ANNEXURE-VI
ANNEXURE-VI
ENGINEERING LEVEL CROSSING GATES, NON-INTERLOCKED, NOT PROVIDED WITH
TELEPHONE, WITH NORMAL POSITION "CLOSED TO ROAD TRAFFIC"
(General Instruction are common for all types of Manned Level Crossing Gates)
1. MODE OF OPERATION - Detailed mode of operation for opening and closing the level crossing gate
shall be provided in the respective Station Working Rules and Gate Working Instructions incorporating
local operational requiremets, when level crossing gate is required to be opened for passage of road
traffic. The Gateman must first open the gate farthest away from approaching road traffic and then open
thegateonthesidenearesttheapproachingroad traffic.
(i) Whenever the Gateman has to pass a road vehicle across the level crossing gate, he must ensure
thatnotrainisinsightineitherdirection,northereisanyaudiblesoundofanapproachingtrain.
(ii) Heshallthenplantredbannerflagsbydayandredflashinglampsbynightonpostsprovidedon
bothsidesofthegateforthispurpose.
(iii) Heshallthenopenthegatetopassroadtraffic,andcloseitagainimmediatelythereafter.
(iv) Heshallthenremovetheredbannerflagsbydayandredflashinglampsbynight.
(v) If the Gateman sees or hears a train approaching the level crossing gate when the gate is in open
condition, he shall rush with detonators and red flag by day and red flashing hand signal lamp by
nighttowardstheapproachingtrain.
(vi) Ifthetrainistooclose,heshallplacedetonatorsonthelineatadistanceasforawayhecango.
(vii) Thereafter,heshallstoptheapproachingtrainbywavinghisredflagbydayandredflashinghand
signal lampbynightrepeatedly
(viii) If there is sufficient time, the Gateman will protect his gate as stipulated in General instructions
fordutiesofGatemanunderitemno.l.5.(5).
2. FAILUREOFLIFTINGBARRIERSORLEAFGATE:
(a) FailurewhentheGateisinopencondition:
(i) Gatemanshallfirstensurethattheliftingbarriers/leafgatesdonotfoulthetrack.
(ii) Gatemanshallsecurethegateagainstroadtrafficbymeansofsafetychainsandpadlocks.
(iii) He shall fix red banner flag by day and red flashing lamps by night on posts provided at
bothsidesofthegateforthispurpose.
(iv) Ifheseesatrainapproachingthegatebeforehehassecuredthegate,heshallrushtowards
thetrainwithdetonatorsandredflagbydayandredflashinghandsignallampbynight.
(v) Heshallplacedetonatorsonthelineatadistanceasfarawayhecango.
(vi) There after he shall stop the approaching train by waving his red flag by day and red
flashinghandsignal lampbynightrepeatedly.
(vii) HeshallsendinformationthroughGangmate/Petrolman/Keymanorlocopilotofatrain
to theJE/SE/SSE(P.way)/StationMastertonecessary action.
(viii) StationMasterondutyshallissuecautionordertotheLocoPilotofadepartingtrain.
301
TftftlB-V W l ^ ^ T O t o
(ix) ^ M H i ^ M ^ « ^ W ^ * ^ W ^
(x) ^ W * 3 ^ ^ ^ ^ ^ ^ M ^ f c / # ^ ^ ^ W ^ ^ / ^ k
(xi) ^^^ f^^rdr^ i^v^^^w^^^^^f^^^^ / f fe^ t^
(i) ^ ^ ^ ^ ^ ^ t a ^ ^ # ^ ^ 3 c ^ ( W ) ^ ^ 3 ^ ^ f M ^
(ii) M ^ ^ ^ R l 3 1 k f ^ % W T ^ ^ ^ T O % W T ^ ^ f ^ ^ T ^ ^ f ^ , ^ 3 ^
(iii) 3 * % ^ ^ ^ f ^ ^ ^ r a ^ l
(iv) W ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ M ^ T O ^ ^ a ^ M /
(V) ^ W ^ ^ f ^ % ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ W t o ^ ^ f % 3 ^
(vi) ^w^i^w^^tw-wlwff^to
(Vii) ^ ^ ^ ^ l * t t ^ t 3 W ^ % 3 ^ ^ R WV%f^
(ix) ^ w ^ t o ^ M ^ ^ a f c ^ ^ a ^ ^ l ^ ^ r f t w
(x) ^ H W < < ^ l 4 l ^ ^ W ^ P d P ^ I ^ V # q » ^ ^ W W % f ^ # H 1 ^ f t g ^ f
(xi) ^ M O T M f e t e f c / e t t ^ f l ^ ^ ^ f t e / t e ^ ^ ^ l
OSSO
302
Appendix-'A' RULES FOR WORKING LEVEL CROSSING
(ix) He shall also advise the Station Master at the dispatching end, under exchange of private
number, to similarly issue a Caution order to the Loco Pilot before dispatching a train in
theblocksectionfromhisend.
(x) Station Master shall advise maintenance staff responsible for maintaining the lifting
barrier/leafgatestorectifythesameattheearliest.
(xi) Normalworkingwillberesumedonlyaftermaintenancestaffrepairtheliftingbarrier/leaf
gates andissuereconnection/fitmemo forthe same.
(b) FailurewhentheGateisinclosedcondition-
Gateman shall send information through Gang man/patrolman/key man or Loco Pilot of a
passing train to the JE/SE/SSE(PWay)/Station Master concerned, asking for necessary action.
3. OBSTRUCTIONATTHELEVELCROSSINGGATE-
(i) Ifthegateisbrokenbyaroadvehiclewhichisfoulingthetrack,orifliftingbarriers/leafgatesor
any other part ofthe gate foul the track, or if there is any other obstruction at the gate, the Gateman
shall immediately fix Red Banner flag by day and Red flashing Signal Lamp by night on posts
providedatbothendsofthegate,forthispurpose.
(ii) Gatemanshallthenrushwithdetonatorsandredflagbydayandredflashinghandsignallampby
night in the direction ofthe approaching train and protect the gate as stipulated in General
InstructionfordutiesofGatemanunderitemno. 1.5 (5).
(iii) Thereafterheshallprotectthegatefromtheotherdirectionalso.
(iv) He shall note down the particulars ofthe road vehicle, name ofthe Driver, owner and relay these
detailstotheStationMasterandJE/SE/SSE,(PWay)throughaGangmate/Patrolman/Keymanor
anyotherrailwayemployeeorthroughtheLocoPilotofapassing train.
(v) After being informed the Station Master shall not start any train unless he has verified that the
obstructionhasbeenremoved and the Gate is safe forthe passage of trains.
(vi) The Station Master shall also inform the Station Master at the dispatching end, under exchange of
privatenumber,nottodispatchanytrainintheblocksectionuntilthetrackhasbeenclearedfrom
allobstruction.
(vii) AfterthetrackhasbeenclearedfromallobstructionstheGatemanshallinformtoStationMaster
accordinglyunderexchangeofprivatenumber.
(viii) Station Master shall then issue a Caution order to Loco Pilots of all trains to proceed cautiously
and pass the Gate on green hand signal ofthe Gateman, if the gate is broken, but is clear of any
obstruction.
(ix) Gateman shall secure the gate against road traffic by means of safety chains and padlocks and
thereafterexhibitgreenhandsignaUfthegateisnotobstructed.
(x) Station Master shall advise maintenance staff responsible for maintaining the lifting barriers/leaf
gates to repair the same at the earliest.
(xi) Normal working will be resumed only after maintenance staff rectify the defective lifting
barriers/leaf gates andissuereconnection/fitmemo for the same.
4. OBSTRUCTIONONTHETRACKNEARLEVELCROSSINGGATE-
If there is rail fracture or obstruction on the track due to falling of a tree, fouling by Road Vehicle or
derailment, which is visible to the Gateman. Then Gateman and Station Master will adopt the procedure
given under item no. 3 above. If the obstruction fouls the level crossing gates. Gateman must keep the
gatesclosedagainstRoadtraffictillthetrackisclearedoftheobstruction.
G8%r>
302
TftRlB-'tf i W * r f % *ran?rc frm
(i) ^ ^ ^ % 3 # f ^ ^ M % ^ ^ 3 ^ q f ^ ^ ^ f ^ n ^ ^ ^ ^ ^ 3 ^ ^ ^ f ^
(ii) ^ ^ W ^ ^ M ^ ^ i T T H ^ ^ ^ ^ ^ ^ ^ M ^ ^ f ^ f f ^ ^ ^ R ^ ^ ^ T T I
(i) ^Mf-^^^^tw^^fe^fe^^M^^te^TOi
(ii) ^ ^ 3 ? 7 W ^ ^ - ^ 3 # 3 ^ W ^ * ^ f ^ * ^ ^ % M ^ ^
(iii) ^ - ^ 3 # ^ ^ ^ ^ ^ % M ^ % ^ ^ ^ ^ ^ % ^ | f « ^
(iv) ^ ^ - ^ ^ O T ^ ^ ^ ^ ^ t ^ ^ ^ t ^ R 3 ^ ^ ^ % f ^ i ^ ^ t 3 ^ f ^ f
A W1TC. 3
(i) i T r q . 1 . ^ % ^ ^ % f ^ % ^ T ^ ^ ^ 3 ^ ^ ^ t l
(ii) f^rf^^^a^t-
(*) « t a 4 . 1 5 ( i ) - ^ . ^ « * * « * « ^ ^ ^
A W . 3 T K . 4 - ^ ^ ^ 4 ^ - ? ^ ^ ^ ^ ^ ( 3 . 0 4 8 ^ ) ^ ^ ^ ^ i ^ . ^ . ^ ^ ^ 3 t f ^ ^ i W
(3.658 to)^%™^^^^rf3^|f^^^^^t^^3^«
303
Appendix - 'B' RULES FOR WORKING OF EMU TRAINS
APPENDIX -'B'
TRACTION RULES FOR WORKING OF EMU TRAINS
TSR1.
(i) In addition to these rules all General and Subsidiary Rules which control the movement and
operation of trains, shall also apply to the movement and operation of EMU's except as otherwise
providedinthese rules.
(ii) Station Master, Inspector and Staff working EMU's must have thorough knowledge of these
rules.
TSR2. Definitions -
(i) Motorman - means a duly certified Loco Pilot ofa single or multiple unit train.
(ii) Gaurd's emergency Brake valve- means a valve fitted in the driving compartments of EMU train
equipped with compressed air brakes, by means of which the Guard can apply the brakes of the
train in timesof emergencies.
(iii) Jumsers-meansmulti-coreflexiblecablesconnectedbetweenallcoachesofmultipleunitstrains
by means of which the control of the electrical equipment is affected from any driving
compartmentinuse.
(iv) Trailer Coach - Means a passenger carrying coach equipped for coupling to and operating with
motor coach, and not possessing traction motors, pantographs or driving or high voltage
compartments.
TSR3.
(i) OnlyonemotormanisnecessaryforoperationofanEMUtrain.
(ii) The following exceptions are permitted:
(a) GR 4.15 (1) - Side lights showing white towards the front and red towards the rear are not
providedonEMUs.
(b) GR6.03(3)OnanEMUthereisonlyonemotormanfordrivingandhemustnotleavehis
postexceptforattendingtodefectiveequipmentinhis train.
TSR4. M d t h o m o j ± - O w i n g t o t h e e x t a w i ^
conventional stock, staff are specially cautioned to stand well clear of passing trains and to warn passengersof
thedangerof standing toonearthe edge of the platform. Motormen and Guards must not put their heads out of
theircompartmentswhenthetrain is running or when it is standing at a line when another train is passing on the
adjacenttrack.
TSR5. Work inside EMU car shed-In case ofwork to be done in EMU car shed, the rules as laiddowninGR
17.04 Shouldbe followed.
TSR 6. Washing and cleaning of stock - When EMUs are placed in siding for washing, cleaning etc. the
sectionswitchforthatparticularsidingmustbeopenedbythemaninchargeofwashingandthekeyretainedby
him.
TSR7. Accidents: Responsibility of ElectricalDepartment-In the event ofanv accident occurring in which
electric coaching stock is involved or where damage to overhead structures or equipment takes place, the
railwayservantwhonoticesitshalltakenecessaryprecautionsagainstdangerofelectricshockandshallinform
thenearestStationMaster,sectioncontrollerandTractionPowerController to take immediate action to cutoff
power supply, if necessary, and restore the equipment as early as possible. The line is not to be re-opened for
traffic until a responsible official of the Electrical Department inspects the site and certifies that the line is safe
forthepassageoftrain.
303
TftRlB-'tf i W * r f % ^ ^ £m
(i) ^ / ^ ^ / 3 l i « r P r f e ^ T < ? l ^
% ^ ^ ^ ^ ^ 3 ^ i r « / f t ^ ^ ^ ' ' f ^ ^ ^ 3 ^ f % ^ ^ i f ^
(ii) ^ ^ ^ % ^ f , ^ # f ^ ^ % f ^ ^ ^ ^ ^ ^ r i w ^ # ^ f M ^ f ^ ^
^ i N t r f ^ ^ ^ f a ^ ^ ^ ^ f i
(iii) ^ 3 q ^ t f * t o - ^ f ^ 3 q ^ a ^
A w m . 1 o - ft^ ^ if f ^ ^ ^ (^) 5 ^ ^ W ^ ^ w # i i (^) ftidqft a q ^ ^ ^
^ a i k ^ i f w ^ ^ i f ^ f ^ M ^ l
CT^^^fi. HU Î Pud ^ 1 P ^ K ( ^ ) ^ ^ ^ I
AT^T.3TR.15-
(i) ^ i ^ . ^ . ^ % ^ ^ 3 i k ^ % ^ i f f ^ 3 R f ^ ^ f e ^ ^ ^ ^ 3 ^ ^ ^ t ^ ^
f * ^ w ^ ^ ^ ^ % ^ i f w ^ ^ w ^ i ^ ^ ^ i f w ^ ^ 3 ^
(ii) # ^ ^ ^ ^ ^ t ^ f e # ^ ^ w i f f ^ ^ ^ ^ i f ^ ^ ^ w ^ ^ 3 ^ f M ^
^ . 3 T C . 1 7 - 5 l 5 f ^ f t t e t ^
304
Appendix - 'B' RULES FOR WORKING OF EMU TRAINS
TSRS.WarningBoards-
(i) For the protection of staff employed on coaches/at car shed/stabling depots/or on platforms.
warning boards must be placed in a conspicuous position on the ends of the coach or rake by the
staff concerned before proceeding to carry out any work in or under the coaches. This board
shouldbeararemark-NottobeMoved-inwhitelettersonaredbackgroundandonnoaccountit
shouldberemovedexceptbythemanwhoplacedtheminposition.
(ii) Warning Boards are on no account to be removed and power applied until all precautions have
been taken to ensure that all men are clear of danger.
(iii) Overhead equipment alive - The whole of the overhead equipment comprising of contact wire.
catenary, droppers, register arms, steady arm etc is always to be considered "ALIVE" and men
workingovertheelectrifiedareamusttakecareto see that nothing comes in contact with it. There
is danger take care to see that nothing comes in contact with it. There is danger of death if men
comein contact, directly or indirectly, with the overhead contact system.
TSR9. Fire:-SeeGR6.10andtheirS.R.s.
TSR10. StaffemployedintheElectricalareamustimmediatelyinformtheSectionControllerbytelephoneas
quickly as possible the event of (a) accident (b) disabling of train (c) Unusual occurrence on overhead
equipmentoronoverheadfeeders or high tension cables etc. (d) any occurrence affecting the working of trains.
TSR11. MessagessentthroughStationMastermustbefullyrecordedbythemintheMessageBookandanote
mustbemadeinthediary.
TSR 12. The Section Controller will immediately take action on the information received and promptly inform
the Traction Power Controller who will take necessary action with any switching operations which may be
necessary on the overhead equipment or at sub-station and will immediately inform Sr. Divisional Electrical
Engineer(Traction).
TSR 13. Access to the high tension compartment can be had only by authorised persons in possession of a
reversing handle or special key provided for this purpose. Motormen and other officials to whom such keys are
issued should keep them in their personal custody to prevent un authorised person tampering with the
equipment.
TSR 14. No spanners or keys except those issued by the Railway Administration should be used for operating
theequipmentinelectrictrains.
TSR 15.
(i) No unauthorised person is allowed to travel in motormen's and Guard's Compartment of an EMU train
unless he holds a Motorman's or Guard's Compartment pass. The Number of authorised persons, other
than the Motorman and Guard (if travelling with Motorman), travelling in Motorman's Cab must not be
morethan three atanytime.
(ii) A Motorman who is off duty is not permitted to enter or travel in any of the driving compartments or to
usehis reversing handle under any circumstances.
TSR 16. A trainee or apprentice motorman when authorised by Divisional Electrical Engineer (Traction) may
driveanElectrictrainunderthesupervisionofacertifiedmotormanandthelattershallkeepacontinouswatch
overthetraineeorapprenticeandshallberesponsibleforsafeworkingofthetrain.
TSR 17. A driving Inspector is authorised to drive EMUs provided he had been driving at least 160 kms. In a
calendermonthoverthe entire EMU territory.
304
Tftfe-V iWi- * f f % wmi f*pr
M^t^r^^rf^-
a > * .
(0
(ii)
(iii)
(iv)
(v)
(vi)
(vii)
•^ -^
Hk<HH &KI *IM
JlW 4HIHM (4.5 5 £bi l l . ) /M' ^ 7 f%.
2 . 0 f ^ . m . / 4 4 2 % ( ^ ^ ) ^ R ^
^it f .^Ff l
<M^R ^ * i 3fr te anqRT *|foi>
^ ^ ^ M
W M ^ ^ ^ I
^ofm^^^ 3.5 f^M./W^K
' 3 f R ' ^ l )
305
Appendix-'B RULES FOR WORKING OF EMU TRAINS
TSR 18. Line chargemen and other maintenance staff who are required to attend to defective equipment are
allowed to handle the equipment in running train. They shall, however do this with the utmost care to ensure
thatthesafetyofthetrainandtheequipmentisnotendangeredin anyway.
TSR 19. An electric multiple unit train shall carry (a) one head light (b) one set of code lights in center (c) Two
red tail lights (d) Two red tail lights in one fitting. The lights will have provision for blinking.
TSR 20. Responsibility for head lights etc. of EMU's - The motorman is responsible for carrying the correct
Head lights by night and for ensuring that the tail lights are not seeing that the tail lights are not exhibited in the
front. The Guard is responsible for seeing that the tail lights/tail boards, as the case may be, are correctly
exhibited. In case of failure of electrical red tail lights, Guard should fix his hand signal lamp on the bracket
providedforthispurpose.
TSR 21. Lighting and fan circuit of EMUs - Guards must regulate the lighting of coaches and switch off the
fans whennotrequired. In the event of a defect in the lighting or in circuits the Guard will immediately inform
theMotormanandthenearestStationMasterwillarrangeforelectrical staff to rectify defects.
TSR22.
(a) Before an EMU train is brought on to a running line after inspection or maintenance in an EMU shed or
stabling line, the brakes of the train shall be jointly tested by the Motorman and Guard to ensure that
electropheumatic and automatic brakes are functioning normally and the brake pipe is continuous
throughout the train. The horn or whistle should be sounded and precautions taken to see that no one is
working onEMUtrainbeforebraketestis undertaken.
ProcedureforTestingtheBrakes:
Sl.No.
(i)
(ii)
(iii)
(iv)
(v)
(vi)
(vii)
To be done bv the Motorman
Give five rings to guard to be ready for brake
test.
Start the air compressor and when the main
reservoir pressure is normal (4.55 kg/sq. cm. to
7kg/ sq.cm.), open the isolating cock switch to
charge the brake pipe.
Make an electrical application to a pressure of
2.0 kg/sq.cm. (Approximately).
Make a full EP application
Move the brake controller handle to the
'release' position to release brake.
On observing drop in brake pipe pressure,
move brake controller handle to emergency.
Keep the handle of the brake controller in
release-running position and bring it to
emergency position only after Guard has
applied emergency brake by opening
emergency application cock.
To be done bv the Guard
Acknowledge by five rings.
When the brake pressure is 4.2 kg/sq. cm.,
give one ring to Loco Pilot.
