LawGrids logoLAWGRIDS.ORG

Rule 19, The Punjab Urban Planning and Development Building Rules, 2021: Boundary wall Maximum height allowed

The Punjab Urban Planning and Development Building Rules, 2021 - Rule 19

Text of rule 19

Boundary wall Maximum height allowed

19. Boundary wall Maximum height allowed: - Facing road or open area: upto 0.9m solid wall with 0.9m high perforated Grill/Jali. Facing other property: upto 1.83m solid wall. Minimum Turning Radius for corner plot: - 5’-0” or 1/8th of the adjoining road width, whichever is more and maximum upto 20’-0” 20. Basement Plot size upto 2025 sq.m: single story basement is allowed upto zoned area or upto the boundary of the plot except front and rear side, as the case may be, subject to the condition that the owner shall leave minimum 2.44 m (8'-0") setback from the respective side of the boundary wall of the plot, if adjoining plot has a building upto 2.44m from the plot line. Plot size above 2025 sq.m: The multi-level basement shall be allowed below the ground and beyond the building line at ground level subject to a clear minimum front margin of 4.5 m and side Serial Parameter Permissible Limits Num- Category Pre Nursery/ Primary School High/ Sr. Sec. ber Nursery/ Creche (Class 1 To 5) School/ College or Edu. Institute/ Universities PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2360 and rear margins of 3 m, subject to the provision of mechanical ventilation and all safety provisions and drainage. Basement shall not be allowed in the case of No construction Zone/ Area or Master Plan Green area or any other restricted area/zone under the provision of any other Act/policy of the State or Central Government. Minimum clear height for basement shall be as below: • Non-Habitable use: 2.40 m • Habitable Use: 2.75 m 21. Vehicular Ramp Ramps are mandatory for plot size above 3000 sq.m. Minimum width: 7.2m for two way traffic 4m for one way traffic Slope: i) Cars not less than 1:8 and at curve 1:12 ii) Heavy not less than 1:15 vehicles 22. Minimum 1.5 Equivalent 1.5 Equivalent School, College: Parking Car Spaces / Car Spaces / 1.5 Equivalent Car required 100sq.m of total 100sq.m of total Spaces /100 sq.m Floor Area Ratio Floor Area Ratio. of the total Floor Area Ratio area University Campus: 1.0 Equivalent Car Space/ 100 sq.m of the total Floor Area Ratio area 23. Allowable 1.83 m wide Projection (Free from Ground Coverage and Floor Area Ratio) 24. Balcony (Free 1.83 m wide from Ground Coverage and Floor Area Ratio) Serial Parameter Permissible Limits Num- Category Pre Nursery/ Primary School High/ Sr. Sec. ber Nursery/Creche (Class 1 To 5) School/ College or Edu. Institute/ Universities PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2361 25. Rain Water Required Harvesting System 26. Solar Water Not mandatory but recommended to meet its hot water Heating System demand from solar water heaters, as far as possible. 27. Solar Photo Having Connected Load Minimum requirement Voltaic 30 KWp and above Minimum 2 Kilo Watt peak or 5 percent of whichever is higher 28. Flushing System Provision of dual button type flushing cistern in each water closet. 29. DG Set The location of the Diesel Generator (DG) set and exhaust pipe height shall be as per the provisions of the CPCB norms. 30. Parapet or Railing Minimum Height: 1.0 m Maximum Height: 1.4 m from the finished floor level 31. Amalgamation Amalgamation allowed or Fragmentation Fragmentation not allowed Notes:- a) In case of new school area of 1 acre or above, the front boundary wall shall be recessed by 6m to accommodate visitors parking within setback area. b) Minimum 15 percent of site area shall be kept/developed as playground with minimum width of 15 m. c) Upto 15 percent of the total Floor Area Ratio area in educational buildings shall be permissible for the housing of staff or workers. d) In case of large Campus/Universities/Indian Institute of Technology (IIT)/ Indian Institute of Management (IIM), upto 30 percent of the total Floor Area Ratio area can be utilized for residential use for essential staff and fellow accommodations by providing housing for staff, dormitories, guest houses or crèche. e) Student Hostel shall not be counted in residential component. f) Area requirements of each type of educational institutions wherever not specified shall be as per the norms or guidelines issued by the affiliating. Serial Parameter Permissible Limits Num- Category Pre Nursery/ Primary School High/ Sr. Sec. ber Nursery/ Creche (Class 1 To 5) School/ College or Edu. Institute/ Universities PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2362 7 INSTITUTIONAL.- The institutional buildings of various types shall be governed by the following norms, namely:- (1) Hospital or Nursing Home or Medical Laboratory; Orphanage Home; Old Age Home; Children's Centre or Care Centre or School or Institute for Mentally Challenged or Physically Handicapped Persons Serial PARAMETERS Permissible Limits Num- Category Hospital/ Nursing Orphanage Home, Old ber Home/ Medical Age Home, Children's Laboratory Centre/ Care Centre/ School/Institute for Mentally Challenged or Physically Handicapped Person 1. Minimum 12 m 18 m 24 m 12m Approach Road (40'-0") (60'-0") (80'-0") (40'-0") 2. Permissible / 1000 2000 Above 1000 sq.m Minimum upto upto 4000 Site Area 2000 4000 sq.yd sq.yd sq.yd 3. Minimum Set 6m minimum from site boundary and as per sub rule (1) of back required: - these building rules. However, for the plots upto 2025 sq.m area where width of the plot is less than 30.50m (100'-0") and the maximum height of building is below 15m excluding the architectural and symbolism element of religious building like dome, minarets, sikharas, crucifix etc. from building height, then one side setbacks may be relaxed subject to the condition that the owner has to submit a fire safety certificate from the competent authority in this regard. 4. Maximum Floor 1:1.50 1:1.75 1:2.25 1:1.5 Area Ratio 5. Maximum 40 percent of plot area 50 percent of plot area Ground Coverage 6. Plinth 450mm or as specified by competent authority (from the crown of adjoining road in front). Provided that for a detached building, the plinth level may be more than 450mm: Section 180 (2) PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2363 Provided further that the level of front courtyard of any building shall not exceed 450 mm and the ramp from the front road to the courtyard shall be within the plot boundary. 7. Maximum Height No Restriction subject to the fulfilment of norms such as of Building setbacks around building, ground coverage, Floor Area Ratio, structural safety and fire safety norms. However, clearance from Airport Authority of India or Indian Air Force is required in case the height of the building is 15m or more or site falls in the red colour of home grid of Colour Coded Zoning Map issued by Airports Authority of India or Indian Air Force. 8. Minimum Component of Building Min. Min. Min. requirements of area Width Clear different (SQ.M) (M) Height (M) component of a Habitable room 9.5 2.4 2.75 building Kitchen • where separate 5 1.8 dining area is provided • where separate 4.5 1.8 2.75 store is provided • where dinning 7.5 2.1 included Bathroom 1.8 1.2 2.1 Water Closet (W.C.) 1.2 0.9 2.1 combined bath and w.c 2.8 1.2 2.1 Store 3 1.2 2.2 Single occupancy 7.5 2.1 2.75 Servant Room Serial PARAMETERS Permissible Limits Num- Hospital/ Nursing Orphanage Home, Old Age ber Home/ Medical Home, Children's Centre/ LaboratoryCare Centre/ School/Institute for Mentally Challenged or Physically Handicapped Person PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2364 9. Light and (a) one or more openings, such as windows and ventilators, Ventilation opening directly to the external air or into an open Verandah. (b) such openings, excluding doors inclusive of frames, shall not be less than one-tenth of the floor area. In case of Kitchen such opening shall be increased by 25 percent. 10. Ventilation Shaft the size of ventilation shaft shall not be less than the values given below:- Height of building Size Min. one dimension (sq.m) 10m 1.2 0.9 m 12m 2.8 1.2 m 18m 4.0 1.5 m 24m 5.4 1.8 m 30m 8.0 2.4 m Above 30m 9.0 3.0 m Notes:- (a) For buildings of height above 30 m, a mechanical ventilation system shall be installed besides the provision of minimum ventilation shaft. (b) For fully air conditioned the ventilation shaft need not be insisted upon, provided the air conditioning system works in an uninterrupted manner, also, provided there is an alternative source of power supply. (c) Mechanical ventilation in building shall be as per the provision of the National Building Code of India, 2016, as amended from time to time. Serial PARAMETERS Permissible Limits Num- Hospital/ Nursing Orphanage Home, Old Age ber Home/ Medical Home, Children's Centre/ Laboratory Care Centre/ School/Institute for Mentally Challenged or Physically Handicapped Person PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2365 11. Interior courtyard Minimum area 9 sq.m for Light and Minimum width 2.4 m or 1/5 of the average height of the Ventilation building whichever is more. 12. Staircase Minimum Minimum Clear Width: 2000 mm Clear Width: 1500 mm Minimum Tread: 300 mm Minimum Tread: 300 mm Maximum Riser: 150 mm Maximum Riser: 150 mm Minimum Minimum Headroom Headroom Height: 2200 mm Height: 2200 mm 13. Lift and Ramp Lift is mandatory in buildings 15m or more in height and requirement for basement provided more than one level as per the provision pedestrians, of the National Building Code of India, 2016. differently-abled, upto Plinth Level upto Plinth Level elderly and Min. Width - 2400mm Min. Width - 1800mm children Min. Slope - 1:12 Min. Slope - 1:12 Only for In-patient Medical Facilities upto Higher Floors – Minimum Width - 2400mm or as per the occupant load whichever is more Minimum Slope - 1:12 14. Mumty Allowed upto 2.75 m, otherwise counted towards the height of the building as well as Floor Area Ratio. 15. Services on Solar Photo Voltaic installation, Water tank, Rain water pipes Terrace with drainage, Water Tank, cooling towers for air conditioning plants, mumty, machine room and screening parapet to hide services or as per the provisions of the National Building Code Of India, 2016. Serial PARAMETERS Permissible Limits Num- Hospital/ Nursing Orphanage Home, Old Age ber Home/ Medical Home, Children's Centre/ LaboratoryCare Centre/ School/Institute for Mentally Challenged or Physically Handicapped Person PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2366 16. Gate and post Watch and ward cabins upto 100 sq.ft along each entry gate check exempted from Ground Coverage and Floor Area Ratio (FAR). 17. Boundary wall Maximum height allowed: - Facing road or open area: upto 0.9m solid wall with 0.9m high perforated Grill/Jali. Facing other property: upto 1.83m solid wall. Minimum Turning Radius for corner plot: - 5’-0” or 1/8th of the adjoining road width, whichever is more and maximum upto 20’-0”. 18. Basement Plot size upto 2025 sq.m: single story basement is allowed upto zoned area or upto the boundary of the plot except front and rear side, as the case may be, subject to the condition that the owner shall leave minimum 2.44 m (8'-0") setback from the respective side of the boundary wall of the plot, if adjoining plot has a building upto 2.44m from the plot line. Plot size above 2025 sq.m: The multi-level basement shall be allowed below the ground and beyond the building line at ground level subject to a clear minimum front margin of 4.5 m and side and rear margins of 3 m, subject to the provision of mechanical ventilation and all safety provisions and drainage. Basement shall not be allowed in the case of No construction Zone/ Area or Master Plan Green area or any other restricted area/zone under the provision of any other Act/policy of the State or Central Government. Minimum clear height for basement shall be as below: • Non-Habitable use: 2.40 m • Habitable Use: 2.75 m 19. Vehicular Ramp Ramps are mandatory for plot size above 3000 sq.m. Minimum width: 7.2m for two way traffic 4m for one way traffic Slope: i) Cars not less than 1:8 and at curve 1:12 ii) Heavy vehicles not less than 1:15 Serial PARAMETERS Permissible Limits Num- Hospital/ Nursing Orphanage Home, Old Age ber Home/ Medical Home, Children's Centre/ Laboratory Care Centre/ School/Institute for Mentally Challenged or Physically Handicapped Person PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2367 20. Parking 2 Equivalent Car Spaces/ 1 Equivalent Car Space / 100 sq.m 100 sq.m of the total of the total Floor Area Ratio Floor Area Ratio 21. Projection or Maximum allowable projection (free from ground coverage Balcony and floor area ratio): 1.80m (6’-0”) within zoned area 22. Rainwater Compulsory Harvesting 23. Solar Water Not mandatory but recommended meeting its hot water Heating System demand from solar water heaters, as far as possible. 24. Solar Photo Connected Load Minimum Requirement Voltaic (a) 50 KWp to Minimum 10 Kilo Watt peak or 1000 KWp 5 percent of connected load, whichever is higher. (b) Above 1000 KWp Minimum 50 Kilo Watt peak or3 percent of connected load, whichever is higher. 25. Flushing System Dual button type flushing cistern in each water closet. 26. Parapet or Minimum Height: 1.0 m Railing Maximum Height: 1.4 m from the finished floor level. 27. Minimum Hospital, Nursing Homes, etc.: 2400 mm Passage or Orphanage Home: 1500 mm for single loaded and 1800 mm Corridor for double loaded. This width shall increase with increase in the occupant load of the building and shall provide as per the National Building Code Of India, 2016. Notes:- a) Maximum up to 2 percent of Floor Area Ratio area shall be allowed to be used for community space / creche / chemist shop/ bank counter on Hospital sites and also Medical College/ Nursing and Paramedic institute sites. b) In case of hospitals, 25 percent of the total Floor Area Ratio area may be utilized for residential use for staff, dormitory/ hostels for attendants of the patients, creche etc. Serial PARAMETERS Permissible Limits Num- Hospital/ Nursing Orphanage Home, Old Age ber Home/ Medical Home, Children's Centre/ Laboratory Care Centre/ School/Institute for Mentally Challenged or Physically Handicapped Person PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2368 c) Adequate arrangements for disposal of hospital waste have to be made as per the Bio- Medical Waste (Management and Handling) Rules, 1998, as amended from time to time along with the instructions/ guidelines issued by the Punjab Pollution Control Board from time to time. d) Floor Area Ratio above 1:1.50 will be chargeable on pro-rata basis in Hospital, Nursing Home and Medical Laboratory sites. However, the site allotted or sold by the development authority the charges shall be applicable as per the terms and conditions of the allotment letter. e) For sites of Orphanage Home, Old age home, Children's centre/ care centre/ school/ Institute of Mentally challenged or Physically Handicapped Person: Minimum 15percent of site area shall be kept/ developed as playground/green with minimum width of 15 m. f) In case of school for mentally/differently able persons, 25 percent of the total Floor Area Ratio area can be utilized for residential use for essential staff and student accommodations. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2369 8 PUBLIC BUILDINGS.- The public buildings of various types shall be governed by the following norms, namely:- (1) Community Centre, Public Concert Hall or Auditorium, Museum, Gymnasium or Public Exhibition; Religious Building; Public Offices Serial PARAMETERS Permissible Limits Num- Community Centre, Religious Public ber Public Concert Hall Building Offices or Public Exhibition Auditorium, Museum or Gymnasium 1. Minimum Within Master Plan: 12 m 18m 18 m Approach Road 18 m (60'-0") (40'-0") (60'-0") (60'-0") Outside MasterPlan: 12m (40'-0") 2. Permissible or 2000 sq.m 1000 Above 1000 Minimum Site upto 2000 sq.m Area 2000 sq.m sq.m 3. Minimum Set 6m minimum from site boundary and as per sub rule (1) of back required: - rule 26 of these building rules. However, for the plots upto 2025 sq.m area where width of the plot is less than 30.50m (100'-0") and the maximum height of building is below 15m excluding the architectural and symbolism element of religious building like dome, minarets, sikharas, crucifix etc. from building height, then one side setbacks may be relaxed subject to the condition that the owner has to submit a fire safety certificate from the competent authority in this regard. 4. Maximum 1:1.0 1:1.0 Minimum permissible Floor approach Area Ratio (FAR) Road width: FAR 18m: 1:2.0 30m: 1:2.5 45m: Unlimited 5. Maximum 40 percent of 40 percent of 40 percent of Ground plot area plot area plot area Coverage Section 180 (2) PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2370 6. Plinth 450mm or as specified by competent authority (from the crown of adjoining road in front), Provided that for a detached building, the plinth level may be more than 450mm: Provided further that the level of front courtyard of any building shall not exceed 450 mm and the ramp from the front road to the courtyard shall be within the plot boundary. 7. Maximum Height No Restriction subject to the fulfilment of norms such as of Building setbacks around building, ground coverage, Floor Area Ratio, structural safety and fire safety norms. However, clearance from Airport Authority of India or Indian Air Force is required in case the height of the building is 15m or more or site falls in the red colour of home grid of Colour Coded Zoning Map issued by Airports Authority of India or Indian Air Force. 8. Minimum Clear 3.6m Ceiling Height for religious gathering area 9. Minimum Component of Building Min. Min. Min. requirements (SQ.M) Width Clear of different (M) Height (M) component Habitable room 9.5 2.4 2.75 of a building Bathroom 1.8 1.2 2.1 Water Closet (W.C.) 1.2 0.9 2.1 combined bath and w.c 2.8 1.2 2.1 Store 3 1.2 2.2 10. Light and (a) One or more openings, such as windows and ventilators, Ventilation opening directly to the external air or into an open Verandah. Serial PARAMETERS Permissible Limits Num- Community Centre, Religious Public ber Public Concert Hall Building Offices or Public Exhibition Auditorium, Museum or Gymnasium PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2371 (b) Such openings, excluding doors inclusive of frames, shall not be less than one-tenth of the floor area. In case of Kitchen such opening shall be increased by 25 percent. 11. Ventilation Shaft The size of ventilation shaft shall not be less than the values given below:- Height of building Size (sq.m) Min. one dimension 10m 1.2 0.9 m 12m 2.8 1.2 m 18m 4.0 1.5 m 24m 5.4 1.8 m 30m 8.0 2.4 m Above 30m 9.0 3.0 m Notes:- (a) For buildings of height above 30 m, a mechanical ventilation system shall be installed besides the provision of minimum ventilation shaft. (b) For fully air conditioned, the ventilation shaft need not be insisted upon, provided the air conditioning system works in an uninterrupted manner, also, provided there is an alternative source of power supply. (c) Mechanical ventilation in building shall be as per the provision of the National Building Code of India, 2016, as amended from time to time. 12. Interior courtyard Minimum area 9 sq.m for Light and Minimum width 2.4 m or 1/5 of the average height of the Ventilation building whichever is more. 13. Staircase Minimum Clear Width: 2000 mm or as Min. Width: 1500 mm per occupants or as per occupants load load whichever whichever is more is more Serial PARAMETERS Permissible Limits Num- Community Centre, Religious Public ber Public Concert Hall Building Offices or Public Exhibition Auditorium, Museum or Gymnasium PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2372 Minimum Tread: 300 mm Min. Tread: 300 mm Maximum Riser: 150 mm Max. Riser: 150 mm Minimum Min. Headroom Headroom Height: 2200 mm Height: 2200 mm 14. Lift and Ramp Lift is mandatory in buildings 15m or more in height and requirement basement provided more than one level as per the provision of the National Building Code of India, 2016. Ramp requirement for pedestrians, differently-abled, elderly and children upto Plinth Level :- Min. Width - 1800mm Min. Slope - 1:12 15. Mumty Allowed upto 2.75 m otherwise counted in calculating the height of the building as well as covered area. 16. Services on Terrace Solar Photo Voltaic installation, Water tank, Rain water pipes with drainage, Water Tank, cooling towers for air conditioning plants, mumty, machine room and screening parapet to hide services or as per the provisions of the National Building Code of India, 2016. 