Annexure III, Indian Railways (Open Lines) General and Subsidiary Rules: ANNEXURE-III

Indian Railways (Open Lines) General and Subsidiary Rules - Annexure III

Text of annexure III

ANNEXURE-III

ANNEXURE-III TRAFFIC LEVEL CROSSING GATE NON-INTERLOCKED PROVIDED WITH TELEPHONE, WITH NORMAL POSITION "CLOSED TO ROAD TRAFFIC" (General Instructions are common for all types of Manned Level Crossing Gates) 1. MODE OF OPERATION - Detailed mode of operation for opening and closing the level crossing gate shall be provided in the respective Station Working Rules and Gate Working Instructions incorporating local operational requirements. When level crossing gate is required to be opened for passage or road traffic, the Gateman must first open the gate farthest away from approaching road traffic and then open thegateonthesidenearesttheapproachingroad traffic. 2. EXCHANGE OF PRIVATE NUMBERS - (i) Gateman must seek permission from Station Master/Cabinmaster/Cabin man for opening the gate. (ii) Station Master/Cabinmaster/Cabin man shall ensure that there is no train movement within the station limit. Thereafter Station master Cabinmaster/Cabin man shall exchange private number to theGatemanallowinghimtoopenthegateforthepurposeofclearingto road traffic. (iii) Suitable entries shall be made by the Station Master/Cabinmaster/Cabin man in the Train Signal Register,PrivatenumberBookandLogBookinredink. (iv) After passage of road traffic, Gateman shall close the gate and confirm this to Station Master/Cabinmaster/Cabinmanunderexchangeofprivatenumber. (v) Gate once closed can be opened by the Gateman, after passage of train/trains or change in planning of train movement etc. with the permission of Station Master as the need of opening is known to Gateman according to road traffic to be cleared. Obviously it can be done only after exchanging private number with the control Station Master who will ensure that there is no train movementtowardsthelevelcrossing. 293 TftftlB-V W l ^ ^ T O t o (vi) wt^^^^^^^^^^w^m^^i^tm^U (i) ^ f e ^ R W ^ , to/W^^^^fM^^^ton^^R, f ^ f ^ 3 T f c ^ ^ t l (ii) ^ % f t ^ f ^ ^ ^ ^ % « ^ ^ ^ ^ 3 # * ^ ^ | (iii) ^ ^ ^ ^ # ^ ^ 3 ™ / ^ f ^ ™ 3 f f q ^ ^ l (iv) ^ ^ ^ ^ 3 ^ 3 ^ % ™ ^ ^ ^ ^ ^ ! ^ ^ ^ ^ % ^ (V) ^ W t ^ « ^ W ^ ^ l W ^ ^ , W R # ^ ^ (Vii) ^ ^ ^ t l ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ T O f l w - (viii) W H i l ^ R T O W l 4 t « w W t t ^ # W ^ (ix) W 3 ^ ^ ^ ^ # w * ^ # ^ ^ T O ^ / ^ % f ^ ^ ^ t i (i) ^M^^3qw#^^ftw%™^^to^™^^ rlMRrT ^ f e ^ R W^/%to WV%f*R*T ̂ Wfe R*TC % 3 ^ ™ R % 3Wfa (ii) ^ ^ ^ f ^ % W T ^ ^ ^ 3 1 k w % W T ^ ^ f ^ ^ f ^ T 3 k ^ ^ 3 n # (iii) ^ ^ W M % f ^ ^ « ^ 3 i k t e ^ ^ ^ ^ l (iv) ^ ^ ^ W M % t e ^ ^ % ^ ^ f ^ % W T ^ ^ t 3 i k w % W T (V) ^ ( d ^ ^ H H I ^ ^ ^ ^ ^ f f i T O 3 ^ # ^ l (vi) W M R M ^ ^ R T O i t ^ ^ ^ ^ T O ^ ^ ^ ^ ^ ^ ^ ^ t (vii) ^^H i^^<^^^w^^ rd r^ i fev^^^^w^^ / i ^ tg (viii) ^^w^^rdr^i^v#^^^w^^%^^:^to/f fe^t^% 294 Appendix-'A' RULES FOR WORKING LEVEL CROSSING (vi) When a train has to be piloted to and from the station yard or any shunting movement is to be done, the staff deputed to pilot the train or to perform shunting across the gate shall be personally responsibleto ensure that the gate is closed against the road traffic before allowing any movement across thegate. 