On observing 2.0 kg/sq.cm. pressure in the
brake cylinder gauge, give one ring.
On observing 3.5 kg/sq.cm. pressure in the
brake cylinder gauge, give one ring.
On seeing that the brake cylinder pressure
is 0, open the Guard's emergency brake
valve (i.e. move the handle to 'ON')
On observing pressure 3.5 kg/sq.cm. in the
brake cylinder gauge, move the emergency
valve handle to 'OFF'
Open emergency application cock by
means of red brake handle to destroy brake
pipe pressure to zero and will observe
3.5+0 kg/sq.cm. pressure in brake cylinder
gauge.
305
«s-V i W ^ % ^ ^ Fm
(viii)
(ix)
(x)
3l
(ii) # ^ ^ % ^ ^ i ^ ^ ^ ^ ^ ^ « ^ ^ ^ ^ # i t i
(iii) ^ ^ ^ % ™ i W . ^ % ^ ^ ^ ^ ^ ^ ^ w ^ ^ ^ i
A^.am-2 4 - i w T . ^ t ^ ^ ^ ^ -
(i) ^ ^ ^ ^ a f o ^ ^ ^ ^ ^ ^ l
(ii) fr^^^f^afatafrn^sro^i
(iii) ^ w r ^ ^ ^ ^ a i k ^ ^ ^ ^ ^ i
306
Appendix - 'B' RULES FOR WORKING OF EMU TRAINS
(viii)
(ix)
(x)
When the brake pipe pressure is zero move the
brake controller handle to the 'release' position
and when the brake pipe pressure is normal
again, apply the automatic brake by reducing
the brake pipe pressure to 3.8 kg/sq.cm.
(approx).
Move the brake controller handle to 'release'
position.
Motorman will acknowledge completion of test
by giving five rings.
Observe the drop in brake pipe
pressure on the gauge and then give
one ring.
On observing that brake cylinder
pressure is zero and brake pipe
pressure normal on gauge, give one
ring.
Guard will observe that brake pipe is
5 kg/sq.cm. and give five rings to
indicate that above tests have been
completed correctly from his end.
(i) During brake tests, Guard and motorman may use one pause one ring to draw the other person's
attentionincaseofanylapseorabnormahty.
(ii) Duringbraketesting,oneringfromguardwillindicateacknowledgementofmotorman'saction.
(iii) As far as possible, this joint test should be taken before the EMU train leaves the shed or stabling
line. However, if authorised by C.E.E. and COM, the brake test may be taken on the platform
before commencement of the firsttrip.
(b) The examination and adjustment of brake must be carefully carried out before entering service.
Motorman must ensure that jumpers and hose pipes are properly secured in their dummy receptacles
aftercoupling.
He must take a careful examination of multiple units before taking them into service and any
defect or deficiency noticed must be brought to the notice of the supervisor and he must see that the
defectcardinpositionandinitialledtothiseffect.
Whentakingoverfromanothermotormanofanyfaultordefectlikelytoaffecttheworkingofthe
train.
(c) The above procedure must always be carried out most carefully when putting unit into service after
stabling, also after two units have been coupled up. The train crew must assist the station staff in
coupling anduncouphngunits.
(d) Themotormanshouldchecktheworkingofthedeadman'ssafetydevice.
TSR23. ItisthedutyoftheGuardandtheMotormantochangethedestinationindicatorsatrespectiveendsof
thetrain.
TSR24. StablinganEMUtrain-
(a) When stabling an EMU train in car shed or on a stabling line, the Motorman or Engine Turner who has
takenovertherakewillcarryoutthefollowingessentialoperations:
(i) Switchoffthelightsandfans,ifon.
(ii) Tripthemaincircuitbreakersanddropthepantographs.
(iii) Destroythebrakepipepressure,isolatethebrakecontroller.
306
TftRlB-'tf i W * r f % ^ ^ £m
(iv) ^ ' ^ ^ M ^ ^ ^ F f i
(v) ^ ^ r % ^ ^ t o ^ ^ ^ i
(vi) ^ T O M ^ ^ ^ ^ ^ ^ I
(vii) ^ k 3 ^ f t i f M f e ^ 3 ^ ^ f 3 ^ i
A^.3TR.30-
(i) ^ i f c ^ 3 f c ^ ^ ^ % ^ 3 ^ W 3 f t * 3 ^ ^ 3 ^ W ^ ^ I
(ii) ^ 3 ^ ^ t e ^ ^ ^ ^ ^ t ^ W ^ # f ^ ^ ^ ^ ^ f % 3 ^ M ^ ^ ^ 3 ^ 3 ^
AWTR.31 -
(i) ^ ^ 3 i k 3 ^ ^ ( M . ^ ^ ) ^ ^ - i ^ . ^ . ^ ^ ^ # W K % ^ W ^ t ^ t 3 ^
307
Appendix - 'B' RULES FOR WORKING OF EMU TRAINS
(iv) Applythehandbrakesfullyinthe'D'coaches.
(v) Putoffthemainbatteryswitchinthemotorcoaches.
(vi) Locktheequipmentcompartmentsanddrivingcabs.
(vii) Anyotheroperationprescribedinlocalinstructions.
(b) When a rake is to be stabled, the Motorman should invariably be at the leading cab. Backing an
EMUrakeintoasidingwiththeMotormanattherearcabisstrictlyforbidden.
(c) After stabling an EMU train or handing it over to the Engine Turner, the Motorman before going
off duty shouldconveytosupervisorinchargeoftheCarshedorstablingline(orto the TLC) any
defectorabnormahtiesnoticedduringtheprevioustripsrequiringimmediate attention.
Note : On arrival of train at terminal station for stabling, the Guard shall swith off lights and fans. No
MultipleunitorcoachmayenterashedataspeedexceedinglOkmperhourandonly after soundingthe
whistleandcomingtoastandoutsidetheshed.
TSR25. Speed Control ofEMU-For any position ofthe Master Controller chosen by the Motorman. the step
by step notching is controlled automatically. The Motorman should switch on the Master Controller to the
requiredpositiondependinguponthespeedtobeattained.
TSR 26. Oiling and Greasing - Motorman must not oil or grease any part ofthe train or equipment except to
attendawarmorhotbearingandwhenthishasbeendonehemustspeciallyreporttheoccurrencetoTLC.
TSR27.Motormanmustkeepasharplookoutforalldefectsoranythingunusualintherollingstock equipment
and promptly report suchdefects to the TLC or to the line chargemen and also record in the logbook. In thecase
ofseriousdefects,adetailedreportmustbemadebytheMotorman.
TSR 28. Electric Trains outside Electrified Area - Electric Trains must not be hauled outside the electrified
areauntilthepantographshavebeenlowered.
TSR 29. Non-electrified sidings - Except in case of emergency, electric train must not be placed in non-
electrified sidings within the electrified area, but when it is necessary to do so, care must be taken by Motorman
to ensure that all pantographs are lowered and that there is no obstruction on or along side the siding that will be
likelytocomeincontactwiththepantographoranyotherpartofthetrain,afterwhichthetrainmustbeshunted
into thesidingwith caution.
TSR30.
(i) Every Motorman and Guard must have with him while on duty all the equipments prescribed as per
Annexure'A'.
(ii) The Guard and the Motorman should also ensure that emergency telephone set is provided both in the
frontandrearcabbeforestartingthetrain.
TSR31.
(i) Automatic and semi-permanent coupler - EMU stock is fitted with Schaku couplers of two types, i.e.
automatic couplers for coupling unit to unit and semi permanent couplers for coupling the coaches of
each unit. The units are coupled merely by bringing them together at a slower speed (between 3 to 5
KMPH). Both the automatic couplers should be in uncoupled position. While coupling the stationary
unit or coaches it should have, its brake on. While uncoupling the automatic coupler, uncoupling ropes
of both the couplers are pulled simultaneously and then the coaches are drawn apart.
It is, therefore, not necessary for the staff to go between the coaches during coupling operation.
While coupling inbetween coaches ofthe unit, adjustable cup sleeves of end 'A' type coupler are opened
by the handles provided on the semi-permanent coupler. Both the semi-permanent couplers are aligned
manually and then coupled together by tightening the cup sleeves. Note that both the semi-permanent
couplers, i.e. End 'A' and 'B' are aligned properly before coupling.
307
Trftfta-'tf t^.*ff%*fti<?rcf*m
(ii) 3 e t ^ M M n - ^ ^ ^ ^ w ^ ^ f ^ ^ W T ^ ^ ^ ^ ^ ^ % % f ^ ; f % ^ ^ # t 1 %
(iv) ^ ^ ^ H ^ i q ^ ^ ^ - ^ r ^ M r H J ^ # ^ 3 ^ 3 ^ ^ W T ^ ^ ^ ^ R ^ r f e f f
(V) ^ ^ ^ ^ f ^ ^ f e ^ ^ ^ 3 W ^ ^ * f f M T O f l t o M
(Vi) ^ ^ 3 ^ * * | f M ^ ^ ^ ^ 3 ^ ^ 3 T R T O ^ ^ ^ 3 ^ ^ ^ ^ ^ ^
Awm.33- i22^^tMt^-^^f^^^^^iWL.%f^3
(ii) 3^-f^^w^^%*^^^^^^^w^f^^^M
(iii) ^ M % ^ ^ % W T ^ f ^ ^ ^ 3 H W ^ - H ^ 4 H ^ T ^ I ^ % 3 H ^ ^ ^ R ^ : ^ ^
(iv) M i ^ - ^ ^ ^ % f ^ ^ ^ ^ W T ^ ^ W ^ ^ ^ ^ ^ t ^ | T T ^ ^ ^
(V) M^^W-3^f^^^^^HKId:W^^ld<aru^^<<3W''f^^^^^
AWTR.36-
308
Appendix-'B RULES FOR WORKING OF EMU TRAINS
(ii) Coupling of Units - In coupling units together, the station staff will be responsible for seeing that the
jumper connections are properly made. Care is to be taken not to touch the contacts or to let them come
into contact with the rails, ballast or metal-work of the coach when inserting jumpers in the receptacles
provided. In all cases, this operation will be carried out under the supervision of the Motorman who will
firstensure that both the motor generator sets are switched off.
(iii) Stopping places of EMU trains - EMU trains shall be stopped at stopping marks as laid down in local
orders.
(iv) Guards to assist Station Staff-Guard must assist the station staffin coupling and uncoupling units which
mayhavetobeattachedordetached.
(v) Guards are responsible for seeing that all lighting and fan switches and the main lighting switch are off
before units are uncoupled.
(vi) At Stations or sidings where it is necessary for the units to be disconnected, the person performing the
workmustbeforeuncoupling,receivetheassuranceonaregisteroftheGuardandMotormanthatallthe
lighting and fan switches as well as the motor generator sets on both halves of the train have been
switchedoff
TSR32. Whentwoseparateunitsarecoupledtogetheratstations,onlyoneMotormanmustbeinchargeand
on no account, a Motorman who is off duty allowed to use his reversing handle under any
circumstances.
TSR33. FormationofEMUs-Unlessspecialinstructions are issued to thecontrarv. the formation of EMUs
isnottobealtered.
TSR34. ShuntingofSingleandMultipleunittrains.Whenshuntingistobeperformedtherulescontainedin
GR5.14mustbecompliedwith.
TSR35.
(i) Shunting and Setting Back - When performing shunting, the Motorman shall be in the driving
compartment nearest to the front and in the direction of movement when driving is being done from
other than the leading coach the man incharge of the movement must be in the leading coach in such a
positionthattheMotormancanreadilyseehissignals.
(ii) G^asting-Powermustbeswitchedoffasearlyaspossiblebeforetheapplicationofthebrakesinorderto
reduce consumption of electric energy.
(iii) Coasting Board to be observed in working trains - Motormen will normally observe the Coasting
Boards. When time is to be made up, they may switch off power later than normal. The maximum
permissiblespeedforthevarioussectionsshallnot,howsoever,beexceededinorderto makeup time.
(iv) Stopping - Care must be taken when applying the brakes to stop the train as smoothly as possible and the
brakes must be put on at such a distance as will enable the motorman to pull up at the proper stopping
pointatthestationplatform.
(v) Brake Application - Normally the brakes should only be applied after the Master Controller handle has
beenreturnedtothe "OFF'Position, except in case of emergency.
TSR36.
(i) Deadman'sHandleappliedtoinEMUs-Obstructiononthepermanentwavifanvobstructionisseenon
the line ahead and the train cannot be brought to a stand still by ordinary application of brakes, the
Motormanshouldremovehishandfromthemastercontrollerhandlewhenthepowerwillbecutoffand
thebrakeappliedautomatically.Thisshouldonlybedonewhenanemergencyapphcationofthebrakeis
required. The brake controller handle should then be moved to the full 'ON' position and the Master
Controllerswitchedoff
308
TftRlB-'tf i W . * r f % ^ ^ £m
(ii) ^ ^ | f ^ % ™ # ^ ^ ^ ^ f ^ 3 i f c 4 ^ ^ R ^ ^ ^ ^ 3 i W ^
^ ^ # ^ M ^ R ^ ^ R ^ W R n
AT^.3TR.37-
(ii) ^ ^ ^ ^ ^ ^ f t ™ ^ q # , R ^ ^ ^ t ^ M ^ f l ^ % ^ %
* f e ^ f % ^ ^ l ^ * ^ 3 ^ , %wft, ^ * OT f*FR^f * i ^ ^RRf 3 ^ fiRT
A^.3TR.38-
a > . * .
1.
2.
3.
4.
5.
6.
%̂n
^ t % ^ M % f ^
*.R. 4.21 % 3Rpfa ^NleFT «fl
^ t ^ ^ ^ R T
^ t ^ R T
*.R. 4.21 % 3 T ^ ^
^ ? T O ^ ^ % ^
<¥
00
00-00
000
0
0000
000000
4 t e ^ ^ f * R f ^ ^ ^ f * F R ^ 3 ^ ^ ^ W ^ -
XX.
1.
2.
3.
4.
5.
6.
^5?r
4 ^ k l ? R R ^ 3 ^
* . R . 9 . 0 2 % 3 ^ < 3 f R ' f ^ R 3
^ ^ ^ R < * ^
M ^ ^ T % f ^
4te*Ni#*r*raF?
^
000-000
0000-00
0000-0000
00
00000
000-0000
^
00
00-00
000
0
0000
000000
mwrf\
000-000
0000-00
0000-0000
00
00000
000-0000
feM-V^^fl^^i
309
Appendix-'B RULES FOR WORKING OF EMU TRAINS
(ii) In the event of dead man's handle becoming defective or inoperative the Motorman must stop his train
immediately,calltheGuardandaskhim to travel in the driving cab and should inform the Traffic Section
Controllerwhoshouldtakethetrainoutofserviceimmediatelyifthedefectisnotrectified.
TSR37.
(i) When EMU train is driven in accordance with G.R. 4.21, its speed should not exceed 15KMPH. At the
first station where facilities are available, the train should be cancelled and withdrawn from service for
repairs.
(ii) Before giving the starting code signal to the Motorman, the Guard must satisfy himself that the correct
signals are shownforthe train to start andthat the section is clear. The Guard must keep a good lookout
and must exhibit a green hand signal to the Motorman. The absence of such signal shall indicate
"Danger" and the Motorman must stop at once. He must keep a good lookout and be prepared to stop the
train when necessary. He will also be responsible for observing all further signals en route. All Caution
Orders, warning notices, advices and authorities regarding defective signals, authority to proceed
without line clear, etc. Must be first delivered to the Motorman who will countersign these before they
are sent to the Guard in the leading compartment. The Guard will retain such documents while he is in
charge and will be responsible for seeing that the orders are carried out. At the end of the run these
documentsmustbehandedovertotheMotormanandhissignatureobtained.
TSR38.
(a) The following code of Bell signals shallbe givenby the Guard and acknowledged by the Motorman:
1.
2.
3.
4.
5.
6.
(b)
1.
2.
3.
4.
5.
6.
Indication
Start train
StarttrainwhenworkingunderGR. 4.21.
Pushbacktrain
Stoptrain
Stop train when working under G.R. 4.21.
Guardleavingthecab
Code
00
00-00
000
0
0000
000000
Acknowledgment
00
00-00
000
0
0000
000000
ThefollowingcodeofBellsignalshallbegivenbytheMotormanandacknowledgedbytheGuard.
Indication
GuardrequiredbyMotorman
Motorman has received an authority to pass a
signal at danger.
Passing anAutomatic Signal in 'On'position as
G.R.9.02
Train running through station
Fortestingthebrakes
Protecttraininrear
Note:'0'meansonering.
Code
000-000
0000-00
0000-0000
00
00000
000-0000
Acknowledgment
000-000
0000-00 followed by
code to start the train.
0000-0000
00
00000
000-0000
309
TftRlB-'tf i W . ^M % ^ ^ £m
AiW.3iK.4i - ? M M ^ i l s - ^ % ^ ^ ^ ^ K ^ 3 * ^ f ^ ^ ^
AWTK. 42 - iTT?.̂ . ^ H ^ H , Pud ^|41 ̂ f ^ % ^ ^ ^ , ^ ^ ? t , W r ^ t E E
ATW.3TK. 4 3 - i T ^ . ^ . ^ % - ^ r ^ M l d H ^ ^ ^ ^ M ^ ^ ^ ^ i % % ^ ^ ^ ^ f i ^ ^ 3 W ^
(*) ^ i T ^ ^ ^ % M ^ i % ^ w ^ ^ ^ ^ ^ ^ i % ^ ^ ^ t ^ ^ % ^ t ^ ^ r ^
^ ^ T ^ | ^ f ^ ^ ^ ^ ^ ^ 1 0 i % A ^ ^ 3 l t e ^ # f t ^ | T 3 ; i
a f c ^ ^ ^ i o f e A ^ . t a f e ^ M ^ i
O) *T f*mf % («r) <?\) aik w ^ 3 t M ^ qftf^M % 3RPf?r 4 ^ a* ^m ^im sk
&WRTC. 4 5 - i T ^ . ^ . ^ ^ ^ ^ ^ W 3 ^ ^ ^ W ^ ^ O T ^ ^ W ? - ^ 3 ^ f ^ T % ^
310
http://AiW.3iK.4i
Appendix-'B' RULES FOR WORKING OF EMU TRAINS
TSR 39. Disabled train - In the event of an electric train failing another electric train or a locomotive may be
usedtoassistthe disabled train, only after the motorman or the line Charge Man has certified that it is safe to be
moved.
TSR 40. Loss of time in locating defects - When a defect occurs which the Motorman is unable to rectify he
mustnotwastetimeintryingtolocatedefects after isolation has been effected except in case where itwouldbe
unsafeto proceed. Every effort is to be made to work the train to the nearest examining point and to get it out of
trafficassoonas possible.
TSR41.Daai!ment-In the eventof derailment, the Traction Power Controller will pass the information to the
electrical foreman, who will treat it as if it is a line fault and shall proceed to take all necessary precautions to
preventdamagetotheoverheadhneduringthere-railingprocess.
TSR42.Inthecaseofpartialelectricaldisablementofanelectricmultipleunittrain,suchtrainmustbeworked
todestinationifpossibleandstabled there until certified fit for running by electrical department.
TSR 43. Procedure when automatic brakes cannot be operated from the leading driving compartment of EMU
train- When the automatic brake cannot be operated from leading driving compartment of an EMU train, the
followingprocedureshouldbeobserved.
(a) Allpassengersmustbedetrainedatthefirststationwithplatform.
(b) If the automatic brakes cannot be operated from any driving compartment of an EMU train but the
driving apparatus in the leading compartment is in working order, the guard shall accompany the
Motorman on the leading compartment and shall operate the hand brakes as required. The speed of the
trainshallnotexceedlOKMPH.
(c) Ifthebrakeapparatusintheleadingcompartmentonlyisdefective,theguardshallberesponsibleforthe
operation of the automatic brake from the nearest compartment (from the front) in which the brake
apparatus is in working order. He will operate in accordance with the Motorman's signals. The speed of
thetrainshallnotexceedlOKMPH.
(d) If the driving apparatus in leading compartment in addition to the automatic brake is defective the Guard
shall travel in the leading compartment and operate the hand brake as required. The Motorman shall
drive from the nearest compartment in which the driving and automatic brake apparatus is servicable.
