Form IV, Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023.: FORM IV
Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. - Form IV
Text of form IV
FORM IV
FORM IV
(Electrical Installations in Mine)
Report No.: ______________ Date of Inspection: ______________
Date of last inspection: ______________ Name of the Inspecting Officer: ______________
1. Name of the Mine:
2. Name of the Owner:
3. Name of the Agent:
4. Name of the Mine Manager:
5. Name of the Colliery Engineer:
6. Name of the Safety Officer:
7. Name of the designated Electrical Safety Officer:
8. Name of the Electrical Supervisor:
9. Name of the workman Inspector (Electrical) :
10. Name of the Engineer (concerned Section) :
11. Name of the working seam:
12. Working district Inspected:
13. Name of the persons accompanied during inspection:
14. Voltage and system of supply:
(i) Volts ________________
(ii) No. of Phases _____________
(iii) AC/DC _______________
15. Particulars of the installations/ apparatus installed and their location as per mine plan:
16. Illumination level:
17. Percentage of methane/other explosive gas:
18. Dry bulb temperature, wet bulb temperature in case of underground mine:
19. Velocity/speed of air in case of underground mineL:
20. General conditions of the installation:
Sl.
No.
Regulation No. Requirements Report
1. Regulation 98 On or before the first day of February in every year, notice in
the form set out in Schedule IX or Schedule X whichever is
applicable is sent.
Yes/No
2. Regulation 99 The plans specified under this regulation are kept in the office of
the mine manager and available to the Inspector or inspector of
Yes/No
166 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
mines.
3. Regulation 100
(i) Whether adequate illumination by electricity without
causing glare and strain has be provided in the mines?
Yes/No
Satisfactory/
Not satisfactory
(ii) Whether efficient means of communication is provided
between the point where the switchgear under sub-
regulation (1) Regulation 107 is erected, the shaft bottom
and other distributing centers in the mine.
Yes/No
Satisfactory/
Not Satisfactory
(iii) Whether fire extinguishing appliances of adequate capacity
and of an approved type are installed and properly
maintained in every place containing apparatus, other than
cables, telecommunication and signalling apparatus.
Yes/No
Satisfactory/
Not Satisfactory
(iv) Is minimum clearance above ground of the lowest
conductor of overhead lines or overhead cables where
dumpers or trackless vehicles are being operated, not less
than twelve metre in height.
Yes/No
4. Regulation 101 (i) Are transformers and switchgear placed in a separate room,
compartment or box where necessary to prevent danger of
mechanical damage?
Yes/No
(ii) Is the room, compartment or box substantially constructed
and kept dry and illuminated?
Yes/No
(iii) Is efficient ventilation provided for all apparatus installed
therein?
Yes/No
5. Regulation 102 (i) Is earthing carried out by connection to an earthing system
at the surface of the mine and in a manner approved by
Electrical Inspector of mines?
Yes/No
(ii) Are all metallic sheaths, coverings, handles, joint boxes,
switchgear frames, instrument covers, switch and fuse
covers of boxes, all lamp holders, unless efficiently
protected by an insulated covering made of fire resisting
material, and the frames and bedplates of generators,
transformers and motors, including portable motors, earthed
by connection to an earthing system in the manner specified
in regulation 102?
Yes/No
Satisfactory/
Not satisfactory
(iii) Are all conductors, of an earthing system having
conductivity, at all parts and all joints, at least equal to fifty
per cent of that of the largest conductor used solely to
supply the apparatus?
Yes/No
6. Regulation 116 Whether the neutral or mid-point is earthed by connection to the
earthing system in the manner specified in regulation 102.
Yes/No
7. Regulation103 (i) Is automatically disconnection of supply to any part of the
system, where a fault, including an earth fault, occurs and is
the fault current limited to the specified values, by
employing suitably designed, restricted neutral system of
power supply?
Yes/No
(ii) Whether the operation of the switchgear and the relays are
recorded daily at the generating station, substation or switch
station in a register kept for the purpose?
Yes/No
(iii) Whether the effectiveness of the switchgear and the
protective system being always kept and maintained in
working order?