17. Gate and post Watch and ward cabins upto 100 sq.ft along each entry gate check exempted from Ground Coverage and Floor Area Ratio (FAR). 18. Boundary wall Maximum height allowed: - Facing road or open area: upto 0.9m solid wall with 0.9m high perforated Grill/ Jali. Facing other property: upto 1.83m solid wall Minimum Turning Radius for corner plot: - 5’-0” or 1/8th of the adjoining road width, whichever is more and maximum upto 20’-0”. 19. Basement Plot size upto 2025 sq.m: single story basement is allowed upto zoned area or upto the boundary of the plot except front Serial PARAMETERS Permissible Limits Num- Community Centre, Religious Public ber Public Concert Hall Building Offices or Public Exhibition Auditorium, Museum or Gymnasium PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2373 and rear side, as the case may be, subject to the condition that the owner shall leave minimum 2.44 m (8'-0") setback from the respective side of the boundary wall of the plot, if adjoining plot has a building upto 2.44m from the plot line. Plot size above 2025 sq.m: The multi-level basement shall be allowed below the ground and beyond the building line at ground level subject to a clear minimum front margin of 4.5 m and side and rear margins of 3 m, subject to the provision of mechanical ventilation and all safety provisions and drainage. Basement shall not be allowed in the case of no construction Zone/ Area or Master Plan Green area or any other restricted area/zone under the provision of any other Act/policy of the State or Central Government. Minimum clear height for basement shall be as below: • Non-Habitable use: 2.40 m • Habitable Use: 2.75 m 20. Vehicular Ramp Ramps are mandatory for plot size above 3000 sq.m. Minimum width: 7.2m for two way traffic 4m for one way traffic Slope: (i) Cars not less than 1:8 and at curve 1:12 (ii) Heavy vehicles not less than 1:15 21. Parking 3 Equivalent Car 2 Equivalent 1 Equivalent Spaces/ 100 sq.m Car Spaces/ Car Space / of the total Floor 100 sq.m of 100 sq.m of Area Ratio the total Floor the total Floor Area Ratio Area Ratio 22. Projection or Maximum allowable projection (free from ground coverage Balcony and floor area ratio): 1.80m (6’-0”) within zoned area 23. Rainwater Compulsory Harvesting Serial PARAMETERS Permissible Limits Num- Community Centre, Religious Public ber Public Concert Hall Building Offices or Public Exhibition Auditorium, Museum or Gymnasium PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2374 24. Solar Water Not mandatory but recommended meeting its hot water Heating System demand from solar water heaters, as far as possible. 25. Solar Photo Connected Load Minimum Requirement Voltaic i) Community (a)50 KWp to 1000 KWp Minimum 10 Kilo Watt peak Centre, Public or 5 percent of connected load, Concert Hall or whichever is higher. Public Exhibition (b) Above 1000 KWp Minimum 50 Kilo Watt peak or 3 Auditorium, percent of connected load, Museum or whichever is higher. Gymnasium ii) Public Offices (a) 30KWp and above Minimum 2 Kilo Watt peak or 5 percent of connected load, whichever is higher. 26. Flushing System Dual button type flushing cistern in each water closet. 27. Parapet or Railing Minimum Height: 1.0 m Maximum Height: 1.4 m from the finished floor level. 28. Minimum Passage 2000mm or as per 2000mm or as 1500 mm for or Corridor occupant load which- per occupant single loaded ever is more load whichever and 1800 mm is more for double loaded or as per occupant load whichever is more. Notes:- (a) In case of Community Centre, it shall only have banquet hall, kitchen, library, office Serial PARAMETERS Permissible Limits Num- Community Centre, Religious Public ber Public Concert Hall Building Offices or Public Exhibition Auditorium, Museum or Gymnasium PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2375 and reading room, except these, if any, other activity is proposed then it shall be considered as club. (b) Upto 1.0 percent of the total Floor Area Ratio area of Community Centre, Public Concert Hall or Auditorium, Museum, Gymnasium or Public Exhibition shall be allowable for commercial activity. (c) *Unlimited Floor Area Ratio shall be subject to fulfilment of building controls such as ground coverage, setbacks around the building, parking norms, light and ventilation, height, fire and structural safety. (d) Floor Area Ratio above 1:1.75, shall be chargeable on pro-rata basis except State or Central Government offices. However, the site allotted or sold by the development authority the charges shall be applicable as per the terms and conditions of the allotment letter. (e) Upto 15 percent of the total Floor Area Ratio area in Public buildings shall be permissible for the housing of staff or workers. (2) Convention Centre Serial PARAMETERS Permissible Limits Number 1. Minimum Within Master Plan: 18 m (60'-0") Approach Road Outside Master Plan: 12m (40'-0") 2. Minimum Site Area 2000 sq.m 3. Minimum Set back 6m minimum from site boundary and as per table of sub required rule (1) of rule 26 of these building rules. However, for the plots upto 2025 sq.m area where width of the plot is less than 30.50m (100'-0") and the maximum height of building is below 15m excluding the architectural and symbolism element of religious building like dome, minarets, sikharas, crucifix etc. from building height, then one side setbacks may be relaxed subject to the condition that the owner has to submit a fire safety certificate from the competent authority in this regard. 4. Maximum Floor 1:2.0 Area Ratio 5. Maximum Ground 50 percent of plot area Coverage PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2376 6. Plinth 450mm or as specified by competent authority (from the crown of adjoining road in front). Provided that for a detached building, the plinth level may be more than 450mm: Provided further that the level of front courtyard of any building shall not exceed 450 mm and the ramp from the front road to the courtyard shall be within the plot boundary. 7. Maximum Height No Restriction subject to the fulfilment of norms such as of Building setbacks around building, ground coverage, Floor Area Ratio, structural safety and fire safety norms. However, clearance from Airport Authority of India or Indian Air Force is required in case the height of the building is 15m or more or site falls in the red colour of home grid of Colour Coded Zoning Map issued by Airports Authority of India or Indian Air Force. 8. Minimum Component of Building Min. Min. Min. Clear requirements of area Width Height (M) different (SQ.M) (M) component of Habitable room 9.5 2.4 2.75 a building Kitchen • where separate 5 1.8 dining area is provided • where separate 4.5 1.8 2.75 store is provided • where dinning 7.5 2.1 included Bathroom 1.8 1.2 2.1 Water Closet (W.C.) 1.2 0.9 2.1 combined bath and w.c 2.8 1.2 2.1 Store 3 1.2 2.2 Single occupancy 7.5 2.1 2.75 Servant Room Serial PARAMETERS Permissible Limits Number PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2377 9. Light and (a) One or more openings, such as windows and ventilators, Ventilation opening directly to the external air or into an open Verandah. (b) Such openings, excluding doors inclusive of frames, shall not be less than one-tenth of the floor area. In case of Kitchen such opening shall be increased by 25 percent. 10. Ventilation Shaft The size of ventilation shaft shall not be less than the values given below:- Height of building Size (sq.m) Min. one dimension 10m 1.2 0.9 m 12m 2.8 1.2 m 18m 4.0 1.5 m 24m 5.4 1.8 m 30m 8.0 2.4 m Above 30m 9.0 3.0 m Notes: (a) For buildings of height above 30 m, a mechanical ventilation system shall be installed besides the provision of minimum ventilation shaft. (b) For fully air conditioned, the ventilation shaft need not be insisted upon, provided the air conditioning system works in an uninterrupted manner, also, provided there is an alternative source of power supply. (c) Mechanical ventilation in building shall be as per the provision of the National Building Code of India, 2016, as amended from time to time. 11. Interior courtyard Minimum area 9 sq.m for Light and Minimum width 2.4 m or 1/5 of the average height of the Ventilation building whichever is more. 12. Staircase Minimum Clear Width: 2000 mm or as per occupant load whichever is more Minimum Tread: 300 mm Maximum Riser: 150 mm Minimum Headroom Height: 2200 mm Serial PARAMETERS Permissible Limits Number PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2378 13. Lift and Ramp Lift is mandatory in buildings 15m or more in height and requirement basement provided more than one level as per the provision of the National Building Code of India, 2016. Ramp requirement for pedestrians, differently-abled, elderly and children upto Plinth Level :- Min. Width - 1800mm Min. Slope - 1:12 14. Mumty Allowed upto 2.75 m, otherwise counted towards the height of the building as well as Floor Area Ratio. 15. Services on Terrace Solar Photo Voltaic installation, Water tank, Rain water pipes with drainage, Water Tank, cooling towers for air conditioning plants, mumty, machine room and screening parapet to hide services or as per the provisions of the National Building Code of India, 2016. 16. Gate and post Watch and ward cabins upto 100 sq.ft along each entry gate check exempted from Ground Coverage and Floor Area Ratio (FAR). 17. Boundary wall Maximum height allowed:- Facing road or open area: upto 0.9m solid wall with 0.9m high perforated Grill/Jali. Facing other property: upto 1.83m solid wall. Minimum Turning Radius for corner plot: - 5’-0” or 1/8th of the adjoining road width, whichever is more and maximum upto 20’-0”. 18. Basement Plot size upto 2025 sq.m: single story basement is allowed upto zoned area or upto the boundary of the plot except front and rear side, as the case may be, subject to the condition that the owner shall leave minimum 2.44 m (8'-0") setback from the respective side of the boundary wall of the plot, if adjoining plot has a building upto 2.44m from the plot line. Plot size above 2025 sq.m: The multi-level basement shall be allowed below the ground and beyond the building line at ground level subject to a clear minimum front margin of 4.5 m and side and rear margins of 3 m, subject to the provision of mechanical ventilation and all safety provisions and drainage. Serial PARAMETERS Permissible Limits Number PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2379 Basement shall not be allowed in the case of no construction Zone/ Area or Master Plan Green area or any other restricted area/zone under the provision of any other Act/policy of the State or Central Government. Minimum clear height for basement shall be as below: • Non-Habitable use: 2.40 m • Habitable Use: 2.75 m 19. Vehicular Ramp Ramps are mandatory for plot size above 3000 sq.m. Minimum width: 7.2m for two way traffic 4m for one way traffic Slope:(i) Cars not less than 1:8 and at curve 1:12 (ii) Heavy vehicles not less than 1:15 20. Parking 2 Equivalent Car Spaces/ 100 sq.m of the total Floor Area Ratio 21. Projection or Maximum allowable projection (free from ground coverage Balcony and floor area ratio): 1.80m (6’-0”) within zoned area 22. Rainwater Compulsory Harvesting 23. Solar Water Not mandatory but recommended meeting its hot water Heating System demand from solar water heaters, as far as possible. 24. Solar Photo Connected Load Minimum Requirement Voltaic (a)50 KWp to 1000 KWp Minimum 10 Kilo Watt peak or 5 percent of connected load, whichever is higher. (b) Above 1000 KWp Minimum 50 Kilo Watt peak or 3 percent of connected load, whichever is higher. 25. Flushing System Dual button type flushing cistern in each water closet. 26. Parapet or Railing Minimum Height: 1.0 m Maximum Height: 1.4 m from the finished floor level. 27. Minimum Passage 2000mm or as per occupant load whichever is more or Corridor Serial PARAMETERS Permissible Limits Number PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2380 Notes:- (a) Upto 30 percent of the total Floor Area Ratio area of Convention Centre shall be allowable for hotel activity. (b) Upto 1.0 percent of the total Floor Area Ratio area of Convention Centre shall be allowable for commercial activity. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2381 PART-III PROCEDURE OF SUBMISSION OF APPLICATIONS FOR BUILDING PLAN, COMPLETION CERTIFICATE AND OCCUPATION CERTIFICATE 9 Erection or re-erection without permission. - Subject to the provisions of the Act and other provisions of these rules, no person shall commence the erection or re-erection of any building on any site without previous sanction of the competent authority. 10 Design and supervision. - Except where standard design has been supplied by the competent authority, the architectural design of every building shall be prepared and signed by an Architect or Civil Engineer and every building operation shall be supervised by an Architect or an Engineer. 11 Application to erect or re-erect buildings (without self-certification).- (1) Every person who intends to erect or re-erect a building shall make an application in Form ‘A’ (Annexure 1) to the competent authority along with the following documents and fee as determined by the competent authority, namely:- (i) ownership documents-lease deed or sale deed or possession letter in the name of owner issued by the allotment authority or permission to use the land issued by the competent authority; (ii) Site plan as detailed in sub- rule (3); (iii) Hard copy of Building plan and other plans along with an un-editable Compact Disc or DVD or any other electronic medium permissible by the competent authority from time to time containing the drawings in “dwg” format as detailed in sub- rule (4); (iv) Details of specifications of the work to be executed in Form- ‘C’ (Annexure 3); (v) Structural safety drawings (for record) as per Form- ‘B’ (Annexure 2); (vi) Fire safety design as required under Part IV, Fire and Life Safety of the National Building Code of India, 2016, as amended from time to time, if applicable; (vii) Heating, Ventilation, Air-Conditioning (H.V.A.C.) service plan wherever required; (viii) Certificate of conformity to regulation and structural safety for the relevant buildings (depending upon type and height) in the relevant Form ‘B’(Annexure 2); (ix) Public health services plan in un-editable compact Disc or DVD or any other electronic medium, containing drawings in “.dwg” format; (x) Scrutiny fees (non–refundable) shall be deposited in favour of the competent authority through any specified payment mode, at the rate as described below: Section 108 (2) Section 108 (2) Section 108 (2) PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2382 Scrutiny fees for building plan approval Type of Building Rate in Rupees Per Square meter of the Total Covered Area of the Proposed Building Residential 30 Commercial buildings and other Public 60 Buildings Construction of boundary wall @Rs. 10 per running meter of the of plots having area more than 1000 sq.mt. boundary wall. No scrutiny fees for building plan approval of care centre or school for disabled persons, care centre or school for mentally challenged persons, orphanage and old age home shall be chargeable. In case of revised or superseded plans, the fee chargeable shall be half of the rates charged for fresh plans for such category of plots as mentioned above. Note:- (a) The applicant shall submit all kind of plans in electronic format on the online portal of the competent authority along with hard copies of the plans. The competent authority shall convey objections or observations or sanction or refusal through online portal or as specified mode. (b) Every person applying under this rule shall appoint an Architect or Engineer for drawing up of building plans or structural drawings and for the supervision of erection or re-erection of the building. The supervision of erection or re-erection of residential or commercial building up to 15 metres height (G+3 floors including stilt) may be undertaken by the Architect or the Engineer. However, in case of buildings of 15 meters or above height (including stilt), the supervision shall be undertaken by both the Architect and the Engineer. During construction, if appointed Architect or Engineer notices that violations (except compoundable) are going on, he shall intimate the owner and advise him to stop further construction and remove the violation and shall also intimate the concerned authority. (c) The applicant, the Architect and the Engineer shall sign the application, plans, structural drawings, specifications and the certificates as required in the relevant forms and documents, before making submission to the competent authority. (d) In case of row type or semi-detached building, at the time of re-erection of building, the owner shall provide an indemnity bond as per Annexure 21 that in case of any damage caused to the adjoining property during construction, the owner shall be bound to get the damages repaired to the satisfaction of the neighbour. (2) Size of drawing sheets and colouring of plans. – The size of drawing sheets shall be any of those specified below, namely:- PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2383 Size of drawing sheets Serial Number Sheet name Sheet size (in mm) I. A0 841 X1189 II. A1 594 X 841 III. A2 420X594 IV. A3 297 X 420 Note: (a) All dimensions in plan can be indicated in metric or feet-inches units. (b) Various elements of plans (site and building), elevation, section and details shall be shown in different colours and thickness or type of line, etc., and shall be preferably prepared in layers and as per Bureau of Indian Standard (BIS) Code. (c) The prints of drawings shall be on one side of paper only. (3) Site plan.- Site plan fully dimensioned shall be drawn to a scale of not less than 1: 500 for a site up to one hectare and not less than 1: 1000 for a site more than one hectare and shall show:- (i) boundaries of the site and any contiguous features; (ii) direction of the north point relative to the site of the building; (iii) streets or roads adjoining the site with their width clearly dimensioned and names, if any, giving also all existing roads, trees, lamp posts or any other feature or structure likely to affect the approach to the building; (iv) outlines of the proposed building; (v) immediate neighbours on all sides identified, whether buildings or vacant plots; (vi) levels of the site and the plinths of the building in relation to those of the neighbouring roads and also the level of courtyard and open space; (vii) area calculations such as ground coverage, Floor Area Ratio and Non Floor Area Ratio, parking calculations, any other relevant calculations as required; (viii) all existing buildings or structures on or over or under the site or projecting beyond it; (ix) proposed access points on site boundary for the proposed construction; (x) methods of disposal of waste water, sewerage and storm water; (xi) surroundings up to a distance of fifteen metres on all sides from the boundaries of the site; (xii) prominent trees in the area of the drawing and any important urban service points above or under ground (like sewer or water pipes, gas pipeline, transformers, electric poles or lines, phone distribution boxes, etc.); PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2384 (xiii) such other particulars as may be specified by the competent authority; and (xiv) plot number or revenue particulars of the property on which the building is intended to be erected. (4) Building plans, sections and elevations.