LawGrids logoLAWGRIDS.ORG

Form 3 (B), THE UTTAR PRADESH GROUND WATER (MANAGEMENT AND REGULATION RULES, 2020: Form 3 (B)

THE UTTAR PRADESH GROUND WATER (MANAGEMENT AND REGULATION RULES, 2020 - Form 3 (B)

Text of form 3 (B)

Form 3 (B)

Form 3 (B) (Commercial or Industrial or Infrastructural or Bulk user having N.O.C. issued by Central Ground Water Authority or by Ground Water Department) [See Rule 8(2)] (EMBLEMORHOLOGRAMOFTHE DISTRICT GROUND WATER MANAGEMENT COUNCIL) CERTIFICATE OF REGISTRATION OF EXISTING/NEW WELL {UIS10(1)oftheUttar Pradesh Ground Water Management and Regulation Act, 2019} REGISTRATION NO... 1. (a) Nameoftheownerapplicant : Shri/Smt. ………. (b) SonIDaughterof: (c) Addressoftheapplicant: (e) Application FormSerialNo. anddateofsubmission: (f) Specimensignature: 2. Locationparticulars: (a) District: (b) Block: .. .. (c) . PlotNo.: (c) Municipality ICorporation, WardNo./: 3.Particularoftheexistingwellandpumpingdevice: (a) DateofconstructionIsinkingofthewell (b) Type ofthewell: (c)Depthofthewell(m): (d) Purposeofthewell: (e) Assembly size (for tube well) : (f) Strainerposition(for tubewell) (g) Diameter(fordugwell): (h) Typeofpumpused (i) H.P.ofthepump: (j) ... Operationaldevice (k) Rateofwithdrawal (m3/ hr.): (I) Dateofenergization(incaseofelectricpump): Thiscertificateofregistrationisissued onthebasis oftheinformation furnishedbytheapplicantsubjecttotheconditionsstatedoverleaf. Place: Date: Yoursfaithfully, Signatureoftheissuingauthority andDesignation 51 CONDITIONS (1) For the purpose of measuring and recording the quantity of ground water extracted, every said user shall affix water meters, which record rate and quantum of extraction, at outlet of pumping devices and it shall be presumed that the quantity recorded by the meter has been extracted by the said user, until the contrary is proved. Therateofextractionofgroundwaterfromthewellasshowninitem3(k) shallnotexceed to the recorded rate from water meters. (2) The District Ground Water Management Council reserves the right to stop extraction of ground water from the well due to quality hazards or any other reasons, if the situation so demands. (3) Incase of anychange of ownership of the existing well, fresh registrationhastobeobtained. (4) Nochangeoflocation,design,rateofwithdrawalandpumpingdevice inrespectoftheexisting wellasindicated atSI.(2)and(3)ofthis certificate shallbemadewithout priorpermission oftheDistrict Ground Water Management Council.Anydeviationinthisregardshallleadtocancellationofthis registration. (5) Incase, anyoftheparticulars Iinformationfurnishedbytheapplicant inhisapplicationforissuanceofthisregistrationisfoundtobeincorrect duringverification atanysubsequent stage,thisregistration isliable forcancellation. (6) Construction of piezometers and installation of digital water level recorders with telemetry shall be mandatory for user. Depth and zone tapped of piezometer should be commensurate with that of the pumping well. The data, obtained from digital water level recorders shall be made available to this office on monthly basis. (7) Guidelines for Installation of Piezometers and their Monitoring Piezometer is a borewell /tubewell used only for measuring the water level by lowering the tape/ sounder or automatic water level measuring equipment. It is also used to take water sample for water quality testing whenever needed. General guidelines for installation of piezometers are as follows:  The piezometer is to be installed/constructed at the minimum of 50 m distance from the pumping well through which ground water is being withdrawn. The diameter of the piezometer should be about 4” to 6”.  The depth of the piezometer should be same as is case of the pumping well from which ground water is being abstracted. If, more than one piezometers are installed the second piezometer should monitor the shallow ground water regime. It will facilitate shallow as well as deeper ground water aquifer monitoring.  The measuring frequency should be monthly and accuracy of measurement should be up to cm. the reported measurement should be given in meter upto two decimal.  For measurement of water level sounder or automatic water level recorder (AWLR)/ Digital Automatic water level recorder (DWLR) with telemetry system should be used for accuracy. 52  The measurement of water level in piezometer should be taken, only after the pumping from the surrounding tube wells has been stopped for about four to six hours.  All the details regarding coordinates, reduced level (with respect to mean level), depth, zone taped and assembly lowered should be provided for bringing the piezometer into the Hydrograph Monitoring System for Ground Water Department, Uttar Pradesh, and for its validation.  The ground water quality has to be monitored twice in a year during pre-monsoon (May/June) and post-monsoon (October/November) periods. Quality may be got analyzed from NABL approved lab. Besides, one sample (1 lt capacity bottle) to the concerned Director, Ground Water Department, Uttar Pradesh, for chemical analysis.  A Permanent display board should be installed at piezometer/Tube wells site for providing the location, piezometer/ tube well number, depth and zone tapped of piezometer/tube well for standard referencing and identification.  Any other site specific requirement regarding safety and access for measurement may be taken care off. (8) Anyother condition(s)thatmaybeimposedbytheDistrict Ground Water Management Council. OFFICE SEAL 53

Previous and next

All provisions of THE UTTAR PRADESH GROUND WATER (MANAGEMENT AND REGULATION RULES, 2020

Questions people ask

Is form 3 (B) of THE UTTAR PRADESH GROUND WATER (MANAGEMENT AND REGULATION RULES, 2020 still in force?

No repeal of the UTTAR PRADESH GROUND WATER (MANAGEMENT AND REGULATION RULES, 2020 is recorded.