Yes/No
(iv) Whether the switchgear and the protective system checked
once every three months and the result thereof recorded in a
Yes/No
[भाग III—खण्ड 4] भारतकाराजपत्र:असाधारण 167
separate register kept for the purpose?
8. Regulation 104 (i) Is electricity transmitted into a mine at a voltage exceeding
11000 V and used therein at a voltage exceeding 6600 V?
Yes/No
(ii) Is the voltage of hand-held portable apparatus used, not
exceeding 125 V?
Yes/No
Applicable/ Not
applicable
(iii) In belowground mines, whether the lighting system has a
mid or neutral point connected with earth and the voltage
not exceeds 125 V between phases is used?
Yes/No
Applicable/ Not
applicable
(iv) On the surface of a mine or in an open cast mine, has the
neutral or the midpoint of the lighting system is connected
with earth and the voltage between the phases not exceeds
250 V?
Yes/No
(v) Is the voltage of portable hand-lamps used in underground
working of mine or oil-fields not exceeding 30 V?
Yes/No
Applicable/ Not
applicable
9. Regulation 105 Where electricity is transformed, has suitable provision made to
guard against danger by reason of the lower voltage apparatus
becoming accidentally charged above its normal voltage by
leakage from or contact with the higher voltage apparatus.
Yes/No
10.
Regulation 107 (i) Whether properly constructed switchgear for disconnecting
the supply of electricity provided at a point approved by
Electrical Inspector of mines?
Yes/No
(ii) When any cable or overhead line supplying electricity from
the aforesaid switchgear is live, whether a person
designated to operate the said switchgears is available
within easy reach thereof?
Yes/No
(iii) Whether the main mechanical ventilator operated by
electricity interlocked with the switchgear so as to
automatically disconnect the power supply in the event of
stoppage of main mechanical ventilator?
Yes/No
Applicable/ Not
applicable
(iv) Whether every motor is controlled by switchgear, arranged
so as to disconnect the supply from the motor and from all
apparatus connected thereto and whether such switchgear
be so placed to easily operate by the person designated to
operate the motor?
Yes/No
(v) Is the switchgear so placed, disconnects the supply
automatically, in the event of conditions of over-current,
over-voltage and single phasing?
Yes/No
(vi) Is the Auxiliary fan interlocked with the switchgear
controlling power supply to the in bye face equipment of
below ground coal mine for automatic disconnection of
power supply in the event of the stoppage of the auxiliary
fan?
Yes/No
Applicable/ Not
applicable
11. Regulation 108 (i) Whether all cables are covered with insulating material and
efficiently protected from mechanical damage and
supported at sufficiently frequent intervals and in such a
manner as to prevent damage to such cables?
Yes/No
Satisfactory/Not
satisfactory
(ii) Whether all cables are protected by a metallic covering and
which contain all the conductors of a circuit and the sheath
of metal-sheathed cables and the metallic armouring of
Yes/No
Satisfactory/Not
168 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
armoured cables is of a thickness not less than that
recommended in the relevant Standard?
satisfactory
(iii) Is the metallic covering of every cable electrically and
mechanically continuous throughout, earthed by a
connection to the earthing system of conductivity specified
therein and efficiently protected against corrosion?
Yes/No
Satisfactory/Not
satisfactory
(iv) Whether the metallic covering of every cable is having a
conductivity at all parts and at all joints at least equal to
fifty per cent of the conductivity of the largest conductor
enclosed by the said metallic covering?
Yes/No
Satisfactory/Not
satisfactory
(v) Are the cables and conductors where connected to motors,
transformers, switchgear and other apparatus, installed so
that they are mechanically protected by securely attaching
the metallic covering to the apparatus and the insulating
material at each cable end is efficiently sealed so as to
prevent the diminution of its insulating properties?
Yes/No
Satisfactory/Not
satisfactory
(vi) Whether properly constructed and certified glands or
bushes are used to prevent abrasion or to secure gas-
tightness?
