Annexure III, Indian Railways (Open Lines) General and Subsidiary Rules: ANNEXURE-III
Indian Railways (Open Lines) General and Subsidiary Rules - Annexure III
Text of annexure III
ANNEXURE-III
ANNEXURE-III
TRAFFIC LEVEL CROSSING GATE NON-INTERLOCKED PROVIDED WITH TELEPHONE, WITH
NORMAL POSITION "CLOSED TO ROAD TRAFFIC"
(General Instructions are common for all types of Manned Level Crossing Gates)
1. MODE OF OPERATION - Detailed mode of operation for opening and closing the level crossing gate
shall be provided in the respective Station Working Rules and Gate Working Instructions incorporating
local operational requirements. When level crossing gate is required to be opened for passage or road
traffic, the Gateman must first open the gate farthest away from approaching road traffic and then open
thegateonthesidenearesttheapproachingroad traffic.
2. EXCHANGE OF PRIVATE NUMBERS -
(i) Gateman must seek permission from Station Master/Cabinmaster/Cabin man for opening the
gate.
(ii) Station Master/Cabinmaster/Cabin man shall ensure that there is no train movement within the
station limit. Thereafter Station master Cabinmaster/Cabin man shall exchange private number
to theGatemanallowinghimtoopenthegateforthepurposeofclearingto road traffic.
(iii) Suitable entries shall be made by the Station Master/Cabinmaster/Cabin man in the Train Signal
Register,PrivatenumberBookandLogBookinredink.
(iv) After passage of road traffic, Gateman shall close the gate and confirm this to Station
Master/Cabinmaster/Cabinmanunderexchangeofprivatenumber.
(v) Gate once closed can be opened by the Gateman, after passage of train/trains or change in
planning of train movement etc. with the permission of Station Master as the need of opening is
known to Gateman according to road traffic to be cleared. Obviously it can be done only after
exchanging private number with the control Station Master who will ensure that there is no train
movementtowardsthelevelcrossing.
293
TftftlB-V W l ^ ^ T O t o
(vi) wt^^^^^^^^^^w^m^^i^tm^U
(i) ^ f e ^ R W ^ , to/W^^^^fM^^^ton^^R,
f ^ f ^ 3 T f c ^ ^ t l
(ii) ^ % f t ^ f ^ ^ ^ ^ % « ^ ^ ^ ^ 3 # * ^ ^ |
(iii) ^ ^ ^ ^ # ^ ^ 3 ™ / ^ f ^ ™ 3 f f q ^ ^ l
(iv) ^ ^ ^ ^ 3 ^ 3 ^ % ™ ^ ^ ^ ^ ^ ! ^ ^ ^ ^ % ^
(V) ^ W t ^ « ^ W ^ ^ l W ^ ^ , W R # ^ ^
(Vii) ^ ^ ^ t l ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ T O f l w -
(viii) W H i l ^ R T O W l 4 t « w W t t ^ # W ^
(ix) W 3 ^ ^ ^ ^ # w * ^ # ^ ^ T O ^ / ^ % f ^ ^ ^ t i
(i) ^M^^3qw#^^ftw%™^^to^™^^
rlMRrT ^ f e ^ R W^/%to WV%f*R*T ̂ Wfe R*TC % 3 ^ ™ R % 3Wfa
(ii) ^ ^ ^ f ^ % W T ^ ^ ^ 3 1 k w % W T ^ ^ f ^ ^ f ^ T 3 k ^ ^ 3 n #
(iii) ^ ^ W M % f ^ ^ « ^ 3 i k t e ^ ^ ^ ^ l
(iv) ^ ^ ^ W M % t e ^ ^ % ^ ^ f ^ % W T ^ ^ t 3 i k w % W T
(V) ^ ( d ^ ^ H H I ^ ^ ^ ^ ^ f f i T O 3 ^ # ^ l
(vi) W M R M ^ ^ R T O i t ^ ^ ^ ^ T O ^ ^ ^ ^ ^ ^ ^ ^ t
(vii) ^^H i^^<^^^w^^ rd r^ i fev^^^^w^^ / i ^ tg
(viii) ^^w^^rdr^i^v#^^^w^^%^^:^to/f fe^t^%
294
Appendix-'A' RULES FOR WORKING LEVEL CROSSING
(vi) When a train has to be piloted to and from the station yard or any shunting movement is to be
done, the staff deputed to pilot the train or to perform shunting across the gate shall be personally
responsibleto ensure that the gate is closed against the road traffic before allowing any movement
across thegate.