- The building plans, sections and elevations shall be drawn to a scale of 1:100. The building plans and details so drawn shall show - (i) the plans of all the floors including basements and all external elevations and cross sections illustrating distinctly all the different levels and minimum one section through staircase, water closet, bath, kitchen and garage; (ii) the plinth level of the building with reference to the level of the mean level of street from where approach to the site is taken; (iii) the schedule indicating the size of the doors, windows, openings and other methods of ventilation of each room or area; (iv) the use or occupancy of all parts of the buildings; (v) the means of access to the buildings and to its various floors as well as the means of escape in case of fire, if required under the specific law or code; along with ramps and steps with respect to the building; (vi) in case of proposed additions and alterations in the existing building, all new works shall be shown on the drawings in distinctive colours along with index; (vii) exact location of essential services, for example, water closet, sink, bath and the like; (viii) the method of disposal of waste water, sewage, storm water and water supply in detail; (ix) provision of rain water harvesting system in accordance with rule 40 (wherever applicable); (x) provision for photovoltaic solar power plant in accordance with these rules (wherever applicable); (xi) provision for barrier free build environment for persons with disability and elderly persons in accordance with these rules (wherever applicable); (xii) indications of the north point relative to the plan. Note: The requirement of 1:100 is permitted to be flexible for specific details needed for further illustration; and also for drawings for these in electronic form. In case any detail in building plan is not readable, the same can be shown in enlarged form with clouding of that area. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2385 (5) Standard design and architectural controls.- Where the applicant intends to construct a building in accordance with a standard design, approved by the competent authority concerned, he shall obtain a copy of the same before starting the construction and notify the competent authority accordingly of the site and design. In such cases, he shall not be required to submit any building plan. However, the site plan showing access, building footprint and all other aspects in accordance with sub-rule (3) should be submitted. Only the design plans can be indicated referring to standard design names or numbers: Provided that if the owner proposes certain permitted modifications in the standard design or the architectural controls, then he shall submit the same to the competent authority for approval. Note: For any urban area within the State of Punjab, notified in the Master Plan as a “Special Area” of planning for any special purpose by virtue of historical, functional, natural features or any other significance, for which a Form Based Codes (FBC) or Regulating Plan has been prepared and notified by the concerned Local Authorities, provisions under sub-rules (3), (4) and (5) shall be in accordance with such Form Based Codes (FBC) or Regulating Plan superseding any other general development norms and standards stipulated in these Building Rules. 12 Procedure for submitting application through self-certification.- (1) The self-certification is applicable on the following category of buildings, namely:- (i) Residential plot having size upto 1000 sq.yd (836 sq.m); (ii) Industrial plots having size upto 1000 sq.yd (836 sq.m); and (iii) Commercial plots such as shop-cum-office (SCO), shop-cum-flat (SCF), Shops and Booths within approved layout for which standard design has been approved by the competent authority. (2) Procedure.- (i) Any person intending to erect or re-erect building shall apply through an architect in Form ‘A’ along with documents specified in rule 11 to the competent authority for approval of building plans duly signed with stamp of “sanctioned”, under self-certification by giving thirty days notice to the competent authority for record of building plans intimating the date of start of construction. The construction of proposed building can be started after thirty days, in case any objection is not conveyed to the applicant. (ii) The plan submitted shall conform to the provisions of these rules as amended from time to time and approved zoning plan. In this regard, a certificate shall be given on the plan as under, namely:- “Certified that the above building plan is as per the zoning plan Drg. No. ........ dated..... and as per the Punjab Urban Planning and Development Building Rules, 2021 as amended from time to time.” Architect/Civil Engineer Seal with signature Section 108 (2) PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2386 (iii) Certificate of conformity to regulation and structural safety for the relevant buildings (depending upon type and height) in the relevant Form. (iv) After receiving the above documents, the competent authority issues an auto- generation receipt mentioning that documents have been received and are being kept in the office for record with this understanding that these plans have been prepared as per the provisions of approved zoning plan and these rules. The competent authority shall also convey within thirty days to the applicant regarding discrepancies in the building plans and the applicant shall be bound to rectify the discrepancies in building plans and shall submit the same before start of the construction otherwise submitted plan shall be taken as deemed approved. (v) The competent authority or any other person authorized by him reserves the right to check the building plans and construction at any stage and violations (except compoundable ones), if found, shall have to be rectified by the owner or applicant. In case the owner or applicant fails to rectify the violations, the competent authority may take necessary steps to remove the violations and the action shall also be taken against the defaulting Architect or Civil Engineer by referring his case to the Council of Architecture or Institute of Engineers of misconduct and for debarring or blacklisting the Architect or Civil Engineer from doing all practice, especially for the Departments of the State Government or Authorities. All rectifications shall be at the risk and cost of the owner and no plea of the owner shall be entertained for any default committed by the Architect or Civil Engineer engaged by him. In all such cases, the procedure of self-certification shall stand aborted. (vi) If a building is erected or re-erected or construction work is commenced in contravention to any of the building regulations, the competent authority or any other person authorized by him shall be competent to require the building to be altered or demolished, by a written notice delivered to the owner. Such notice shall also specify the period during which such alteration or demolition has to be completed and if the notice is not complied with, the competent authority or any other person authorized by him may demolish the said building at the expense of the owner. Notes:- (a) The decision of the competent authority, in case of any dispute, shall be final and binding on all concerned. (b) At any stage during construction, if an Architect or Civil Engineer notices that violations (except compoundable ones) are taking place, he shall intimate to the concerned authority of such violations and stop further supervision. He shall also intimate the allottee about the violations and advise him to stop further construction. Complete details along with photographs shall be PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2387 submitted to the concerned authority. The competent authority shall immediately issue a notice to the owner on the basis of the Architect’s or Civil Engineer's certificate to suspend further work and rectify violations. In such cases, the owner shall be held responsible for further additions in violations. Such a situation shall automatically annul the process of self-certification and the owner may, after removal of violations, engage an Architect or Civil Engineer for preparing the revised drawings. In such case, completion shall be given only after scrutiny of revised drawings and inspection of site. (c) The compoundable changes shall be allowed to be done, provided that at the completion stage all changes are incorporated by the Architect or Civil Engineer in the completion drawings to be submitted by the owner to the competent authority. While seeking completion certificate, the Architect or Civil Engineer shall give a certificate that all changes done are in accordance with these rules and policies of the Government as amended from time to time. (d) After submission of application or during the construction of building, if the Owner or Architect or Civil Engineer or Structural Engineer are changed, the applicant shall intimate the competent authority by email or online building plan approval system that he is no longer responsible for the project from the date of actual dispatch of the letter. The information must be sent within seven days of occurrence of the change to the competent authority by the respective owner or Architect or Engineer. The construction work shall have to be suspended until the new owner or Architect or Civil Engineer or Structural Engineer, as case may be, undertakes the full responsibility of the project vide forms and documents submitted at the time of applying for erection or re- erection of the building within seven days of his taking over. The owner’s intimation regarding change of name of professionals shall be considered to be final by the competent authority or any other person authorized by him. 13 Preparation of building plans of the Departments of the Government.- The Department of the Government intending to erect or re-erect building shall get their building plans prepared from the Department of Architecture of the State Government or Central Government, as the case may be, conforming to these building rules and shall issue a certificate specifying that the provisions of these building rules have been followed in all respects. Such plans shall be Section 108 (2) PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2388 submitted to the competent authority for information and record before commencement of erection or re-erection of the building. However, if the building plans are prepared by the private Architect or Civil Engineer, the same shall be submitted to the competent authority for approval. 14 Completion certificate. – (1) The applicant shall submit a notice of completion of the building to the competent authority regarding completion of the work as per approved plans. The notice of completion shall be submitted by the owner through the Architect and Engineer as engaged for building plan design who fulfills the specified qualifications mentioned in Annexure 13, or as the case may be, who has supervised the construction, in the Performa given in Form- ‘F’ and ‘G’ respectively (Annexure 6 and Annexure 7), accompanied by three copies of completion plan and the following documents along with the specified fee, namely:- (i) copy of all inspection reports of the Authority e.g. Fire Safety, Structural Safety, Green Building (if applicable) etc; (ii) detail of compoundable violations from the approved building plans, if any, in the building, jointly signed by the owner, Architect and Engineer along with demand draft of the due payment for compounding charges of such violations at the rates specified by the competent authority shall be submitted; (iii) complete completion drawings or as-built drawings - certified by the Architect and Engineer; (iv) photographs of front, side, rear setbacks, front and rear elevation of the building shall be submitted along with photographs of essential areas like cut outs and shafts from the roof top. An un-editable compact disc or DVD or any other electronic media containing all photographs shall also be submitted; (v) structural stability certificate duly signed by the Structural Engineer; (vi) certificate of fitness of the lift from concerned Department wherever required; (vii) certificate from the Punjab Energy Development Agency (PEDA) for installation of Rooftop Solar Photo Voltaic Power Plant in accordance to orders or policies issued by the Renewable Energy Department from time to time; Section 108 (2) PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2389 (viii) completion certificate or final Certificate or no objection certificate from the rating agencies (GRIHA/LEED/IGBC) for green building or Bureau of Energy Efficiency (BEE), Certified Energy Auditor for Green Building or constructing building in accordance to the provision of the Punjab Energy Conservation and Building Code, wherever applicable; (ix) no objection certificate (NOC) of fire safety of building from concerned Fire Officer or an officer authorized for the purpose; and (x) any other information or document that the Authority may deem fit. (2) The ‘completion certificate’ or ‘partial completion certificate’ shall be issued on the basis of the following parameters, namely: - (i) the applicant shall remove or demolish any temporary building which might have been erected and the debris from the site and adjoining roads or vacant site before the completion certificate is issued; (ii) the partial completion certificate may be granted for partially constructed building with at least one habitable room, one water closet and one kitchen as per the sanctioned plan and duly functional in case of a residential house; (iii) the partial completion certificate may be granted for partially constructed non- residential buildings subject to the minimum completion of 25 percent construction of the availed total floor area along with all the required public utilities and public safety measures; (iv) the partial completion certificate to shop-cum-offices or shops may be granted subject to the condition that construction of ground floor is completed along with public safety measure; (v) in case of large campus or complex, completion of individual block or building shall be issued by the competent authority in accordance with the construction work completed phase wise; (vi) in case of high rise buildings, partial completion certificate shall be issued if the superstructure of the building has been constructed as per approved plans along with all the required parking, public utilities, public safety etc. measures of the proportionate area completed on site; and (vii) the minimum permissible covered area as mentioned below shall have to be constructed to obtain partial completion certificate for industrial buildings: PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2390 Minimum permissible ground coverage to obtain partial completion certificate for industrial buildings Serial Number Area of site Percentage of permissible ground coverage I. Upto 2 acre 25 percent II. Above 2 acre upto 5 acres 20 percent III. Above 5 acres 15 percent (3) The competent authority on receipt of the notice of completion shall inspect the work and communicate the approval or refusal, or objection thereto, in the Performa given in Form- ‘H’ within thirty days from the receipt of notice of completion. However, the competent authority may also seek compounding charges of compoundable violations which are compoundable before issuance of completion certificate. If nothing is communicated within this period, it shall be deemed to have been approved for completion provided that the fact is immediately brought to the notice of the competent authority in writing by the person, who had given the notice and has not received any intimation from the competent authority within the specified period. Where the completion certificate is refused, the reasons shall be intimated for rejecting in the first instance itself. (4) If the Architect or Engineer engaged by the owner or applicant submits a wrong report while making application under these rules or if any additional construction or violation is reported to exist at site or has concealed any fact or misrepresented regarding completion of construction of building along with its eligibility for seeking completion certificate or before the completion of such report, he shall be jointly and severally held responsible for such omission and complaint against the Architect or Engineer for suspension of his registration and the owner shall be liable to pay for the penalty as may be decided by the competent authority after giving an opportunity of hearing. Further, if it is emerged that the information is concealed by the Architect or Engineer, necessary penal proceedings shall be initiated along with debarring such Engineer or Architect from practicing in the State of Punjab. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2391 PART IV ADMINISTRATIVE CONTROL 15 Power of the competent authority to sanction or refuse erection or re- erection.- (1) The competent authority shall refuse to sanction the erection or re-erection of any building, if it is in contravention of any of the provisions of these rules. (2) The competent authority may sanction the erection or re-erection of any building either absolutely or subject to such modification in accordance with these rules as it may deem fit and one copy of the sanctioned plans shall be sent to the applicant. (3) The intimation of sanction or rejection of the building plans shall be given in Form 'D'. 16 Presumption of sanction.- If the competent authority fails to convey approval or rejection within a period of sixty days of the receipt from any person of a valid application, complete in all respect to erect or re-erect a building, the plans shall without prejudice to the provisions of these rules and the restrictions specified for erection or re-erection of buildings, be deemed to have been sanctioned and the applicant may proceed with the erection or re-erection of building or carryout any development work as described in the application and in any accompanying documents, but not so as to contravene any of the provisions of the Act and rules made thereunder and the restriction specified for erection or re-erection of buildings. 17 Pre-approved building applications.- Where building applications which have been already approved by the competent authority before coming into force of these rules and where construction is in progress and has not been completed within the specified period of such approval, the said approval or permission shall be deemed to be sanctioned under these rules and shall only be eligible to re-validation under these rules, but where the construction on site has not yet been started, the owner or applicant may get his building plans revised after paying the requisite charges. 18 Validity period of sanction.– Every sanction for the erection or re-erection of any building or carrying out any development work shall remain in force, unless it is modified or cancelled by the competent authority by due process of law. 19 Submission of revised building plans in case of major alterations.- (1) If during the construction of a building, any major deviation from the sanctioned plan is intended to be made, approval of the competent authority for the same Section 108 (2) Section 108 (2) Section 108 (2) Section 108 (2) Section 108 (2) PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2392 may be obtained before the change is made. The revised plan showing the deviations shall be submitted and the procedure laid down for the sanction of building plan as specified in these rules shall be followed for all revised plans, along with the balance scrutiny fee, if any. (2) The building approval is not necessary for compoundable alterations or violations, which do not otherwise violate any provisions regarding general building requirements, structural stability and fire safety requirements of these rules. 