Yes/No
12. Regulation 109 (i) Whether flexible cables used for portable or transportable
apparatus are covered with insulating material which shall
be efficiently protected from mechanical injury?
Yes/No
(ii) Is the flexible metallic covering of a cable, used by itself to
form an earth conductor for such apparatus without an earth
conductor?
Yes/No
(iii) Whether every flexible cable intended for use with portable
or transportable apparatus connected to the system and to
such apparatus by properly constructed connectors?
Yes/No
(iv) At every point where flexible cables are joined to main
cables, is a circuit breaker provided which is capable of
automatically disconnecting the supply from such flexible
cables?
Yes/No
(v) Is every flexible cable attached to a portable or
transportable machine examined periodically by the
designated person?
Yes/No
(vi) Whether flexible cable exceeding in specified length being
used with any portable or transportable?
Yes/No
(vii) Are flexible cables used with apparatus other than portable
or transportable apparatus?
Yes/No
13. Regulation 110 Whether all portable and transportable machines operate on
remote control from the concerned switchgear with relevant
provision?
Yes/No
14. Regulation 111 (i) Whether all apparatus maintained reasonably free from
dust, dirt and moisture, and kept clear of obstruction?
Yes/No
Satisfactory/
Not satisfactory
(ii) Whether the following notices in Hindi and local language
of the district, so designed and protected as to be easily
legible at all times, be exhibited at the following places,
namely: –
where electrical apparatus is in use, a notice forbidding
undesignated persons to operate or otherwise interfere
with such apparatus;
in the interior or at the surface of the mine where a
Yes/No
Yes/No
[भाग III—खण्ड 4] भारतकाराजपत्र:असाधारण 169
telephone or other means of communication is
provided, a notice giving full instructions to person, at
the surface of the mine, designated to effect the
disconnection of the supply of electricity to the mine?
(iii) Whether all apparatus, including portable and transportable
apparatus, operated only by those persons who are
designated for the purpose?
Yes/No
(iv) Where a plug-and-socket-coupling other than of bolted type
is used with flexible cables, whether an electrical inter-lock
or other approved device provided to prevent the opening of
the coupling while the conductors are live?
Yes/No
15. Regulation 112 Give report on the compliance of provisions of this regulation as
the case maybe.
Satisfactory/Not
satisfactory
16. Regulation 114 (i) Whether adequate precautions are taken to prevent signal
and telephone wires coming into contact with other cables
and apparatus?
Yes/No
(ii) Is the voltage used in any one circuit not exceeding 30 V? Yes/No
17. Regulation 115 (i) Whether haulage by electric locomotives on the overhead
trolley-wire system, at voltage not exceeding 650V?
Yes/No
(ii) Whether haulage by storage battery locomotives used with
the prior consent in writing of the Electrical Inspector of
mines?
Yes/No
18. Regulation 117 (i) Whether electrical supervisors, as directed by Electrical
Inspector of mines are appointed in writing by the owner,
agent or manager of a mine or by the agent or the owner, of
one or more wells in an oil-field to supervise the
installation?
Yes/No
(ii) Whether electricians as directed by the Electrical Inspector
of mines, are appointed in writing by the owner, agent or
manager of a mine or by the agent or the owner, of one or
more wells in an oil-field for compliance with the duties
specified in this regulation?
Yes/No
(iii) Whether persons appointed to operate, supervise, examine
or adjust any apparatus are competent to undertake the
work which he is required to carry out as directed by the
Engineer?
Yes/No
Satisfactory/Not
satisfactory
(iv) Whether the electrical supervisor is maintaining log-book
made up of the daily log sheets prepared in the form set out
in Schedule-XI?
Yes/No
19. Regulation 118 Whether the persons engaged for operation and maintenance
of electrical installations have undergone training meant for
the particular mining installations
Yes/No
Satisfactory/Not
satisfactory
Date:
Signature of the Inspecting Officer
Name ______________________
Designation _________________
File No. ____________________
Copy forwarded to Electrical Inspector for ………………....