3. FAILURE OF TELEPHONIC COMMUNICATIO - When Telephonic Communication fails or it does not get any response from the Gateman despite 2 or 3 attempts, the following procedure should be adopted- (i) Station Master on duty shall send written advice to the Gateman through the Portor/Pointsman withfulldetailsofnumber,descriptionanddirectionofthetrain. (ii) The Gateman on receipt of such advice shall acknowledge the same after closing the gate, duly supportedbyaprivatenumber. (iii) Onreceiptofconfirmationaboutcloserofthegate,reception/departuresignalswillthenbetaken 'OFF' (iv) WhensufficienttimeisnotavailablebecauseofgreaterfrequencyoftrainserviccStationMaster will issue writtenauthority to the train Loco Pilot to pass the signal at 'ON position. (v) In addition, Station Master shall also issue a caution order advising the Loco Pilot to whistle continuouslyandapproachthegate cautiously. (vi) The train Loco Pilot should be instructed to pass the gate cautiously, on being hand signalled by theGateman.Ifhandsignalisnotseen, Loco Pilot should be prepared to stop short of the gate and ensure that gate is closed following GR 3.73 (2) (b). (vii) In case of an approaching train, the Station Master shall advise the Station Master at the dispatching end, under exchange ofprivate number, that the telephone at the gate has failed. (viii) The StationMasteratthedispatchingendshall then issue a caution order to the Loco Pilot, before dispatchingatrainintheblocksectionfromhisend. (ix) He should also advise S & T staff responsible for maintenance of the telephone to rectify the defect atthe earliest. (x) Normal working will be resumed only after S & T staff rectify the telephone and issue reconnection/fitmemoforthesame. 4. FAILUREOFLIFTENINGBARRIERSORLEAFGATES- (i) When the gate cannot be closed due to failure of lifting barriers or leaf gate the Gateman will immediately inform the Station Master on duty, under exchange or private number, and ensure thathftingbarriersorleafgatesdonotfoulthetrack. (ii) Heshallimmediatelyfixredbannerflagbydayandredflashinghghtbynightonthepostatthat endfirst from which the train is approaching and then at theother end. (iii) Gatemanshallsecurethegateagainstroadtrafficbymeansofsafetychainsandpadlocks. (iv) AftersecuringthegateagainstroadtrafficGatemanshallshowgreenhandsignalflagbydayand greenhghtbynighttotheLocoPilotofanapproachingtrain. (v) StationMasterondutyshallissueacautionordertotheLocoPilotofadepartingtrain. (vi) He shall also advise the Station Master at the dispatching end, under exchange ofprivate number. to similarly issue a caution order to the Loco Pilot before dispatching a train in the block section fromhisend. (vii) Station Master should also advise maintenance staff responsible for maintenance of lifting barriers/leafgatestorectifythedefectattheearhest. (viii) Normal working wiUbe resumed only after maintenance staff rectifythe lifting barrier/leafgates andissue reconnection/fitmemoforthesame. Note: (a) In case of failure of lifting barriers/leaf gates worked from the cabin, Station Master will send stationportertosecurethegateagainstroadtrafficbymeansofsafetychainsandpadlocks. (b) Authoritytopasssignalsat'ON'positionasperrulesshallalsobeissuedtotheLocoPilotsofboth departing and arriving trains. 294 TftftlB-V W l ^ ^ T O t o 5. W ^ 3 ^ - (i) ^ te * ^ ^ R m m ^ t ^ # &> ^ 3 c ^ ( W ) ^ W ?t 3*RT ^ (ii) ^ t e ^ ^ % ^ d ^ i d î4<d ^ H W < A P ° H w v % f r r f t r ^ ^ / 3 T ^ % ^ 3 (iii) ^ ^ ^ ^ w ^ / % f ^ w v % f % ^ ^ l l M f ^ n ^ ^ f % 3 ^ m / ^ R , m w f f ^ (iv) ^ 2 - 3 ^ % ^ ^ ^ ^ / ^ ^ / ^ ^ ^ ^ ^ t a d l ^ (V) M ^ ^ 3 f c f ^ % W T ^ ^ ^ T O % W T ^ < T ^ ^ ^ ^ , ^ (vi) ^ ^ w ^ f t w ^ ^ ™ ^ i (vii) ^ ^ T O % f ^ , ^ , * n f ^ ^ ™ ^ ^ ™ ^ w v ^ w v ^ (Viii) ^ W * ^ f ^ % ^ W ^ ^ ^ 4 . 