20 Revocation of sanction.–The sanction granted under these rules can be revoked by the competent authority, if it is found that such sanction has been obtained by the owner by misrepresentation of material facts or fraudulent document submitted along with the building plan application or otherwise or the majority of construction is not being done in accordance with the sanction granted. 21 Maintenance of e-register for sanction or Registration of Building Plans.– An online e-register shall be maintained for all building applications received, permissions given or deemed to have been given or refused or returned under these rules. The said register shall be available online to the public for inspection on Departmental website. 22 Damp proof course certificate.– The owner shall submit a certification from an Architect or Civil Engineer or by himself, in case of self-certification to the effect that the construction of building upto damp proof course level is as per sanctioned plan. The competent authority shall verify the certification and shall issue consent or comments within fifteen days of receiving the certification. The damp proof course certificate shall be deemed to be accepted, if it is in conformity with these rules, and no consent or comments have been passed by Competent Authority within a specified time. 23 Occupation certificate.– (1) The applicant shall apply for obtaining occupation certificate of the building to the competent authority for which completion certificate has already been issued as specified in Form- “I”. No owner or applicant shall occupy or allow any other person to occupy building or part of a building or any portion whatsoever, until such building or part thereof has been issued Occupation Certificate by the competent authority after checking and found fit to occupy the building. (2) After receipt of application, the competent authority shall communicate in writing within thirty days, his decision for grant or refusal of such permission for occupation of the building in Form- ‘J’. The E-register shall be maintained as specified in these rules for maintaining record in Section 108 (2) Section 108 (2) Section 108 (2) Section 108 (2) PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2393 respect of Occupation Certificate. If no communication is received from the competent authority within thirty days of submitting the application for “Occupation Certificate”, the owner is permitted to occupy the building, considering deemed issuance of “Occupation certificate” and the application Form-D shall act as “Occupation Certificate”. However, the competent authority may check the violations made by the owner and take suitable action. (3) Revocation of occupation certificate.- In case, after the issuance of occupation certificate, if found at any stage that the building is used for some other purpose against the permission or make any addition or alteration in the building without approval, then, after affording personal hearing to the owner, the competent authority may pass orders for revocation of occupation permission and the same shall be restored only after removal of violations. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2394 PART V PLANNING AND ARCHITECTURAL CONTROLS 24 Compliance of zoning plan or standard design or architectural control sheets and master plan/ zonal plan.- In addition to these rules, the erection or re-erection of any building(s) and uses thereof as well as activities permissible therein shall comply with the provisions of the Zoning Plan or Standard Design or Architectural Control Sheets; schedule of clauses appended thereto and use of the site shall conform to the Master Plan or Zonal Plan of the area. 25 Compliance to Special Area development and control as per Master Plan or Zonal Plan.- For the planned and regulated development of all ‘Special Areas’ with specific emphasis on harmonious development with Public spaces, the planning and development shall be undertaken by specially formulated Form Based Codes (FBCs) for each such ‘Special Area’, namely:- (1) Planning authority to delineate “Form Based Zoning Districts” within the Master or Zonal Plan for special consideration of planning with integrated Public spaces; (2) Form Based Zoning Districts (FBCs) to be formulated for each such Form Based Zoning Districts (FBZDs) with Single or Multiple Regulating Plans as necessary to cover the entire delineated special area; (3) Space Use matrix along with Form Based Codes (FBC) development standards, for each Form Based Zoning District (FBZD) as formulated in the Form Based Codes (FBC) are to be used for site layouts and building designs for all types of buildings; and (4) Form Based Codes (FBC) standards of flexible and adaptive designs shall be superseding, overriding all stipulations from rule 3 to rule 8 of these rules for all types of buildings in the respective Form Based Zoning Districts (FBZDs). 26 General Planning/ Development Norms.- (1) Setbacks and Height of other buildings.– For buildings other than residential plotted or independent floors or row type buildings or crèche or pre nursery or nursery school or farm house, the set back around the building(s) or outer open spaces shall be as given in the Table below: - Section 108 (2) Section 108 (2) Section 108 (2) PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2395 Minimum Setback or Open Space Around Buildings Serial Height of Setback all Number building (m) around building (m) I. 10 3 II. 14.99 5 III. 18 6 IV. 21 7 V. 24 8 VI. 27 9 VII. 30 10 VIII. 35 11 IX. 40 12 X. 45 13 XI. 50 14 XII. 55 16 XIII. 70 17 XIV. 120 18 XV. Above 120 20 Notes: (a) In case of industrial buildings (except I.T. buildings), the open spaces around the building shall not be less than 4.5m for height upto 15 m, with an increase of the open spaces of 0.25 m for every increase of 1 m or fraction thereof in height above 15m. However, for industrial plots (including I.T Buildings) upto 2025 sq.m area where width of the plot is less than 30.50 m (100'-0"), the front and rear set back shall be ¼ of the height or 2m whichever is more are mandatory. The side setbacks may be relaxed subject to the condition that the owner has to submit a fire safety certificate from the competent authority in this regard. (b) Where rooms do not derive light and ventilation from the exterior open space, the width of such exterior open space as given above may be reduced by 1 m subject to a minimum of 3m and a maximum of 8m. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2396 (c) In case of Residential Group Housing, if the length or depth of the building exceeds 40 m, add to the above Table ten percent of length or depth of building minus 4.0 m subject to maximum requirement of 20 m. (d) For high rise buildings and special buildings as specified in rule 30(11) (see Part4 Fire and Life Safety' of the National Building Code of India, 2016 as amended from time to time), the approach to the building and open spaces on all sides shall not be less than 6 m. (e) For buildings other than residential plotted or independent floors, industrial plotted or general industrial buildings, or hazardous building, minimum setback from the boundary shall be 6 m or as shown in zoning plan whichever is more. However, for the plots upto 2025 sq.m area where width of the plot is less than 30.50m (100'-0") and the maximum height of building is below 15m excluding the architectural and symbolism element of religious building like dome, minarets, sikharas, crucifix etc. from building height then one side setback may be relaxed subject to the condition that the owner has to submit a fire safety certificate from the competent authority in this regard. However, if the corner plot upto 2025sq.m in size, the side setback adjoining to the side road may be relaxed and shall not be less than 3 m from the boundary subject to the following conditions, namely: (i) Minimum road width of side road shall not less than 9m. (ii) Minimum setback of the building shall be governed as per table above from the centre of the adjoining side road for this side. (iii) This relaxation shall be applicable only for one time for one side and not applicable for front and rear side. (iv) The height of the boundary wall including railing for this side shall not be more than 2m. (v) No objection certificate from Fire Department is required for this relaxation. (f) In Tower like/ recessed building(s) deficiency of setbacks shall be achieved through additional setbacks at upper levels. (2) Setback of projected portion of roof level.- The projected portion of parapet, flues, ducts, water storage tanks, mumties, minarets, domes, water cooling tanks, lift rooms exceeding 2.75 meters in height shall be receded from the facade by a minimum distance equal to their height above roof level, failing which these shall be counted in calculating the height of the building as well as covered area. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2397 (3) Projection and Balcony.- Projections Serial Size of Plot Maximum allowable projection Number (free from ground coverage and floor area ratio) I. Upto 250 sq.mt. Shall not be more than one-third of the corresponding depth of front or rear setback or 0.91 meters (3'-0"), whichever is less. II. Above 250 sq.mt. 1.83 meter (6'-0") Balcony Serial Size of Plot Maximum allowable projection Number (free from ground coverage and floor area ratio) I. Upto 250 sq.mt. Shall not be more than one-third of the corresponding depth of front or rear setback or 1.22 meters (4'-0"), whichever is less. II. Above 250 sq.mt. 1.83 meter (6'-0") Note: (a) The projection on door and window shall not exceed 0.91 meters. (3'-0"). (b) The projection shall not be at a lesser height than 2.06 meters (6'-9") clear above the plinth level of the building. (c) In case of corner plots, sunshade not exceeding 0.60 meters (2 feet) on window opening on to the side shall be permitted at a height not less than 2.06 meters (6'-9). (d) If the projection or balcony is provided more than the provision of above Tables. then the area of the additional projection shall be counted toward Floor Area Ratio. (e) Wrap around continuous balconies shall be allowed as long as their area does not exceed 50 percent of the total open area. (4) Parking.- (i) Parking of vehicles shall be permissible as given below: - (a) Surface Parking. (b) Under stilts of building(s). (c) Under Basement or Multilevel Basement of the building(s): Provided that the provisions of the basement shall be in accordance with sub-rule (5) of rule 30 of these rules. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2398 (d) Under podium of a building(s): The provisions of the podium shall be in accordance with provisions of the National Building Code of India, 2016, as amended from time to time. (e) Under separate multi-level parking block maximum up-to 20 percent of the plot area and such area shall not be counted towards Floor Area Ratio. (ii) Minimum 10 per cent of the total required parking shall be surface parking on ground level. (iii) Upto 20 percent of the total required parking shall be allowed as mechanical parking, except in residential buildings. However, it shall be provided fully automatic in which lower cars do not have to be manually moved out to take out the cars parked in upper stacks. Mechanical parking shall be permitted subject to mechanical and structural safety and should be covered with permanent or temporary roof structure: Provided that to establish the automatic stacks, brochure showing the working of the stacks shall be taken as part of application for the approval of building plans and completion certificate shall be issued only after verifying that the installed stacks parking works accordingly. (iv) Parking in independent floors under stilts shall be permissible beyond stilts within the plot area, if the parking under stilts is not sufficient as per norms. Clear height from the finished level of the ground floor to the under surface of the beam, joint girders or any other horizontal structure member shall be 7’-6”. (v) In case parking is provided under stilts or podium or basement, it shall not be counted towards Floor Area Ratio and height for calculating the setback of the building for light and ventilation only. (vi) Parking spaces shall be paved and clearly marked for different types of vehicles. (vii) In buildings of mercantile (commercial), industrial (except Information Technology Industry) and storage type, in addition to the parking spaces provided, a space at the rate of 3.5 m × 7.5 m, shall be provided for loading and unloading activities, for each 1000 m2 of floor area or fraction thereof. (viii) For the provision of car parking spaces, the space standards shall be as under.- (a) For open parking: 23 square meters per equivalent car space. (b) For ground floor covered parking: 28 square meters per equivalent car space. (c) For basement or podium or multilevel floors: 32 square meter per equivalent car space. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2399 (ix) Vehicular ramp is mandatory in accordance with sub-rule (12) of rule 30 for multilevel parking i.e. stilt or basement or podium, if used for vehicular parking. However, in case of car showrooms or car workshops, car lift may be allowed subject to condition that the plot area is not more than 3000 sq.m. (x) In the case of parking spaces provided in basement(s) or multilevel podium (s)/ floor(s) at least two ramps of width and slope in accordance with sub-rule 30(12) of rule 30 shall be provided, located preferably at opposite ends. (xi) If there is any doubt regarding the category of any building, for the purpose of calculation of parking the decision of the Government shall be final. Parking for the disabled persons shall comply the provisions of the Rights of Persons with Disabilities Act, 2016 (Central Act 49 of 2016), National Building Code of India, 2016 and Harmonised Guidelines and Space Standards for Barrier-Free Built Environment for persons with Disability and Elderly Persons, 2016. (5) Exemptions.- (i) Exemptions from Ground Coverage:- (a) Canopy/ porch maximum upto 100sq.ft, (b) watch and ward cabins upto 100sq.ft along each entry gates; (c) Atrium/atria, escalator/ travellator well, covered sky bridges in high rise buildings, jogging tracks, swimming pools (open to sky), architectural features or elements such as, coffers, louvers, end wall projected upto 900 mm; (d) Pergolas, other sunshade elements, any landscape element; (e) Fire Staircase, fire towers, ramp; (f) Podium(s) or multi-storey podium, stilt, separate parking block, basement if used for parking and the services like sewerage treatment plant, water treatment plant, garbage collection, electrical sub-station, service ducts, (g) Service area block having services such as Diesel Generator (DG) room, Air Conditioning (AC) plant room etc. No habitable rooms are allowed to be made in any of the items above. If they are, then they shall be part of the Ground Coverage. (ii) Exemptions from Floor Area Ratio (FAR): (a) Canopy/projections upto 100 sq.ft.; (b) watch and ward cabins upto 100 sq.ft along each entry gates; (c) Atrium/atria, covered sky bridges or intermittent floors as relief in high rise buildings; (d) Area on habitable floor for providing services like Heating, Ventilation and Air Conditioning (HVAC), Mechanical Electrical and Plumbing (MEP) installations, Janitor rooms, Air Handling Unit (AHU) room, Air Conditioning (AC) plant room, electric installations, Low Tension (LT) panel room, Closed Circuit Television (CCTV) room or any other similar services; PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2400 (e) Architectural features such as coffers, louvers, end wall projected upto 900 mm, pergolas, other sunshade, elements; (f) Any landscape element, podium(s) or multistorey podium or basement or stilts of building(s) if used for parking and services like water tank or water works, sewerage treatment plant, water treatment plant, garbage collection, electrical sub-station, Diesel Generator (DG) room and service ducts, (g) Ramp, fire exit stair cases or fire towers, fire refuse area (as per the National Building Code of India, 2016 as amended from time to time), toilet blocks for visitors or drivers or guards on ground floor only, cupboards upto depth of 0.6m and 1.8m length shall be exempted from Floor Area Ratio. (h) The width of corridors and staircases provided in addition to their minimum required width shall be exempted from floor area ratio: Provided that the area of lift wells, service shaft shall be taken on one floor: Provided further that in multi-storey buildings, service floors shall be allowed after minimum four floors. Maximum of three service floors shall be allowed in a building. The area of service floors shall not be counted towards floor area ratio and maximum height of such floors shall be 2.40m from floor to bottom of the beam. Any habitable rooms made along with any of the items above shall be taken as part of Floor Area Ratio. (iii) Exemptions to projections into open spaces.- Every open space provided either interior or exterior shall be kept free from any erection thereon and shall be open to the sky, except as given below: (a) Cornice, roof or weather shade not more than 0.75 m wide; (b) Sunshades over windows or ventilators or other openings not more than 0.75 m wide; (c) Canopy not to be used as a sit out with clearance of 1.5 m between the plot boundary and the canopy; (d) Projected balcony at higher floors of width not more than 1.83 m; However, these projections into open spaces shall not reduce the minimum required open spaces and hinder the fire tender movement. (iv) Exemption to accessory use buildings.- The following accessory use buildings may be permitted in the open spaces: (a) In an existing building, sanitary block of 2.4 m in height subject to a maximum of 4m2 in the rear open space at a distance of 1.5 m from the rear boundary may be permitted, where facilities are not adequate. (b) Parking lock up garages not exceeding 2.4 m in height shall be permitted in the side or rear open spaces at a distance of 7.5 m from any road line or the front boundary of the plot; PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2401 (c) Suction tank and pump room each up to 2.5 m2 in area. (d) Meter Room (Power supply) or Diesel Generator (DG) set room, Rain water harvesting Pit, Check post, Waste or Garbage collection room, Covered parking for car or motorcycle or cycles, Pump room or Underground tank or Overhead tank, Cooling Towers for Heating, Ventilation and Air Conditioning (HVAC) Plant and Diesel Generator (DG) set, Sewer treatment plant and water treatment plant may be allowed in rear and side setback of the site subject to that they cannot hinder the fire tender movement with minimum 6m setback from the building(s) and the maximum height of these structure shall not more than 2.75m. 27 General Notes.