170 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
Schedule III
Form for obtaining test results by supplier at each supply point to consumer
[See sub-regulation (4) of regulation (33)]
1. Name and address of the consumer
2. Details of installation
3. Short circuit fault level of the installation
4. Date of commissioning of installation (in case of additional supply or reconnection)
5. Results of tests conducted:
Sl.
No.
Equipment Test Conducted Test Results Remarks
1. Linked Switch
with fuse(s)
(i) Mechanical operation Smooth/troublesome
(ii) Rating of fuse --------- Amp.
(iii) Contact of blades Full/Partial
2. Isolator (i) Mechanical operation OK/not OK
(ii) Remote operation OK/Not OK
(iii) Local operation OK/Not OK
(iv) Measurement of contact resistance --------------micro Ohm
(v) Interlocking with earth switch OK/Not OK
(vi) Interlocking with CB OK/Not OK
(vii) IR Values
Open condition
Closed condition
Ph-Ph Ph-E
--- M Ohm --- M Ohm
--- M Ohm --- M Ohm
3. Circuit Breaker
Sl. No. ------
Circuit Breaker
Control Circuits
(i) Rating of Circuit Breaker
(a) Type
(b) Voltage
(c) Normal Current
(d) Rupturing capacity
-------------------
------------------- kV
------------------- Amps
------------------- KA
(ii) IR Values
Open condition
Closed condition
Ph-Ph Ph-E
--- M Ohm --- M Ohm
--- M Ohm --- M Ohm
(iii) Contact Resistance -------------micro Ohm
(iv) Mechanical operation Instant smooth/ time gap
(Sec.)
(v) Remote operation OK/Not OK
(vi) Local operation OK/Not OK
(vii) Interlocking with isolator OK/Not OK
(viii) Interlocking with earth switch OK/Not OK
(ix) Alarm and Trip for OTI/ WTI/
Buchholz / PRV
OK/Not OK
(x) Earth Fault Relay OK/Not OK
(xi) Over Current Relay OK/Not OK
(xii) Under Voltage Relay OK/Not OK
(xiii) SF6 pressure alarm and trip operation
test
OK/Not OK
4. Transformer
Sl. No. ----
(i) Insulation Resistance Values:
HT to LT
--------------M ohm
[भाग III—खण्ड 4] भारतकाराजपत्र:असाधारण 171
HT to Earth
LT to Earth
--------------M ohm
--------------M ohm
(ii) Break down Voltage Test
Oil Sample – I (Top)
Oil Sample – II (Bottom)
--------------kV
--------------kV
(iii) Vector Group Test OK/Not OK
(iv) Polarity Tests OK/Not OK
(v) Magnetizing Balance OK/Not OK
(vi) Tan Delta Test ( as per capacity) OK/Not OK
(vii) Oil level in conservator Tank: OK/Not OK
(viii) Oil level in breather cup OK/Not OK
(ix) OTI/WTI settings A/T----
0
C A/T----
0
C
(x) OTI/WTI alarm and trip operation OK/Not OK
(xi) Operation of Buchholz relay OK/Not OK
(xii) Operation of PRV OK/Not OK
(xiii) Oil leakage OK/Not OK
(xiv) Interlock of door switch for dry
transformer
OK/Not OK
(xv) Clearances for
Side clearance
Between two Transformers
--------- Cms
---------- Metre
(xvi) Body earth resistance ---------- Ohm
(xvii) Neutral earth resistance N1---Ohm
N2---Ohm
5. DG Set
Sl. no. for
Alternator:
Engine:
(i) Interlocking with other Supply
Sources
OK/Not OK
(ii) Body earth resistance ---------- Ohm
(iii) Neutral earth resistance N1---Ohm
N2---Ohm
6. Cables
Size: ----Sq. mm
(i) Insulation Resistance Values:
Ph - Ph :
Ph – Earth:
Ph – Earth + other Ph:
--------- M Ohm
---------M Ohm
---------M Ohm
(ii) Bending Radius OK/Not OK
7. Earthing (i) Metal and Size of Earth Strips Cu/Al/GI --- Sq. mm
(ii) Type of Earthings:
Plate Earthing
Pipe Earthing
Counter poise Earthing
Yes/No
Yes/No
Yes/No
(iii) Values of earth resistances of earth
electrodes for