The guard shall be responsible for giving such signals as are required, to the motorman by means of the
bell, horn or whistle and the Motorman shall control the train in accordance with these and the speed
shallnotexceedlOKMPH.
(e) Under the circumstances mentioned in (b), (c) and (d) above, the Motorman shall arrange for the Section
Controller and nearest train examiner to be informed. The Section Controller shall take immediate steps
to have the train withdrawn from service at the nearest station where siding accommondation is
available.
TSR 44. In case of any emergency when thetrain is held up in block section, the Motorman/Guard should stop
the train nearest to the telephone explaining the emergent situation and asking for assitance if required and also
switch'on'theblinker lights.
TSR 45. Working of alarm bell and Inter- Communication chain apparatus of an EMU train - When in an
emergency, in inter-communication chain handle is pulled by an emergency, the inter-communication chain
handle is pulled by a passenger, a red disc shoots out in the corresponding coach and an electrical contact is
made completing the electric circuit of the alarm bell located in each driving cab and the alarm bell will
continuously ring in all the cabs warning the Motorman to stopthetrain immediately. On hearing the alarm bell
the Motorman should apply the emergency brakes and stop the train as per extant rules. After ascertaining the
reason for chain pulling the Guard should reset the disc in the corresponding coach with the help of the pole
providedinthecab.
310
Tft&IE-'tf iw.% * r f % ^ ^ PPW
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
1 1 .
12.
T ^ s r a f t ™ ^ c f l w , 4 f i ^ a * T )
^ ^ T T ^ O i w a M ^ )
IMTHP^H afaw.lffo w ^ ^ f e r e r
T ^ s f e M ^ W
T ^ ^ M ^ T ^ R ^
T^#ft
^ f e ^ ^ ^
T ^ ^
T^^WT^r fM
r^ i^d ^ u ^ T K i ^ f t ^ ^ ^ ^ ^ f ^ ^ ^ f ^ ^ f ^ y ^
^ f ^ a r f c f ^ t ^ ^ i ^ l W ^
^ ^ t ^ ^ t ^
(ii) i ^ . ^ . ^ ^ ^ ^ ^ ^ ^ ^ ^ f ^ M ^ ^ ^ ^ W ^ ^ ^ ^ ^ t ^ W T
a ^ ^ m a * ^ -
a*fo> ton
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
1 1 .
12.
13.
14.
15.
k ^ C T ^ ^ ^ f ^ ^ # ^ l w f l
^ W T W M T T ^ ^ 3 ^
qtafrrtftttfS
* K i M « q f c f ^ % f ^ t t t S 5
ffcftfrffeer
qte^T^Pi^uMir^T
fo*Sfcn#^
^ f e ^ ^ t
^ ^ ^ % f ^ « i ^ t
^4T^deneraJk^gw^i t
^ a i k ^ w ^ ^ f ^ ^ a i k ^ R ^
^ T W t a ™
EMeflfrl W T K f ^ M ^ f % ^ R ^ ^ r f ^ t o ^
^
w
1
1
1
1
2
3
1
1
1
2
1
1
1
1
1
311
Appendix-'A' RULES FOR WORKING OF EMU TRAINS
ANNEXRUE'A'
(i) The following articles shall comprise the prescribed equipment of a Guard working on EMU train.
whichhemustcarrywithhimatalltimewhileperformingduty.
1. Onehandsignallamp(Tricolor,4drycelllamp)
2. OnesetofFlags(Onegreenandtwored).
3. Twoflagsticksofaluminiumtelescopicpipes.
4. OneFirstAidBox.
5. Onecasecontainingtendetonators.
6. Onewhistle.
7. Onecarriagekey.
8. Onewatch
9. OneworkingTimeTable.
10. Onerulebookforworkingelectrictrainsonelectrifiedsection.
11. OnedetailbookshowingthehnkofGuardetc.
12. OneGuard'sMemoBook.
(ii) The following articles shall comprise the personal equipment of a Loco Pilot working an EMU train.
whichhemustcarrywithhimatalltimewhileperformingduty.
S.No. Description
1. Handbookandtroubleshootingdirectoryformotorman.
2. CopyofWorkingTimeTableandschedule.
3. Motorman'smemobook.
4. MemoBookforreportingdefects.
5. Reversinghandles
6. Motorman'scontrolkeys
7. Brakecontrolkeys
8. Carriage Key
9. Modifiedkeyformotorcoachdoor
10. Handsignalflagsredandgreenwithsticks
11. Torchwithredandgreenadoptersandsparebulbs.
12. Boxoftendetonators
13. Rulebookforworkingelectrictrainonelectrifiedsections.
14. Watch
15. Duster
G8%r>
Quantity
1
leach
1
1
2
3
1
1
1
2
1
1
1
1
1
311
ms-v ^ W ^ . ^ f ^ ^ ^ f ^
(i) ^^-^^i^^^^^^z^^m^mr^HVi^ i
(ii) ^ g ^ t k ^ - ^ ^ m ^ ^ ^ ^ w M ^ f a d ^ d H ^ ^ ^
(iii) ^ ^ - ^ 3 T ^ t M ^ ^ ^ ? ^ t o % ^ # ^ d H ^ M d ^ t e ^ ^ % ^ t f ^ t % ^
(iv) M ^ - ^ ^ t f ^ 3 ^ % f ^ * # ^ ^ ^ ^ ^ f ^ # ^ ^ ^ « ^ 3 ^ ^
^.T^.am. 3 - a . W ^ % *ran?R % frrrx % ^ ^ $ ^ k ^ a ^ w I1 a . W ^ %
^ . 3 M . 4. W T O ^ ^ ( 3 0 4 8 ) % ^ ^ . ^ . ^ ^ ^ 4 ^ 3 2 4 5 ^ . ^ . 1 ,
(ii) ^ ^ 3 ^ ^ % f ^ ; f c ^ ^ ^ * T O ^ ^ i
(iii) ^ ^ . T r H . ^ . ^ ^ ^ ^ ^ ^ M ^ . T r H . ^ ^ ^ ^ ^ ^ f ^ f f e ^ R ^ a ^ ^ W ^ ^
^.T^.am. 7. ̂ . w ^ . % A ^ i f l cBt (cs) ^ f a (^r) TTT̂Y eft ̂ 00 ̂ # ^ B ^ W R T ^ f o r i
312
Appendix-'C RULES FOR WORKING OF DMU TRAINS
APPENDIX - 'C
RULES FOR WORKING (DMU) DIESEL MULTIPLE UNIT TRAINS.
DSR1.
(i) In addition to these rules, all general and subsidiary rules which control the movement and operation of
trains shall also apply to the movement and operation of DMUs except as otherwise provided in these
rules.
(ii) StationMastersJnspectorsandstaffworkingDMUsmusthavethroughknowledgeoftheserules.
DSR2. Definitions -
(i) Moionnan.meansadulycertifiedmotormanofasingleoramultipleunittrain.
(ii) Guards emergency brakes valve - means a valve fitted in the driving compartments of Diesel Multiple
unit train equipped with compressed air brakes, by means of which guard can apply the brakes of the
train in times of emergencies.
(iii) Jumper- means multiple core flexible cables connected between all coaches of Diesel Multiple Unit
trainsbywhichthecontroloftheelectricalequipmentiseffectedfromany driving compartment in use.
(iv) Trailer Coach- Means a passenger carrying coach equipped for coupling to and operating with motor
andnotpossessingtractionmotors.
DSR 3. On a DMU train, only one motorman is provided for driving and he must not leave his post except for
attending to defective equipment in his train and protection in front in case of accidents. On a Double or
Multiple line section if adjacent line in opposite direction is obstructed or fouled Motorman himself to protect
infrontasperGR6.03.
Thefollowingexceptionarepermitted:-
(a) GR.4.15(l)(a)SideLightsshowingwhitetowardsthereararenotprovidedonDMUs.
(b) G.R.4.14(1) OnDMUtrainonlyheadlightandTailLightsareprovided,nomarkerlightisprovided.
DSR4. WithofDMUstock3245MMagainst(3048)ofconventionalstock
DSR5. Work inside DMU Car Shed-It should be ensured that proper safety precautions are taken like display
ofredflag/fixedlight,blockingofthemovementonthelinebyscotchblockandlockingthesame.
DSR6.Fire-
(i) IntheeventofafireonaDMUstock,themotormanshallimmediatelyswitchoffthecircuitbreakerand
shutdown theengine.Thetrainshallbebroughttoastopatonce.
(ii) TheguardshallgiveallpossibleassistancetotheMotormaninputtingoutthefire.
(iii) ThefireextinguishersofapprovedtypeshallbeprovidedoneachmotorcoachofaDMUwhenaDMU
rake is turned out the Car shed. The SSE (C&W) Incharge of the Shed shall inspect the fire extinguisher
andensurethattheseareingoodworkingorder.
DSRT.EveryemployeeintheDMUmustimmediatelyinformthesectioncontrollerbytelephoneasquicklyas
possible in the event of (a) accident (b) Disabling of train (c) any unusual occurrence affecting the working of
trains.
312
mm-V ^.w^^f^^^f^
(i) ^^^^^^w^^^^.^ite^wrtmF^^^^^*^
(ii) ^ M ^ i ^ ^ ^ ^ ^ ^ W T H . ^ . ^ ^ # ^ * ^ ^ l
(iii) ^ % f ^ ^ ^ ^ ^ ^ M ^ ^ ^ 3 ^ ^ t e ^ R ^ f ^ ^ ^ | T T | ^ ^ ^ ^
(iv) ^ i f c ^ t ^ ^ W T W ^ ^ # m ^ W ^ f % ^ ^ ^ ^ | 3 ^
(V) d M J T h M f ^ l ^ 3 f i ^ * P I ^ ^
313
Appendix - 'C RULES FOR WORKING OF DMU TRAINS
DSR 8. Access to the generator, engine & radiator compartments can be had only by authorised persons in
possession of a special key provided for this purpose. Motorman and other official to whom such keys are
issued should keep this in their personal custody to prevent unauthorised persons tempering with the
equipment.
DSR 9. No Spanners of key except those issued by the Railway Administration should be used for operating
theequipmentinDMU trains.
DSR 10. No unauthorised person is allowed to travel in motorman's or Guard's compartment of a DMU train
unless he holds a motorman or guard's compartment pass. The number of authorised persons, other than the
motormanandguard(iftravellingwithmotorman)inmotorman'scabinmustnotbemorethan3atanytime.
DSR 11. The Diesel multiple unit train shall carry (a) headlight (b) one flasher Light (c) one set of code lights
(d)oneredtaillight.
ResponsibilitvforheadlightsofDMU-Themotorman is responsible for carrying out the correct headlights bv
night and ensuring that the tail lights are not exhibited in the front. The Guard is responsible for seeing that the
tail light/tail board as the case may be correctly exhibited. In case of failure of electrical red lights, the guard
shall fix his handsignallamponthebracketprovidedforthispurpose.
DSR 12. Lighting and Fans Circuits of DMU- Guards must regulate the lighting of coaches and switch off the
fans whennotrequired. In the eventofadefectin the lighting, theguard will immediately inform themotorman
and thenearestStationMastertoarrangeforelectricalstaffto rectify thedefects.
DSR 13.
(i) Before a DMU train is brought on to a running line after inspection or maintenance in a DMU Shed or
stabling line,thebrakesofthetrainshallbejointlycheckedbythemotormanandtheguardto ensure that
the brakes are functioning normally and the brake pipe is continuous through out the train, the horn
should be sounded and precautions taken to see that no one is working on DMU train before the brake
testis undertaken.
(ii) As far as possible, this joint test should be taken before the DMU train leaves the shed or stabling line.
However, if specially authorised the brake test may be taken on the platform before commencement of
thefirsttrip.
(iii) Examination and adjustment of brakes must be carefully carried out before entering service. Motorman
must ensure that jumpers and hose pipes as properly secured in their dummy receptacles after coupling.
He must take a careful examination of Multiple Units before taking them into service and any defect or
deficiencynoticedmustbebroughttothenoticeoftheSupervisorandhemustseethatthedefectcardis
inpositionandclearedof all entries unless these have been rectified and initialled to this effect.
(iv) Whentakingoverfromanothermotorman,itwillbehisdutytoascertainwhetheranydefectexistsand
the motorman handing over must acquaint him of any fault or defect likely to affect the working of the
train.
(v) The above procedure must always be carried out most carefully when putting the unit into service after
stabling, also after the two units have been coupled up. The train crew must assist the station staff in
coupling&uncouphngtheunits.
DSR 14. Working or deadman's knob safety device -
(i) Two deadman knobs have been provided in the DMU, one on the throttle handle and 2nd near the left
knee of the Motorman's desk. The deadman knob has to be kept depressed both in the course of driving
andduringintermittenthaltsofthetrain.InordertogivetheMotormanapossibilityofrelievingtheright
palm by releasing the deadman knob during station stops or during driving. Aknee operated mushroom
headed switch has to be passed side wards to enable the deadman knob to be released, without
application of emergency brakes. Before releasing the deadman's knob from the operating handle it has
tobeensuredthattheknewoperatedswitchispressedbytheMotorman.
313
ms-v $W.% ^ i fH % *ran?R f*w
(ii) ^ ^ | ^ O T # ^ ^ ^ ^ f M ^ i f c ^ ^ ^ 3 ^ ^ ^ ^ ^ ^ ^
^T.3TR. 15. ? f f i ^ ^ R f ^ ^ ^ ^ ^ - ? m ^ ^ ^ f f ^ , W ^ f ^ f ^ % # f t l ^ ^
(*T) M ^ ^ ^ M ^ ^ ^ I
(*) ^ % # s / ' ^ a n ^ ' f ^ ^ ^ t f i
(*r) ^ t e ^ % ^ / ^ f ^ r ^ ^ i f ^ n ^ i
^ .^ .3^ .16. ^ . W T . ^ ^ ^ ^ - ^ ^ ^ . W T . ^ T O ^ ^ ^ ^ ^ ^ ^ i ? T t
(*) t ^ * ^ ^ 3 * ^ ^ ^ ^ t e « ^ f t q T ^ I
(*) ^ ^ ' ^ ^ f ^ ^ ^ ^ ^ ^ f ^ ^ i t t a ^ i
(*r) ^ ^ % ^ f ^ r < * ^ ^ ^ ^ ^ f t ^ ^ i
314
Appendix - 'C RULES FOR WORKING OF DMU TRAINS
(ii) Intheeventofadeadman'shandlebecomingdefectiveorinoperative.themotormanmuststophistrain
immediately, call the guard and ask him to travel in the driving cab, and should inform the section
controllerwhoshouldtakethetrainoutofserviceimmediatelyifthedefectisnotrectified.
DSR 15. Change over the cab at the terminal station - At the terminal section, the direction of travel will
reverse. The operating personnel on the train will now switch their roles as motorman and Guard. The
leadingcarduringtheprevioustravelwillbecometraillingwithGuardforthedirectionofdriveandthe
trailing car during the previous will become leading car. The following is procedure to be followed for
effectingthechangeofMotorman'scab:
Inthepreviousleadingcab-
(a) Releasethedeadmanknob.Thisresultsintheoperationofemergencybrakes.
(b) Shiftthereversinglevertozeroposition.
(c) SwitchofftheMotorman'slock/knoboperatedswitch
(d) Operatetheguard'slock/knoboperatedswitch.
In theprevious training cab-
(a) Switchbacktheguard'slock/knobtooffposition.
(b) OperatetheMotorman'slock/knobtooffposition.
(c) Movethereversinglevertoforwardposition.
Note-Itisthedutyoftheguardandthemotormantochangethedestinationindicatorsatrespectiveends
ofthetrain.
DSR 16. Stabling of DMU train - When stabling a DMU train in the Car shed or on a stabling line, the
followingprocedureforputtingthetrainoutofoperationshouldbefollowed.
OperationbvMotorman-
(a) ShutofftheeXcitationalternatorbyoperatingeXcitationshutoffswitch.Movethetrainoperatinghandle
tothe8thnotchtherebyincreasingthedieselenginespeedtol800RPM.Keeptheenginerunningatthis
speedforapproXimately2minutes.Thiswillbeheldincoolingdowndieselengine.
(b) Switchoffthedieselenginebyactuatingthedieselenginepushbuttonsatthedesk.
(c) Move the reversing order to zero position and take out the lever from the slot provided in the master
controller.
(d) Switch back the key/knob operated Motormen switch and take out the key from the Motorman's lock
switch.
(e) Takeouttheguardskeyfromtheguardslockswitch/switchofftheknob.
(f) Switch-offthelightingandventilationcircuits.
(g) Applytheparkingbrake.
(h) Switchofftheswitchfuseunit.
OperationbvGuard:-
(a) Switchbackthekey/knob-operatedguardsswitchandtakeoutthekeyfromtheguardslockswitch.
(b) TakeouttheMotorman'skeyfromMotorman'slock/knobswitch.
(c) Takeoutthereversinglevelfromthemastercontroller.
(d) Whentherakeisstabled,themotormanshouldinvariablybeattheleadingdrivingcab.BackingaDMU
rakeintoasidingwiththemotormanattherearcabisstrictlyprohibited.
(e) After stabling a DMU train or handing it over to the supervisor, the motorman before going off duty
should convey to the supervisor/Incharge of the car shed or stabling line any difficulty or abnormalities
noticed duringtheprevioustipsrequiringimmediate attention.
(f) On arrival of the train at terminal station for stabling, the guard shall switch off the lights and fans. No
multiple unit or coach may enter the shed at speed exceeding 10 KMPH and only after sounding the
whistleandcomingtoastandoutsidetheshed.
(g) Oil and water levels : All oil and water levels shall be checked by the motorman before leaving the Car
shed.AnydeficiencyfoundshouldbegotattendedbeforeleavingtheCarShed.
314
ms-v ^ W ^ ^ f ^ ^ ^ f ^
^T.3TR.17.-
(i) ^ ^ ^ t e ^ T r 4 ^ ^ ^ % W T ^ ^ Y ^ f ^ f % ^ ^ ^ W l t ^ ^ ^ | T T |
(ii) ^ ^ ^ t e ^ ^ ^ ^ ^ ^ ^ ^ # f ^ ^ # f f ^ l f ^ f e ^ % ^ ^ % ^ i f a < N l d * l e i ) H
^ .WTK.18 . 3 ^ 1 5 M 2 1 I ^ - ^ 3 ^ ^ ^ R ^ W T ^ R ^ % ^ ^ ^ ^ ^ ^
t W . 3 M . 2 0 . T O ^ ^ - ^ ^ ^ - ^ ^ W T ^ . a m . 5.14 3 f ^ ^ 1 ^ ^ 3 q q i e F r
^t^^^rH^dH^r^i^^fe^^w^^t^^idi^Mr^MH^^^iTTi
^ s f d w ^ % ^ 3 ^ % ^ ^ % w ^ ^ i ^ ^ ^ ^ ^ 3 ^ w * t w
d ^ w t f l ^ ^ ^ ^ ^ ^ ^ f e a ^ ^ w f ^ ^ f ^ ^ w r f ^
315
Appendix - 'C RULES FOR WORKING OF DMU TRAINS
DSR17.
(i) Eve^motormanandGuardmusthavewithhimwhileondutyalltheequipmentsasperAnnexureA'.
(ii) The guard and the motorman should also ensure that emergency telephone set is provided both in front
andrearbeforestartingthetrain.
DSR 18. Coupling Unit- In coupling the unit together, the station staff/car Shed staff will be responsible for
seeingthatthejumperconnections are properly made. Care is to be taken not to touch the contacts or to let them
come into contact with the rails, ballast or metal work of the coach when inserting jumpers in the receptacles
provided. In all cases this operation will be carried out under the supervision of the motorman who will first
ensure that all the motor generator sets are switched off. Guards are responsible for seeing that all lights and
fans switches and the main light switches are off before units are coupled or uncoupled.
DSR 19. FormationofDMU- Unless special instructions are issued to the countary, the formation of DMU's
isnottobealteredDMU are nottobeusedto haul ordinary train coaches.