- (i) For projects proposed within the “Special Area” as defined or delineated in the Master Plan or Zonal Plan, the Development regulations of Height, Floor Area Ratio, Ground Coverage and any other building controls stipulated in these rules for general buildings shall be superseded by site-specific Form Based Code prepared and notified by the competent authority under the Punjab Regional and Town Planning and Development Act,1995 and the provision of rule 3 to rule 8 of these rules shall be superseded by relevant Form Based Code or Regulating Plans. (ii) For projects proposed within the Prohibited and Regulated areas as defined in the Ancient Monuments and Archaeological Sites and Remains Act, 2010, the development regulations of Height, Floor Area Ratio, Ground Coverage and any other controls stipulated in these rules for general buildings shall be superseded by site specific Heritage Bye-Laws prepared and notified by the competent authority or the National Monuments Authority under the said Act of 2010. No Objection Certificate shall have to be obtained in accordance with the rules framed under the said Act by submission of required documents as may be necessary vide rules, including “Heritage Impact Assessment” report, if so necessitated by the National Monuments Authority. (iii) The premises for which building regulations have not been formulated shall be examined by the competent authority on the basis of actual requirements and other relevant factors. Activities or uses for which these rules are silent shall be governed by the National Building Code of India, 2016, as amended from time to time and where the National Building Code of India, 2016, as amended from time to time are silent; Norms or Guidelines of Model Building Byelaws, 2016, as amended from time to time shall be followed. (iv) The provision of minimum setbacks for different sizes of plots for all categories of the plots if not specified in these rules shall be in accordance with the provisions of the Zoning Plan of the said site. Section 108 (2) PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2402 (v) The area requirements of each type of educational institutions wherever not specified shall be in accordance with the norms or guidelines issued by the affiliating authority for such institutions. (vi) The Punjab Energy Conservation Building Code notified by the Government of Punjab, Department of New and Renewable Energy vide Notification No. 18/4/16-6;1/1856, dated the 24th June, 2016, as amended from time to time, wherever applicable shall be adhered to the buildings in additions to these rules. (vii) The setting up of the Petrol Pumps, Brick Kiln, Rice Sheller, Stone Crusher, Cinema, Multiplex, Economical Weaker Section Houses, Affordable Housing, Communication Towers, Iconic building, Low Density Country Homes, Housing for All, Ancient Building and any other activity not specifically mentioned in these rules, shall be governed by the relevant respective Acts or rules or notifications or policy guidelines or norms of the Department of Housing and Urban Development, Punjab or any other department concerned, as the case may be. (viii) In addition to these rules, Guidelines or Notifications as amended from time to time issued by the Punjab Pollution Control Board (Department of Science, Technology and Environment, Government. of Punjab) and the Department of Forests and Wildlife Preservation, Punjab shall be applicable, where ever required. (ix) No sub-division of the land or site would be subsequently permitted. (x) The specific approvals shall be obtained from Airport Authority of India, National Highway Authority of India, Ministry of Environment, Forest and Climate Change, Fire Services Department, Pollution Control Board, designated authorities under the Factories Act, 1948 or the Punjab Cinemas (Regulation) Act, 1952, Archaeological Survey of India, Heritage Committee and any such other authority, as may be applicable. Approval of Fire Services Department shall be required for buildings of height 15 m or above and for such other buildings or special buildings referred to in Part 4 – Fire and Life Safety of the National Building Code of India, 2016, as amended from time to time. (xi) In case the height of building or structure is 15 m or more, then ‘No Objection Certificate’ from Airports Authority of India or Indian Air Force is required. Further provided that if, site falls in the red colour of home grid of Colour Coded Zoning Map issued by Airports Authority of India or Indian Air Force, then irrespective height of the building or structure, it is mandatory to get ‘No Objection Certificate’ from Airports Authority of India or India Air Force, as the case may be.” PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2403 PART VI GENERAL BUILDING REQUIREMENTS 28 Occupant Load.- The occupant load of any building shall be calculated as under, namely:- Occupant Load Serial Type of occupancy Occupant load factor (sq.m Number per person) I. Residential 12.50 II. Educational 4.00 III. Institutional Indoor patient area 15.00 Outpatient area 10.00 IV. Assembly: Concentrated use without 0.65 fixed seating Less concentrated use 1.40 without fixed seating Fixed seating Multiplying the number of seats by 1.2 Dining areas and restaurants 1.80 with seating and table V. Mercantile: Street floor and sales 3.00 basement Upper sales floor 6.00 Storage/warehouse, 20.00 receiving and the like VI. Business 10.00 VII. Industrial Calculated on the basis of Detailed VIII. Storage Project Report (DPR) approved by IX. Hazardous labour Department plus 10 percent addition of it. However, if DPR is not approved by the labour Department then applicant shall submit the undertaking in this regard as per annexure 22. Section 108 (2) PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2404 Notes:- (a) Gross area shall be the floor area as defined in clause (lxxviii) of sub-rule (1) of rule 2 of these rules. All factors expressed are in gross area unless marked net. (b) Occupant load in dormitory portions of homes for the aged, orphanages, insane asylums, etc, where sleeping accommodation is provided, shall not be calculated at less than 7.5 m2 gross floor area/ person. (c) For the purpose of public health facilities like W.C., urinal, washbasin, drinking water fountain, ablution tabs etc., occupant load shall be calculated on floor area ratio. 29 Clearance zone for buildings near High Tension Electrical Line.- The building shall not be constructed within the clearance zone. The clearance zone shall be in accordance with the guidelines of Punjab State Power Corporation Limited (PSPCL) and in accordance with the table given below, as amended from time to time: Clearance Zone for buildings near High Tension Electrical Line Type of supply line Type of supply line Horizontal clearance (in meters) (including both sides and from the centre line of the tower) High voltage lines up to 11 KV 11.5 High voltage lines above 11 KV 15.0 and up to 33KV High voltage lines above 33 KV and 18.0 up to 66KV High voltage lines above 66 KV 27.0 and up to 132KV High voltage lines above 132 KV 35.0 and up to 220KV High voltage lines above 220 KV 52.0 and up to 440KV 30 Part Building requirement.-This part sets out the standard space requirements of various parts of a building (for all types of buildings-low/high rise), namely:- Section 108 (2) PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2405 (1) Plinth.- The plinth level for building (s) shall be computed from the crown of the adjoining road in front or as specified by the Competent Authority from time to time. Interior court yard shall be raised at least 150 mm above the determining ground level and shall be satisfactorily drained. (2) Lighting and ventilation of rooms.- (a) If a window is partly fixed, the openable area shall be counted. (b) No portion of a room shall be assumed to be lighted, if it is more than 7.5 m away from the opening assumed for lighting that portion. (c) The area of openings above shall be increased by 25 percent in the case of a kitchen. (d) In bathroom or water closet have a window or ventilator, opening to a shaft or open space, of area not less than 0.3 m2 with side not less than 0.3 m. (e) No room containing water-closets shall be used for any purpose except as a lavatory and no such room shall open directly into any kitchen or cooking space by a door, window or other opening. Every room containing water- closet shall have a door completely closing the entrance to it. (f) Mechanical light and ventilation shall be permissible in accordance with the National Building Code of India, 2016, as amended from time to time. (3) Ledge or Tand. – (i) Height.- The minimum head-room of ledge or Tand or loft shall be 2.2 m. The maximum height of loft shall be 1.5 m. (ii) Size.- A ledge or Tand or loft in a habitable room shall not cover more than 25 percent of the area of the floor on which it is constructed and shall not interfere with the ventilation of the room under any circumstances. (4) Mezzanine Floor.- (i) Height.- It shall have a minimum height of 2.2 m. with no beams or protuberances below 1.8 m. (ii) Size.- The minimum size of the mezzanine floor, if it is to be used as a living room, shall not be less than 9.5 m2. The aggregate area of such mezzanine floor in a building shall in no case exceed one-third the plinth area of the building. Notes:- (a) A mezzanine floor may be permitted over a room or a compartment; (b) It conforms to the standard of living/ habitable rooms as regards lighting and ventilation in case the size of mezzanine floor is 9.5 m2 or more; (c) It is so constructed as not to interfere under any circumstances with the ventilation of the space over and under it; PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2406 (d) Such mezzanine floor is not subdivided into smaller compartments; (e) Such mezzanine floor or any part of it shall not be used as a kitchen; and (f) In no case shall a mezzanine floor be closed so as to make it liable to be converted into unventilated compartments. (5) Basement.- (i) The multi-level basement in plots of an area above 2025 sq.m shall be allowed below the ground and beyond the building line at ground level subject to a clear minimum front margin of 4.5 m and side and rear margins of 3 m, subject to the provision of mechanical ventilation and all safety provisions and drainage. However, it is essential that the basement top slab below the external circulation at ground level should be designed for fire fighting vehicular loads as given in clause 4.6 of Part III of the National Building Code of India, 2016, as amended from time to time. The owner or the applicant, as the case may be, shall be bound to execute indemnity bond in the favour of competent authority as specified in Annexure 21. (ii) In case of plot size upto 2025 sq.m, single story basement is allowed upto zoned area or upto the boundary of the plot except front and rear side, as the case may be, subject to the condition that the owner shall leave minimum 2.44 m (8'-0") setback from the respective side of the boundary wall of the plot, if adjoining plot has a building upto 2.44m from the plot line. (iii) The basement shall not be allowed in the case of No construction Zone or Area or Master Plan Green area or any other restricted area or zone under the provision of any other Act or policy of the State or Central Government. (iv) Other conditions:.- The following are the conditions for the basement, namely:- (a) First level basement area may be used for habitable purposes subject to the condition that mandatory parking norms are fulfilled and compliance of all requirements for fire safety in accordance with Part 4- Fire and Life Safety of the National Building Code of India, 2016, as amended from time to time and necessary measures for required lighting, ventilation and water supply, drainage and sanitation is ensured; (b) The minimum height of basement shall be 2.40 meters measured from the finished level of the floor to the under surface of the beam, joist girders or any other horizontal structural member. However, if basement is used for habitable purpose than the minimum height and space requirement of that area shall be in accordance with these rules; (c) Adequate ventilation shall be provided for the basement. Any deficiency may be met by providing adequate mechanical ventilation in the form of blowers, exhaust fans, air conditioning system and conform to fire safety and structural safety; PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2407 (d) The minimum height of the ceiling of first level basement shall be 0.9 meters and maximum 1.2 meters above the average surrounding ground level, except convenient shopping and residential plots. However, if sunken court is provided for light and ventilation or stilt is provided for parking or then the same shall not be mandatory; (e) Adequate arrangement shall be made that surface drainage does not enter the basement; (f) There shall be provisions of sufficient doors in case the basement is used for habitable purposes and maximum travel distance from any point to the door shall not exceed 15 meters; (g) In case, where the basement is allowed beyond the building envelope in accordance with sub-rule (5), then the level of the basement shall be at the ground floor level and the slabs should be designed to bear the load of fire tenders; (h) The walls and floors of the basement shall be watertight and be so designed that the effects of the surrounding soil and moisture, if any, are taken into account in design and adequate damp proofing treatment is given; (i) The access to the basement shall be separate from the main and alternative staircase providing access and exit from higher floors. Where the staircase is continuous in the case of buildings served by more than one staircase, the same shall be of enclosed type serving as a fire separation from the basement floor and higher floors. Open ramps shall be permitted if they are constructed within the building line subject to the provision of condition (e). (j) In the case of parking spaces provided in basement(s), at least two ramps of width and slope in accordance with sub-rule (12) shall be provided, located preferably at opposite ends. (k) Access to basements through ramps shall be permitted subject to provision of condition (e). The requirements for the ramps shall be in accordance with sub- rule (12) and the National Building Code of India, 2016, as amended from time to time; (l) For all public buildings and uses including group housing, having basement going up to more than one level, access to all levels shall also be provided through lift. The exit requirements in basements shall comply with the provisions of Part 4- Fire and Life Safety of the National Building Code of India, 2016, as amended from time to time: Provided that in case where basement used for habitable purpose shall be counted in Floor Area Ratio. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2408 (6) Chimneys.- The chimneys shall be built at least 0.9 m above flat roofs, provided the top of the chimneys is not below the top of the adjacent parapet wall. In the case of sloping roofs, the chimney top shall not be less than 0.6 m above the ridge of the roof in which the chimney penetrates. (7) Cabin.- The size of cabins shall not be less than 3.0 m2 with a minimum width of 1.0 m. The clear passages within the divided space of any floor shall not be less than 0.75 m and the distance from the farthest space in a cabin to any exit shall not be more than 18.5 m. In case, the sub-divided cabin does not derive direct lighting and ventilation from any open spaces or mechanical means, the maximum height of the cabin shall be 2.2 m. (8) Boundary wall.- (i) In case of corner plot, radius of corner boundary wall shall be minimum 5’-0” or 1/8th of the width of the adjoining road whichever is more and maximum upto 20’-0” excepted residential plot or independent plots in which turning radius shall be 5’-0”. (ii) In industrial buildings like workshops, factories, electric sub-stations, trans former stations and institutional buildings like sanatoria, hospitals, sports complex, stadium, and educational buildings like schools, colleges, including hostels, and other uses of public utility undertakings and strategically sensitive buildings, a height up to 2.4 m may be permitted on special request of the applicant. However, in case of security establishments, Jails, mental hospitals, etc. where additional height of the boundary wall is required by the applicant, the same may be allowed by the competent authority. (iii) Boundary wall may be allowed to be constructed in No Construction Zone after leaving the road widening, if required, subject to the condition that the owner shall dismantle the boundary wall as and when required by any Government agency or authority without any claim. (9) Septic tanks.-Where a septic tank is used for sewage disposal, the location, design and construction of the septic tank shall conform to requirements of Part 9- ‘Plumbing Services (including Solid Waste Management) and Section 2- Drainage and Sanitation’ of the National Building Code of India, 2016. (10) Meter rooms.-For all buildings 15 m and above in height and in special occupancies, like educational, assembly, institutional, industrial, storage, hazardous and mixed occupancies with any of the aforesaid occupancies having area more than 500 m2 on each floor, provision shall be made for an independent and ventilated meter (service) room, as per requirements of electric (service) supply undertakings on the ground floor with direct access from outside for the purpose of termination of electric supply from the licensee’s service and alternative supply cables. The door or doors provided for the service room shall have fire resistance of not less than two hours. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2409 (11) Staircase or exit requirements.- The number of staircases in the building(s) shall be determined on the basis of the occupant load, travel distance, dead end restriction subject to minimum two staircases in respect of buildings identified under these rules: Provided that where the travel distance and other requirements are complied with, one shall be a fire exit staircase out of two staircases. The following Building(s) shall have minimum of two staircases: (i) Building(s) of 15m in height or above, and (ii) Special buildings, such as, (a) hotel, educational, institutional, business, mercantile, industrial, storage, hazardous and mixed occupancies, where any of these buildings have floor area more than 500 m2 on any one or more floors; (b) educational buildings having height 9 m and above; (c) institutional buildings having height 9 m and above; (d) all assembly buildings; (e) buildings having area more than 300 sq.m of incidental assembly occupancy on any floor; and (f) buildings with two basements or more, or with one basement of area more than 500 m2. (iii) All exit staircases shall discharge, at the level of exit discharge, to the exist discharge, either, (a) directly, or (b) through an exit passageway, or (c) through a large lobby. At least 50 percent of the staircases shall discharge as per (a) and/or (b) above. (12) Ramps.- Ramp requirement for vehicular movement.- (a) Open Ramps with minimum width of 6m may also be provided in the setbacks which can be sloped considering unhindered movement of fire engine and in no case, the gradient shall be less than 1:10. (b) The ramp to basement and parking floors shall not be less than 7.2 m wide for two way traffic and 4 m wide for one way traffic, provided with gradient of 1:8 for cars and 1:15 for heavy vehicles. At curved portions of the ramp or for circular ramps, the slope should not be more than 1:12. (c) After a 40 m length of continuous ramp, a flat surface of minimum 6.0 m length shall be provided. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2410 (d) All and structural design or safety aspects as per latest Bureau of Indian Standard Codes and the National Building Code of India, 2016 shall be complied along with consideration of weight of Fire Engine and its maneuverings. (13) Exit Requirements.- In respect of width and travel distance, all aspects of exit requirements for corridors, doors, staircases, ramps shall be as per Part 4- Fire and Life Safety of the National Building Code of India, 2016. (14) Roofs.- (i) The roof of a building shall be so designed and constructed as to effectively drain water by means of sufficient rain water pipes of size as specified in the National Building Code of India, 2016, as amended from time to time wherever required, so arranged, jointed and fixed as to ensure that the rain water is carried away from the building without causing dampness in any part of the walls, roof or foundations of the building or an adjacent building. (ii) The rain water pipes shall be connected to a drain or a sewer which connects the rain-water pipe to the road gutter or in any other approved manner. (iii) The rain-water pipes shall be affixed to the outside of the external walls of the building or in recesses or chases cut or formed in such external walls or in such other manner as may be approved by the Authority. (iv) It is desirable to conserve rain water using suitable rain water harvesting techniques including by roof water collection. For this purpose, the provisions made in Part 9- Plumbing Services (including Solid Waste Management), Section 2 Drainage and Sanitation of the National Building Code of India, 2016 shall be followed. (15) Sunken courtyard.