Reactor Neutral:
LAs:
Structure:
Frames/Bodies of equipment:
Motors:
N1 ----ohm N2 ----ohm
(R) ---ohm (Y) ---ohm
(B) ----ohm
--------ohm
--------ohm
--------ohm
8. Potential (i) Ratio test OK/Not OK
172 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
Transformer (ii) Polarity test OK/Not OK
(iii) BDV of oil ----------kV
(iv) IR test (R) P-E-------M Ohm
(Y) P-E-------M Ohm
(B) P-E-------M Ohm
9. Current
Transformer
(i) Ratio test OK/Not OK
(ii) Polarity test OK/Not OK
(iii) BDV of oil ----------kV
(iv) IR test (R) P-E-------M Ohm
(Y) P-E-------M Ohm
(B) P-E-------M Ohm
10. Transmission
line
(i) Physical condition of conductor/tower OK/Not OK
(ii) Check of tower accessories OK/Not OK
(iii) Tower footing resistance ----------Ohm
(iv) Conductor continuity test OK/Not OK
(v) Check of ground clearance OK/Not OK
(vi) Check of electrical clearance along the
route
OK/Not OK
General Observations:
Sl. No. Item Observations
1. Check of required phase to phase, phase to ground and sectional clearance.
2. Check of equipment lay out and over all installation details.
3. Test of resistance of earth mat or earth electrodes as applicable.
4. Check of consumer‟s pre-commissioning test reports of individual equipment.
5. Check of manufacturer‟s routine/type test reports of individual equipment.
6. Whether Inspector‟s approval if applicable is obtained?
7. Whether owner‟s self-certification about compliance with the Regulations is
obtained?
8. General observation and views (specific deviation from the requirements of
the Regulations shall be clearly brought out).
Name, Signature and Seal of the Authority
Schedule IV
Form for notice in respect of failure of supply
[See sub-regulation (3) of regulation (41)]
(1) Name and address of the supplier :
(2) Date and time of failure of supply :
(3) Areas affected due to failure :
(4) Causes of failure :
(5) Probable time for restoration of supply :
(6) Additional information, if any :
Date :
(Name, Signature, Designation and Seal of Authoity)
Place:
Time:
[भाग III—खण्ड 4] भारतकाराजपत्र:असाधारण 173
Schedule V
Minimum safety working clearances where electricity at voltage exceeding 650 V is supplied, converted,
transformed or used
[See sub-regulation (2)(iii) of regulation (46)]
Highest System Voltage (kV) Safety Working Clearance (Metre)
12 2.6
36 2.8
72.5 3.1
145 3.7
245 4.3
420 6.4
800 10.3
(1) The above values are valid for altitude not exceeding 1000 m. A correction factor of 1.25 per cent per
100 m is to be applied for increasing the clearance for altitude more than 1000 m and up to 3000 m;
(2) The above safety working clearances are based on an insulation height of 2.44 m which is the height of
lowest point on the insulator, where it meets the earthed metal, from the ground;
(3) “Safety Working Clearance” is the minimum clearance to be maintained in air between the live part of
the equipment on one hand and earth or another piece of equipment or conductor on which it is necessary to
carry out the work, on the other;
(4) The “Highest System Voltage” is defined as the highest rms phase to phase voltage which occurs under
normal operating conditions at any time and at any point of the system. It excludes voltage transients (such
as those due to system switching) and temporary voltage variations due to abnormal system conditions (such
as those due to fault conditions or the sudden disconnection of large loads).