DSR 20. ShuntingofSindeandMultipleUnit- When shunting is to be performed, the rules contained in GR
5.14mustbecomphedwith.
DSR21.Brakeapplication-
a. Normally the brakes should only be applied after the master controller handle (throttle) has been
retumedtotheoffpositionexceptinthecaseofemergency.
b. Emergencybrakes:Ifanyobstructionisseenonthelineaheadandthetraincannotbebroughttoastand
still by ordinary application of brakes the motorman should remove his hand from the master controller
handle when the power will be out off and the brakes applied automatically. This should only be done
when an emergency application of brakes is required. The brake controller handle then to be moved to
thefullonpositionandthemastercontrollerswitchedoff
DSR22.WorkingofDMUswhenmotormanisnotoperatingformthefrontcab-
(i) The rules contained in GR 4.21 should also be applicable for the DMU trains. The speed should not
exceed 15 KMPH.
a. Themotormanshallbeintheleadingdrivingcompartmentwhenthetrainisinmotionortrainis
stationaryonanyrunninglineexceptasotherwiseprescribedin these rules.
b. In the case of a single or multiple unit train. If the driving apparatus in the leading driving
compartment becomes defective, the train shall be driven cautiously from the nearest driving
compartment which is serviceable ; in this event, the Guard shall travel in the leading driving
compartmentandshallconveythenecessary signals to the Motorman, the Guard shall also sound
thehornorwhistleasnecessaryandapplythebrakeincaseofemergencyandshallberesponsible
forstoppingthetraincorrectlyatsignals,stationandobstructions.
c. Before giving the starting code signal to the motorman, the guard must satisfy himself that the
correctsignalsareshownfortrain to start and that the section is clear. The guard must keep a good
look out and must exhibit a signal to the motorman. The absence of such signals shall indicate the
dangersignalandthemotormanmuststopatonce.Hemustkeepagoodlookoutandbeprepared
to stop the danger signal and the motorman must stop at once. He must keep a good look out and
be prepared to stop the train when necessary. He will also be responsible for observing all further
signals enroute. All caution orders, warning notices, advices and authorities regarding defective
signals, authoritiestoproceedwithouthneclear etc. must be first delivered to themotorman who
will counter sign these before they are sent to the guard in the leading compartment. The guard
willretainsuchdocumentswhileheislnchargeandwillberesponsibleforseeingthattheorderis
carried out. At the end of the run all these documents must be handed over to the motorman and
hissignatureobtained.
315
q f ^ U - V ^ . W ^ ^ f ^ ^ ^ f ^
^ T . 3 T R . 2 3 .
(.yj
*%n
1. ^ ^ ^ T
^ te I W S M
00 00
2. ^mPTf^W4.2i % 3 ^ k ^ f ^ p ; ^ 00-00 oo-oo
3. ^W\TUW^W
4. ^ ^ ^
000 000
0 0
5. OT*Tf^W4.21 % 3 T ^ ^ f ^ | I 3 ; ^ 0000 0000
6. J||^+NH s4l£d ^H-4 000000 000000
^<L\ * y+d 4, MHldRsId <*>U Hk<HH &KI R-M *IH ̂ I I I ^ ^R Jll£ &RI ̂ <+l illlkl <*l *IHI ^111^-
* % n ^te wiwz
1. WIRT P m 9.02 if 3 g f l R ^ e r ^ 5 ? r 0000-0000 0000-0000
2. ^ R ^ ^ t % S ^ ^
3. toki^^^a^w^
4. ^ ^ f ^ R i f ^ W W ^ ^
s. M^qftw^tg
6. ^ ( f ^ R ) ^ ^ t ^ ^ M
00 00
000-000 000-000
0000-00 0000-00 ^ R ^ t ^
00000 00000
000-0000 000-0000
^ . W . 3 T R . 2 4 . 3 ^ ^ - ^ % 3 ^ ^ ^ 3 ^ ^ ^ ^ ^ 3 T ^ ^ ^ ^ ^ i f R w ^ ^ d T i
316
Appendix - 'C RULES FOR WORKING OF DMU TRAINS
DSR23.
(a)
(b)
DSP
The following code of bell signals shall be given by the guard and acknowledged by the motorman
Indication
1. Starting train
2. Start train when working under G.R. 4.21
3. Push back train
4. Stop train
5. Stop train when working under GR 4.21
6. Guard leaving the cab
Code
00
00-00
000
0
0000
000000
Acknowledged bv
00
00-00
000
0
0000
000000
The following code of bell signals shall be given by the motorman and acknowledged by the guard
Indication
1. Passing an automatic signal in'ON
position as per GR 9.02.
2. Train running through station
3. Guard required by motorman.
4. Motorman has received an authority
to pass a signal at danger.
5. For testing the brakes.
6. Protect train in rear.
Note : V means one ring.
. 24. Disabled Train - In the event of DMU train failii
Code
0000-0000
00
000-000
0000-00
00000
000-0000
l g , another engi
Acknowledged by
0000-0000
00
000-000
0000-00 followed by the code
to start the train.
00000
000-0000
nemaybeusedto assist the disabled
train, only after the motorman has certified that it is safe to be moved, and under no circumstances, a DMU train
shall be used to assist a train. Since the DMU rakes are equipped with compressed air brakes, the train will be
controlledby engine brakes only. The speed when hauling adisabledtrainmustbe cautious speed.
316
q f ^ U - V ^ . W ^ ^ f ^ ^ ^ f ^
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
1 1 .
T ^ t ^ f ^ R ^ ^ T ( f ^ ^ 4 ^ ^ )
^ ^ T ^ O ^ ^ t ^ )
I ^ P H P H ^ ^ W T ^ ^ ^
T ^ s f e ^ ^
T ^ W f ^ T T ^ f ^ f ^ f 1 0 ^ R t #
^ # £
T ^ ^ f ^ ^ t
T ^ ^
^ ^ ^ ^ . ^ n f t
T ^ f ^ W ^
^^li^m^m
a.Tgr.̂ . ̂ ^ *l4<d ^l^%t^ft ^Wff % rHHPd̂ d ;
^wr*ra*at f?Mt-
1.
2.
3.
4.
5.
6.
7.
8.
9.
^^/iK^^fm™
iwwwft
^fe^^t
kf tw^(4#w*?t)
t̂ mw f̂tw f̂)
1 0 W t a ^ f ^
f ^ W ^
S ^
^
^ 3 T f ^ ^ ^
1
1
1
2 * ^ 5
1
1
1
1
1
317
Appendix-'C RULES FOR WORKING OF DMU TRAINS
DSR25. Working of alarm bell in inter communication chain apparatus of DMU train-When in an emergency.
theinter communication chain handle is pulled by a passenger a red disc shoots out in the corresponding coach
and an Electrical contact is made completing the electric circuit of the alarm bell located in each driving cab.
The alarm bell will continuously ring in all the cabs warning motorman to stop the train immediately. On
hearing the alarm bell, the motorman should apply the emergency brakes and stop the train as per extant rules.
After ascertaining the reason for alarm chain pulling, the guard should re-set the disc in the corresponding
coachwiththeheldofthepoleprovidedinthecab.
The following articles shall comprise the prescribed equipment ofguard working on DMU train, whichhemust
carry with him at all time while performing duty-
1. One hand signal lamp (tri-colour torch 4 dry cell)
2. Onesetofflags(onegreen2red).
3. Two flag sticks of aluminium telescopic pipes.
4. One First Aid Box.
5. One case containing 10 detonators.
6. One whistle
7. One carriage key.
8. One watch.
9. One working Time Table.
10. One Rule Book
11. One Guard's Memo Book.
The following articles shall comprise personal equipment of motorr
must carry with him at all times while performing duty:-
1. Note Book/trouble shooting diary
2. Working Time Table.
3. Carriage Key
4. Hand Signal flags (red & Green with sticks)
5. Hand Signal Lamp (tri-colour Torch)
6. One case containing 10 detonators.
7. Rule Book.
8. Duster
9. Watch
nan working
1
1
1
2 each
1
1
1
1
1
317
ms-v ^ ^ T f e W T f % ^ ^ % f ^ W
(1) ̂ B
(2) 3M.3M.fr cEHWTft-
(*) 3m.3M.fr ^R.W^ 3fa. (^T TO) % 3 T ^ ^ ^ t , fr 1% 3m.3M.fr % W W t
^ | ^ 3 ^ ^ ^ * i ^ ^ ^ t w ^ ^ ^ 3 m ^ « ^ l
(*T) W * 3 ^ 3M.3M.fr < M TO? ̂ 3M.3M.fr 3 M ^ W ^ 3M 3M.3M.fr M ^ f e
3 ^ 3 « f r ^ ? ^ % T O % ^ ^ f ^ t l
fefr^%^t^f^«|l
(3) ^ M t A ^ f f W -
(*) 3M.3M.fr 3 M ^ (3M.3M.fr F̂TC>) V 3 ' f ^ ^ M i f f f e ^ ^ T T ^ ^ W T W
3 ^ W ^ ^ ^ ^ ^ f e T f ^ ^ # ^ ^ ^ r H ^ I ^ K M ^ 3 W ^ f |
(*) ^ J l f ^ ^ a ^ ^ ^ J l f ^ ^
Crr) *%OT3^^M^^^^3MW^^M^*>^^W^
(5) 3M.3M.fr ^ 1 M T 3 H N ^ ^ | R ^ ^ T O W 3 ^ ^ ^ I
318
http://3M.3M.fr
http://3m.3M.fr
http://3m.3M.fr
http://3M.3M.fr
http://3M.3M.fr
http://3M.3M.fr
http://3M.3M.fr
http://3M.3M.fr
http://3M.3M.fr
Appendix -'D' RULES FOR MOVEMENT OF RAIL-CUM-ROAD VEHICLES
APPENDIX -*D*
RULES FOR MOVEMENT OF RAIL-CUM-ROAD VEHICLES
(1) GENERAL -
(a) Rail-cumRoadVehiclehereinafterreferredasRRVisaselfpropelledvehicle,whichcanrunon
railway track as well as on road. It shall be treated as a "Train" as defined in GR 1.02 (58) for the
purposeofworkingonopenline.
(b) Rail cum Road vehicle is meant for track maintenance works and may also be used for OHE and
S&Tworksasandwhenessential.
(c) RRV will normally run on road, and would run on track only on the section where some
maintenance work is required to be done. Its running on track shall always be under BLOCK
protectiononly.
(d) For movement of RRV in Track circuited area, a certificate will be issued by SEE/Signal, which
shallbevahdfor06months.
(e) Advance weekly programme shall be finalized at the level of Sr. DOM and Sr. DEN/Branch
Officer concerned so that section supervisor/Chief Controller/Station Master is aware of such
operating and maintenance schedule.
(f) RRV shall not be moved between running lines siding/stabling line (s) without the written
permissionofSMondutyintheformofshuntingorder.
(g) OndoubleorMultipleLineSectionRRVshall,invariablyrunonproperline,i.e.rightline.
(2) INCHARGEOFRRV-
(a) TheRRVshallrununderthechargeoftheSSE/JE(P.Way)hereaftercalledas'Incharge'whoshall
be personally responsible for all safety aspects regarding the movement of the RRV and shall be
responsible for taking block, clearing the blocks, protection of line while the RRV is working as
train and also when it is "on tracked" or "off tracked". After 'off tracking' the Incharge shall be
personallyresponsibletopositionRRVawayfromthetracksothatitdoesnotfoul/obstructanyof
the lines. As an assurance to the fact that no line is fouling, incharge will issue his private number
totheStationMasterconcernedmakingentryinthegateregistertothiseffect.
(b) The Loco Pilot of the RRV, hereafter to be called the RRV Operator, and other staff on RRV shall
workunderdirectsupervisionofsaidlncharge.
(c) ThelnchargewillensurethattheRRVOperatorissoberandnotinthestateofintoxication.
(3) COMPETENCYOFTHERRVOPERATOR-
(a) The Operator of RRV shall be fit in A-3 medical category. While on duty, he shall have with him.
twopairsofsuchspectacles,asheis required towearundermedicalrules.
(b) For transportation training the RRV Operator shall under go training/refresher at Zonal Railway
Training Institute and Principal ZRTI will issue competency certificate. The
competency/refresher certificate shall be valid for 3 year.
(c) On successful completion of training, he shall be examined and if found competent, shall be
issued a competency certificate by the concerned Sr. DEN and Sr. DOM. The certificate shall be
keptinpersonal custody of the Operator while on duty and be produced as and when required by
theinspectingofficials.
(d) Theoperatorshallalsopossessvalid"HeavyvehicleDrivingLicense"forroadvehiclesissuedby
State Road Transport Officer, the Incharge of RRV shall ensure that driving license of road
vehicle issued to operator of RRV is renewed from time to time, as may be required under the
rules.
(e) Competencyrecords(updated)ofOperatoretcshallbemaintainedbytheIncharge.
318
ms-v ^ ^ T f e W T f % ^ ^ % f ^ W
(4) W 3 1 W -
I. ^ e n e n ^ T p » ^ ? w W t
ii. ^ # T « B n # e n s r f t w r ^
in. <nd*fMr*T
IV. ^ * f ^ 2 ^
V. ^ i # ^ f t ™
VI. ^ ^
VI I . ^ R ̂ ^ *ran?R w r ^rrfM ( ^ t a n w n ^ . ^ f e I )
VIII. ^ R T ^ ^ ^ f ^ W ^ ^ I ^ W H f ^ T ^ f ^ T f l
IX. T T ^ ^ R ^ ^ T ^ ^ ^ f
X. ^ » ^ f t
XL ^ q f e f e £ # ^
XII. T^qi#*F#
XIII. c & * r c ^
XIV ^ ^ ^ ^ ^
XV ffc5S-2
XVI. 3 P f ^ ^ # 2
(5) *ran?R*eppT-
(ii) ^ t o w ^ A ^ ^ ^ ^ ^ i ^ ^ ^ i w i ^
(iii) a M m t a ^ k ^ ^ ^ ^ ^ ^ T O ^ ^ ^ f e R ^ ^
(iv) ^ t m.*^. ^ R % ^ R * M , ffcffiSfr ^ R % ̂ R W * «# A t ^ .
(R) ^ M ^ a ^ H W i , 3HIHH r^Hd 3ffq?^%3M.3MA ^ f o f o ^ l
(*) 3 T R . 3 ^ . % 3 ™ ^ ^ M f ^ ^ % ^ ^ ^ ^ ^ H P ^ ^ ^
0*) w.ft. 8.oi % fM^w^ to^ i
(ii) ^ ^ # f ^ % ^ ^ ^ # ^ ^ d ^ l ^ V ^ f ^ f ^ ^ f ^ / ^ f n ^ ^ r f ^ ( T g I f ^ ^
^ 3 T ^ ^ « ^ ) ^ ^ ^ / ^ ^ 3 ^ . 3 ^ . ^ * ™ -
f^Oft.wft.)%^to^i
( ^ ) ^ R ^ f ^ T ^ ^ ^ 3 T R . 3 T R . ^ . ^ ^ ^ f ^ ^ i ^ ^ ^ ^ ^ ^ , T T 4 O T
319
Appendix -'D' RULES FOR MOVEMENT OF RAIL-CUM-ROAD VEHICLES
(4) SAFETYEOUIPMENTS-
(a) Autoflasherlights(likelocomotives)shallbeprovidedonbothsidesofRRV
(b) RRV shall have a LV board and Flashing Tail Lamp, which shall be displayed in the rear during
movement.
(c) The Operator and Incharge of RRV shall be responsible for ensuring that the essential safety
equipments are complete and available in RRV in working order as listed below-
I. TwoRedonegreenFLS.Flag.
II. TwoTri-ColourH.S.Lamps.
III. Two Chains withpadlocks.
IV Two Clamps withpadlocks.
V Tenfogsignals.
VI. OneWatch
VII. CopyoftheWorkingTimeTableofthesectionwhereRRVisworking.
VIII G& SRbookwithupdate with amendment slips.
IX. Onefourcellflasherlighttorch.
X. Onepetromaxlamp.
XL Oneportable field telephone.
XII. Onewalkie-talkie.
XIII. Twobannerflags.
XIV OnefirstAidBox.
XV Skids-02
XVI. Fireextinguisher-02
(5) RULESFOROPERATION-
(I) WhentheRRVistobemovedfromoneBlockStationtoanotherBlockStationwithconventional
(mechanical) interlocking
(a) The Incharge of RRV shall give the requisition in writing, in duplicate, to the SM for the
movementofRRVfromoneblockStationtoanadjoiningBlockStation.
(b) Onreceiptof the requisition SM Shall -
i. ObtainthepermissionofSectionController.
ii. Obtain Line Clear and issue Proper Authority to Proceed, take 'Off dispatch signals
treatingRRVatparwithaTrain.
hi. Return one copy of the requisition, and issue Caution order for the section, to the
RRVOperator.
iv. GiveTESsignaltotheSMofreceivingstationassoonastheRRVleavesthestation
andalso advise the Section Controller.
(c) The SM at the other end of the Block section shall receive the RRV by taking 'Off
Receptionsignals.
(d) On arrival of RRV, the Incharge of RRV shall issue a certificate for the clearance of the
BlockSectiontotheStationMasterofthereceivingStation.
(e) After the receipt of this certificate, the Station Master shall close the block section. He
shallalso inform the Section Control.
(f) RulesunderGRS.Ol shall be followed.
(II) Movement of RRV on section/stations with track circuiting/block proving with axle
counter/RRI/Panel interlocking (Absolute or Automatic Block System).
(a) When RRV is to be dispatched from or received at a station with track circuiting/block
proving axle counter/RRI/Panel interlocking, such movement in the block section would
bedoneonPLC.
(b) The line on which the RRV is stabled at a station would be treated as under block and
clearanceofsuchlinewouldbeensuredbytheSMthroughphysicalverification.
319
ms-v ^ ^ T f e W T f % ^ ^ % f ^ W
(iii) 'are ̂ TPf3Tfr3Efr f* fire E I&H
FT) ^^^™*T«T^ioft^Tferr^i
(*) MMffi t i ff iWM^Mi-^3"i t^w^H^#fTO
^ it ^ a m . a r K A ^ '3TR ̂ ' t f e r a ^ i ^ r ffPwRifad R « H - i , f t f ^ n ^ t -
(!) OT^^^Tr4f%A^tt3m.3mA^"3fR^"^^tl
(ii) 3 T R . 3 m . ^ . ^ " 3 T R ^ " ^ ^ 3 ^ ^ W T I
(iii) ^ T ^ 3 T ^ 3 T ^ T I
(xv) fc ^ T * ^ t % A W TR 3TR.3TR.̂ . «*t " « ^ J » ^ ?t 3T*M ^ * ^ R ^ i
f ^ - ^ ^ ^ ^ ^ t ^ ^ W T K W ^ I ^ f ^ ^ f ^ ^ ^ f f %
™ W ^ ^ < 3 T R & ' ' ^ ^ 3 i k ^ W T K W ^ 3 T ^ ^ ^ « f e T r
^ l ^ « ^ ^ 3 T T } % ^ « ^ ^ 3 r k 3 T ^ « * t ^ ( f ^ ^ f
^ | ) R ^ ^ % t % ^ « w t o f ^ ^ i
3 T R . 3 m . ^ . ^ ^ ^ M ^ % ^ ^ T R R ^ ^ ^ ^ % f ^ ( 3 T R ^ f ^ ^ ) 3 ^ f M ^ ^ F r
^ ^ ^ ^ ; ^ ^ ^ « ^ % f ^ 3 ^ ^ m ^ ^ ^ l f e M * t
3 ^ ^ ^ % m ^ ^ 3 ^ ^ ^ | * t ^ 3 ^ ^ « ^ 3 ^ f ^ t %
^TTOTt ̂ 3 ^ - ^ R fen ^ H , # t% £ * H W * * ^T3Tf ^ 3 ^ - * ^ ^ 3TR
(*) % f i ^ * t ^ ^ ^ ^ ^ ^ # f ^ ^ f % ^ 3 k ^ ^ * t ^ « | l
M ^ w ^ 3 T ^ ^ ^ ^ « ^ ^ % f ^ ( ? T r ™ ^ f ^ % 3 T ^ ^
c^H TR) 3TR.3m.3t. ™ft eft ̂ ^ |
(IT) ^ ^ ^ % ^ ^ ^ W ^ 3 ^ t % W ? H ^ W * 3 m . 3 m A ^ < 3 T H ^ ' ^ ^
(3T) 3TR.3TR.̂ T. <3TH ^ ^ ^ W M , # I W ^ 3TK.3TK.3t. % <3TR ̂ ?R ̂ cfoft
^ ^ ^ ^ ^ % W T ^ ^ ^ ^ ^ % 3 T T ^ - ^ % ^ t ™ ^ ^
(?) < 3 T R & ^ ^ f ^ ^ ^ ^ ^ 3 T ^ - ^ ^ ^ % f i ^ t ^ ^ ^ R
w * ^ ^ ^ T O ^ ^ T ^ ^ ^ I
t%TT^f t^ r t i
320
http://3TR.3m.3t
Appendix -'D' RULES FOR MOVEMENT OF RAIL-CUM-ROAD VEHICLES
(III) Instructionfor-IntermediateOnTrackingandOffTracking"
(a) RRVhasanuniquefacilityof"OnTracking"and"OffTracking"ofthevehicle.