- Sunken courtyard up to 3 m in depth from the ground level and minimum 2 m width and minimum 10 sq.m. area as ‘light well’ within zoned area shall be permitted for light and ventilation for basement area provided that it does not interfere with the movement of fire tenders and adequate arrangements for drainage shall be provided. However, for plot size upto 2025 sq.m area, sunken courtyard may be allowed upto the boundary wall of the plot in rear courtyard subject to the fulfillment of parking and fire tender movement as required. (16) Fitments for drainage and sanitation.- (i) For Residences.- Dwelling with individual convenience shall have at least the following fitments, namely:- (a) one bath room provided with a tap and a floor trap; (b) one water closet with flushing apparatus with an ablution tap or health faucet; and (c) one tap with a floor trap or a sink in kitchen. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2411 (ii) The requirements for fitments for drainage and sanitation in the case of buildings other than residences shall be in accordance with Tables as below. Office Building Serial Fixtures Public Toilets Staff Toilets Num- Male Female Male Female ber Executive Rooms and Conference Halls in Office Buildings I. Toilet suite comprising one Unit could be For individual Water Closets (WC), one common for officer rooms wash basin (with optional male/female shower stall if building is or separate used round the clock at depending on user's option) the number of Pantry optional as per user of each user requirement facility Main Office Toilets for Staff and Visitors II. Water Closets (WC) 1 per 25 1 per 15 III. Ablution tab with each water 1 in each water closet closet IV. Urinals Nil up to 6 - see see 1 for 7 to 20 note note 2 for 21 to 45 3 for 46 to 70 4 for 71 to 100 From 101 to 200, add @ 3 percent ; for over 200, add @ 2.5 percent V. Wash Basins 25 25 VI. Drinking Water Fountain 1 per 100 persons VII. Cleaner's sink 1 per floor Note:- Staff and public toilet utilities are generally common in office buildings. Where public toilets are to be provided separately, similar requirements as that of staff toilet may be provided. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2412 Cinema, Multiplex Cinema, Concert and Convention Halls, Theatres and Stadia Serial Fixtures Public Toilets Staff Toilets Num- Male Female Male Female ber I. Water Closets 1 per 100 3 per 100 1 for up 1 for up up to 400; up to 200; to 15 to 12 Over 400 Over 200 2 for 16 2 for 13 add at 1 add at 2 to 35 to 25 per 250 per 100 or part or part thereof thereof II. Ablution tab 1 in each water closet 1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water closets and urinals III. Urinals 1 per 25 - 1 for 1 to 20 - or part 2 for 21 to thereof 45 IV. Wash Basins 1 per 200 or part 1 for upto 1 for upto thereof 15 12 2 for 16 2 for 13 to to 35 25 V. Drinking Water 1 per 100 Fountain VI. Cleaner's sink 1 per floor VII. Showers/bathing As per trade equirements rooms Notes :- (a) Some Water Closets (WC) may be Indian style, if desired. (b) Male population may be assumed as two-third and female population as one-third. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2413 Art Galleries, Libraries and Museums Serial Fixtures Public Toilets Staff Toilets Num- Male Female Male Female ber I. Water Closets 1 per 200 1 per 100 1 for up 1 for up up to 400; up to 200; to 15 to 12 Over 400 Over 200 2 for 16 2 for 13 add at 1 add at 1 to 35 to 25 per 250 per 150 or part or part thereof thereof II. Ablution tab 1 in each water closet 1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water closets and urinals III. Urinals 1 per 25 - 1 for 1 to 20 - or part 2 for 21 thereof to 45 IV. Wash Basins 1 per 200 1 per 100 1 for 1 for up to 400; up to 200; upto 15 upto 12 Over 400 Over 200 2 for 16 2 for 13 add at 1 add at 1 to 35 to 25 per 250 per 150 or part or part thereof thereof V. Drinking Water 1 per 100 Fountain VI. Cleaner's sink 1 per floor VII. Showers/bathing As per trade requirements rooms Notes :- (a) Some Water Closets (WC) may be Indian style, if desired. (b) Male population may be assumed as two-third and female population as one-third. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2414 Restaurants Serial Fixtures Public Toilets Staff Toilets Num- Male Female Male Female ber I. Water Closets 1 per 50 2 per 50 1 for up to 1 for up seats up to seats up to 15 to 12 200; Over 200; Over 2 for 16 to 2 for 13 200 add 200 add 35 to 25 at 1per at 1 per 3 for 36 to 3 for 26 100 or part 100 or part 65 to 40 thereof thereof 4 for 66 to 4 for 41 to 57 to 100 5 for 58 to 77 6 for 78 to 100 II. Ablution tab 1 in each water closet 1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water closets and urinals III. Urinals 1 per 50 - 1 for 1 - persons to 20 or part 2 for 21 thereof to 45 3 for 46 to 65 4 for 66 to 100 IV. Wash Basins 1 per 1 per 1 per 1 per Water Water Water Water Closets Closets Closets Closets (WC) (WC) (WC) (WC) V. Cleaner's sink 1 per restaurant VI. Kitchen sink/ 1 per kitchen dish washer Notes :- (a) Some Water Closets (WC) may be Indian style, if desired. (b) Male population may be assumed as two-third and female population as one-third. (c) Provision for additional and special fittings where required shall be made. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2415 Shopping Malls and Retail Buildings Serial Fixtures Public Toilets for Staff Toilets in Number floating population Shopping Building Male Female Male Female I. Water Closets 1 per 50 1 per 50 1 for up to 15 1 for up to 12 (min. 2) (min. 2) 2 for 16 to 35 2 for 13 to 25 3 for 36 to 65 3 for 26 to 40 4 for 66 to 100 4 for 41 to 57 5 for 58 to 77 6 for 78 to 100 II. Ablution tab 1 in each water closet III. Urinals 1 per 50 - 1 for 1 to 20 - 2 for 21 to 45 3 for 46 to 65 4 for 66 to 100 IV. Wash Basins 1 per 1 per 1 per 1 per Water Water Water Water Closets Closets Closets Closets (WC) (WC) (WC) (WC) V. Cleaner's sink 1 per floor VI. Bath/showers 1 per 100 persons Notes :- (a) Toilet facilities for individual facilities in a shopping building should be taken same as that for office buildings. (b) Staff toilets in the shopping buildings provide facilities for persons working in shops and building, as well as for maintenance staff. (c) The number of persons against the fixture bath/showers represent the maintenance staff requiring such facility. (d) Public toilet facilities are provided for a large floating population for buyers and visitors. (e) Some Water Closets (WC) may be Indian style, if desired. (f) Male population may be assumed as two-third and female population as one-third. (g) Provision for additional and special fittings where required shall be made. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2416 Hotel Serial Fixtures Public Room Non Residential Staff Number Male Female Male Female I. Toilet suite Individual guest rooms - comprising one with attached toilets Water Closets (WC), wash basin with shower or a bath tub Guest room with common facilities II. Water Closets 1 per 100 1 per 100 1 for up 1 for up to 12 persons up persons to 15 2 for 13 to 25 to 400; up to 200; 2 for 16 3 for 26 to 40 over 400 over 200 to 35 4 for 41 to 57 add at 1 add at 1 3 for 36 5 for 58 to 77 per 250 per 100 to 65 6 for 78 to or part or part 4 for 66 100 thereof thereof to 100 III. Ablution tab 1 in each water closet 1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water closets and urinals IV. Urinals 1 per 50 - 1 for 1 - person or to 20 part 2 for 21 thereof to 45 3 for 46 to 65 4 for 66 to 100 V. Wash Basins 1 per 1 per 1 for up 1 for up Water Water to 15 to 12 Closets Closets 2 for 16 2 for 13 (WC) (WC) to 35 to 25 3 for 36 3 for 26 to 65 to 40 4 for 66 4 for 41 to 100 to 57 PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2417 VI. Bath (showers) 1 per 10 person or part thereof VII. Cleaner's sink 1 per 30 rooms, minimum 1 per floor VIII. Kitchen sink 1 per kitchen Notes :- (a) Some Water Closets (WC) may be Indian style, if desired. (b) Male population may be assumed as two-third and female population as one-third. (c) Provision for additional and special fittings where required shall be made. Hospital with indoor patient ward Serial Fixtures Patient Toilets Staff Toilets Number Male Female Male Female I. Toilet suite Private room with For individual doctor's / comprising one up to 4 patient officer's rooms Water Closets (WC), one wash basin and shower stall For General wards, Hospital staff and visitors II. Water Closets 1 per 5 Beds or part 1 for up 1 for up thereof to 15 to 12 2 for 16 2 for 13 to 35 to 25 III. Ablution tab 1 in each water closet 1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water closets and urinals IV. Urinals 1 per 15 - 1 for 1 to 20 - beds 2 for 21 to 45 V. Wash Basins 2 for every 30 beds or 1 for up 1 for up part thereof. Add 1 per to 15 to 12 additional 30 beds or 2 for 16 2 for 13 part thereof to 35 to 25 Serial Fixtures Patient Toilets Staff Toilets Number Male Female Male Female PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2418 VI. Drinking Water 1 per Ward 1 per 100 person or Fountain part thereof VII. Cleaner's sink 1 per Ward - VIII. Bed pan sink 1 per Ward - IX. Kitchen sink 1 per Ward - Notes :- (a) Some Water Closets (WC) may be Indian style, if desired. (b) Male population may be assumed as two-third and female population as one-third. (c) Provision for additional and special fittings where required shall be made (d) Drinking water fountain are not recommended for hospitals for reasons of infection control. This is to be decided by the health authority recommendations. Hospital with Outdoor Patient Department Serial Fixtures Patient Toilets Staff Toilets Number Male Female Male Female I. Toilet suite For up to 4 patient For individual doctor's / comprising one officer's rooms Water Closets (WC) and one wash basin (with optional shower stall if building used for 24 h) II. Water Closets 1 per 100 2 per 100 1 for up 1 for up persons persons to 15 to 12 or part or part 2 for 16 2 for 13 thereof thereof to 35 to 25 III. Ablution tab 1 in each water closet 1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water closets and urinals IV. Urinals 1 per 50 - 1 for 1 - persons to 20 or part 2 for 21 thereof to 45 Serial Fixtures Patient Toilets Staff Toilets Number Male Female Male Female PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2419 V. Wash Basins 2 per 100 persons 1 for up 1 fot up or part thereof to 15 to 12 2 for 16 2 for 13 to 35 to 25 VI. Drinking Water See note (d) 1 per 100 person or Fountain part thereof Notes :- (a) Some Water Closets (WC) may be Indian style, if desired. (b) Male population may be assumed as two-third and female population as one-third. (c) Provision for additional and special hospital fittings where required shall be made. (d) Drinking water fountain are not recommended for hospitals for reasons of infection control. This is to be decided by the health authority recommendations. (e) The Water Closets (WC) shall be provided keeping in view the location of main Out Patient Department (OPD) waiting hall and sub-waiting halls, floor wise, so as to serve the people effectively. The number of patients shall be calculated floor wise. The Out Patient Department (OPD) population shall include patient attendants @ at least 1 per patient. Hospital Administrative Buildings Serial Fixtures Staff Toilets Number Male Female I. Toilet suite comprising one For individual doctor's /officer's Water Closets (WC) and one rooms wash basin (with optional shower stall if building used for 24 h) II. Water Closets 1 per 25 persons 1 per 15 persons or part thereof or part thereof III. Ablution tab 1 in each water closet 1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water closets and urinals Serial Fixtures Patient Toilets Staff Toilets Number Male Female Male Female PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2420 IV. Urinals Nil up to 6 - 1 for 6 to 15 2 for 16 to 50 V. Wash Basin 1 per 25 persons or part thereof VI. Drinking Water Fountain 1 per 100 persons or part thereof (see note c) Notes:- (a) Some Water Closets (WC) may be Indian style, if desired. (b) Male population may be assumed as two-third and female population as one-third. (c) Drinking water fountains to be provided only where there is a separate block and patients will not use it. Factories Serial Fixtures Offices/Visitors Workers Number Male Female Male Female I. Water Closets 1 for up 1 for up 1 for up 1 for up (workers and to 15 to 12 to 15 to 12 staff) 2 for 16 2 for 13 2 for 16 2 for 13 to 35 to 25 to 35 to 25 3 for 36 3 for 26 3 for 36 3 for 26 to 65 to 40 to 65 to 40 4 for 66 4 for 41 4 for 66 4 for 41 to 100 to 57 to 100 to 57 From 101 5 for 58 From 101 5 for 58 to 200, add to 77 to 200, add to 77 @3 percent; 6 for 78 @3 percent; 6 for 78 for over to 100 for over to 100 200, add From 101 200, add From 101 @ 2.5 to 200, @ 2.5 to 200, percent add @ 5 percent add @ 5 percent; percent; for over for over 200, add 200, add @ 4 @ 4 percent percent Serial Fixtures Staff Toilet Number Male Female PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2421 II. Ablution tab 1 in each water closet III. Urinals 1 for 1 - 1 for 1 - to 20 to 20 2 for 21 2 for 21 to 45 to 45 3 for 46 3 for 46 to 70 to 70 4 for 71 4 for 71 to 100 to 100 From 101 From 101 to 200, to 200, add @ 3 add @ 3 percent; percent; for over for over 200, add 200, add @ 2.5 @ 2.5 percent percent IV. Wash Basins 1 per 25 or part thereof (wash basins in rows or troughs and taps spaced 750 mm c/c V. Drinking Water 1 per 100 persons or part thereof with minimum Fountain one on each floor VI. Cleaner's sink 1 on each floor VII. Showers/bathing As per trade requirements rooms VIII. Emergency - - 1 per every shop floor per shower and eye 500 persons wash fountain Notes :- (a) For factories requiring workers to be engaged in dirty and dangerous operations or requiring them to being extremely clean and sanitized conditions, additional and separate (if required so) toilet facilities and if required by applicable Industrial and safety laws and the Factories Act shall be provided in consultation with the user. Serial Fixtures Offices/Visitors Workers Number Male Female Male Female PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2422 (b) Depending on the type of disability of a person and the hazard posed by the type of activities in the factory for a person with disabilities, if a person with disabilities is decided to be engaged for a particular activity, the requirements of accessibility shall be guided by the provisions given in 13 of Part 3 -'Development Control Rules and General Building Requirements of the National Building Code of India, 2016' as amended from time to time. Schools and Educational Institutions Serial Fixtures Nursery Non-Residential Residential Number School Boys Girls Boys Girls I. Water Closets 1 per 15 1 per 40 1 per 25 1 per 8 1 per 6 pupils or pupils or pupils pupils pupils part part or part or part or part thereof thereof thereof thereof thereof II. Ablution tab 1 in each water closet 1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water closets and urinals III. Urinals - 1 per 20 - 1 per 25 - pupils or pupils or part part thereof thereof IV. Wash Basins 1 per 15 1 per 60 1 per 40 1 per 8 1 per 6 pupils or pupils or pupils or pupils or pupils or part part part part part thereof thereof thereof thereof thereof V. Drinking 1 per 50 1 per 50 pupils or 1 per 50 pupils or Water pupils or part thereof part thereof Fountain part thereof VI. Cleaner's sink 1 per each floor VII. Bath or 1 per 40 - 1 per 8 1 per 6 Showers pupils or pupils pupils part or part or part thereof thereof thereof Notes :- (a) Some Water Closets (WC) may be Indian style, if desired. (b) For teaching staff, the schedule of fixtures to be provided shall be the same as in case of office building. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2423 Hostels Serial Fixtures Resident Non-Resident Visitor/ Number Common Room Males Females Males Females Males Females I. Water 1 per 8 1 per 6 1 for 1 for up 1 per 1 per Closets or part or part upto 15 to 12 100 up 100 up thereof thereof 2 for 16 2 for 13 to 400; to 200; to 35 to 25 add add 3 for 36 3 for 26 at 1 at 1 to 65 to 40 per per 4 for 66 4 for 41 250 100 to 100 to 57 5 for 58 to 77 6 for 78 to 100 II. Ablution tab 1 in each water closet 1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water closets and urinals III. Urinals 1 per 25 - 1 for 1 - 1 per - or part to 20 50 thereof 2 for 21 or part to 45 thereof 3 for 46 to 70 4 for 71 to 100 IV. Wash 1 per 8 1 per 6 1 for up 1 for up 1 per 1 per Basins or part or part to 15 to 12 Water Water thereof thereof 2 for 16 2 for 13 Closets Closets to 35 to 25 (WC) (WC) 3 for 36 3 for 26 to 65 to 40 4 for 66 4 for 41 to 100 to 57 5 for 58 to 77 6 for 78 100 PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2424 V. Bath or 1 per 8 1 per 6 - - - - showers or part or part thereof thereof VI. Cleaner's 1 per each floor sink Notes :- (a) Some Water Closets (WC) may be Indian style, if desired. Fruit and Vegetable Markets Serial Fixtures Shop Owners Common toilets public toilet Number in market for floating building population Males Females Males Females Males Females I. Water 1 per 8 or 1 for up 1 for up 1 per 1 per Closets part thereof to 15 to 12 50 50 2 for 16 2 for 13 (min 2) (min 2) to 35 to 25 3 for 36 3 for 26 to 65 to 40 4 for 66 4 for 41 to 100 to 57 5 for 58 to 77 6 for 78 to 100 II. Ablution tab 1 in each water closet 1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water closets and urinals III. Urinals - - 1 for 1 - 1 per - to 20 50 2 for 21 to 45 3 for 46 to 70 4 for 71 to 100 Serial Fixtures Resident Non-Resident Visitor/ Number Common Room Males Females Males Females Males Females PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2425 IV. Wash 1 per 8 or part 1 for up 1 for up - - Basins thereof to 15 to 12 2 for 16 2 for 13 to 35 to 25 3 for 36 3 for 26 to 65 to 40 4 for 66 4 for 41 to 100 to 57 V. Bath or 1 per 8 1 per 6 - - 1 per 1 per showers or part or part 50 50 thereof thereof persons persons Notes :- (a) Toilet facilities for individual buildings in a market should be taken same as that for office buildings. (b) Common toilets in the market buildings provide facilities for persons working in shops and their regular visitors. (c) Special toilet facilities for a large floating population of out-of-town buyers/ sellers, labour, drivers of vehicles for whom special toilet (public toilets). Bus Stations, Airports and Railway Stations Serial Fixtures Junction Terminal Domestic Number Stations, Railway and Intermediate and Bus International Stations and Stations Airports Bus Stations Males Females Males Females Males Females I. Water 3 for 4 for 4 for 5 for for for Closets up to up to up to up to 200: 5 200: 8 1000 1000 1000 1000 for for add 1 add 1 add 1 add 1 400: 9 400: 15 per per per per for for additio- additio- additio- additio- 600:12 600:20 nal nal nal nal for for 1000 1000 1000 1000 800:16 800:26 or part or part or part or part for for thereof thereof thereof thereof 1000: 1000: 18 29 Serial Fixtures Shop Owners Common toilets public toilet Number in market for floating building population Males Females Males Females Males Females PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2426 II. Ablution tab 1 in each water closet 1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water closets and urinals III. Urinals 4 for - 6 for 1 per - to up up to 40 or 1000 1000 part add 1 add 1 thereof per per additio- additio- nal nal 1000 1000 IV. Wash 1 per WC Basins V. Bath or 2 per 1000 or 3 per 1000 or 4 per 1000 or showers part thereof part thereof part thereof VI. Drinking 2 per 1000 or 3 per 1000 or 4 per 1000 or Water part thereof part thereof part thereof Fountain or taps (in common lobby for male/ female) VII. Cleaner's 1 per toilet compartment with 3 WCs sink Notes :- (a) Some Water Closets (WC) may be Indian style, if desired. (b) Male population may be assumed as three-fifth and female population as two-fifth. (c) Separate provision shall be made for staff and workers. Serial Fixtures Junction Terminal Domestic Number Stations, Railway and Intermediate and Bus International Stations and Stations Airports Bus Stations Males Females Males Females Males Females PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2427 PART VII FIRE PROTECTION, STRUCTURAL DESIGN, BUILDING MATERIAL, LIGHTING AND VENTILATION 31 Fire protection.