Form 3 (A), THE UTTAR PRADESH GROUND WATER (MANAGEMENT AND REGULATION RULES, 2020: Form 3 (A)
THE UTTAR PRADESH GROUND WATER (MANAGEMENT AND REGULATION RULES, 2020 - Form 3 (A)
Text of form 3 (A)
Form 3 (A)
Form 3 (A)
(Commercial or Industrial or Infrastructural or bulk user)
[See Rule 8(1)]
(EMBLEMORHOLOGRAMOFTHE
DISTRICT GROUND WATER MANAGEMENT COUNCIL)
CERTIFICATE OF REGISTRATION OF EXISTING/NEW WELL
{UIS10(1)oftheUttar Pradesh Ground Water Management and Regulation Act, 2019}
REGISTRATION NO...
1. (a) Nameoftheownerapplicant : Shri/Smt. ……….
(b) SonIDaughterof:
(c) Addressoftheapplicant:
(e) Application FormSerialNo. anddateofsubmission:
(f) Specimensignature:
2. Locationparticulars:
(a) District:
(b) Block:
.. .. (c) . PlotNo.:
(c) Municipality ICorporation, WardNo./:
3.Particularoftheexistingwellandpumpingdevice:
(a) DateofconstructionIsinkingofthewell
(b) Type ofthewell:
(c)Depthofthewell(m):
(d) Purposeofthewell:
(e) Assembly size (for tube well) :
(f) Strainerposition(for tubewell)
(g) Diameter(fordugwell):
(h) Typeofpumpused
(i) H.P.ofthepump:
(j) ... Operationaldevice
(k) Rateofwithdrawal (m3/ hr.):
(I) Dateofenergization(incaseofelectricpump):
Thiscertificateofregistrationisissued onthebasis oftheinformation
furnishedbytheapplicantsubjecttotheconditionsstatedoverleaf.
Place:
Date:
Yoursfaithfully,
Signatureoftheissuingauthority
48
andDesignation
CONDITIONS
(1) For the purpose of measuring and recording the quantity of ground water extracted,
every said user shall affix water meters, which record rate and quantum of extraction,
at outlet of pumping devices and it shall be presumed that the quantity recorded by the
meter has been extracted by the said user, until the contrary is proved.
Therateofextractionofgroundwaterfromthewellasshowninitem3(k) shallnotexceed to the
recorded rate from water meters.
(2) The District Ground Water Management Council reserves the right to stop
extraction of ground water from the well due to quality hazards or any other reasons, if
the situation so demands.
(3) Incase of anychange of ownership of the existing well, fresh
registrationhastobeobtained.
(4) Nochangeoflocation,design,rateofwithdrawalandpumpingdevice
inrespectoftheexisting wellasindicated atSI.(2)and(3)ofthis certificate
shallbemadewithout priorpermission oftheDistrict Ground Water Management
Council.Anydeviationinthisregardshallleadtocancellationofthis registration.
(5) Incase, anyoftheparticulars Iinformationfurnishedbytheapplicant
inhisapplicationforissuanceofthisregistrationisfoundtobeincorrect duringverification
atanysubsequent stage,thisregistration isliable forcancellation.
(6) Construction of piezometers and installation of digital water level recorders with
telemetry shall be mandatory for user. Depth and zone tapped of piezometer should be
commensurate with that of the pumping well. The data, obtained from digital water level
recorders shall be made available to this office on monthly basis.
(7) Guidelines for Installation of Piezometers and their Monitoring
Piezometer is a borewell /tubewell used only for measuring the water level by lowering
the tape/ sounder or automatic water level measuring equipment. It is also used to take
water sample for water quality testing whenever needed. General guidelines for
installation of piezometers are as follows:
The piezometer is to be installed/constructed at the minimum of 50 m distance from the
pumping well through which ground water is being withdrawn. The diameter of the
piezometer should be about 4” to 6”.
The depth of the piezometer should be same as is case of the pumping well from which
ground water is being abstracted. If, more than one piezometers are installed the
second piezometer should monitor the shallow ground water regime. It will facilitate
shallow as well as deeper ground water aquifer monitoring.
The measuring frequency should be monthly and accuracy of measurement should be
up to cm. the reported measurement should be given in meter upto two decimal.
49
For measurement of water level sounder or automatic water level recorder (AWLR)/
Digital Automatic water level recorder (DWLR) with telemetry system should be used for
accuracy.
The measurement of water level in piezometer should be taken, only after the pumping
from the surrounding tube wells has been stopped for about four to six hours.
All the details regarding coordinates, reduced level (with respect to mean level), depth,
zone taped and assembly lowered should be provided for bringing the piezometer into
the Hydrograph Monitoring System for Ground Water Department, Uttar Pradesh, and
for its validation.
The ground water quality has to be monitored twice in a year during pre-monsoon
(May/June) and post-monsoon (October/November) periods. Quality may be got
analyzed from NABL approved lab. Besides, one sample (1 lt capacity bottle) to the
concerned Director, Ground Water Department, Uttar Pradesh, for chemical analysis.
A Permanent display board should be installed at piezometer/Tube wells site for
providing the location, piezometer/ tube well number, depth and zone tapped of
piezometer/tube well for standard referencing and identification.
Any other site specific requirement regarding safety and access for measurement may
be taken care off.
(8) Anyother condition(s)thatmaybeimposedbytheDistrict Ground Water Management
Council.
OFFICE SEAL
50
Previous and next
All provisions of THE UTTAR PRADESH GROUND WATER (MANAGEMENT AND REGULATION RULES, 2020
Questions people ask
Is form 3 (A) of THE UTTAR PRADESH GROUND WATER (MANAGEMENT AND REGULATION RULES, 2020 still in force?
No repeal of the UTTAR PRADESH GROUND WATER (MANAGEMENT AND REGULATION RULES, 2020 is recorded.