(b) "On tracking" or "Off tracking" of RRV in the block section shall be done under block protection
onlyfromamannedlevelcrossing gate providedwith telephone.
(c) ThisoperationmustbecompletedwithinlOminutesperiodasfaraspossible.
(d) WhenRRVistobe "On Tracked" in the block section - The Incharge of RRV shall give in advance
a written requisition with message No. to the Station Master of the station connected to the gate
withtelephonefromwhichRRVistobe'ontracked'withfollowingparticulars.
(i) ThelevelcrossinggateNo.Kmatwhichhedesiresto'OntracktheRRV
(ii) Approximatetimefor'ON'trackingtheRRV
(iii) Approximatedurationofblock.
(iv) LevelcrossinggateNo.andKmatwhichRRVshall'OffTrackorthestationatwhichthe
RRVwillcleartheblocksection.
Note- If there is no level crossing gate in the block section where the site of work is situated 'On
Tracking' shall be done at the level crossing of Block section in rear and accordingly block shall
be taken by the Incharge RRV at such Level Crossing of Block section in rear and accordingly
blockshallbetaken by thelncharge RRV at such Level Crossing from the Station in advance. On
arrival at the said Block station, the Block shall be cleared. And, for entering in the next required
BlockSection,freshblockshallbeobtainedbytheIncharge.
(e) As soon as the RRV is ready for 'On Tracking' at the nominated manned level crossing provided
with telephone, the Incharge ofRRV shall request for block (for the purpose of'On Tracking') on
Gate telephone to the SM with reference to his message number of the requisition for block and
alsogivetheprivatenumberfromtheGateman'sprivatenumbersheet.
(f) Such entry shall be made by the Incharge personally in the Gate Log Register of the Level
Crossing concerned. On duty Station Master shall inform the Section Controller. According to the
train movement Section Controller shall grant permission with his private number to impose the
block. After obtaining the permission ofthe block from the Section Controller the Station Master
shall inform the SM at the other end ofthe Block Section under exchange of Private numbers.
There after the Station Master on duty shall give the private number to Incharge of RRV for the
impositionofBlock.
(g) Where the gate is connected with a cabin, such exchange of information would be between the
Incharge and the Cabinman/Cabin Master/Cabin ASM, who in turn shall exchange information
withtheSMandshallactontheinstructionoftheSMunderexchangeofprivatenumber.
(h) On double line section both station Masters shall also ensure that no train is in movement from
either direction. The Station Master will inform the Incharge/RRV quoting his private number for
impositionofBlocknominatingthelineonwhichtheRRVshouldbe'Ontracked'(asperthedue
directionofthetraffic).
(i) On receipt of such permission supported with the private number of the Station Master, the
Incharge of RRV shall start the process of On tracking ofthe RRV. On double line, he shall ensure
that the RRV is On Tracked on the line as per the due direction of traffic in accordance with
StationMaster'spermission.
(j) AftertheRRVhasbeen'OnTracked',theInchargeofRRVshallinformtheSMwithexchangeof
private number and entry in gate log register that the RRV has been 'On tracked' and on double
line thatthe adjacent line isclear so that train movement can be started on other direction. During
the'ON'trackingprocedure,theflasherlightshallbeswitched'ON.
(k) OnreceiptofsuchinformationandexchangeofprivatenumberregardingOnTrackingondouble
linesections,StationMasterwillresumenormalmovementontheotherhne.
(1) As soon as the Block is granted, the on duty SM shall take the precautions as observed while
grantingtrafficblocksand-
(i) Ontokenlesssinglelinesection,StationMastershallextracttheSHkey
320
ms-v ^ ^ T f e W T f % ^ ^ % f ^ W
(ii) efcjR WK$ ̂ f t 1 ^ ?W1 ^ ^ ^ W ? ^ R P«frlgl<M ̂ RE toR ^ cl^
^ t ^ W R ^ I
(ii) ^IRT ̂ H ^ Wt TR w . ^ . i ^ ^ ^ OT^ ^ } ^ t ^ f f RR *
^ ^ W ? ^ 3 ^ <tf a.3ft.W. ^ f » if OT f^PR # t cR» ^ cl«nfo W
^ k ^ ^ H ^ ^ R R ^ w i f t i
(iii) cfctf ^ H ^ Wf ^RP #^T ^ T O W ^ ^TOT etf iff, cfrtf 3TR * ^ ^
W ? W - ^ A ^ ^ f^IeT # t W ^RP f ^ R ^ cR» 3iq* TOT R*3Rt ̂ r f^
^frraeff ^ H ̂ ^ R R I * w iff I
(*) ' ^ . ^ A ; ^ t f ^ ^ w ^ ^ ^ y ^ R T ^ r f ^ W M W ^ ^ ^ W ^ ^ ( ^ ^ T R
f ^ ^ w r ^ <* a r ^ ) ? ^ R w ? ? t 'afw t f ^ r ' ^ agnfr ^^fMm^
(?j) Wt WTR ^ ^ T ^ l f t ^ f j T ^ W ^ ^ / * f ^ W * / * f r T TJ.̂ .TPT. *
W W ^ ^ W ? * Ĵ*R13ff ^ ST^Rf-J^Rf ^RT 3TR J ^ ^RT ̂ ^ R f - J ^ R
^ W ^ H W ^ f ^ M ^ T O R ^ R T I
(jT) ^ ^ ^ ^ ^ ' ^ ^ t ^ ^ ^ W ^ ^ W ^ ^ ^ ^ R ^ ^ k ^ ^ ^ ^ ^ R P ^ R T ,
^ T i f r f ^ ^ ^ ^ f o ^ d l ^ ^ t R f o ^ f ^ i f ^ ^ - ^ ^ f
(ET) ' ^ ^ t f ^ ' ^ f ^ ^ ^ H ^ ^ K d l ^ l - ^ s i R ^ f e T m i f W ^ ^ I
^ ^ R R ^ t t eft 3TR3Trc.<ft JPTF&. $ ^ <ft ^ R R i W «cTR» ^RT <* W ^ if
^ f ^ l c r ^ ^ W ? ^T ̂ ^ ^ *TT I ^ R W ? ^RP ̂ f ^ R ^ * W ^ if
VWK ^ R f * ^ R T - ^ R T ^ W ^ f ^ ^ ( e R 3lk ^RP %^ $ W%m$\ ^W^
^ r a ^ cfr ^ W t ^ ^ I T ^ OT^ ^knRT ^ ^ WTR W ^ ^R '3fTO £ T f^JT
viTT̂ Tt
(&) ' ' ^ $ f ^ / ; ^ $ f ^ ' ' ^ ^ ^ M ^ ^ f % T f % i f W ^ R ^ w i t e ^ ^ R T i t e
^ ^ ^ T ^ p H ^ H I ^ K ^ ^ ^ ^ ^ ^ R l ^ r f ^ / q f ^ ^ W ^ f ^ ^ R ^
(IV) ^H imn if "afH t f ^ r / » t f ^ T ' ^ T T -
(^) ora ^ R T ^ r a ^ ^ ^ ^ f%# W T R w ^ m 3TR.3IRA ^r "afn $ ^ ^ afro $^" f ^ n
^ ^ j?r eft WT ̂ e T ̂ WKK W ^ ^R # f^JT ^ R ^ ^ f ^ W t ^ ̂ ^ ^ ^ W T ^T|
(̂T) "3fR t f ^ T ' ^ e T Rrf̂ cT ̂ ^ m & ^ ^Rt^ , f ^ "3TR $ f W Jlf^IT ^ S ^ * ^8T #
^ R E W ^ R t ^ l
(ET) ' ' ^ $ f ^ / ; ^ t f ^ ' ' ^ f ^ i t e ^ t ^ ^ w ^ i t e # ^ ^ ^ ^ ^ ^ ^ ^ w ^ f % ^
oTT̂ TTI
(^) "3fR $f%^/3fTO t ^ " * WH*! if ^R.^R.^. JPTP& * f t ^ eTH 3 * *f ̂ f e ^R t 3lk ^
q m f e ^ ^ R t t % ^ M c | d l d l ^ ^ ^ W ^ f t |
321
Appendix-'D' RULES FOR MOVEMENT OF RAIL-CUM-ROAD VEHICLES
(ii) On single line Token territory, Station Master shall extract the token and keep it till the
removalofblock
(iii) On double line where SGE Lock and Block instruments are provided, the Station Masters
or both stations at either end shall turn the commutator directly to TOL position till the
block has been removed. However, commutator of wrong line can be brought to line
closedpositionprovidedlnchargeofRRVhas given the clearance of adjacent line.
(iv) On double line where block proving Axle counter instrument are provided, the Station
Masters of both stations at either and shall take out LCB Key. The LCB key shall be kept
withSMtilltheblockhasbeenremoved.HowevertheLCBkeyofwronglinecanbeputin
the block instrumentprovided SSE/JE (P. Way) incharge or RRVhas given the clearance of
adjacent line.
(m) WhenRRVistobe'OffTrackedinblocksection-
(a) Before off tracking or RRV, Incharge RRV shall advise the Station Master concern for off
tracking and give his private number, to the SM from the nominated (as per the requistion
givenatthestation)levelcrossing gate telephone.
(b) Wherethegateisconnectedwithacabin,suchexchangeofinformationwouldbebetween
the Incharge RRV and the Cabinman/Cabin Master/Cabin SM, who in turn shall exchange
information with the SM and shall act on the instructions of the Station Master under
exchangeofprivatenumbers.
(c) On double line section Station Master shall block the adjacent line also before permitting
the RRV to be 'off tracked'. After ensuring that no train is in movement on other direction
on double line section Station Master shall give his private number to the incharge/RRV
confirminghispermissionto'offtrack'theRRV.
(d) Duringofftrackingproceduretheflasherlightsshallalsobeswitchedon.
(e) As soon as the RRV is off tracked' and comes out of level crossing gate and not fouling
adjacent track. Incharge RRV shall give the private number to concerned Station Master
for clearance of track as well as for removal of block. Station Master will inform the
section controller and adjoining station of the block section under exchange of private
numbers regarding the clearence of the block.
(f) If the gate telephone of the nominated gate where the RRV is to be 'Off Tracked has
become defective, the RRV shall be "Off tracked' at the next manned level crossing gate
equippedwith telephone.
(g) During the "On tracking" and "Off tracking" the position of the Gates would be treated as
open and precautions/procedure for opening of gates as per rules will be followed by the
Gateman.
(h) After'Offtracking',firsttrainmaybeworkedonPLC.
(IV) 'OnTracking'/Offtracking'instationsection-
(a) WhenRRVistobe'OnTracked'orOffTracked'atalevelcrossinggatewithinstationsection,the
sameshallbedoneonlyatmannedgateprovidedwith telephone.
(b) Such'OnTracking/offTracking'ShallalwaysbedonewithpriorwrittenpermissionoftheSM.
(c) "On Tracking" shall be done only on the nominated line, which shall be treated as blocked once
the "Ontracking" operationhas started.
(d) The gate shall be opened for 'On Tracking/off tracking' after fulfilling all the conditions for
openingofthegate.
(e) Incharge shallmake entries in the CabinLog Resister regarding "On Tracking/Off Tracking" and
confirmationthatadjacenthnesareclearofobstruction.
321
ms-v ^ ^ T f e W T f % ^ ^ % f ^ W
1 ^ t 31R ^ W^T ̂ R f ^ f t JRJR ̂ WKW ^ t f, ^R .^RA ^T%T ̂ H ^R (eTT̂ T ^
(6) ftw^^f^fe^f-
(*) ^ . ^ A ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ 3 l k ^ R ; f ^ R f ^ ^ ^ R
fr) t^ ^T^ ̂ t f̂ rm if, mfr 6.03 Ttf T3̂ # ^RR> f^Rf c£ ̂ ^R 3TR3TR<ft. ^ OT ftfcTT
oTT^TTI
(7) (cp) ^ ^ W T ^ O T l ^ ^ ^ i ^ ^ ^ ^ . ^ A ^ J P ^ ^ ^ ^
^ ^ ^ ^ ^ R ^ . ^ A ^ c i d H H ^ M V f e q t ^ ^ t f ^ c ^ t -
SFvCT.
1
2
3
4
5
6
7
8
9
10
11
12
13
$ellSI«llci H"«Sd
^ H K vH.
rv r
PMI^
^RcfR>
^ M l l
s
^ d t ? ^
v
* H ^ ^ T J C H - 2
* ^
$<i|c||
i ^ . \
[t?|chldNK
C ^ d l
WTSR̂ T uf.
^c^|J|ci vjj.
^Vji l Vjj.
aM H^d
akfl
^
d M d ^
vHMKI H««dd
STT'RT
*l<tfl * d l
OSSO
322
Appendix -'D' RULES FOR MOVEMENT OF RAIL-CUM-ROAD VEHICLES
(f) The gateman/Cabinman/Cabin Master/Cabin SM shall close the gate only after the Incharge has
confirmed in the cabin log register that the RRV has been "Off Tracked" and all lines are free of
obstructions that the RRV has been "On tracked" on the nominated line (line No. to be entered)
andthatadjacentlinesarefreeofobstruction.
(g) Station Master shall resume normal operation after this has been confirmed by the Cabinman/
Gateman/CabinMaster/CabinSMunderexchangeofprivate number.
(6) FAILURES AND ACCIDENTS -
(a) AccidentsinvolvingRRVshallbetreatedastrainaccidentsundertheappropriateclassandaction
shouldbetakenasperrulesinforce.
(b) In case of failure of RRV in block section, the incharge may decide to push the disabled RRV to
the nearest station or level crossing gate in consultation with SM concerned provided the brake
powerisingoodcondition.
(c) Intheeventofbreakdown,RRVshallbeprotectedunderGR6.03&S.R.thereunder.
(7) (a) During total interruption of communications on single line the RRV may be sent to open
communication for establishing contact with the Station Master of the block station at the other
endoftheaffectedblocksection.
(b) Rail-cum-Roadvehiclemaybeutilizedasarelieftrainduringaccidents.
(c) The Station Master, where RRV is located shall advise the Incharge of the RRV at the time of
accident/Totalinterruptionofcommunication.
ThelocationofRail-cum-RoadvehiclesonNCRare given below:-
S.No.
1
2
3
4
5
6
7
8
9
10
11
12
13
Allahabad Division
ChunarJn
Mirzapur
Bharwari
Khaga
Fatehpur
KanpurCentral-2
Phaphund
Etawah
ShikohabadJn
TundlaJn
HathrasJn
AligarhJn
KhurjaJn
Jhansi Division
Jhansi
Lalitpur
Agra Division
Agra
Kosikalan
osso
322
M R R I ^ - '^ ' mzftwf
^ . m 2
1. w ^ ^ g^Rj arc* w ^ ^ *ne * P ^ *rc jrafecr ^ ^ k Mwrsff <* w * r if M *
2. 200 if 1 * 3 # ^ ^ tf£ <STeT ^ * W f ^ ^ # <* WeFT <* ftp? W e f t jJRT ^ ^
^ ^ f^Ptf/weR ^ M if M * agfcr ?r f^ f^r v^Fti * a ^ r mv ^
fr) W1cTTraM-re - PHHPdRdd ^^TRT f ^ C T *eT ^ ^ * 1fo\ W * T t *TT3 f ^Rf if 3 ^
1. d U l M m d r i / ^ l ^ d W l M H d r i
2. S R *
3. c ^ f r T O
4. ^ H W ^ ^ W ?
5. ^
6. gil^l v d H K K / ^ l HIW
7. o f c R % * f ^ H ^ W ^
8. ^ ^ 3 1 N ? f ^
® W ^ ^ ^ ^ R ^ W ^ ^ M ^ I d P ^ d U l M M d r i ^ ? ^ ^ ^ ^ ^ ^ ; ^ ^
(ST) WmTSWFnra - ^ R ^ WeT q f ^ ^ SWP ^T PHHPdfad W f if ^STW JRM Wf <fl ofra
if ^^rfe^r^t w^rar ^ Jmrfacr w r ff% * * * R
qaT fcrt * f*PJ ^ t a HT3 f ^ R t if f ^ ^ ^ t ^ R ^ * P ^ ^ *nf%*lf ^ t i i
323
Appendix -'E' GHAT RULES
APPENDIX -*E*
GHAT RULES
SRG1. GhatMg^ThesubsidiaryRulesforworkingon^
GhatRulesandthesectionstowhichtheyapplyasGhatSections.
SRG2.
(a) These Rules apply to the following sections of North Central Railway :-
AllahabadDivision Chunar - Chopan
Note:-
(i) Divisional Railway Manager shall issue special instructions for local features prevailing on Ghat
Sectionsovertheir Divisions.
(ii) Divisions shall embody special instructions in SWRs/ working instructions for working trains
sections having short grades steeper than 1 in 200. These instructions should be consistent with
general&subsidiary/GhatRules.
(b) All other subsidiary Rules apply to the working of Ghat Sections, except those modified or superseded
bytheGhatRules.
(c) Certificate of Competency- The under noted staff, who are directly concerned with train movements.
must qualify and shall not assume duties on graded sections until they are granted a certificate of
competencybytheirexecutiveofficers.
1. Loco Pilots/Asstt. Loco Pilots.
2. Shunters
3. Traincontrollers
4. StationMastersandyardMasters
5. Guards
6. ShuntingJamadars/shuntingMaster
7. Leverman/CabinmanandCabinMasters
8. Pointsmen/Porters/Shuntmen
Thecertificateofcompetencyshallbevalidforaperiodofthreeyearsonly
(d) A shunter or a Loco Pilot, before being allowed to learn road on Ghat Sections, should qualify in Ghat
Rules.
(e) ALocoPilotonhavinglearnttheGhatSectionwillnotbeallowedtoworkindependentlyunlessaLoco
Inspectoraftertravellingwithhim,declarestheLocoPilotconversantwiththesection.
(f) Certificate of Competency- Asst. Operating Manager are authorised to examine, issue and renew
certificates of competency in the following form.
North Central Railway
I, The undersigned, hereby certify that Sri has passed the examination in
Subsidiary Rules for working sections with steep gradient contained in unified Ghat Rules for
theNorthCentralRailway
(Designation of Divl. Officer)
NOTE : Sr. Divisional Operations Manager may nominate Senior subordinates to examine, issue and renew
certificateofcompetencyinrespectofclass IV staff.
323
M R R I ^ - '^ ' mzf^m
iMf <* > s U" ^ w^im^ 3 mw iftf xn%j i
^ ^ R ^ f ^ W W ^ I
w.