- (1) All requirements of fire protection through classification of buildings based on occupancy, type of construction and other requirements shall be as per Part 4- Fire and Life Safety of the National Building Code of India, 2016. (2) For buildings having more than four storeys in height, non-combustible material shall be used for construction. 32 Structural design.- Structural design of all buildings shall be as per Part 6- Structural Design of the National Building Code of India, 2016. For requirements regarding construction (including management and safety), reference shall be made to Part 7- Construction Management, Practices and Safety of the National Building Code of India, 2016. 33 Lighting and ventilation.- For requirements regarding lighting and ventilation for different uses and occupancies, reference shall be made to Section 1- Lighting and Natural Ventilation of Part 8- Building Services of the National Building Code of India, 2016. 34 Electrical and allied installation.- The electrical installation in the building shall be carried out in conformity with the requirements of the Electricity Act, 2003 and the rules made thereunder, the work of electric installations shall be carried out under the supervision of a person holding a Certificate of Competency issued by the Chief Electrical Inspector, Punjab. For requirements regarding electrical installations in buildings including lightning protection of buildings, reference shall be made to Section 2- Electrical and Allied Installations of Part 8-Building Services of the National Building Code of India, 2016. 35 Building Material.- Building Materials shall be as per Part 5-Building Materials of the National Building Code of India, 2016 and use of glass in buildings shall conform to the relevant provisions of the Bureau of Indian Standard Code or the National Building Code of India, 2016. Section 108 (2) Section 108 (2) Section 108 (2) Section 108 (2) Section 108 (2) PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2428 PART VIII PROVISIONS FOR DIFFERENTLY-ABLED, ELDERLY AND CHILDREN 36 Applicable provisions.- (1) In the case of group housing building, studio apartments building, commercial building, industrial building, educational building, institutional building, public building, office building, assembly buildings or any type of building used for public purpose, provisions contained in Harmonised Guidelines and Space Standards for Barrier-Free Built Environment for persons with Disability and Elderly Persons, 2016 and The Rights of Persons with Disabilities Act, 2016 related to planning, designing and construction of public buildings and guidelines issued thereunder and space standards for Barrier Free Environment as specified under the said Act (as amended from time to time), shall also be complied with. (2) Annexure-B of Part-3 (Anthropometrics and Requirements for Accessibility in Built-Environment for Elders and Persons with Disabilities) of the National Building Code of India, 2016 (as amended from time to time) shall also be applicable for requirements for accessibility in Built-Environment for persons with disability, elderly and children. Section 180 (2) PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2429 PART IX GREEN BUILDINGS AND SUSTAINABILITY PROVISIONS 37 Provisions and applicability. - The approval of building plans shall be subject to the fulfilment of provisions of water conservation and management, energy efficiency, waste management and solar energy utilization as are given in the table below: - (a) Provisions for various plot sizes (Residential uses) Residential plotted Group housing Green Building Provisions Plot Area in Sq.mt. Upto Above Above Above Above As per 250 250 500 1,000 3,000 Govern- upto upto upto ment 500 1,000 3,000 policy Water Rain √ √ √ √ √ Conservation Water and Harvesting Management (by Recharge) Low Water √ Consump- tion Plumbing Fixtures Energy Efficiency and Provisions of notification no. 18/4/16 HG 1/1856 Solar Energy Utilization dated: 24-06-2016 of Department of New and Renewable Energy shall be applicable or as amended from time to time. (b) Provisions for various plot sizes (Non-Residential uses) Green Building Provisions Plot Area in Sq.mt. Upto Above Above Above Above 250 250 500 1,000 3,000 upto upto upto 500 1,000 3,000 Water Rain √ √ √ √ Conservation Water and Harvesting Management (by Recharge) Section 180 (2) PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2430 Low Water √ Consump- tion Plumbing Fixtures Energy Efficiency and Provisions of notification no. 18/4/16 HG 1/1856 Solar Energy Utilization dated: 24-06-2016 of Department of New & Renewable Energy shall be applicable or as amended from time to time. Note:- The √ indicate that the provision is applicable for a plot. 38 Energy efficiency.- The provisions of the Punjab Energy Conservation Building Code shall be applicable to the buildings or areas in accordance with the notification issued by the Government vide No. 18/4/16 HG 1/1856, dated the 24th June 2016, as amended from time to time. (ii) The applicant or owner shall submit a certificate from an architect or Civil Engineer confirming that the building plans conform to the Punjab Energy Conservation Building Code and is duly verified by Punjab Energy Development Agency (PEDA) along with the application approval of building plan. (iii) The completion and occupation certificate of buildings shall be issued by the competent authority only after the applicant or owner shall submit a certificate from an architect or Civil Engineer (who has supervised the construction of building), that building has been constructed in accordance with the provisions of the Punjab Energy Conservation Building Code and is duly verified by Punjab Energy Development Agency. (iv) An incentive of additional Floor Area Ratio of five percent for Three Star or Bronze or Sliver rated building, seven and half percent for Four Star or Gold rated building and ten percent for Five Star or Platinum rated building free of cost with hundred percent exemption of building scrutiny fee shall be permissible Residential plotted Group housing Green Building Provisions Plot Area in Sq.mt. Upto Above Above Above Above As per 250 250 500 1,000 3,000 Govern- upto upto upto ment 500 1,000 3,000 policy Section 108 (2) PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2431 on submission of Green Building Certificate from the following agencies with rating duly verified by rating agencies, namely: - (a) Buildings granted Three Star or Four Star or Five Star rating by Green Rating for Integrated Habitat (GRIHA); or (b) Buildings granted Bronze or Silver or Gold or Platinum rating by Leadership in Energy and Environmental Design (LEED); or (c) Buildings granted Bronze or Silver or Gold or Platinum rating by Indian Green Building Council (IGBC). However, in case the owner or applicant fails to submit maintenance certificate after a period of every three years from the rating agencies (GRIHA/LEED/ IGBC), the defaulter can be penalized equivalent to five times the collector rate of land proportional to the five percent additional Floor Area Ratio availed and Building scrutiny fee shall be recovered along with interest at the rate of twelve percent from the date of the approval of building plans. 39 Provisions for tree plantation in new building sites.- The building plan shall only be approved, if the provision for planting trees of indigenous species is shown on the building plans as given below:- (i) One tree for every 225 sq.m covered area of building(s) shall be planted. While calculating the number of trees, if there is a fraction less than 0.5, it shall be rounded down to the nearest whole digit and if there is a fraction equal to or greater than 0.5, it shall be rounded up to the nearest whole digit. (ii) The occupancy certificate shall only be granted, if the owner has planted the requisite number of trees as per the sanctioned plans. 40 Rainwater harvesting.- The harvesting of rainwater simply involves the collection of water from surfaces on which rain falls, and subsequently storing this water for use. The rainwater collected can be stored for direct use or can be recharged into the underground aquifers. In scientific terms, water harvesting (broadly) refers to collection and storage of rainwater from the rooftops. This also restricts evaporation and seepage into building foundations. A rainwater harvesting system consists of the following: - (a) Roof catchment; (b) Gutters; (c) Down pipes; (d) Rain water/ Storm water drains; Section 108 (2) Section 108 (2) PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2432 (e) Filter Chamber; (f) Storage Tanks/ Pits/ Sumps; and (g) Ground Water recharge structures like pit, trench, tube well or combination of above structure. (1) Rainwater harvesting techniques. – There are two main techniques of rain water harvestings, namely: - (a) Storage of rainwater under surface; and (b) Recharge to ground water. (2) Harvesting provisions in various building categories.- The provision for rain water harvesting is as under: Rainwater harvesting by building types:- Category/ Area of Provisions to be made Other conditions Use Plot Residential Plotted Houses New Above 250 Construction of Rain Water Shall have emphasis on Proposals sq.mt. Harvesting Structure. both storage and reuse. Group Housing New All plot Construction of Rain Water Should indicate the Proposals sizes Harvesting Structure. system of Storm Water Concrete paving to be Drainage, Rain Water avoided and permeable Harvesting Structure and materials are to be used Recharging Well or all open parking spaces. Government and Semi Government Public Buildings and Private Institutions All Proposals Above 250 Shall have Rain Water Shall have emphasis on sq.mt. Harvesting Structure and both storage and reuse. storage Shall have Recharge pits Commercial / Mixed use Buildings All Above 100 Construction of Rain Proposals Sq.mt. Water Harvesting Structure. Should indicate the Soft landscape provisions and system of Storm Water open spaces with Percolation pits. Drainage, Rain Water Common treatment plant to be Harvesting Structure and PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2433 made part of the integrated Recharging Well development, funded by sale Shall have emphasis on of commercial space. both storage and reuse. Industrial All Above 100 Construction of Rain Should indicate the proposals Sq.mt. Water Harvesting Structure. system of Storm Water Soft landscape provisions and Drainage, Rain Water open spaces with Percolation pits. Harvesting Structure and Use of abandoned bore wells for Recharging Well. recharging of ground water. Provision should be made Common treatment plant to be not to inject contaminated made part of the integrated water into recharge development funded by sale structures in industrial of commercial space. areas and care is to be taken to keep such structures away from sewer lines, septic tanks, soak pits, landfill and other sources of contamination. Provided that design and structural specification of rain water harvesting system shall be prepared and certified by an Engineer dealing with civil work. Category/ Area of Provisions to be made Other conditions Use Plot PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2434 41 Sustainable waste management.- (1) Zero waste is a concept of waste management and planning approach that emphasize waste prevention as opposed to end waste management. This means restructuring production and distribution systems, designing and managing products and processes to systematically follow the rule of 3R’s i.e., Reduce, Re-use and Re-cycle, the volume of waste, to conserve and recover all used resources, and therefore, eliminating all discharges to landfills, and prevent air, water and land pollution. (2) Zero waste/ land-fill can be achieved by adopting systematic approach of segregation at source by planning, by collection facilitation and most importantly by creating public awareness. (3) The green waste can be converted into fuel cakes, kitchen waste into manure, construction and demolition waste into bricks, plastic waste into oil, paper, glass and steel back into the same and all residual inert materials can also be converted into bricks. Achieving zero land-fill is more conveniently possible, if :- (a) the collection is made from house to house and some segregation is done at household level; (b) separate wet and dry bins must be provided at the ground level; and (c) the recycling is done at decentralized. (4) For Plot area 500 sq.m and above, the composting of biodegradable waste such as kitchen waste, garden waste etc. is mandatory. They should not be allowed to send their biodegradable waste to landfill. Final product after composting i.e Humus or Black Gold should be used as manure for green area within their complexes or sites. Section 108 (2) PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2435 PART X CONSERVATION OF HERITAGE SITES INCLUDING HERITAGE BUILDINGS, HERITAGE PRECINCTS AND NATURAL FEATURE AREAS 42 Applicable provisions.- The provisions for conservation of heritage sites including heritage buildings, heritage precincts and natural feature areas shall be as per the Model Building Byelaws, 2016 (as amended from time to time) and the provisions in the prohibited and regulated areas as defined in the Ancient Monuments and Archaeological Sites and Remains (Amendment and Validation) Act, 2010 and the site specific Heritage Bye-Laws prepared and notified by the competent authority or the National Monuments Authority under the said Act, shall be applicable. PART XI ENVIRONMENTAL CLEARANCE FOR BUILDING PLAN APPROVAL 43 Integration of environmental conditions for building plan approval.- The competent authority shall adhere to the objective and monitorable environment conditions as given in the policy notified vide notification no. S.O 3999(E), dated the 9th December, 2016 by the Government of India, Ministry of Environment, Forest and Climate Change, as amended from time to time, regarding construction of building as per the size specified in ‘Annexure-14’. Section 108 (2) Section 108 (2) PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2436 PART XII PUBLIC HEALTH: WATER SUPPLY, SEWERAGE AND DRAINAGE 44 WATER SUPPLY.- (1) Application for connection.- Every application for water connection from the main water supply for a private domestic purpose shall be made in Form- 'K' to the competent authority through a registered plumber. (2) Material for water connection.- Every applicant shall procure at his own cost at least a ferrule ISI (Indian Standards Institute) mark, a stop cock ISI (Indian Standards Institute) mark, water meter and surface box, if the water meter and surface box is not supplied by the competent authority, medium size G.I. (Galvanised Iron) pipes and specials to be installed for the ground floor level. (3) Sanction of water connection.- On receipt of the application under sub-rule (1) of rule 44 and subject to the fulfilment of the requirements of these rules, the competent authority may sanction the water connection and direct the applicant to deposit such security and any other charges, as may be determined by the Chief Administrator for getting the water connection. (4) Release of water connection.- (i) After the water connection is sanctioned under rule sub-rule (3) of rule 44, the applicant shall excavate the trench in a safe manner at the place from where connection from the water main has been sanctioned and thereafter supply pipe line shall be drilled and ferrule and connection pipe shall be laid. (ii) No building or premises shall be supplied with water by the competent authority through more than one communication pipe and in the case of multi storeyed flats, separate water connection for each flat will be allowed and its water meter shall be installed at the ground floor. (iii) All works to be carried out by the applicant in connection with the supply or use of water shall be required to be executed by the registered plumber and shall conform to the standard and specifications laid down for such items in the Punjab Public Works Department specification Book 1986 Edition and if no standards or specifications are laid down for any item, it shall be as per standard and specifications of the Indian Standard Institute and if no standard and specifications are laid down by the Indian Standard Institute, then that item shall be as per the Bureau of Indian Standards. (iv) The applicant shall make provision of dual button type flushing cistern in each water closet. (v) Tertiary treated water from nearby Sewerage Treatment Plant shall be supplied to every public, commercial, residential building through separate Section 180 (2) PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2437 connection which shall be utilized for non-potable purposes such as gardening, washing of floors or courtyards, flushing of WC’s (Water Closet) through separate network system to be provided in the building. This provision shall be applicable to newly developed areas after coming into operation of this provision. (5) Notice and certificate of completion of work.- (i) No connection to any public sewer shall be made nor any water borne sanitary installation and drainage work intended to be connected through the connection shall be brought into use, until the applicant, after completion of minimum works, has applied to the competent authority for a certificate, and a certificate has been issued by the competent authority in Form 'H' after satisfying that the sanitary installations and drainage have been satisfactorily completed in compliance with these rules. (ii) If no decision is communicated or taken on the application for a certificate mentioned under sub-rule (5) of rule 44 within a period of 20 days of the receipt of the application to the applicant, the certificate shall be deemed to have been granted. 45 SEWERAGE AND DRAINAGE .- (1) Application for connection with public sewer.- (i) After the grant of the certificate referred to in sub-rule 44(5) of rule 44 or in the event of the certificate having been deemed to have been granted, every person intending to connect a drain or sewer to a public water sewer shall apply in Form- 'L' to the competent authority at least seven days before the date on which connection is required. (ii) The application under sub-rule (i) shall be accompanied by the certificate referred to in sub-rule 44(5) of rule 44 along with a fee, which the Chief Administrator may specify from time to time. (iii) On receipt of the application and subject to the requirements of sub-rule 44(5) of rule 44, the Competent Authority shall accept or reject the application after giving the opportunity of being heard. (iv) In the event of the required connection having been sanctioned, it shall be got connected through a registered plumber. (2) Connection with public sewer.- Every drain or sewer discharging into a public sewer shall join the sewer obliquely in the direction of the flow of the sewer and such a connection shall be made at an existing junction in the sewer or there shall be an intersection manhole before the connection within the boundaries of the site. (3) Material for drain and construction.