Schedule VI
Minimum safety clearances to be maintained for bare conductors or live parts of any apparatus in out-
door HVDC substations, excluding overhead lines of HVDC istallations
[See sub-regulation (3) of regulation (46)]
Sl. No. DC Voltage (kV) Pole to Earth Clearance
(Metre)
Ground Clearance
(Metre)
1. 100 kV 1.17 4.55
2. 200 kV 1.80 5.65
3. 300 kV 2.45 6.75
4. 400 kV 3.04 8.00
5. 500 kV 3.65 9.00
6. 600 kV 3.98 10.10
7. 800 kV 5.30 11.20
(1) The above ground clearances are not applicable to equipment that are housed within fence or a building and
where access is prevented under energised condition through a suitable safety interlocking scheme;
174 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
(2) The above pole to earth clearances are for conductor-structure electrode configuration using gap factor k
equal to 1.35.
(3) It is recognised that within a substation many different types of electrode configurations shall be there with
different values of k, therefore, the above clearance shall be modified based upon the values of gap factor for a
particular electrode configuration subjected to the minimum ground clearance.
(4) Clearance shall be provided for electrical apparatus so that sufficient space is available for easy operation
and maintenance without any hazard to the operating and maintenance personnel working near the equipment
and for ensuring adequate ventilation.
Schedule VII
Part-A
Form for reporting failure of transformer & reactor of 220 kV and above voltage class
[See sub-regulation (8) of regulation (48)]
1. Name of Substation :
2. Utility :
3. Faulty Equipment
(ICT/auto-transformer/GT/reactor etc.)
:
4. Rating
(MVA/MVAR, Voltage ratio, 1-phase/3phase)
:
5. Make (Original equipment manufacturer) :
6. Serial No. :
7. Date and time of occurrence of fault :
8. Fault discovered during operation or periodic testing/
maintenance
:
9. Year of manufacturing :
10. Date of commissioning :
11. Sequence of events/Description of fault
(SoE with time stamp, protection
operated during fault)
:
12. Details of tests done after failure
(What tests were conducted after the discovery of failure. If
no tests were conducted, reasons for the same may be
stated.)
:
13. Observations
(Visual observations e.g. bulging of tank, fire, any leakage
of oil, damage to various components of transformer/
reactor and nearby equipment/ material etc.)
:
14. Probable cause of failure :
15. If original equipment manufacturer representative had
inspected the equipment or visited the site after failure, their
remarks, MoM etc. may be attached.
:
16. Present condition of equipment :
[भाग III—खण्ड 4] भारतकाराजपत्र:असाधारण 175
(Whether repairable or beyond repair)
17. (a) Details of previous maintenance
(Activities carried out in previous maintenance
including the tests conducted, periodicity of the
maintenance activities)
(b) Whether any abnormality observed in these tests. If yes,
attach the test reports.
(c) What steps were taken to address the abnormality?
:
18. Details of any previous failure on the same unit :
19. Is tertiary winding provided : Yes/No
20. Is tertiary loaded?
If yes, specify load on tertiary
: Yes/No
21. Whether tertiary terminals are bare/ insulated?
22. Details of protection for tertiary :
23. Whether relay time is synchronised with UTC? : Yes/No
24. Bushing details
(OIP/RIP/RIS, porcelain /polymer housing)
:
25. On Load Tap Changer or Off Circuit Tap
Changer
:
26. Tap position of OLTC at the time of failure :
27. Past record of operation of OLTC :
28. Tap range :
29. Details of P\protection provided for
transformer/GT/reactor
:
30. Details of Protection operated :
31. Whether equipment is properly earthed :
32. Earth resistance of substation and date of its measurement :
33. Surge arrester:
(a) Is SA provided for protection?
(b) Whether healthiness of SA is monitored?
(c) Whether reading of SA counter changed during failure?
:
Yes/No
Yes/No
Yes/No
34. Lightning Impulse and Switching Impulse Withstand
Voltage of the bushings of all voltage level
:
35. Lightning Impulse and Switching Impulse Withstand
Voltage of the winding of all voltage level
:
36. Type of fire protection provided
(Emulsifier system/ N2 Injection based fire protection
system/ foam based protection etc.)
:
37. Weather conditions at the time of failure
(clear sky/rainy/thunderstorm etc.)
:
176 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
38. Storage condition of equipment at site before commissioning:
(a) Period of storage
(b) Idle charged or uncharged
(c) Dry air filled/Nitrogen filled/ oil-field illed
:
39. Whether short circuit test was carried out on this transformer
or same design transformer/reactor or short circuit withstand
capability was verified on the basis of calculation?
