LawGrids logoLAWGRIDS.ORG

Form 4A, The West Bengal Ground Water Resources (Management, Control and Regulation) (Amendment) Rules, 2022: Form 4A

The West Bengal Ground Water Resources (Management, Control and Regulation) (Amendment) Rules, 2022 - Form 4A

Text of form 4A

Form 4A

Form 4A [See rules 9(3) and 10(5)] (HOLOGRAPHIC EMBLEM OF THE CONCERNED AUTHORITY)PERMIT FOR SINKING OF NEW WELL (ABSTRACTION OF GROUND WATER FOR INDUSTRIAL/ (b) (c) (d) (e) (f) (g) (h) INFRASTRUCTURAL/ COMMARCIAL USE) [U/S 7(3)(b) /7(4)(b) /7(5)(a) of the West Bengal Ground Water Resources (Management, Control and Regulation) Act, 2005.)] PERMIT NO. EAE EI LLAA AAA NSA LE Beer cette Ay Bhs eneamutg'eg ip pideenres onc Name of the Applicant with Designation : Shri / Smt. Name of the Industry/ Infrastructure/ Commercial Unit : Type of Industry (Micro/Small/Medium/Large) : Location details of the Industry/ Infrastructure/ Commercial Unit: District— . Block — s Mouza— J.L.No. — Plot No. — Lat/Long : — Subdivision/Corporation/Municipality/Urban Development Authority/ Statutory Industrial Notified Area/SEZ/Gram Panchayat — Assessee No. (for CLA only) — Ward No.— Borough No.— Holding No.— Communication Address : Postal Address with PIN : Book No & Serial No. of the Application Form and date of submission : Approved in DLA/CLA/SLA/HLA details - Specimen Signature of the applicant : Se ee 2. Particulars of the Proposed well and pumping device : (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) Purpose of the well : (domestic & drinking/ processing/ storing/ manufacturer/ others) Type of the well : Approx. depth of the well (m) : Assembly size (for tube well) : mn. x mmApprox. Strainer length (for tube well): m Type of the pump to be used : H.P. of the pump : Operational device : Rate of withdrawal (m3/hr.) : Maximum allowable running hours per day : Maximum allowable running days per year : This permit authorizes the owner applicant (user) to sink a well in the location specified at SI. (1) (d) for extractionof ground water at a rate not exceeding that as shown at SI. (2) (i) and for running hours / day and maximum runningday per year as shown at SI. (2) Gj) & (k), and is valid subject to the observance of the conditions stated overleaf. Place: Date: Signature of the Issuing Authority with Designatiou OFFICIAL SEAL 24 _ THE KOLKATA GAZETTE, EXTRAORDINARY, OCTOBER 14, 2022 [A.] (1) (2) 3) (4) [B.] 1. 10. 11. 42. General Conditions : . In case of any change of ownership of the proposed well, fresh permit has to be obtained. No change of location, design, rate of withdrawal and pumping device in respect of the proposed well as indicatedat SI (1) and (2) of this certificate shall be made without prior permission of the Competent Authority. Any -deviation in this regard shall lead to cancellation of this permit. In case, any of the particulars /-information furnished by the applicant in his/her application for issuance of thispermit is found to be incorrect during verification at any subsequent stage, this permit is liable for cancellation.Any other condition imposed by the concerned Authority. Mandatory Conditions : The sinking of Tube-Well should be done within one year from the date of issuance of the permit. If not, then theuser must be informed to the permit issuing authority with a satisfactorily explanation. Installation of Separate Energy/ Electric Meter is mandatory for each tube well & confirmation of the same shall beintimated to the permit issuing authority within 45 days from the date of installation of the tube well. Provision/ Arrangement of "Rooftop Rain Water Harvesting" is mandatory in the premises as per the prevailingModel Building By Laws, for all applicant. The stored water shall be utilised for beneficial uses (other than drinkingpurpose) by the applicant. Groundwater Quality report from Govt, approved/ NABL accredited lab to be submitted by the applicant to thepermit issuing authority in yearly basis. Industries extracting groundwater more than 100 m?/day shall undertake annual water audit through certifiedauditor and submit the audit report within three months to the DLA/CLA. All such industries shall be required toreduce their ground water use by 20% over next three years through appropriate means techniques.The “Safe Distance Criteria” (as per the instruction of DLA/CLA/SLA/HLA) for more than one tube wells shouldbe adopted. Environmental Clearance Consent to Establish (CTE)/Consent to Operate (CTO) for Medium to Large Scale Unitfrom SPCB/ SEAC/SEIAA, whichever is applicable. BIS Certificate and FSSAT License is mandatory for all Packaged Drinking Water, Food & Beverages Projectsbefore Marketing. A copy of the same has to be submitted to the concerned DLA/CLA. Treated water/ waste water shall not-bde tsed for recharge to ground water, sitwe it may contain heavy metals &other toxic isment:, The treated water shall be fully used by the srononent 6: eny other agency, who éan utilize’it without contaminating ths underlying aquifer or water bodies. ; 15. 16. 17. THE KOLKATA GAZETTE, EXTRAORDINARY, OCTOBER 14, 2022 25 Installation of Sewage Treatment Plants (STP) shall be mandatory for proposed Infrastructure projects, whereground water requirement is more than 20 m3/day. The water from STP shall be utilized for toilet flushing, carwashing, gardening etc. Industries which are likely to cause ground water pollution e.g., Tannery, Slaughter Houses, Dye, Chemical, Coalwashery, other hazardous units, etc (as per CPCB list) need to take necessary well head protection measures toensure prevention of any kind of contamination of ground water. The issue of this permit does not imply that other statutory/ administrative clearances shall be granted to the projectby the concerned authority. Such authorities would consider the project on merits and take decisions independentlyof the permit. In case of permission within KMC area boring permit will only be valid after generating KMC Licence Fee demandu/s 248 of KMC Acct. Violation of any above mentioned conditions will be treated as offence under Section 10 and 16 of the West BengalGround Water Resources (Management, Control & Regulation) Act, 2005 and Rules made thereunder. OFFICIAL SEAL 26 | THE KOLKATA GAZETTE, EXTRAORDINARY, OCTOBER 14, 2022’ (b) (c) (d) (e) (£)

Previous and next

All provisions of The West Bengal Ground Water Resources (Management, Control and Regulation) (Amendment) Rules, 2022

Questions people ask

Is form 4A of the West Bengal Ground Water Resources (Management, Control and Regulation) (Amendment) Rules, 2022 still in force?

No repeal of the West Bengal Ground Water Resources (Management, Control and Regulation) (Amendment) Rules, 2022 is recorded.