(i)
(ii)
(iii)
fc|cNul
S \ r\
Jllf^ifl' *R
Hld'H^Sl - l* i l l /<Wl
vJIsT *TR 4 0 W ^f> cfTef
8 Mf̂ AII Hid fe«ll cTC*
HldJII-Sl - f * ( J I /M l
vW *TR 4 0 W ^f j cTTef
8 MfsHll Hid fe«ll ^
3 f f ^ Ft
S'uH A
W-^-
6 foill/M
fr.*ft.
sfoin/^ft2
5 fow/M
5 foill/M
ftttd slcbc|H H'
wft
5.8 foill/M2
sfr/ft
4.8 foill/>M2
4.8 foil 1 /Ml 2
4.7 % m / # f t 2
(i) ifrn ^ t ^ R r̂ <JR ̂ <E*T fefe w -
CCT4 ^ T y^K
\ \ r\ v
Hd/^chHtl>H J|l4l H
flcllfl J||^l A
f\ V
HleHllSI *\
$«H
53
50
46
sl*c|H
47
44
38
aflfld
50
47
42
( i i ) ^^f%^^3M«?3^t^^f^™: W^ T̂ * ĉ ?K ^
324
Appendix-'E GHAT RULES
BRAKES
SRG 3. Vacuum/Air Brake - Rules on the Vacuum/Air Brake are to be read in conjunction with other extent
Vacuum/AirBrakeRules.
SRG 4. Engine Brakes - Every engine working on Ghat Section must be fitted with the automatic vacuum/air
brake in good working order and must be itselfbraked either by the vacuum brakeorair brake. The handbrake
ofallenginesmustbeinproperworkingorder.
SRGS.mideirak^-TrainmnningonGhatSectionmustbevacuum/airbrakedthroughout.
SRG 6. Hand Brakes - All goods vehicles on a train except powder vans must be fitted with a screw brake or
handleverbrakecapableofbeingfasteneddown.
SRG 7. Examination of Train before Starting - The train examiner, Loco Pilot and Guard must test the
vacuum/Air brake of each train before its departure according to the Special instructions laid down in this
behalf.
SRG 8. MinimumVacuum/AirPressureontheEngineandinRearBrakeans-
(a) MinimumairpressureinengineandrearbrakevanofPassengerandGoodstrainsatthetimeofstartinga
train.
Particulars
(i) On Mail, Express and
Passenger train
(ii) On Goods train Kg/cm2 with
load up to 40 air braked 8
wheeler wagons.
(iii) On goods trains with more
than 40 air braked 8 wheeler
wagons.
OnEngine
FP
6 Kg/Cm2
. . .
. . .
BP
5 Kg/Cm2
5 Kg/Cm2
5 Kg/Cm2
Onrearbrakevan
FP
5.8 Kg/Cm2
...
...
BP
4.8 Kg/Cm2
4.8 Kg/Cm2
4.7 Kg/Cm2
(b) Standardizationofvacuumlevelinengineandbrakevenofpassengerandgoodstrains:-
(i) Minimumlevelorvacuuminengineandbrakevan:-
TypeofService
M/E
Passenger
Goods
Engine
53
50
46
Brakevan
47
44
38
Average
50
47
42
(ii) Whenever a coaching train runs initially on passenger and subsequently on express services.
vacuumlevelsonsuchrakeswillbemaintainedas those prescribed on M/E trains.
324
M R R I ^ - '^ ' mzf^m
U <fr w*r if ?n$ <t>fa\M ^ fo^t
^ ^ W ^ f ^ ^ ^ ^ ^ ^ l ^ W ^ ^ d ^ H M I ^ f o ^ W q ^ ^ ^ t
*.fr.W.10 ^ ^ ^ - ^ ^ T R ^ W ^ ^ t f o ^ ^ ^ ^ f ^ / W ^ R ^ f a f c
*f*TT|
^ f t mw wi $ i% ^ # * w r <* %* if ^wrâ P Crater/w jm *q*w 11 ^R ;wra^ f̂ rakr
fe^ ^ t ^ t eft ^ eftfT TRT^ ^T ^ OT *nf^ ^ R eft̂ T TO^ ^ f f l ^ ^ f ^ f c T / W ^ R .
t ^ ™ ^ ^ ^ ^ ^ ^ ^ W R n ^ ^ ^ ^ ™ T O ^ ^ ^ ^ w n ? s R ^
i T ^ ^ ^ ^ ^ ^ f ^ ^ ^ ^ W ^ ^ ^ ^ l ^ ^ l ^ ^ ^ ^ ^ t f
R̂T f%^^ IjvfcR* ̂ J W ^ ^ ^ ^ W R ĈT ^ eft ^ * ^ t f % ^ ^ T ^ t ^ M
l?lcIT WT 11 WJ^ ^tel <* ftp? ̂ ^ * M ^ #^ ^ f ^ qR ^ # <* W f <* ^ ^
S R ^ R ^ #t f f%rf%^ ^ P ? ^ T * ^ w ^ f ^ ^ R f t ^ ^ t *n%j f% M f^W
f ^ i f ^ ^ f r w r t w ^ ^ ^ l
^ i f f t ^ ^ ^ ^ f M ^ i % ^ ^ t i
^ R ft^cr/ W ^ J <* ̂ <* ftp? W ^ cftf^T $SK ^ eft̂ T TRT^ ^ d ^ R f t ^TT I ̂ cftf^T
^ ^ ^ d U l M H d r i ^ C T W f M ^ i f . ^ ^ ^ ^ R ^ a ^ ^ ^ ^ ^ ^ ^ ^ d K ^ ^ ^ i f ^ R T m
^TT f%^ ^ Crater ̂ ^ s m ^ ^ w ^ f ^ i
fM^/w^^^^if^^^^r^^(^)if^ipH^^^i^^^dUiMmdri^
f ^ m if i N t f%M ^ <* % * <fl 3fR ^ f % f ^ <fr W f if ora ^ ^ c£ ^RTcp ^ CM
325
Appendix-'E GHAT RULES
RESPONSIBILITY OF TRAIN STAFF AS REGARDS BRAKES
SRG 9. Loco Motto try Vacuum/Air Brakes - Loco Pilotmust satisfy himself that the vacuum/Airbrake is in
proper working order through out the train before leaving the Starting station and at each station where any
vehicle is attached or detached and also before descending steep gradients. He must also satisfy himself that he
hasenoughbrakepowerbeforepassingtheoutersignalofanystationatwhichthetrainhastobestopped.
SRG 10. Defective Vehicles - If a Loco Pilot finds the vacuum/Air brake on his train defective, the vehicle
with defective vacuum/Air brake if not immediately repairable must be detached from the train. Under no
circumstances, whatsoever may/D.V. cylinder be blanked off. He must also refuse to attach any vehicle with a
defectivebrake,buthemustgivehisreasonsinwritingtotheStationMasterifaskedtodoso.
SRG 11. Guardto see Vacuum/Akpressure Gauge-The Guardincharge before dying the signal to startmust
satisfyhimselfthattherequiredvacuum/Airpressureisregisteredonthegaugeinhisbrakevan.Iftherequired
Vacuum/Air pressure is not registered he must inform the Loco Pilot. If the Loco Pilot is not able to create the
required vacuum/Air pressure as required on the gauge in the rear brakevan, the train must not start until the
defect has been remedied by detaching defective vehicles or otherwise. The signal to start given by the Guard
Incharge is an indication to the Loco Pilot that the gauge in the rear brakevan shows the required vacuum/Air
pressure.
SRG 12. Descending Long and Heavy Grades -
(a) In controlling trains on descending long and heavy grades, Loco Pilots are cautioned against allowing
the vacuum above the pistons to fall too low which usually happens unless periodically restored by
blowing up with the large ejector. The destruction of vacuum above the pistons, owing to leakage, is
always taking place during the continuous application of the brake while descending long grades, and it
is of the utmost importance that the vacuum above pistons should be restored by the use of large ejector
but before using the large ejector the speed must be reduced to allow for increase of speed which will
take place when large ejector release to brakes. The large ejector must be used in several short periods
insteadofonelongperiodfortheabovepurpose.Advantageshouldbetakenoflongcurvesorstartsafter
stops at catchsidings to recreate the vacuum above the pistons. Care must be taken that the speed during
the release of the brakes is not allowed to increase beyond as safe limit. If the speed is allowed to get
beyond the certain point, the brakes will not pull the train up.
(b) LocoPilotsmustnote,thatreadingofvacuumchamberneedleontheenginegivesnoindicationalsothe
vacuum above the pistons throughout the trains.
SRG 13. ControlofVacuum/AirBrakeonRunningTrains-
(a) When a second leading engine is employed to pull a train (and not a banking engine pushing it). The
Loco Pilot of the first leading engine will be held responsible for the working of the automatic
vacuum/Air brake. The Loco Pilot of the second leading engine must, however, in case of emergency
assist in stopping or reducing the speed ofthe train by applying the air and hand brakes as may be require
buthemustnotmaintainorrecreatevacuum/airpressure.
(b) When an additional engine or engines are employed to push a train, the Loco Pilots thereof must not
interfere with the working ofthe vacuum/Air brake, which shall be under the control ofthe leading
engineLoco Pilot. As laid down in para (a), except in case of a run back, when the banking engine Loco
PilotautomaticallybecomestheleadingLoco Pilot.
325
M R R I ^ - ' ^ ' mzf^m
(i) * c R I I ^ ^ 1 * ^ * 3 1 1 * 1
(ii) ^ 1 ^ ^ ^ ^ ^ % * |
f ^ ^ ^ i f T ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ q ^ ^ f ^ ^ ^ ^ ^
(ET) ^ 3 # f ^ ^ ^ ^ T O ^ f » i ^ ^ ^ M ^ ^ ^ ^ f ^ i f ^ 3 k ^
® ^ 3 ^ f » i f % ^ ^ ^ ^ T O ^ o ^ ^ ^ ^ T O ^ « T R 3 r R ^ O T
3>TH^I4»HI*ll[^|
eft̂ r TO^I ^ ^ w r ^ f t ^ i Crater / w ^ ^ A 3 ^ ^ ^ r ^ w *n%j vira
^ ^ f ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ f ^ r o ^ ^ f ^ ^ R }
^ V J T T C I T t l
; * f M ^ ^ ^ W ^ ^ ^ ^ n ^ 1 5 0 i f l ^ ^ ; ^ ^ ^ ^ ^ ^ ^
f M ^ ^ w i ^ i o o i f i ^ ^ ; ^ ^ ^ ^ ^ ^ ^ f M ^ f ^ T O
gf eft PHHPdfad ̂ PdP<4d ̂ P d ^ ^cft ^ R M I
sfn frferaf ^ ?p$ W ̂ r a «crra» ^ sfn / JU %^ U fe^ ^ * w ^ ^RJ? ^> / ^RJ ^ 326
Appendix-'E GHAT RULES
(c) WheneveraGhatSectioncomprisesofeitherdescendingorascendinggradientonlyandnotboth,inthe
same direction, the second engine should be attached as under: -
(i) Ondescendinggradientinfrontofthetrain.
(ii) Onascendinggradientintherearofthetrain.
If, however, it consists of both descending and ascending gradients following each other in quick
succession, the banker may be attached in the rear only of the train.
(d) Loco Pilots of all additional engines will, at all times keep the handle of the vacuum ejector in the
runningposition,andthesmallejectorsmustbeclosed.
(e) IntheeventoftheLocoPilotoftheengineinrearrequiringinanemergencytoattracttheattentionofthe
leading engine Loco Pilot, he shall give a whistle signal (one long blast).
Note- These rules are to avoid the serious danger, which would arise if the Guard or Loco Pilots of additional
enginesweretoattempttoputthebrakeon,whiletheleadingLocoPilotwastryingtorecreatevacuum.
SRG14. Stoppingatstations-
(a) Loco Pilots must enter stopping stations at such a speed that it would be possible to stop the train at
proper place. The vacuum/Air brake must be applied by the Loco Pilot in stopping train or reducing its
speed.
(b) Guards must watch the speed of the train and assist Loco Pilots by the use of their hand brakes, if
necessary. They may only apply the vacuum/Air brake when it is necessary to make an emergency stop.
WORKING OF TRAINS
SRG 15. Sand Boxes- Dry, sharp sand not mixed with clay, is essential on all Ghat sections and Loco Pilots
mustseethattheirsandboxesarefullandsandinggear is inworking order.
SRG 16. SpeedRestriction-Thespeedoftrainslaiddown in the working Time Table must be rigidly adhered
to. Innocircumstancewhatsoevermaytimebemadeupondescendinggradessteeperthanl in50.
SRG17. Startir^Ltain-Whenatram^^
first. Allbeingreadytherearenginewill also give whistle as a signal to all other engine starting from the rear.
SRG 18. Admission of Train in Station - When two trains are approaching a station from opposite directions
and cannotbereceived without one of them being stopped, the descending train must be stopped at the firststop
signal and the ascending train given preference provided that the descending train is not stopped in a tunnel or
onabridge.
SRG 19.
(i) Ifforanyreason,atrainisbroughttoastandforaperiodlongerthanl5minutes,thehandbrakesofthe
locomotive shall be applied in addition to the application of vacuum/Air Brakes etc. If such stoppage
happens to be, of train having vehicles with roller bearings on a section with a grade of 1 in 150 and
steeper,andtrainhavingvehiclesotherthanrollerbearingsonasectionwithagradelinlOOandsteeper,
thefollowingadditionalprecautionsshallbetaken.
On trains carrying the passengers, the Guard shall apply hand brakes in the brakevan and wedges
or scotch blocks as the case may be to the wheels of two vehicles nearer to the descending steep incline.
On goods trains, hand brakes of at least one third of the wagons in the train or 10 wagons behind the
engine and 5 wagons inside the brakevan, whichever is more, shall be pinned down, in addition to the
applicationofGuardshandbrakeinthebrakevan.
(ii) Whenthetrainisexpectedtostart,propervacuum/airpressuremustberecreated/recharged,asthecase
may be, and the vacuum brake/air brake must be applied before the wedges or scotch blocks removed
and/orhandbrakesreleased.Thereafterthevacuum/airbrakesmaybereleasedtostartthetrain.
326
M R R I ^ - ' ^ ' mzf^m
(iii) ^ T R ^ ^ O T ^ f ^ ^ ^ ^ ^ T O ^ , ^ ^ % ^ w f % ^ l N ^
(iv) ^ T O ^ ^ 3 t ^ 1 ^ ^ f t e T f ^ £ ^ ^ ^ , 1 5 0 ^ 1 ^ 100 3 l ^ ^ t o ^ ^ ^ ^ ^ f
^ O T ^ ^ ^ f ^ q ^ ^ ^ f r w W ^ l ^ ^ ^ w f l ^ f ^ f ^ ^ R ^
TO^^^^;^R^^^f^w^^^R^^^^^^^^^^^
^ ^ W ^ f ^ f ^ ^ ^ 5 o 3 l ^ ; ^ ^ ^ ^ ^ f ^ ^ ^ ^ ^ ^ J ^ R
.̂Rm.24. w f ^ 5 0 ^ 1 ^ ^ ; ^ ^ ^ e f t f ^ ^ ^ w f f ^ ^ ^ f ^ ^ ^ ? -
S O ^ I ^ ^ ^ ^ ^ ^ ^ f ^ ^ ^ w f l ^ ^ ^ f ^ ^ R ^ I ^ ^ ; ^ ^ ^ ^
t l
.̂m.m.25. ffrnft ^ ^r w r̂ ^ f WRH ^R^T - f ^ t *nf%tf ^r w * ^TO (^R^ft <* aierrai)
(ii) ^ 3 ^ ^ W T O ^ ^ l ^ ^ ? W R ^ ^ ^ 1 5 M . ^ . 3 f t ^ ^ ^ 8
(iii) ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ , ^ d U l M M d r i ^ ^ % T O f ^ R ^
(iv) ^ ^ ^ ^ ^ ^ f ^ ^ M w ^ f ^ 3 f ^ ^ w ^ t ^ f % # ^ ^ ™ ^
327
Appendix-'E GHAT RULES
(iii) The Loco Pilot himself or, onhis direction, the Assistant Loco Pilot, shall be responsible for application
and release of the hand brakes of wagons behind the engine. The Guard shall be responsible for similar
actioninregardtothewagonsinsidethebrakevan.
(iv) Considering the condition of brake power on train, the Loco Pilot may take additional precautions.
duringthestoppageofhistrainonsectionflatterthanlinlSOorlinlOOtoavoidrunaway.
SRG 20. Failure of the Vacuum/Air Brakes between Stations - If the vacuum/Air brake becomes defective
whilethetrain is running between stations so thatitis dangerous to proceed, the Loco Pilot must bring the train
toastandandtakeitin portions to thenext station, eachportionbeingnotmorethanhecan safely control. The
vehiclesleftbehindwillbe secured. The Guard will remain with the portion of the train left behind and protect
it.
BALLAST TRAINS
SRG 21. Brake of Ballast Trains- Each vehicle of a ballast train, in addition to being provided with the
vacuum/air brake must be provided with an efficient hand brake capable ofbeing fastened down.
SRG22.ApplicationofBrakeswhenStoppingBallastTrainonaGrade-Onstoppingaballasttrainonagrade.
theLocoPilotmustgivelongblastofwhistletoattracttheattentionoftheGuard,andthereaftergivethreesharp
blasts for the application of all handbrakes. The brakes must not be released until the Loco Pilothas signalled
forthisbygivingtwosharpblasts.
SRG 23. PositionofBallasttrain engine whenstandingonaGrade 1 inSOorsteeper - Before entering a section
on which a ballast train is required to stand on a grade of 1 in 50 or steeper the engine must be attached so that
whenthetrainisstanding,theengineisatthedownhillendofthetrain.
SRG24.VehiclenottobedetachedfromaBallastTrain where Gradesorl in 50 or steeper-Vehicle must not be
detached from ballasttrainonaGradeof 1 in50 or steeper. The engineitself maybe detached with the Guards
permissionafterhehadseenthatthehandbrakesoneachvehicleareproperlyapphed.
SRG25. BallastTrainnottoworkatNight-BallastTrainmustnotworkatnightexceptinanemergency.
SRG 26. Restrictions and condition for pushing Ballast trains - Ballast trains are not allowed to be pushed
outsidestationlimitsoverdescending gradients. Such trains may push provided that-
i. Theportionofthelineoverwhichthetrainwillrunisonacontinuousascendinggrade.
ii. ThespeedofthetrainmustnotexceedlSkmsperhouronthestraightlineandSkmsperhouron
the turn out if the leading vehicle is a brakevan and 8 kms per hour, if the leading vehicle is not a
brakevan.
iii. The Guard must travel in the leading brakeven or the leading vehicle and must exhibit hand
signals to theLoco Pilot.
iv. Thetraincrewmustkeepagoodlookoutespeciallyinthedirectioninwhichthetrainmovingand
mustbepreparedto stop shortof any obstruction, and
v. When approaching turn-outs, the Guard must stop the train and satisfy himself that the points are
correctlysetandthatallnon-interlockedfacingpointsarelockedandmanned.
Nste^Thisrule will also apply when the engine is placed somewhere in the middle of the train in an emergency
orin exceptional circumstances.
327
M R R I ^ - ' ^ ' mzf^m
(i) f ^ ^ ^ ^ c f t ^ t ^ ^ ^ ^ ^ T ^ ^ ^ H ^ f ^ ^ R T t
(ii) ft^^^^^^^^f^^^^^^^^^f^^^^^f^^ST-^STf^
(iii) rt^w^^teRw^fkwti
(iv) ^ O T ^ ^ ^ ^ ™ ^ t f ^ ^ ^ ^ ; f f l ^ ^ f r ™ 3 ^ W ^ d T t
(v) ^ ^ ^ ^ % ^ f ^ ^ ^ ^ ^ f ^ ^ ^ ' ' ; ^ ' ' ^ f ^ w t ^ w w ^ ^ ^ ^
P ^ H P d ' l ^ ^ % T O ^ r ^ M ^ ' f t g T f ^ W ^ t |
(ii) ^ ^ ^ ^ ^ W ^ ^ T O ^ ^ ^ ^ I ^ ^ ^ ^ T ^ ^ ^ F T ^ ^
f ^ F T (ftraro fern ̂ f ^ ffcrfr *) I
.̂FT.m.29. f ^ ^ f ^ ^ ^ ^ ^ ^ W ^ ^ ^ - f ^ ^ ^ f ^ R ^ l ^ l ^ ^ f e
^ciW ^ an* ̂ f t ^ t ^r w ^ ^ ftmer ^ f % ^ # ^ f^rr ^ T i ̂ cRif ^ an* ̂ f t ^ t <#
328
Appendix-'E GHAT RULES
SAFETY SIDING
SRG27. Ddinition-Therearetwokindsof safety siding called "Catch" and"Slips" siding.