:
40. Number of through faults the equipment
was subjected to before failure
:
41. Attach the following:
(a) Single Line Diagram of the
substation
(b) Photographs of the failed equipment
(c) Disturbance Recorder/Even Logger Data
(d) Reports of tests conducted after
(e) failure
(f) Factory test results
(g) Pre-commissioning test results
(h) Protection schematic diagram
:
(Signature and name of Manager/
Executive Engineer of the installation)
Contact details (Address /Mobile No./Phone No./Email)
To,
The Secretary
Central Electricity Authority
Sewa Bhawan, R .K. Puram
New Delhi-110066
Part-B
Form for reporting failure of towers of 220 kV and above voltage class transmission lines
[See sub-regulation (8) of regulation (48)]
1. Name of Transmission line with voltage level:
2. Date and time of occurrence/discovery of failure:
3. Length of line (km):
4. Type of configuration: (S/C, D/C, M/C, S/C strung on D/C towers, narrow base and the like):
5. Number of Towers and Type of Towers failed:
[Suspension/ tension/ dead end/ special tower/ river crossing tower/ Power line crossing/ Railway Crossing etc.,
with/ without extension (indicate the type & length of extension)]
6. Tower location no. with reference to nearest substation (indicate Name):
7. Name and size of conductor:
8. No. of sub-conductors per bundle and bundle spacing:
[भाग III—खण्ड 4] भारतकाराजपत्र:असाधारण 177
9. Number and size of earth wire/ OPGW (if provided):
10. Type of insulators in use (Porcelain/ Glass/ Polymer):
11. Configuration of insulators (I/ V/ Y/ tension):
12. No. of insulators per string and no. of strings per phase:
13. Year of construction/ commissioning:
14. Executing agency:
15. Weather condition on the date of failure:
16. Terrain category:
17. Reliability level:
18. Wind zone (1/2/3/4/5/6) and velocity of wind:
19. Details of earthing of tower (pipe type/ counter poise):
20. Line designed as per IS:802 (1977/1995/2015 any other code):
21. The agency who designed the line:
22. Any special consideration in design:
23. Details of last maintenance activity along with date:
24. Power flow in the line prior to failure:
25. Any missing member found before/ after failure of towers:
26. Condition of foundation after failure:
27. Brief description of failure:
[Along with photographs (if available), other related information like tower schedule,
newspaper clipping for cyclone / wind storm etc.]
28. Probable cause of failure:
29. Details of previous failure of the line/ tower:
30. Whether line will be restored on ERS or spare tower will be used:
31. Likely date of restoration:
32. Present status:
33. Details of any tests carried out after failure (attach test reports):
34. Wind speed data of date & time of failure from nearby authorised observatory:
35. Location of failed tower:
a. Location Coordinates:
b. Nearest Airport:
c. District and State:
36. Single line diagram/ clearance diagram of failed tower(s) with all dimensions (horizontal & vertical dimensions
including base width of tower):
37. Tower weight:
38. Tower spotting data:
39. Tower schedule of affected section:
40. Sag-tension calculation considered for design of tower:
41. Design document of failed towers:
42. Any other relevant information:
Date:
178 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
(Signature and name of Manager/Executive Engineer/ Incharge of
the installation)
Contact details (Address /Mobile No./Phone No./Email)
To,
The Secretary
Central Electricity Authority
Sewa Bhawan, R.K. Puram
New Delhi-110066
Schedule VIII A
Minimum clearance in air above ground and across road surface of Highways or roads or railway
corridors or navigational or non-navigational rivers for lowest conductor of an alternating current
overhead lines, including service lines of nominal voltage system.
[See sub-regulation (1) of regulation (60)]
Nominal
voltage of
system
Clearance above ground Clearance
between
conductor
and road
surface
across
Highway
(m)
Clearance between conductor
and rail level across Railway
Corridor
(m)
Clearance above HFL for River
crossing
Across
Street
(m)
Along
Street
(m)
Elsewhere
(m)
Normal
OHE (where
no double
stack
containers
are to be run
on railway
tracks.)
