Form J (Rule 11.1 CBR-2017), The Chandigarh Energy Conservation Building Code Rules, 2024.: Form J (Rule 11.1 CBR-2017)
The Chandigarh Energy Conservation Building Code Rules, 2024. - Form J (Rule 11.1 CBR-2017)
Text of form J (Rule 11.1 CBR-2017)
Form J (Rule 11.1 CBR-2017)
Form J (Rule 11.1 CBR-2017)
(Structural certificate to be submitted along with the building plans)
(File No.................)
1. Certified that the building plans for Residential, Industrial, Commercial (SCOs/ SCFs /Bay shops /
Booths / Semi Industrial/ Hospitality/Healthcare/Assembly/Buisness/Educational/ Shopping
Complex/ Mixed Use Building etc. OR above 2 Kanal (all categories) Plot No.________,
Sector/Industrial Area __________, Chandigarh, submitted under Self Certification for
approval satisfy the safety requirements as stipulated under Rule 12.4 of Chandigarh
BuildingRules (Urban) 2017 and the information given there in is factually correct to the best of
our knowledge and understanding.
2. It is also certified that the structural design safety requirements for all situations including safety
from natural hazards based on soil conditions and earthquake has been duly incorporated in the
design of the building and these provisions shall be adhered to during construction.
Signature of the Signature of the Registered
Owner with date Structural Engineer with date
(Name in Block letter (Name in Block letter
and address) and address)
Signature of the Signature of the
Architect with date Third Party Accessor
(Name in Block letter & Address) (Name in Block letter & Address)
622 CHD. ADMN. GAZ., MARCH 20, 2024 (PHGN. 30, 1945 SAKA)
This is Digitally Signed Gazette. To verify, visit :
https://egazette.chd.gov.in
Previous and next
All provisions of The Chandigarh Energy Conservation Building Code Rules, 2024.
Questions people ask
Is form J (Rule 11.1 CBR-2017) of the Chandigarh Energy Conservation Building Code Rules, 2024. still in force?
No repeal of the Chandigarh Energy Conservation Building Code Rules, 2024. is recorded.