- The material and methods of construction for drain shall conform to the Punjab Public Works Department Section 108 (2) PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2438 Specification, 1986 Edition and if there are no such specifications laid down for any item, the same should conform to the specifications laid down for such item by the Bureau of Indian Standards or Indian Standards Institute. (4) Drain connection for trade effluent.- Every drain and private sewer intended solely for conveyance of industrial or chemical or other trade effluent shall be constructed of good and sound type of material unaffected by the chemical action of the effluent and shall be laid as provided in the Punjab Public Works Department Specifications or the National Building Code of India 2016 or in accordance with the instructions issued from time to time by the competent authority. (5) Waste water pipes.- A waste water pipe from a bath, sink (not being a slope sink), bidet or lavatory basin and pipe for carrying water directly shall:- (i) not discharge as to cause dampness in the walls or the foundation of a building; and (ii) if it discharges into a drain, be disconnected from the drain by a trapped gully with a suitable grating above the level of the water in the trap. (6) Manholes.- (i) At every change in alignment, gradient or diameter of a drain, there shall be a manhole inspection chamber, and bends and junctions in the drain shall be grouped together in a manhole as far as possible and a maximum distance between manhole and gully chamber shall not exceed six meters. (ii) Where the diameter of a drain is increased the crown of the pipes shall be fixed at the same level and the necessary slopes given in the invert of the manhole chamber, and in exceptional cases, where the required fall is not available, connection may be made upto half the difference in the diameter that is the connecting branch sewer shall be connected with the main sewer in such a manner that full supply level of both the sewers is maintained running half the diameter of both the sewers of drain and the minimum internal size of chamber (between brick faces) shall be as follows:- Provisions for minimum internal size of Chamber I. For depth of 0.80 meter 0.75 x 0.75 meters II. For depth of more than 0.80 meters but 1.2 x 0.90 metres not exceeding 2.1 meters III. For depths of more than 2.1 meters Rectangular chamber with minimum internal dimension of 1.20 x 0.90 meter PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2439 (7) Septic tank.-(i) No septic tank shall be located within thirty meters of any percolation well, water sources or stream used or likely to be used for drinking or domestic purposes or for the manufacture or preparation of any articles of food or drink for human consumption and it shall be readily accessible so as to permit cleaning operations being carried out without interference with the operation of any water borne sanitary installation as a whole. (ii) Every septic tank shall be constructed into two separate compartments so that one compartment when required may be put out of use for cleaning purposes. (iii) The capacity of every compartment of the septic tank shall be two and a half times, the total water allowance for the total number of residents of the building. (iv) Every inlet pipe into a septic tank shall be effectively trapped. (v) The design of septic tank shall be in accordance with the B.I.S. (Bureau of Indian Standards) Code No. IS 2470, Part-I-1968 and IS 2470 (Part-II-1971) Code of practice for design and construction of septic tank. (8) Absorption pits.- (i) In the matter of location, every absorption pit shall conform to the same restrictions as are laid down for a septic tank under sub-rule (7) of this rule. (ii) No absorption pit shall have any outlet into, or means of communication with, any sewer, storm water, drain or surface drain. (iii) The wall of every absorption pit shall be at least 0.50 metre above ground level so as to exclude effectively the entry of storm water into the absorption pit. (iv) The absorption pit shall be constructed in duplicate, so that one pit can be put out of use for cleaning purpose and the capacity of the absorption pit shall be as approved by the competent authority. (v) The other details of the absorption pit should conform to the B.I.S. (Bureau of Indian Standards) Code No. IS 2470(Part I) 1968 Code of Practice for design and construction of septic tanks. (vi) The absorption pits shall be provided with adequate means of access for removing the filtering media and cleaning the same. Note:- For requirements regarding water supply, drainage and sanitation, solid waste management, gas supply shall be made as per Part 9, Plumbing Services of the National Building Code of India, 2016. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2440 PART XIII RISK BASED CLASSIFICATION OF BUILDING PLAN APPROVAL PROPOSALS 46 Risk Based Classification of building proposals.- (1) Hazardous buildings.- These shall include any building or part there of which is used for the storage, handling, manufacture or processing of highly combustible or explosive materials or products which are liable to burn with extreme rapidity and/or which may produce poisonous fumes or explosions for storage, handling, manufacturing or processing which involve highly corrosive, toxic or noxious alkalis, acids or other liquids or chemicals producing flame, fumes and explosive, poisonous, irritant or corrosive gases and for the storage, handling or processing of any material producing explosive mixtures of dust which result in the division of matter into fine particles subject to spontaneous ignition. The examples of buildings in this class are the buildings, which are used for:- (i) storage under pressure of more than 0.1 N/mm2 and in quantities exceeding 70 m3, of acetylene, hydrogen, illuminating and natural gases, ammonia, chlorine, phosgene, sulphur dioxide, carbon dioxide, methyloxide and all gases subject to explosion, fume or toxic hazard, cryogenic gases, etc; (ii) storage and handling of hazardous and highly flammable liquids, liquefiable gases like LPG, rocket propellants, etc; (iii) storage and handling of hazardous and highly flammable or explosive materials (other than liquids); and (iv) manufacture of artificial flowers, synthetic leather, ammunition, explosives and fireworks. Note:- A list of hazardous substances giving quantities, for which or exceeding which owners handling such substances are required to be covered under the Public Liability Insurance Act, 1991, has been notified under the Rules on Emergency Planning, Preparedness and Response for Chemical Accidents by the Government of India, Ministry of Environment and Forests vide Notification No. G.S.R. 347(E), dated the 01st August 1996. (2) Classification of risk based storage building.- The provisions for site inspection of risk based storage building, as per storage material specifications are as per table given below:- Section 108 (2) PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2441 Classification of risk based storage building Category Storage Material Specifications Stacking Designated officer Height (in m) for site Inspection Medium High Category-I Articles such as Carpets, Non 4 6.5 Assistant Town (Low Risk) synthetic/synthetic yarn and fabrics. Planner/Assistant Mechanical and electrical goods Engineer/Senior (dominantly metal parts), Glassware Divisional Engineer and crockery, fiberboards, groceries, metal goods, Papers other than those listed under categories Moderate and High, Powdered and canned foods, Plastic/glass bottles containing non-flammable liquids, etc. Category-II Articles such as Batteries, Baled 3 5.5 District Town (Medium cotton/synthetic fibers, Books, Baled Planner/Executive Risk) cork, Baled waste paper, Cartons Engineer. containing alcohols ( in cans/bottles), Cartons of canned lacquers which dry by solvent evaporation, Chipboard, Cardboard rolls (horizontally Stored), Cereals/Grains/Foodstuff/ Flour/Sugar in sacks, Cellulose/Cellulose pulp, Electrical goods other than those stated in Category low, Flammable liquids in non-combustible containers, Leather goods, Palletized liquor stocks, Plastics (non-foamed, other than cellulose nitrate), Rolled pulp and paper and asphalted paper (Horizontal storage), Veneer sheets, Wooden patterns, Metal/wooden furniture with plastic seats, etc. Category-III Articles such as Bitumen/Wax coated 2 4.5 Senior Town (High Risk) paper, Candles, Carbon black, Card Planner/Senior board rolls (vertically stored), Charcoal, Engineer. Coal, cellulose nitrate, Foamed plastic PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2442 and foam rubber products, Flammable liquids in combustible containers, Linoleum products, Matches, Plastics other than those stated in Category Moderate, Rolled pulp and paper and asphalted paper (vertical storage), Rubber goods including tyres and tubes, Sawn timber, Ventilated wood stacks, Waxed and asphalt coated papers and containers in cartons, Wood wool, wooden pallets and flats (idle), Ail materials having wrappings or pre-formed containers of foamed plastics, etc. Category-IV Off cuts and random pieces of 1.25 3.5 Senior Town (Extreme foamed plastic or rubber rolls of Planner/Senior High Risk) sheets of foamed plastic or Engineer. foamed rubber, Foam mattress, Expanded polystyrene packaging, Foam upholstery, etc Notes:- (a) The deflector of the sprinkler fitted in the ceiling shall be at more than 1.5 m from the goods stored below. However, in case of jute storage, no jute stock shall reach within 2 m of the deflectors of the sprinkler heads. (b) In case of storage in racks or shelves, if the height of storage is more than what is specified, intermediate sprinklers shall be provided for each shelf/ rack in addition to the ceiling sprinklers and overall design density and Assumed Maximum Area of Operation shall be maintained as per Table of IS: 15105. (c) The aisle width between the storage stacks shall not be less than 2.5 m and the maximum area of each storage stack shall not be more than 150m2. If these parameters are exceeded, the design density applicable shall be loaded by 2.5 L/min/m2. (d) In case of mixed storage (both moderate and high hazard storage) in buildings, the parameters will be governed by the most hazardous occupancy. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2443 (e) Goods stored not higher than what is stated above table for the appropriate category or not higher than the eaves height of the roofs or within 1 m of a flat ceiling whichever is the lowest shall be regarded as moderate hazard storage. If the above conditions are not met, the risk shall be regarded as high hazard storage. (f) Any new use which increases the number of occupants to a figure comparable with other classes of occupancy shall change the classification of the building to that of the new use (for example, Warehouse used for office purposes). (g) Warehouse buildings shall not include any article which is highly combustible or explosive materials or products which are liable to bum with extreme rapidity and or which may produce poisonous fumes or explosions for storage, handling and which involve highly corrosive, toxic or noxious alkalis, acids or other liquids or chemicals producing flame, fumes and explosive, poisonous, irritant or corrosive gases; and for the storage, handling of any material producing ex-plosive mixtures of dust which result in the division of matter in to fine particles subject to spontaneous ignition as such buildings fall in Hazardous Building Category. (3) Classification of risk based industrial building.- The provisions for site inspection of risk based industrial building(s) are as per table given below:- Classification of risk based industrial building Category Nature of risk Designated officer for site Inspection Low risk This subdivision shall include any building in which the Assistant Town contents are of such comparative low combustibility and the Planner/ industrial processes or operations conducted therein are of Assistant such a nature that there is hardly any possibility for any Engineer/ Senior self- propagating fire to occur and the only consequent Divisional danger to life and property may arise from panic, fumes or Engineer smoke, or fire from some external source. Medium This subdivision shall include any building in which the District Town risk contents or industrial processes or operations conducted Planner/ therein are liable to give rise to a fire which will burn with Executive moderate rapidity or result in other hazardous situation and Engineer. may give off a considerable volume of smoke, but from which neither toxic fumes nor explosions are to be feared in the event of fire. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2444 High risk This subdivision shall include any building in which the Senior Town contents or industrial processes or operations conducted Planner/Senior therein are liable to give rise to a fire which will burn with Engineer. extreme rapidity or result in other hazardous situation or from which poisonous fumes or explosions are to be feared in the event of a fire. Hazard of occupancy shall be determined by the competent authority on the basis of the fire loads of the contents, and the processes or operations conducted in the building, provided, however, that where the combustibility of the material, the flame spread rating of the interior finish or other features of the building or structure are such as to involve a hazard greater than the occupancy hazard, the greater degree of hazard shall govern the classification. (a) For determination of fire loads and fire load density for arriving at the classification of occupancy hazard, guidance on calorific values of some common materials is given at Annexure ‘A’ of Part IV of the National Building Code of India, 2016. (b) A broad classification of industrial occupancies into low, moderate and high hazard classes is given at Annexure ‘B’ of Part IV of the National Building Code of India, 2016. (4) Classification of risk based on nature of occupancy in building.- The provisions for site inspection of risk based on nature of occupancy in building(s) are as per the table given below:- Classification of risk based on nature of occupancy in building Category Nature of occupancy Designated officer for site Inspection Low risk • Residential (excluding rental housing) and commercial Assistant Town like shops, booths, sco's building and office below Planner/ 15m height, Assistant • Creche and Pre Nursery/ Nursery School Engineer/Senior Divisional Engineer Category Nature of risk Designated officer for site Inspection PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2445 Medium • Residential and commercial like shops, booths, sco's District Town risk building and office 15m and above but below 30m Planner/ • Educational building, Nursing Homes, Clinics, laboratory, Executive below 15m Engineer. • Orphanage Home , Old Age Home, Children's Centre/Care Centre / School / Institute for Mentally challenged or Physically Handicapped Person below 15m • Hotel/ Motels, Guest House, Lodging & Boarding/Service Apartments below 15m • Restaurant/ Dabha seating capacity below 50 persons • recreational, sports complex (low rise) • rental housing below 15m High risk • Assembly building like Religious, cinemas, multiplex, Senior Town miniplex, concert hall, exhibition hall, convention centre, Planner/Senior marriage palace, stadium, community centre, club, Engineer. Religious Building, Auditorium, Museum, Gymnasium etc. • Residential and commercial like shops, booths, sco's building and office 30m and above • Educational building, Nursing Homes, Clinics, laboratory, 15m and above • Orphanage Home , Old Age Home, Children's Centre/Care Centre School/Institute for Mentally challenged or Physically Handicapped Person 15m and above • Commercials such as Shopping Mall/Shopping Complex • Restaurant/ Dabha seating capacity 50 persons and above • Hospital • Wholesale Trade/ Ware House/ Integrated Freight complex (Standalone) • rental housing 15m and above Note: - Inspection of the risk-based buildings site at the time of approval of building plan shall be carried out as mentioned in tables below:- (i) where the date of issuance of change of land use is within three months from the date of application for approval of building plans Category Nature of occupancy Designated officer for site Inspection PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2446 Serial Nature of Inspection of Remarks Number risk site I. Low risk Not Since the site has already been inspected at the II. Medium applicable time of approval of Change of Land Use and the risk application for approval of building plans has been III. High risk submitted with in the period of three months. Hence re-inspection of the site may not be required after such a short period of time (ii) where the date of issuance of change of land use exceeds a period of three months Serial Nature of risk percent of random inspection Remarks Number I. Low risk 25 - II. Medium risk 50 III. High risk 100 Provided that at the time of issuance of completion and occupation certificate, 100 percent inspection of all categories of buildings shall be carried out. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2447 PART XIV REGISTRATION OF PLUMBERS 47 Registration of Plumbers.- A plumber who is holding any of the qualifications specified in the Annexure 20 and desirous of registration with the Authorized Officer, shall make an application in Form ‘M’ along with such fee as is determined by the Chief Administrator as a registration fee for a period of five years. 48 Grant of registration.- If an application made under rule 47 is found in order, the Authorized Officer may grant registration and issue a Registration Certificate in Form-N to the applicant for registering him as Plumber. 49 Renewal of registration.- A Registration Certificate issued under rule 48 shall be renewable for a period of five years on the payment of such renewal fee as is determined by the Chief Administrator. 50 Cancellation of registration certificate.- A registration certificate granted under rule 48 or renewed under rule 49, shall be liable to be cancelled by the Authorized Officer, if the holder thereof contravenes any of the provisions of the Act or the rules or regulations made thereunder or any direction issued thereunder by the Competent Authority: Provided that before cancelling the registration certificate, reasonable opportunity of being heard shall be afforded to the holder of the registration certificate. Section 108 (2) Section 108 (2) Section 108 (2) Section 108 (2) PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2448 PART XV MISCELLANEOUS 51 Relaxation.- The Government may relax any of the provisions of these rules, for reasons to be recorded in writing, in respect of any class or category of cases. 52 Matters not covered under these rules.- In respect of the matters which are not directly or indirectly covered under these rules, the competent authority shall be guided by the provisions of the National Building Code of India, 2016, as amended from time to time. 53 Repeal and saving.- The Punjab Urban Planning and Development Building Rules, 2018 are hereby repealed: Provided that any order issued or any action taken under the provisions of the rules so repealed, shall be deemed to have been issued or action taken under the corresponding provisions of these rules. Section 108 (2) Section 108 (2) Section 108 (2) PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2449 Annexure 1 FORM-‘A’ [see rule 11]

Previous and next

All provisions of The Punjab Urban Planning and Development Building Rules, 2021

Questions people ask

Is rule 19 of the Punjab Urban Planning and Development Building Rules, 2021 still in force?

No repeal of the Punjab Urban Planning and Development Building Rules, 2021 is recorded.