(i) Ca^.Wm^areplacedabovestationsapproachedbyadescendinggradetoprotectthemfromrunaway
vehiclesortrains.
(ii) ^>,Wm^areplacedbelowstationonagradetopreventvehiclesescapingfromthestationyard
SRG28. Catch Siding -
(a) Thepointsof'Catchsidingmustalwaysbesetandlockedforthe'Catchsidingexceptwhenatrainisto
be receivedor despatched.
(b) 'Catchsidingpointsshouldnotbesetforthemainlineforthereceptionofanapproachingtrainunlessit
has first been broughtto adead stop at the first stop signal and the Loco Pilot whistles, except when the
following conditions are fulfilled.
i. Thelineonwhichthetrainistobereceivedisclearandthetrainistobereceivedonthemainline.
ii. The points leading to the catch siding as well as the points required for a run through train are set
forthemainlineimmediatelyafter granting lineclear to the block station in rear.
hi. Lineclearhasbeenobtainedfortheblocksectionahead.
iv. The gradients in the block section ahead are such that the train can be brought under control
easily.
v. Warner signal in the lower quadrant signalling territory is not taken 'Off and distant signal in
multipleaspectsignalhngterritoryiskeptat'caution'position.
(c) In the case of an outgoing train, the 'Catch' siding points must not be set for the main line unless
permission to approachhas been received from the station in advance.
(d) (i) Thepointsmustberesetandlockedforthe'Catch'sidingassoonasthelastvehicleofthetrainhas
passedoverthem.
(ii) Hand Signal will be exhibited at all 'Catch' siding points. The points shall be fitted with point
indicator showing red when thepoints are set for catch siding and while when they are set forthe
mainline(Exceptwhenspringpoints are provided).
SRG 29. Locking and Unlocking the Points of the Slip Sidings - Except for shunting, the points of slip sidings
mustbenormallylockedforthe siding and must only be unlocked and set for the immediately before taking off
the signal for the admission of an ascending train or, in the case of descending train, after permission to
approachhasbeenreceivedfromthestationin advance. If the authority to proceed, for a descending train which
is bookedto run through the station, has not been received, the descending trainmustbe first broughtto adead
stop atthe first stop signal before the 'Home' and/or'Outer' signals are taken off for its reception. In thecaseofa
descending train. The slip siding points may only be unlocked and set for the main line, when permission to
approach has been received from the station in advance. The points must be reset for the slip siding as soon as
the lastvehicleofatrainhaspassedover them.
Note,
(a) Atcertainslipsidings,springpointshavebeenprovided.Thesearenormallyunlockedandaresetforthe
siding. An ascending train trails through them while entering the station. These points need only be
locked for despatch of a descending train and this should be does only after permission to approach has
beenobtainedfromblockstationin advance.
(b) Point indicator at Slip sidings - Point indicators showing red, when the points are normally set for the
siding and white when set for the main line, shall be provided at all slip siding points. (Except where
spring points are provided).
(c) The duty of locking and unlocking"catch" and "slip" siding points may be performed only by the
pointsman/Porter in whose special charge they have been placed under the orders ofthe Station Master.
328
M R R I ^ - ' ^ ' mzf^m
% ^ ^ ^ ^ f ^ ^ t ^ ^ W ? T < ^ ) ^ ^ f l 3 T N 8 0 0 ^ ^ ^ ^ ^
Wlti ^ti\ I H ^ WeT tm*K 5TCT ^ R * 1 ^ W^ eRI* ^ F t 3k ^ R <* ^RT ^
(ET) ^ R ^ ^ ^ ^ 3 ^ f ^ ^ ; f f l F ^ f M ^ ^ f ^ R ^ ^ ^ f ^ ? T ^ R 3
STTMl
^ ^ f ^ W ^ P H H P d f a d W f ^ ^ ^ t ^ ^ R R n ^ R T I
fr) (i) W ™ ^ ^ , I ^ * ^ ^ ^ ^ ^ ^ W ^ R T 3 1 N ^ ™ R ™
(ii) ^ ^ i ^ w ^ 4 . 5 f e ^ ^ E R ^ i f T R T
(iii) TOft ^ f ^ t W ^ <* « ^ R 3T̂ T W TR ^tim I ̂ R ^ *eT qST M\^ 3 ^ ^ qST
3 R M R # f % ^ ^ R T i
™ ^ R T ^ f t t | ^ W ^ W ^ ^ f R f ^ f ^ R ^ R T f % -
(i) f % # R ^ ^ ( ^ R ^ ^ ^ ^ ^ R ^ ^ ) ^ 3 ^ ^ ^ ^ R ^ ^ ^ t
(ii) R ^ R M ^ ^ ^ ^ R ^ ^ 3 ^ ^ ^ R ^ ^ R ^ f ^ l ^ 3 k ^ W
(iii) R ^ ^ ^ ^ ^ ^ ^ w ^ R ^ ^ R ^ ^ w ^ ^ T w R T R f ^
(R) W ^ H l S . O O ^ R ^ 06.00 ^ ^ ^ ^ ^ R ^ ^ ^ R ^ ^ ^ R W ^ ^ ^ O T
^ ^ ^ ^ f R 3 ^ ^ P ^ M i ^ ' i i R ^ ^ ^ w ^ k ^ w ^ ^ f % R r f % R f ^
329
Appendix-'E GHAT RULES
PATROLLING ON GHAT SECTIONS
SRG30. Orders for Patrolling -
(a) The Sr. Divisional Engineer will decide and issue order regarding the Sections to be patrolled and the
dateonwhichpatrollingistobeginandstop.
(b) At Chunar-Chopan Ghat section the Sr. Divisional Engineers will decide the question whether regular
nightpatrollingistobeintroducedduringthemonsoonperiodi.e.lstJuneto31stOctober,ButtheeXact
date of commencement and termination will be decided by Assistant Engineer of the section. Patrolling
shouldnotbestarteduntilthemonsoonactually arrives.
(c) Vulnerable points: All the vulnerable points will be watched by static patrols, all such points being
carefully selected by the Sr. Divisional Engineer. All vulnerable points (including vulnerable bridges
and locations, which are subject to slips, rock-falls,water falls etc.) will be provided with sign boards
fixed atadistanceofSOOmeters on either side of the vulnerable points. The fixing of these boards will be
arranged by Divisional Engineers immediately before the monsoon and removal immediately after the
monsoon.
(d) TheRailwaytrackandbridgeswillbepatrolledduringmonsoons,stormyweather,heavysnowingorin
the event of any other emergency which may interfere with the safe running of trains. Rains during the
winter months also may be a source of danger to the line and therefore, patrolling should also be
introducedonsuchsectionswherenecessaryduringthewinterrains.
(e) Gang Patrol - In the event of a sudden storm and emergency during day and night, the Mate will on his
own initiative, organise patrolling over the length affected, independent of any other patrolling being in
operation. This patrol will confine its inspection to known points of danger such as cuttings, culverts and
bridges likely to scour and their approaches, embankments likely to be affected and those places which
are liable to be in danger on account of likely breach in railway affecting works such as banks and dams.
In the absence of the mate, the keyman will organisethis patrol. Half the gang will go out during the day
andhalfduringthenight.
SRG 31. Patrol Charts - Patrol charts will be prepared by the Divisional Engineer after the publication of the
timetabletocomeintoforcefromlstApriltakingintoconsiderationthefollowing-
(a) (i) As far as possible, each block section will be treated as a unit of length and will be divided into
approximatelyequalbeats;
(ii) Thebeatofpatrolmenwillnotexceed4.5KMs
(iii) Thepatrolmanwillgooutonhisbeatinaccordancewithchart,Patrolchartswillbescrutinisedby
JE and SE (P. Way) regularly and by ADENs and DENs frequently when on their inspection
rounds.APatrolmanshallnotberestoredtowalkmorethanlSKMs.
(b) In drawing up patrol charts the Divisional Engineers will arrange for maximum 'Protection' possible for
all trains carrying passenger between the hours of sunset and sunrise. This protection can be given by
organisingpatrollingasspecifiedaboveandensuringthat-
(i) The patrolmen meet at the end of their beats before a train (or the first train of a group of trains)
enters thesection, or
(ii) The patrolmen have met and are on their way back when other trains or the group of trains enter
the section, or
(iii) Thepatrolmenarenotbackattheendoftheirbeatsalongtimebeforethetrainentersthesection.
(c) The patrol charts will show all trains between 18 hours and 6 hours with their time of entering and
clearingthesectionsothatthechartswillshowataglancehowthetrainshavebeencovered.
329
M R R I ^ - ' ^ ' mzf^m
(ET) w ^ ^ ^ ^ ^ w ^ < r ^ ^ j ^ ^ ^ w ^ ^ f ^ ^ ^ f % j ^ ^ ^ t
^ t <* ̂ <ST 3RTC ̂ ^ t o lft eft ̂ ^R <*T ̂ ^ <* f ^ W f c f f W <fl o q g w ^
viTTMl
(i) ^ ^ ^ f ^ ^ ^ a f c ^ ^ ^ ^ s ^ ^ ^ ^ a i k ^ ^ ^ ^ s R
(ii) ^ M ^ I ^ ^ ^ T ^ ^ ^ ^ a n ^ # t ^ ^ W T c C T ^ # ^ T f e ^ T T |
TO^, ^R ̂ f ^ f i% ̂ r m xier ̂ iff eft w ^ i R 4 f <* f ^ t <fl w*m^ % i ^R efWr
in
(i) ^ ^ ^ ^ ^ ^ ^ f ^ ^ f % ^ ^ W j l ^ ^ c t , ^ ^ | ^ i l P ^ ^ M ^ ^ ^ | i [ w ^ r
(ii) ^ ^ ^ ^ ^ W ^ ^ M ^ ^ M M ^ T O ^ ^ i g ^ ^ ^ W ^ T O f t
«HHIv^l l |
(iii) ^ ^ ^ ^ f t q < r e - v ^ l f r f t y # ^ i r ^ . ^ ^
(iv) g g ^ M ^ - ^ ^ ^ ^ ^ f M ^ ^ ^ ^ g ^ s ^ ^ ^ ^ ^ ^ w ^ ^ ^
^ ^ ^ f ^ ^ ( ^ ^ ) ^ ^ ^ ^ ^ M ^ ^ % ^ ^ f ^ ^ t * ^ f ^ ^ ^
STTcITt c f T M f e M ^ ^ ^ H HI«W PHHPdfad ct,|4c||^ < ^ | | -
fa) f^^^^^^^t^^^^t^t^f^
<jfeci<^ii,afr
fr) « * r r a » ^ 3 ^ ^ ^ ? n m < t f r w f a/409 ^ ^ ^ ; ^ ^ t ^ f ^ r ^ t
TO^ <tfr ^ m ^ %g f^nr f^r wJfr i ora w f%̂ ̂ ^ ^ * f%# tf fa* *
^ ^ TR q p ̂ ̂ ^^rfa w ^ r * f% ' ^ 3te t ' eft ^ ^ an^r. vatf w ^
^ f ĵT ^ T I *a W f 3 w f ̂ ^ f ^ t ta^ ^ ^ f qpicTT. ^f^icr ^ ^ w ^
330
Appendix-'E GHAT RULES
(d) Afterdrawingoutthepatrolcharts,eachchartwillbeeXaminedbytheDivisionalEngineertoseewhat
cover has been given to each train. If, on any block section, which is known to be giving trouble the
interval between the patrol and the train is too long, an intermediate patrol will be introduced to reduce
the interval.
(e) Copies of patrol charts prepared by Divisional Engineers for different sections will be distributed to the
Assistant Engineers, SE/JE and copy of the relevant portion of the chart will be issued to each Station
Masterwithinstructions-
(i) To record time of arrival and departure of Partolmen in the patrol book and initial these entries.
and
(ii) Torecordtimeofarrivalanddepartureofpatrolmenandtheirnamesinthestationdiary.
(f) Copies of patrol charts together with a statement showing places where Loco Pilots, when running to
time, may expect to pass patrolmen, will be sent to the Shed Foreman by the Divisional Engineer. Loco
Pilots will proceed cautiously. If Patrolmen are not found at the expected kilometrages report the matter
to the StationMasteratthenextstationwhowilltakenecessaryactionandadvise all concerned.
(g) Acopyofthepatrolchartsforpatrollingblocksectionsjistofstationerywatchmenatvulnerablepoints
and mobile patrols between stations will be sent to the office of the General Manager (Engineering) in
themonthofDecembereveryyear.
(h) Officers and Supervisors of the Engineering and Operating Departments, during inspections of station
should check station diaries to ensure that SMs record correctly the time of arrival and departure of
patrolmen.
SRG32. PatrolBooks:-
(i) PatrolBookinatincase,containingsufficientnumberofpageswillbesuppliedtoeachpatrolman.
(ii) The books will be serially numbered to correspond with the number of the patrol on each section. The
first page of the book will contain the name of the patrolman, kilometrage of the patrol section and its
number. The remaining pages will contain columns far date, station, times of arrival and departure and
signaturesofStationMasteronduty.
(iii) DisposalofPatrolBook-JE/SE(P.way)willtakeoverthepatrolbooksfromthepatrolmenaftersunrise
and will tear out the carbon copies and send them by the first available train to the Assistant Divisional
Engineerforhisinformationandrecord.
(iv) ReportingforDuty-PatrolmenwillreportatthetimeshowninthechartfordutytoStationMasterofthe
stationatwhichtheyareheadquartered.Ifanyofthepatrolmenfailstoreportforduty,theStationMaster
must immediately send a message to the nearest JE/SE, so that arrangements maybe made at once for
anotherman.
When a Patrolman, who is due to arrive at a station does not turn up at the Nominated time or does not
turnup at all, the Station Master on duty will take following action:
(a) Stoprunthroughtrainsproceedingintotheblocksection.
(b) Advise the Station Master at the other end of the Section to take similar action and also advise the
Controller, and
(c) Issue Caution Order to all trains proceeding into the block section advising the Loco Pilot to
remaincautiousandspecifyaspeedrestrictionof40KMPHduringthedayandl5KMPHduring
thenight/poorvisibility.CautionOrderwill be discontinued when the patrolman from either end
of the patrol section arrives at the station and reports that all is well. In cases where the patrolman
doesnotturn up at all, the Station Master concerned should initiate action to ascertain thereason
therefore.
330
M R R I ^ - ' ^ ' mzf^m
(ii) ^ # r ^ f « ^ ^ ^ ^ ^ f « ^ ^ ^ 3 ^ ^ i ? T
(iv) ^ ^ ^ ^ ^ ^ i f ^ ^ f ^ O T ^ R ^ f ^ ^ ^
(v) ^ ^ ^ ^ ^ ^ s m f ^ ^ i
(ET) arc* an* ^rr w ^ <* w * r if ^ f ^ i c r ^ ^ ^ ^ ^ ^ ^ ^ ^ T S R SRT OT ciw
^Mcidl ^d l ^ i R 4 f ^ W T ^ f t y ^ f ^ a ^ - ^ H ^ H I I
® ^ W f f TOft ̂ R T 3fc ^ ^ few ^ ^ T R * ^ 3 ^ ^ <fl f » <* W*T f̂ f ^M ^T
3 ^ - ^ H <fr>HI I
aWT^# ta i l4^< f r l44 ia< f r>HI |
(ff) 3 m ^ ^ f » i f ^ ^ ^ ^ t o ^ 3 f c ^ ^ ^ 3 ^ t ^ ^ q f ^ ^ W
3 ^ ^ ^ k ^ ^ ^ f ^ f % ^ ^ ^ ^ ^ R t ^ ^ 3 ^ , W ^ ^ 3 ^ ^
w ^ i f ^ t ^ ^ ^ f ^ ^ f t ^RT r̂ R̂T ̂ ^ n. ^ <^R ^r i ^t wm ^w^
^.Rm.34. ^cft c ^ l f M <fr ffl^ - SK^E WZ STforaT fteT qST) <fr ̂ if P H ^ | ^ ^cft ^ R T
3k ^ t ^ R ^T ̂ <* W f ^ cR» 5CT * ^ f̂ TT ^ T I W^ TOft ^ R T 3?k ^ ^ T R ^t
pHHPdfad *H<M»I ̂ S T ^ vflT f̂t-
(i) W ^ ^ f ^ ^ f e T O ^ ^ ^ ^ f ^ ^ ^ ^ | 3 l k w ^ ^ ^ f ^ ^
(ii) ^ ^ ^ ^ ^ ^ ^ f ^ 1 5 ^ . X l 5 ^ . ^ W ^ ^ l ^ * ^ 7 . 5 ^ .
3 ™ ^ 3 T ^ i f ^ ^ ^ ^ l ^ ^ | ( ^ ^ ^ ^ 3 W ^ ^ W T ^ ^ ^
(iii) W ^ ^ f e ^ f ^ i f l O T O r ^ l
(iv) ^ T K H ^ M d ^ ^ ^ W ^
(v) wmw^srf^^^T
(Vi) T ^ ^ ^ ^ f i r t < f l ^ f W f W * W T e r M c * f t * [ < & 1 ? N
(Vii) w f ^ R T ^ ^ f ^ t l
(Viii) # #
(ix) c f r T * f % 3 * f w ( ^ ) 3 * R » |
^.Rm.35. ^ ^ J ^ ^ M - ^ ^ ^ f ^ ^ ^ ^ ^ f ^ ^ ^ ^ W T ^ f ^
^ ^ ^ ^ ^ f ^ i f r H H P d f a d ^ f m a ^ ^ f t -
(i) ^ f ^ 3 f f i f ^ ^ ^ ^ P ^ H d ^ i d f ^ ^ R ^
331
Appendix-'E GHAT RULES
SRG33. DutiesofPatrolmen-
(a) To walk to and from over the beat in accordance with chart pertaining to his 'Patrol Section' looking for
subsidence, slips, signs of erosion, trees blown across the track during storms or any other causes likely
toendangerthesafetyoftheline.Bridgesandtheirapproacheswillbespeciallywatched.Thefollowing
aresomeinstanceswhendamagetothelinemaybeapprehended-
(i) Whenthefloodlevelreachesdangerlevelatanyofthebridges,orifanydamagehasstartedatthe
bridge audits approaches, evenbeforethe danger level has been reached;
(ii) Whenwaterononesideoftheembankmentisatamuchhigherlevelthanontheotherside;
(iii) Whenwaterseepsthroughthebankfromonesidetotheother;
(iv) Whenanyobstruction,suchasfallentrees,blocksthewaterwayofabridge;
(v) Whenthetrackshowssignsofsettlement.
(b) To take immediate steps to stop trains when any portion of the line is likely to be rendered unsafe. The
patrolmanmustnotallowtrainstopassoverabridgeortrackincaseofdoubt.
(c) Whennodangerisapprehendedtostandonthecessonthelefthandsidefacingthetrainandexhibithis
number plate turning the light of his lamp on to it so that the number can be seen from the passing train,
andtoblowonhis whistle.
(d) To obtain signatures of the Station Master on duty at the station concerned for his arrival and departure
andexchangepatrolbookswithadjacentpatrolman.
(e) Toexchangereportsastoconditionontheirbeatswithadjacentpatrolmanandstationarywatchmen.
(f) ToheedinstructionfromLocoPilotswhomayreportaconditionofdangeratakilometrageandproceed
totheplaceindicatedandtakenecessarymeasures.
(g) Toposthimselfatthedangerspotintheeventofemergencyandnottomoveunderanycircumstancestill
relievedbysomeothergangman.
JEsandSEswillrecorddateofexaminingpatrolmen in their duties in apatrol book, muster sheet or any
other bookissuedto every patrolman for recording this. Similarly, ADENs on their rounds will examine
patrolmen and watchmen in their duties and record the result of the examination in the registers
mentioned.
SRG 34. Equipment of Patrolman - Each patrolman and watchman on each SE (P. Way) will be numbered
consecutively from one end ofthe section to the other. Each patrolman and watchman will be provided with the
following equipment.
(i) Onestaff,spikedandwithahookforhangingthehandsignallamp.Thestaffshouldfurtherbegraduated
in30cms.heightin white and black for taking approximate measurements.
