Rule 44, Tamil Nadu Combined Development and Building Rules, 2019: Solar Energy Capture
Tamil Nadu Combined Development and Building Rules, 2019 - Rule 44
Text of rule 44
Solar Energy Capture
44. Solar Energy Capture.— (1) Solar water heating system,- (a) Fitment of solar assisted
water heating system –the requirements for fitment of solar assisted water heating
system in buildings shall be in accordance with the following regulations.
(i) If the building is a High Rise Building
(ii) If the building is intended to be used as:-
(a) hospitals and nursing homes; exceeding 150 Square metres in floor area
(b) hotels, lodges and guest houses; exceeding 150 square metres in floor area
(c) hostels of Schools, Colleges, Training Centres;
(d) barracks of arms forces, paramilitary forces and police;
(e) individual residential buildings having more than 150 sq.m. plinth area
(f) functional buildings of railway stations and airports like waiting rooms, retiring
rooms, rest rooms, inspection bungalows and catering units;
52 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
(g) community centres, banquet halls, Kalyana Mandapams and buildings for
similar use; exceeding 200 square metres in floor area
(h) Industries wherein hot water is required for processing and
(i) Government buildings or quasi –government buildings wherein electric Geyser
is used.
In which there is a system or installation for supply hot water, a provision shall
be made for an auxiliary solar assisted water heating system.
(b) The Executive Authority of Local Body before issuing Building permit for the
construction of new building shall ensure if it has a provision in the
building design itself for an insulated pipeline from the rooftop in the building
to various distribution points where hot water is required. The new building
shall have provision for continuous water supply to the solar water heating
system. The new building shall also have open space on the rooftop to receive
direct sun light. The load bearing capacity of the roof shall atleast be 50 kilogram
per square meter. All new buildings shall have solar assisted water heating system
installed before they are utilized for business or other activity.
(c) In the existing building, solar assisted water heating system shall be installed at the
time of change of use to any of the categories of building mentioned in item 1 above,
provided there is a system or installation for supplying hot water therein.
(d) The capacity of solar water assisted heating system to be installed on the building of
different categories mentioned in item 1 above shall be decided in consultation with
the Executive Authority. The recommended minimum capacity shall not be less
than twenty five litres per person per day for each bath room and kitchen subject to
the condition that maximum of 50 per cent of the total roof area is provided with the
system as per norms to be fixed by the Tamil Nadu Energy Development Agencies
from time to time.
(e) Installation of solar assisted water heating system shall conform to Bureau of Indian
Standards specification Indian Standard 12933. The Technical specifications of
solar water heating system shall conform to the specifications defined by Ministry of
New and Renewable Energy, Government of India from time to time. The solar
collectors used in the solar assisted water heating system shall have the Bureau of
Indian Standards Certification mark.
(f) Wherever hot water requirement is continuous in any building, auxiliary back up
arrangement shall be provided.
(2) Erection of solar photo voltaic panels.-
Installation of Solar Energy System is mandatory in all buildings in the category of High
Rise Buildings and Non High Rise Buildings exceeding 16 dwelling units and 300 sq.m of
commercial building, Accordingly
(a) Minimum terrace area to be reserved for erecting solar photo voltaic panels shall be
1/3rd of total terrae area.
(b) The space required for erecting solar photo voltaic panels is about 10sq.m. for
generating 1 KW of electricity.
(c) The electricity generated from solar photo voltaic system so erected will be used for
common electricity requirements like staircase lights, setback lights, lifts, pumps
and non-floor space index areas, etc.
(d) Net metering guidelines of Tamil Nadu Energy Regulatory Commission shall apply to
all such installation of solar photo voltaic system.
(e) The competent authority shall monitor the actual erection and give completion
certification to the said buildings only after the erection of solar photo voltaic panels.
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 53
The Tamil Nadu Generation and Distribution Corporation Limited will give service
connection of Net metering only after the completion certificate is issued.
Previous and next
All provisions of Tamil Nadu Combined Development and Building Rules, 2019
Questions people ask
Is rule 44 of Tamil Nadu Combined Development and Building Rules, 2019 still in force?
No repeal of Tamil Nadu Combined Development and Building Rules, 2019 is recorded.