Form K (Rule----), The Chandigarh Energy Conservation Building Code Rules, 2024.: FORM K (Rule----)
The Chandigarh Energy Conservation Building Code Rules, 2024. - Form K (Rule----)
Text of form K (Rule----)
FORM K (Rule----)
FORM K (Rule----)
Certificate: To be submitted at the time of obtaining Completion Certificate
1.Certified that the building (s) has been constructed according to the Sanctioned Plan and Structural design
(one set of structural drawings as executed is enclosed) which incorporates the provision of structural safety as
specified in revised plans submitted for approval satisfy the safety requirements as specified in part-6-Structural
Design of NBC and other relevant Rules/Standards/Guidelines.
2. It is also certified that construction has been done under our supervision and guidance and adheres to the
drawings submitted and the records of supervision has been maintained by us.
3. Any subsequent change from the completion drawings will be the responsibility of the owner (s).
Signature of the Signature of Signature of Structural
Owner with date Architect with Engineer with date Date
(As defined in NBC of India)
Name in Block Name in Block Name in Block
Letters and Address Letters and Address Letters and Address.
CHD. ADMN. GAZ., MARCH 20, 2024 (PHGN. 30, 1945 SAKA) 623
This is Digitally Signed Gazette. To verify, visit :
https://egazette.chd.gov.in
FORM L (Rule 13.6.7 of Chandigarh Building Bye laws 2017)
(Energy Performance Index Report Submission by Owner)
To
Head,
State Designated Agency, Chandigarh
…………..
Sub: Energy performance index Report for Chandigarh Energy Conservation Building Code, 2024 compliant
building constructed on Plot no.________Block No._________Street_________City.
Sir,
I/We,...........................(Name), the owner of building the premises of plot No.________________
Sector___________Chandigarh, request authority to issue the Chandigarh ECBC Compliance
Certificate.
EPI Report duly signed and verified by the TPA in prescribed & Copies of the electricity bills have been
enclosed herewith for your reference.
Yours faithfully
Signature Name
of Owner
Number /Mobile number
Endst to;
1. Estate Office Sector 17 Chandigarh.
624 CHD. ADMN. GAZ., MARCH 20, 2024 (PHGN. 30, 1945 SAKA)
This is Digitally Signed Gazette. To verify, visit :
https://egazette.chd.gov.in
FORM - M (as per CHECBC Rules, 2024)
ECBC Compliance Certificate (issued as per clause iii of sub rule 5 of rule 5)
This is to certify that the building (Description of building) constructed by Sh./ Smt./
Ms./M/s ______________________resident of (address) at plot No.__________ (location of building),
Union Territory, Chandigarh is found to be complaint with the CHECBC, 2024 on the basis of the EPI report
prepared and duly signed by empaneled Energy Auditor (Building)/ TPA and therefore, CHECBC compliance
certificate is hereby conferred upon the above said building as ECBC/ ECBC plus/ Super ECBC compliant
building subject to the following terms & conditions:
1. That the owner abides by all the rules and regulations of CHECBC Act, 2024.
2. The replacement of any of the components if done, the same shall be done as per CHECBC, 2024.
3. The owner, if found that at any stage is using the building for some other purpose against the
permission or make any addition/ alteration, after according personal hearing to owner, the
competent authority may pass order for revocation of this ECBC compliance certificate and same
shall be restored after removal of violations.
4. The owner shall have to conduct an energy audit of the building before expiry of validity ofthis
certificate failing which this certificate will not be revalidated.
The validity of this certificate is up to________________(DD/MM/YYYY). Before expiry of this
date, the owner shall submit the EPI as well as energy audit report for revalidation of this certificate.
(Name of Authority)
Head, State Designated Agency-cum-
Superintending Engineer, Electrical Circle,
UT, Chandigarh.
Endst. No._________ Dated: ___________
To:
1. The Owner.
2. The Estate Office, UT Chandigarh
3. The Director, BEE
4. The Nodal Officer, SDA
Previous and next
All provisions of The Chandigarh Energy Conservation Building Code Rules, 2024.