(ii) Onenumberplatel5cmsxl5Cms.numberofpatrolmenorwatchmenpaintedwithluminouspaintin
7.5 cms. size figures (If luminous paint is not readily available, the plate and number will have to be
larger).
(iii) ItincasecontaininglOdetonators.
(iv) lsetof hand-signal flags.
(v) ltricoloursignallamp.
(vi) lthree-cellelectrictorchwithared-capbynight.
(vii) lboxofmatches.
(viii) Whistle.
(ix) PatrolbookinTincase.
SRG 35. Protecting the line - In the event of any portion ofthe line being breached or otherwise rendered
unsafefortrafficthefollowingprocedurewillbeobserved:-
(a) Incasewheretwopatrolmenareemployed-
(i) Thedangersignalswillbedisplayedatonceinbothdirections.
331
M R R I ^ - '^ ' mzftwf
(ii) ft* cfrtf TOft ^TRT ^ ^ ftPMeT ft^t fq ft^ ft?I13ff ^ W ^ ^ T 3k ^ ^ ^
WT * «F£T ^ H T* 600 *fc* TO* Wl ($& W^ 3tN tf[$ W^ ^ 400 ^ ) J T ^ TOft
^ ^ ^ ^ W ^ I R P H d d ' l l ^ l l ^ ^ ^ ^ ^ ^ ^ ^ 1 2 0 0 ^ ( ^
^ ^ ^ ^ ^ 8 0 0 ^ ) ^ ^ * ^ ^ , ^ # ^ ^ ^ 1 0 ^ ^ ™ *
q?3<toRHHglgHllM|
(iii) ^ ^ ^ ^ ™ ^ f % ^ ^ f % # ^ ^ ^ ^ ^ f ^ ^ ^ W ^ ^
3 ^ TOft ^ R T ^ ^ ftPMeT f^HRPn (eTM > T ^ wA ^ f $t f » j?T) 3?K <ffen
w^ ^km 3tk ^ r TOft ^ R T ^ <tim % r o ^ w ^ H ^ ^ <* w r * ;wft
(i) f ^ w f ^ 3 ^ ^ ^ ^ ^ ^ ^ ^ f ^ f ^ ^ ^ ^ ^ ^ r ^ r ^ ^
^ ^ f t ^ f ^ i t ^ ^ ^ ^ W ^ T U 0 0 ^ ^ ^ W ^ O T 3 1 N 8 0 0 ^
^ q ^ TOT 10-10 ? f c ^ TO*^ ^ I
(ii) ^ w ^ ^ ^ ^ ^ ^ ^ M r i i ^ w ^ f ^ ^ ^ f ^ ^
(iii) ^ ^ W W ^ ^ ^ ^ ™ ^ ( ^ f % ^ ^ ^ ^ ^ 3 ) c f T ^ ^
^ ^ ^ ^ ^ ^ R ^ f e ^ f ^ i t ^ ^ ^ ^ w w r ^ wm$ i
(ET) ^ H H I W -
(i) ^ ^ t ^ ^ ^ M ? ^
(ii) ? s P ^ ^ f ^ ^ H W ^ ^ j f t d 4^l l
(iii) ^ ^ f ^ ^ ^ ^ t ^ f ^ c r ^ r ^ R T ^ T T I
^rfecr wi f^rr w 13tk arrases w ^ tf ^ T i
.̂Rm.36. ^ [ M 3 i a - w i f ^ ^ ^ ^ ^ f ^ ^ ^ ^ ^ ^ ^ ^ ^ a ^ t ^ ^ t 3 k
fr) WZ ^ ^ T (fcr qST) 3tk WR ^ f ^ ^ (fcr qST) ^ tf W ^ ^ * t f 3 31N ^ ^ ^
^w^M^^it^^^f^f^srawft^^^^^^m^^ri 332
Appendix-'E GHAT RULES
(ii) Thetwopatrolmenwillthenproceedinoppositedirectionshowingdangersignals.Onreachinga
distanceof600metersfromthepointofdanger, each will clip one fog signal on the rail; they will
then proceed to a distance of 1200 meters from the point of danger, where they will clip 3 fog
signals atadistanceoflOmeters apart;
(iii) Shouldthenatureoftheobstructionbesuchastorenderimpossibleforeitherofthepatrolmento
get acrossthegap,asforinstanceawash-awaywithadeep flood or strong current, oneofthemen
will show a danger signal (red lamp or flag as the case may be) and endeavour to stop trains
approaching the gap from his side while the other man will proceed, with all haste, towards the
station onhissideofthegap,fiXingfogsignalsonthewayaslaiddowninitem(ii)above,andalso
informingthemateoftheoccurrence,ifthere is any gang-quarter on the way.
(b) Incasewhereonepatrolmanisemployed-whendamageisdetectedonthelinehewill-
(i) place a red lamp in prominent position to warn a train which may approach from one direction.
andrunintheoppositedirectionandclipldetonatorat400metresand3detonatorsat800metres
fromthedamagedpoint;
(ii) returntothedamagedpointandprotecttheothersidewithdetonatorssimilarly;
(iii) in the event of it being impossible to get to the other side of the damaged point (as in a wash-
away), place the red lamp or flag so that it can be seen from as great a distance as possible by a
train approaching from that direction.
(c) The patrolman will arrange to send information to the nearest station, or, in case of an impassable
obstruction, to the station in the opposite direction reporting the occurrence to the Station Master, He
will also send information to theMate, JE/SE(P.Way).
(d) TheStationMasterwill-
(i) Stoptrainsenteringtheblocksection.
(ii) AdvisetheStationMasterattheotherendoftheblocksections,and
(iii) advisetheControllerandallconcerned.
(e) The Mate will proceed with his gang to the kilometrage and ensure proper protection and attend to
repairs asnecessary.
(f) The first duty of all engineering staff on receipt of the report is to proceed to the site and ensure that the
line is protected as described above and then make arrangements for repairing the damage that may have
occurred.
In the case of suspected damage to a portion of the line, a bridge or its approaches, a through inspection
willbecarriedouttestingthetrack,ifnecessary,bypassingalight engine across, after which trains will
be piloted over the threatened zones, These inspections, tests with light engine and piloting of trains will
be carried out by engineering official not lower than the rank of an JE. In case of doubt the JE must not
allow even a light engine to pass across and must await the arrival of the SE, ADEN, or higher railway
officials.
SRG 36. Importance of Checks- Proper supervision shall be exercised and frequent checks carried out to
ensure that the patrolmen and watchmen are on duty and carry out the tasks assigned to them in an efficient
manner.Forthispurposethefollowingchecksareprescribed-
(a) SE and JE will cover their lengths by footplate of engine, trains and by trolley at irregular intervals
frequentlybothbydayandnight.
(b) AssistantEngineerswillexercisesimilarchecksovertheirentiresection.
(c) The Divisional Engineers will also exercise check during their inspections and examine as many
patrolmenaspossiblein their duties.
332
MRRI^ - ' ^ ' mzf^m
^.Rmaz. ^ ^ ^ ( ^ ^ ^ ^ - ^ - ^ ^ I 5 ^ ^ ^ 3 # W ( ^ ^ ^ R ^ T O
?mWZ ^ f t f ^ R f ^T ^ c f t <fr4*llR4T a k ^ # H? fNTcT ^ l ^ R f <ft ^ j f ^ fr^R RR^f ^ f r ^ f £^f
2fgn
.̂Rm.41. M^f^^^M^^?fe-^?fe^^t^^^f^W^^
q ^ ^ ^ ^ ^ ^ ^ ^ ^ w ^ ^ ^ ^ M ^ ^ i ^ f ^ ^ ^ ^ ^ ^ ^ f ^ ^ f ^ ^ R r ^ ^ ^ ^ ^
c K ^ l ^ l ^ ^ f ^ e f R T ^ S T ^ ^ R I
^.R.m47. gfe? afk ^ r ^ t f ^ ^ ^ - *ne * P ^ *rc *to* s ? M ^.R.15.18/1(14) if f^r ^
3 R M ^ 3 R ^ ^ ^ ' ' d l F ^ ^ ^ ' ^ ^ f ^ , ^ W ^ ^ t ^ ^ , ^ ^ ^ f ^ . R . 1 5 . 1 8 / l ( l 2 ) i f
333
Appendix-'E GHAT RULES
SRG 37. SEfPWavYs Certificate- SE (P. Way) will submit certificate by 15th may each year to their Assistant
Engineer, copy to Divisional Engineer that they have made arrangements for monsoon patrolling, and watching
of vulnerable locations and bridges and that patrolmen and watchmen have been made conversant with their
duties and rules for the protection of the line and vulnerable locations in their beats. The SE (P. Way) will also
submit to their ADENs lists of the patrolmen and stationary watchmen with beats locations and bridges
assigned to each. The SE (Pway) will issue to each individual by name, a certificate stating that he has been
examined andis fully conversant with the rules, regulations and duties and also the location ofthe beat or static
postsofdutyassignedtohim.Aduplicatecopyofthis certificate should be kept on record with the SE(PWay)
in a Register and this copy ofthe certificate will bear the signatures or thumb impression ofthe individual
concerned. TheADENs and DENs on their rounds will inspectthis register andalso examine as may as possible
ofthepatrolmenandwatchmen in their duties.
SHUNTING
SRG 38. Loose Shunting - Loose shunting is forbidden, except where specially authorised in the Station
WorkingRules.
SRG 39. Hand Shunting- Hand shunting is forbidden, except where specially authorised in the Station
workingRules.
SRG 40. Shunting at Stations with Slip Sidings - Shunting is forbidden, unless the slip siding points are set
andlockedforthe slip siding, exceptwhen it is absolutely necessary to shunt on the main line. In this case, the
engine must be in front and the points must be manned the whole time any shunting is being carried out over
them andmustberesetforthe slip siding every time the engine has returned over them.
SRG 41. Hand shunting at Stations with Slip Siding - Hand shunting is forbidden, unless the points are set for
the slip siding.
TROLLIES AND LORRIES
SRG42. BrakesonTrollies-AllsidingtrollesinuseongradessteeperthanlinSOmusthavetwoefficientand
independent brakes, which must together brake all four wheels. On other Ghat section the trolley need have
only one brake capable of braking all the four wheels efficiently. These brakes must be tested before each
journey.
SRG43. BrakesonLorries-Allmateriallorries working on Ghat sections must have an efficient screw brake
operating on all four wheels and also a tail rope, which must always be manned when running downhill. The
brakemustbetestedbeforeeachjourney
Note-DiplorriesarenotallowedtoworkonGhatsections.
SRG44. Thepersoninchargeofatrolleyorlorryisresponsibleforanyaccidentresultingfromadefectinthe
trolleyorlony,whichhemightreasonablyhavebeenexpectedto discover.
SRG45. SpeedofLorries-OnfallinggradesthespeedofalorrvmustnotexceedSKms.anhour.
SRG 46. Lorry only to run in Blocked Section or on Line Clear - Before lorry is allowed to enter a Block
Section, the line must be blocked by the engineering official incharge or line clear must be obtained. Not more
than two persons, one brakeman and one helper must travel on the lorry itself the other person would
accompanythelorryonfoot.
SRG 47. Working of Motor and Push Trollies - The motor trollies on Ghat section may either be run on line
clear or trolley permit in accordance with the instructions made down in S.R. 15.18/1(14) push trollies shall
howeverrununderprecautionsmentionedinS.R.15.18/l(12)whichmustberigidlyobserved.
333
M R R I ^ - ' ^ ' mzf^m
fr) 5 ^ ^ f ^ ^ ^ R ^ 3 , ^ ? « ^ ^ ^ ^ f ^ ^ ™ ^ ^ ^ ^ / ; * f t ^
SF$ vtfte m ^ ^ ^ ^ ^ * ^ ^ ^ ^ T ^ T ^Pff URT ftra^ ^ ? M w ? ^
fefecT ^T if cl^Ier ^ r *TT % £Tcft ^T ^ H * B3T f̂ TT W t 3TR T5# ^TO JRSTRf 3 ^ ^ ^
^ q ^ ^ ? ^ ^ W ^ ^ | ^ ? ^ ^ ^ ^ ? ^ W ^ ^ ^ ^ ^ R R R R ^
^ ^ ^ r ^ r * T T r % " ^ f t o f r a m ^ / ^ ^ ^ * ^ ^ofr sft, ^ ^ 3 ™ #
^ f a f R ^ r ^ T ^ ^ f ^ w t . w r c ^ i
(ST) ^ ^ ^ T O ^ ^ ^ ^ ^ f t ^ ^ - ^ ^ ^ ^ i f ; ^ ^ f ^ ^ R T
^ q ^ ^ ? ^ f ^ ^ ^ w ^ ^ ^ ? f T O ^ f » i f ^ ? ^ ^ ^ j r T O
fr) ^ ^ ^ ^ ^ ^ ^ ^ ^ f ^ ^ ^ ^ ^ ^ f ^ ^ H ^ 4 1 ^ ^ H H I ^ ^ f M ^ ^ T i f ^ ^
^ f % ^ ^ ^ ^ ^ ^ ^ ^ T ^ ^ t , f ^ ^ ^ ^ ^ ^ m W ^ t ^ ^ ^ i f ^ ^
^ f ^ ^ ^ ^ ^ f ^ ^ ? ^ W ^ ( W ^ ^ ^ ^ ^ R R ^ ^ H H I ^
^ ) ^ ^ R q̂f%RT ^ T 3k ft* TO ^ ^ ^T WTRf W& * f ^ agnfr T̂T ̂ JIRT ^ T 3TR
^ stifati ^T IRSTRf ^ T ^ £Tcft ^ f ^ <R^T I
*.fr.W.49. 3 ^ ^ ^ - ^ ^ ^ ^ ^ ^ ^ ^ . f ^ ^ M ^ c j k l d d l ^ f t ^ ^ ^
^ f ^ ^ f % ^ * q ™ ^ t ^ * ^ ^ ^ ^ ? ^ ^ ^ ^ r % ^ ^ ? ^ ^ R ^
vJTTtri
q ^ ^ ^ f ^ ^ ^ ^ ^ k f ^ ^ i f ^ ^ ^ q ^ ^ f t ^ ^ k f ^ ^ ^ ^ f ^ w f ^
^ ^ W ^ ^ ^ 5 ^ ^ ^ M ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ f ^ ^ | 4 0 ^ 1 ^ ^
^ t o ^ T sreff R̂ ̂ r f k t o s^mM 3fR ^ R ^ M * ; ^ ^ f « ^ w ^ r ^r ;*^f%^T t
.̂Rf.m.51. ^ f ^ ^ ^ R R f i f -
fr) ^ f ^ ^ ^ R R f i f P H H P d R s l d ^ l ^ ^ ^ ^ -
(i) ^ ^ - ^ ^ ^ ^ ^ ^ ^ W r a ^ f W ^ ^ ^ W M ^ w ^ ^ ,
(ii) W ^ ( ^ ^ r r ^ ) - ^ ^ ^ i f ^ ^ l ^ W ^ ^ ^ f » i f ^ ™ R
(iii) ^ w f T ^ ^ ^ ^ ^ ^ ^ ™ ^ ^ ^ ( ^ 3 T ^ W ^
R r f ^ r a t ^ ^ ^ f i
^ T O ^ W ^ ^ ^ T R ^ ^ I ^ ^ I
.̂RTmsz ^ ^ r ^ ^ ^ ^ ^ - ^ w f ^ ^ ^ i f ^ f t ^ ^ ^ ^ ^ f t ^ r
^ ^ w ^ ^ ^ f ^ ^ ^ ^ ^ ^ ^ ^ ^ w ^ ^ ^ ^ ^ ^ w ^ ^ q f M i f m f ^ r a t
334
Appendix-'E GHAT RULES
SRG48. TrollevBreakDown-
(a) In the event of the break down of a trolley, or its brake gear becoming defective between stations, the
official in charge shall have it removed from the line at once. If the break down occurs between stations
and the trolley is running on an "Authority to Proceed' or "Trolley Permit" the official incharge shall at
once employ the quickestmeans at this disposal to advice the nearest Station Master in writing that the
trolley has been removed from the line, and will RETURN the "Authority to Proceed" or the
"TROLLEY PERMIT" at the same time. The Station Master receiving the advice shall immediately to
theStationMasterattheotherendofthesection"trolleywhichleftyours(ormine)at hours has
failedintheBlocksectionandhasbeenremovedfromthetrack,privatenumber.
(b) A copy of this message must be recorded in the train registers of line clear enquiry and reply books.
Following this, the station towards which the trolley was proceeding or in the case of Neales Token
working, the station which receives the Token, shall give the "Train out of Section" signal for the trolley
intheusualmanner.
(c) When trolley has been made fit to run, the official incharge shall notify the nearest Station Master in
writing that the trolley is fit to run to the Station to which he wishes to proceed, and shall give the
estimatedtime that will be taken for the journey, and will ask for the "Authority to Proceed" or "Trolley
Permit". The Station Master receiving the message will inform station Master at the other end of the
block section concerned accordingly and will then give or obtain the permission to proceed to the
destinationandsend"AuthoritytoProceed"or"TrolleyPermit"totheOfficialIncharge.
SRG 49. Blocked Section- If a section between two stations on which trollies may only run on line clear or
trolleypermit,isblockedby an accidentorby the Way & Works Branch, a trolley may be run through theblock
provided the person Incharge given a message to the Station Master of the stations on each side of the block
sectionstatingthatheisproceedingthroughtheblockandthattheblockmustnotberemoveduntilhearrivesat
the station ahead. Before entering the blocked section, he must get an acknowledgement of his message from
bothstations.
SRG50. InspectionbetweenStations-Whenitisnecessarvtostopforworkbetweenstations.thetrollevmust
be taken off the line and left with Incharge of the trolleyman but if a trolleyman cannot be spared, the trolley
maybeleftafterthewheelshavebeen securely chained and padlocked. On grades 1 in 40 and steeper, not more
thantwoinspectingofficialsandfourtrolleymenareallowedtotravelonatrolley
SECURING OF VEHICLES
SRG51. InSidingsorDeadEnds-
(a) Thesidingordeadendmustbeprovidedwitheither-
(i) ScotchBlockwhichmustbekeptlockedacrossthelinewhenvehiclesarestandinginthesiding.
or
(ii) Trap points which must be kept locked in the open position when vehicles are standing in the
siding, and
(iii) Allvehiclesmustbeplacedinsidethetrapsorscotchblocksandcoupledtogether.
(b) Allhandbrakesmustbeputhardon,oriftheycannotbeputhardonthevehiclesmustbespragged.
(c) ThevehiclesnearestthetrapsofScotchBlockmustbechained,iftherearemorethanthreevehicles,one
mustbechained,outofeverythree.
SRG 52. On Running Lines During Shunting - When there is any risk of vehicles escaping into the block
section.Allhandbrakesmustbeputhardon,or,ifanycannotbeput-hardon,themustbespragged.
334
v<m^ -l? wzf^m
^.m.w.54. fiff^Rff, wra. ^ t 3 ^ ak of^f - ^ ^ ^ ^ ^ s r ^ f ^ ^ w ^ i frfteraf. Wra,
OSSO
335
Appendix -'E' GHAT RULES
SRG53. InTheBlockSection-
(a) Vehicle must not be detached from an engine except in an emergency or as allowed under the rules for
ballasttrains.
(b) In every case where it is decided to detach a vehicle from an engine, the Loco Pilot must obtain a memo
fromtheGuard, in accordance withG.R. 4.48, whichmustbear certificate to the effect thatthetrain has
beenproperlysecured.
(c) Thedetachedvehiclesmustbesecuredbyputtingallhandbrakeshardon. Vehicles, the hand brakes of
whichcannotbeput"hardon"mustbespragged.
SRG 54. Scotches. Wedges and Chains- Every Guard must carry sufficient number of scotches or wedges to
beabletocomplywiththeserules.
OSSO
335
Notes
Previous and next
All provisions of Indian Railways (Open Lines) General and Subsidiary Rules
Questions people ask
Is annexure VI of Indian Railways (Open Lines) General and Subsidiary Rules still in force?
No repeal of Indian Railways (Open Lines) General and Subsidiary Rules is recorded.