3. FAILURE OF TELEPHONIC COMMUNICATIO - When Telephonic Communication fails or it does
not get any response from the Gateman despite 2 or 3 attempts, the following procedure should be
adopted-
(i) Station Master on duty shall send written advice to the Gateman through the Portor/Pointsman
withfulldetailsofnumber,descriptionanddirectionofthetrain.
(ii) The Gateman on receipt of such advice shall acknowledge the same after closing the gate, duly
supportedbyaprivatenumber.
(iii) Onreceiptofconfirmationaboutcloserofthegate,reception/departuresignalswillthenbetaken
'OFF'
(iv) WhensufficienttimeisnotavailablebecauseofgreaterfrequencyoftrainserviccStationMaster
will issue writtenauthority to the train Loco Pilot to pass the signal at 'ON position.
(v) In addition, Station Master shall also issue a caution order advising the Loco Pilot to whistle
continuouslyandapproachthegate cautiously.
(vi) The train Loco Pilot should be instructed to pass the gate cautiously, on being hand signalled by
theGateman.Ifhandsignalisnotseen, Loco Pilot should be prepared to stop short of the gate and
ensure that gate is closed following GR 3.73 (2) (b).
(vii) In case of an approaching train, the Station Master shall advise the Station Master at the
dispatching end, under exchange ofprivate number, that the telephone at the gate has failed.
(viii) The StationMasteratthedispatchingendshall then issue a caution order to the Loco Pilot, before
dispatchingatrainintheblocksectionfromhisend.
(ix) He should also advise S & T staff responsible for maintenance of the telephone to rectify the
defect atthe earliest.
(x) Normal working will be resumed only after S & T staff rectify the telephone and issue
reconnection/fitmemoforthesame.
4. FAILUREOFLIFTENINGBARRIERSORLEAFGATES-
(i) When the gate cannot be closed due to failure of lifting barriers or leaf gate the Gateman will
immediately inform the Station Master on duty, under exchange or private number, and ensure
thathftingbarriersorleafgatesdonotfoulthetrack.
(ii) Heshallimmediatelyfixredbannerflagbydayandredflashinghghtbynightonthepostatthat
endfirst from which the train is approaching and then at theother end.
(iii) Gatemanshallsecurethegateagainstroadtrafficbymeansofsafetychainsandpadlocks.
(iv) AftersecuringthegateagainstroadtrafficGatemanshallshowgreenhandsignalflagbydayand
greenhghtbynighttotheLocoPilotofanapproachingtrain.
(v) StationMasterondutyshallissueacautionordertotheLocoPilotofadepartingtrain.
(vi) He shall also advise the Station Master at the dispatching end, under exchange ofprivate number.
to similarly issue a caution order to the Loco Pilot before dispatching a train in the block section
fromhisend.
(vii) Station Master should also advise maintenance staff responsible for maintenance of lifting
barriers/leafgatestorectifythedefectattheearhest.
(viii) Normal working wiUbe resumed only after maintenance staff rectifythe lifting barrier/leafgates
andissue reconnection/fitmemoforthesame.
Note:
(a) In case of failure of lifting barriers/leaf gates worked from the cabin, Station Master will send
stationportertosecurethegateagainstroadtrafficbymeansofsafetychainsandpadlocks.
(b) Authoritytopasssignalsat'ON'positionasperrulesshallalsobeissuedtotheLocoPilotsofboth
departing and arriving trains.
