Regulation 45, Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023.: Approval by the Electrical Inspector and self-certification
Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. - Regulation 45
Text of regulation 45
Approval by the Electrical Inspector and self-certification
45. Approval by the Electrical Inspector and self-certification. – (1) (a) Every electrical installation of notified
voltage and below shall be inspected, tested and self-certified by the owner or supplier or consumer, as the case
may be, of the installation before commencement of supply or recommencement after shutdown for six months
or more for ensuring observance of safety measures specified under these regulations and such owner or supplier
or consumer, as the case may be, shall submit the report of self-certification to the Electrical Inspector in the
forms as provided under Schedule II of these regulations:
Provided that the self-certified electrical installation shall be considered fit for the commencement of
supply or recommencement after shutdown for six months only after the report of self-certification is duly
received by the office of Electrical Inspector and if not acknowledged by the Electrical Inspector within three
working days, it shall be deemed to be received:
Provided further that the owner or supplier or consumer, as the case may be, has the option to get his
installation inspected and tested by the Electrical Inspector of the Appropriate Government;
(b) Notwithstanding anything contained in clause (a), every electrical installation covered under section 54 of the
Act including every electrical installation of railways shall be inspected and tested by the Electrical Inspector of
the Appropriate Government as specified in sub-regulation (3).
(2) The voltage above which inspection and testing of electrical installations including installations of supplier or
consumer to be carried out by the Electrical Inspector, shall be notified by the Appropriate Government;
(3) Every electrical installation of voltage above the notified voltage and all the apparatus of the generating
units above the capacity specified under regulation 34, shall be inspected and tested by the Electrical Inspector
before commencement of supply or recommencement after shutdown for six months or more for ensuring
observance of safety measures specified under these regulations.
(4) Before making an application to the Electrical Inspector for permission to commence or recommence supply
in installations above the notified voltage after an installation has been disconnected for six months or more, the
supplier shall ensure that electric supply lines or apparatus of more than notified voltage belonging to him are
placed in position, properly joined, and duly completed and examined, and the supply of electricity shall not be
commenced by the supplier for installations of voltage needing inspection under these regulations unless the
provisions of regulations 14 to 31, regulations 35 to 37, regulations 46 to 53 and regulations 57 to 80 have been
complied with and the approval in writing of the Electrical Inspector has been obtained by him:
Provided that the supplier may energise the aforesaid electric supply lines or apparatus for the purpose
of tests specified in regulation 48.
(5) The owner of any installations of voltage above the notified voltage shall, before making application to the
Electrical Inspector for approval of his installation or additions thereto, test every circuit or additions thereto,
other than an overhead line, and satisfy himself that they withstand the application of the testing voltage set out
in regulation 48 and shall duly record the results of such tests and submit them to the Electrical Inspector:
Provided that the Electrical Inspector may direct such owner to carry out such tests, as he deems
necessary or accept the certified tests of the manufacturer in respect of any particular apparatus in place of the
tests required by this regulation.
(6) The owner of any installation who makes any addition or alteration to his installation shall not connect to the
supply his apparatus or electric supply lines, comprising the said alterations or additions, unless and until such
alteration or addition has been approved in writing by the Electrical Inspector or self-certified by the owner of
the installation, as the case may be.
(7) In case of installations of mines and oil-fields, the electrical installations of voltage 650 V and above shall
not be connected to supply, unless and until such installation work including alterations or additions or
recommencement after shutdown for six months are approved in writing by the Electrical Inspector of Mines:
Provided that the electrical installations of voltage below 650 V in mines and oil-fields are to be self-
certified by the owner or agent or manager of the mine before commencement of supply or recommencement
after shutdown for six months or more in the manner specified in sub-regulation (1).
Previous and next
Questions people ask
Is regulation 45 of Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. still in force?
No repeal of Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. is recorded.