ 3 ^ ^ f | ^ p > T
(xii) ^ ^ w ^ ^ ^ ^ ^ w ^ ^ M ^ ^ f ^ / ^ ^ ^ w ^ % f ^ ^ « * f
(xiii) ^ k W M W i f e f c / i A ^ ^ ^ ? : ^ / t e ^ ^ l *
3 ^ ^ TO^T toft " ^ W M % f^ «fe"
(i) ^TO^%f^^wv%f^wv%m^^^i
(ii) ^ ^ ^ M ^ ^ % f ^ W ^ l d H I 3 ^ ^ ^ ^ ^ W ^ ^
(iii) ^ d ^ ^ ^ ^ # ^ ^ r ^ M d ^ ^ ^ z ^ ^ 3 ^ r i m ^ ^ ^ ^ w v
(iv) ^ * n ™ w r % ^ ^ T O ^ ^ 3 f a ^ ^ ^ W V % l ^ ^
(v) f ^ ^ ^ « W ^ ^ ^ 3 ^ ^ ^ ^ W V % f ^ W V % ^ ^
(Vi) T ^ ^ ^ f e n w W ^ ^ / ^ M % W ^ ^ 3 ^ ^ ^ f ^ ^ ^ ^ T f e ^
(i) TOl«I^RTOWtAt«wW^t^#W^
(ii) W B ^ ^ W ^ » # ^ ^ l W ^ ^ « p
298
Appendix-'A' RULES FOR WORKING LEVEL CROSSING
(xi) Gateman shall secure the gate against road traffic by means of safety chains and padlocks and
thereafterexhibitgreenhandsignaUfthegateisnotobstructed.
(xii) Station Master shall advise maintenance staff responsible for maintaining the lifting barriers/leaf
gatestorepakthe same atthe earliest
(xiii) Normal working will be resumed only after maintenance staff rectify the decective lifting
barriers/leafgatesandissuereconnection/fitmemoforthesame.
6. OBSTRUCTION ON THE TRACK NEAR LEVEL CROSSING GATE - If there is a rail fracture or
obstructiononthetrackduetofallingofatrecfoulingbyRoadVehicleorderailmentwhichisvisibleto
theGateman. Then Gateman and Station Master will adopt the procedure given under item No. 5 above.
If the obstruction fouled the level crossing gates, Gateman must keep the gates closed against Road
traffictillthetrackisclearedoftheobstruction.
Previous and next
All provisions of Indian Railways (Open Lines) General and Subsidiary Rules
Questions people ask
Is annexure IV of Indian Railways (Open Lines) General and Subsidiary Rules still in force?
No repeal of Indian Railways (Open Lines) General and Subsidiary Rules is recorded.