High rise OHE
for running of
double stack
containers on
railway tracks.
Navigational
river
(m)
Non-
navigatiional
river
(m)
Up to 650
V
5.80 5.50 4.60 U/G Cable U/G Cable U/G Cable 16.50 5.80
11 kV 6.50 5.80 4.60 U/G Cable U/G Cable U/G Cable 19.00 6.50
22 kV 6.50 5.80 5.20 U/G Cable U/G Cable U/G Cable 19.00 6.50
33 kV 6.50 5.80 5.20 11.60 or
U/G Cable
U/G Cable U/G Cable 19.00 6.50
66 kV 6.50 6.10 5.50 11.60 or
U/G Cable
U/G Cable U/G Cable 19.00 6.50
110 kV 6.50 6.10 6.10 11.60 15.56 17.56 19.00 6.50
132 kV 6.50 6.10 6.10 11.60 15.56 17.56 19.22 6.50
220 kV 7.02 7.02 7.02 12.52 16.46 18.46 20.10 7.02
400 kV 8.84 8.84 8.84 14.00 18.26 20.26 21.90 8.84
765 kV 18.00* 18.00* 18.00* 18.80 21.86 23.86 25.55 18.00
1200 kV 24.00* 24.00* 24.00* 30.00 25.46 27.46 29.90 24.00
For navigable rivers, clearances shall be fixed in relation to the tallest mast in consultation with the
concerned navigational/port authorities.
* Higher clearance due to predominantly induction effects and time varying electric field (ICNIRP limit:
10kV/m for occupational exposure) at voltage exceeding 400 kV.
[भाग III—खण्ड 4] भारतकाराजपत्र:असाधारण 179
Schedule VIII B
The minimum clearance in air above ground and across road surface of Highways, or Minimum
clearance between conductor and Rail Level or navigational or non-navigational rivers for lowest
conductor of high voltage direct current overhead line of nominal voltage system [See sub-
regulation (2) of regulation (60)]
Sl.
No.
DC
Voltage
Ground
Clearance
(m)
Clearance
between
conductor and
road surface
across
Highway
(m)
Minimum
clearance
between
conductor and
Rail Level
(m)
Clearance above HFL for River crossing
Navigational
River
(m)
Non-navigatiional River
(m)
1. 100 kV 6.50 11.25 # 19.00 6.50
2. 200 kV 7.30 12.05 # 19.90 7.30
3. 300 kV 8.50 13.25 # 20.90 8.50
4. 400 kV 9.40 14.15 # 21.90 9.40
5. 500 kV 12.50 17.25 21.23 22.90 12.50
7. 800 kV 18.00 22.75 25.74 25.90 18.00
1. Highway clearances required 4.75 m higher then ground clearances (considering the vehicle hight is
4.75, as mentioned in the Indian Road Congress documents, 1983).
2. #
Railway clearances required 10% higher value than HVAC values ( HVAC values are mentioned in
Indian Railway document: IRSOD, 2004).
3. Navigational River clearances as mentioned in the Regulation of Inland Waterways Authority of
India (Classification of Inland Waterways in India), Regulation, 2006.
180 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
Schedule VIII C
Ground, Vertical and Horizontal clearances
[See sub-regulation (1) of regulation 60, sub-regulation (5) of regulation 62 and sub-regulation (5) of regulation
63]
Maximum Deflection
Maximum Deflection
VCL
HCL
VCL
Building structure
GCL GCL
GROUND
M
a
x
. S
a
g
M
a
x
. S
a
g
M
a
x
. S
a
g
Conductor
portions
Minimum
Clearance Line
. C
GCL: Ground Clearance as per regulation 60
VCL: Vertical Clearance as per regulation 62 and 63
HCL: Horizontal Clearance as per regulation 62 and 63
Schedule IX
Previous and next
Questions people ask
Is form IV of Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. still in force?
No repeal of Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. is recorded.