294
TftftlB-V W l ^ ^ T O t o
5. W ^ 3 ^ -
(i) ^ te * ^ ^ R m m ^ t ^ # &> ^ 3 c ^ ( W ) ^ W ?t 3*RT ^
(ii) ^ t e ^ ^ % ^ d ^ i d î4<d ^ H W < A P ° H w v % f r r f t r ^ ^ / 3 T ^ % ^ 3
(iii) ^ ^ ^ ^ w ^ / % f ^ w v % f % ^ ^ l l M f ^ n ^ ^ f % 3 ^ m / ^ R , m w f f ^
(iv) ^ 2 - 3 ^ % ^ ^ ^ ^ / ^ ^ / ^ ^ ^ ^ ^ t a d l ^
(V) M ^ ^ 3 f c f ^ % W T ^ ^ ^ T O % W T ^ < T ^ ^ ^ ^ , ^
(vi) ^ ^ w ^ f t w ^ ^ ™ ^ i
(vii) ^ ^ T O % f ^ , ^ , * n f ^ ^ ™ ^ ^ ™ ^ w v ^ w v ^
(Viii) ^ W * ^ f ^ % ^ W ^ ^ ^ 4 . 3 ^ - ^ % 3 ^ ^ ^ f %
(ix) ^ ^ ^ ^ ^ ^ ^ ^ . w w ^ ^ ^ R i w ^
(x) ^ t̂e ^ w t , ^ ^ 5 i i » ^ w # * f f ^ TOZ ^
(xi) ^ ^ ^ T l ^ ^ ^ ^ ^ a f c ^ ^ ^ a ^ ^ U ^ ^
r ^ H d R ^ i n
(xii) ^ w w ^ 5 ^ ^ ^ ^ w ^ ^ r d r ^ i f e v ^ ^ ^ w ^ % f ^ ^ M ^ 1 k
(xiii) ^ i ^ ^ i w f ^ * w * ^ ^ f i ^ ^ ^ * f c / t e W ^ ^
3 ^ - I V
f * # T W^R W ^ , 3 } ^ R rffo M ^
295
Appendix-'A' RULES FOR WORKING LEVEL CROSSING
5. OBSTRUCTIONATTHELEVELCROSSINGGATE-
(i) Ifthegateisbrokenbyaroadvehiclewhichisfoulingthetrack,orifliftingbarriers/leafgatesor
any other part of the gate fouled the track, or if their is any other obstruction at the gate, the
Gateman shall immediately fix red banner flag by day and red flashing lamp by night on posts
providedatbothendsofthegate,forthispurpose.
(ii) Immediately after this, the Gateman shall advise the Station Master Cabinmaster/Cabin man on
duty,regardingthedefects/obstructionatthegate,underexchangeofprivatenumber.
(iii) Station Master/Cabinmaster/Cabin man on duty shall be advised to put the reception/departure
signalsbackto'ON'position, if taken 'OFF for a train.
(iv) If there is no response from the Station Master/Cabinmaster/Cabin man after two or three
attempts, he shall first protect the gate and then inform on phone.
(v) Gatemanshallthenrushwithdetonatorsandredflagbydayandredflashinghandsignallampby
night in the direction of the approaching train and protect the gate as stipulated in General
InstructionfordutiesofGatemanunderitemno. 1.5 (5).
(vi) Thereafterheshallprotectthegatefromtheotherdirectionalso.
(vii) He shall note down the particulars of the road vehicle, name of the Driver, owner and relay these
details to the Station Master who shall not start the train unless he has been assured by the
Gateman that the road vehicle or the lifting barriers/leafgates are not fouling the track.
(viii) The StationMastershall also inform the Station Master at the dispatching end, under exchange of
private number, asking him not to dispatch any train in the block section from his end, until the
trackhasbeenclearedofallobstruction.
(ix) After the track has been cleared of all obstructions the Gateman shall inform the Station Master
accordinglyunderexchangeofprivatenumber.
(x) Station Master shall then issue a Caution order to Loco Pilots of all trains to proceed cautiously
and pass the reception/departure signal at 'ON' position on green hand signal of the Gateman, if
theGateisbroken,butisclearofanyobstruction.
(xi) Gateman shall secure the gate against road traffic by means of safety chains and padlocks and
thereafter exhibitgreenhand signal, if the gateisnotobslructed.
(xii) StationMastershalladvisemaintenancestaffresponsibleformaintainingthehftingbarriers/leaf
gates to repair the same at the earliest.
(xiii) Normal working will be resumed only after maintenance staff rectify the defective lifting
barriers/leaf gates and issue reconnection/fit memo for the same.
6. OBSTRUCTION ON THE TRACK NEAR LEVEL CROSSING GATE - If there is a rail fracture or
obstructiononthetrackduetofallingofatrecfoulingbyroadvehicleorderailmentwhichisvisibleto
the Gateman, the Gateman and Station Master will adopt the procedure given under item no. 5. If the
obstructionfoulsthelevelcrossing gate, Gatemanmustkeep the Gates closed against road traffic till the
trackisclearedoftheobstruction.
Previous and next
All provisions of Indian Railways (Open Lines) General and Subsidiary Rules
Questions people ask
Is annexure III of Indian Railways (Open Lines) General and Subsidiary Rules still in force?
No repeal of Indian Railways (Open Lines) General and Subsidiary Rules is recorded.