3 ^ - ^ % 3 ^ ^ ^ f % (ix) ^ ^ ^ ^ ^ ^ ^ ^ . w w ^ ^ ^ R i w ^ (x) ^ t̂e ^ w t , ^ ^ 5 i i » ^ w # * f f ^ TOZ ^ (xi) ^ ^ ^ T l ^ ^ ^ ^ ^ a f c ^ ^ ^ a ^ ^ U ^ ^ r ^ H d R ^ i n (xii) ^ w w ^ 5 ^ ^ ^ ^ w ^ ^ r d r ^ i f e v ^ ^ ^ w ^ % f ^ ^ M ^ 1 k (xiii) ^ i ^ ^ i w f ^ * w * ^ ^ f i ^ ^ ^ * f c / t e W ^ ^ 3 ^ - I V f * # T W^R W ^ , 3 } ^ R rffo M ^ 295 Appendix-'A' RULES FOR WORKING LEVEL CROSSING 5. OBSTRUCTIONATTHELEVELCROSSINGGATE- (i) Ifthegateisbrokenbyaroadvehiclewhichisfoulingthetrack,orifliftingbarriers/leafgatesor any other part of the gate fouled the track, or if their is any other obstruction at the gate, the Gateman shall immediately fix red banner flag by day and red flashing lamp by night on posts providedatbothendsofthegate,forthispurpose. (ii) Immediately after this, the Gateman shall advise the Station Master Cabinmaster/Cabin man on duty,regardingthedefects/obstructionatthegate,underexchangeofprivatenumber. (iii) Station Master/Cabinmaster/Cabin man on duty shall be advised to put the reception/departure signalsbackto'ON'position, if taken 'OFF for a train. (iv) If there is no response from the Station Master/Cabinmaster/Cabin man after two or three attempts, he shall first protect the gate and then inform on phone. (v) Gatemanshallthenrushwithdetonatorsandredflagbydayandredflashinghandsignallampby night in the direction of the approaching train and protect the gate as stipulated in General InstructionfordutiesofGatemanunderitemno. 1.5 (5). (vi) Thereafterheshallprotectthegatefromtheotherdirectionalso. (vii) He shall note down the particulars of the road vehicle, name of the Driver, owner and relay these details to the Station Master who shall not start the train unless he has been assured by the Gateman that the road vehicle or the lifting barriers/leafgates are not fouling the track. (viii) The StationMastershall also inform the Station Master at the dispatching end, under exchange of private number, asking him not to dispatch any train in the block section from his end, until the trackhasbeenclearedofallobstruction. (ix) After the track has been cleared of all obstructions the Gateman shall inform the Station Master accordinglyunderexchangeofprivatenumber. (x) Station Master shall then issue a Caution order to Loco Pilots of all trains to proceed cautiously and pass the reception/departure signal at 'ON' position on green hand signal of the Gateman, if theGateisbroken,butisclearofanyobstruction. (xi) Gateman shall secure the gate against road traffic by means of safety chains and padlocks and thereafter exhibitgreenhand signal, if the gateisnotobslructed. (xii) StationMastershalladvisemaintenancestaffresponsibleformaintainingthehftingbarriers/leaf gates to repair the same at the earliest. (xiii) Normal working will be resumed only after maintenance staff rectify the defective lifting barriers/leaf gates and issue reconnection/fit memo for the same. 6. OBSTRUCTION ON THE TRACK NEAR LEVEL CROSSING GATE - If there is a rail fracture or obstructiononthetrackduetofallingofatrecfoulingbyroadvehicleorderailmentwhichisvisibleto the Gateman, the Gateman and Station Master will adopt the procedure given under item no. 5. If the obstructionfoulsthelevelcrossing gate, Gatemanmustkeep the Gates closed against road traffic till the trackisclearedoftheobstruction.

Previous and next

All provisions of Indian Railways (Open Lines) General and Subsidiary Rules

Questions people ask

Is annexure III of Indian Railways (Open Lines) General and Subsidiary Rules still in force?

No repeal of Indian Railways (Open Lines) General and Subsidiary Rules is recorded.