Form C, Tamil Nadu Combined Development and Building Rules, 2019: FORM-C
Tamil Nadu Combined Development and Building Rules, 2019 - Form C
Text of form C
FORM-C
FORM-C
Form of undertaking to be executed by the land owner or power of attorney
holder or builder or promoter and structural engineer, architect, geo-tech expert and
site engineer.
This deed of undertaking executed at ………….on the…………………day of
……………………20….. by the landowner Thiru/Tmt/Selvi ……………………………………
Son/Daughter of …………………………………. aged…………………………..Residing at
No.………………………………………………………………..... (or) Power of Attorney Holder (or)
Builder (or) Promoter / Structural Engineer __________, Architect __________________, Geo-
Tech Consultant __________________ in respect of proposed development / construction
made in Door No._________, _________________ Road in the following S.No.
S.No. / R.S.No. / T.S.No. Block No. Village Taluk
in favour of the ……………………………………….(competent authority) having office at
………………………………………….witnesseth as follows.
2. I/We (Land Owner or Power of Attorney Holder or Builder or Promoter) have
applied for the Planning Permission for construction in the above premises by submitting
an application to the ………………………………..(competent authority)in accordance with the
planning norms prescribed in these rules. I am associated with the project as Land
Owner/Power of Attorney Holder/Builder/Promoter. The extent of site as per document is
_____ sq.m. and as per Patta / TSLR / PLR / Handing over sketch _______ sq.mt. I assure
that I will put up the construction only in accordance with the approved plan without any
deviation and if any construction is later on found not in accordance with the approved
plan and any unauthorized addition is made, I agree for the forfeiture of the Security
Deposit which will be collected while issuing Planning Permission, and also agree to
demolish the such a deviation marked by the ………………………………………..(competent
authority) within thirty days after such notice, failing which, apart from forfeiture of
Security Deposit, the ……………………………………………………… may demolish or cause to
demolish such unauthorized or deviated constructions at the site under reference and
recover the cost of demolition from me.
3. I/We (Land Owner or Power of Attorney Holder or Builder or Promoter) also
assure that the open space around the building to be left or the usage of the building,
including the car parking in ground floor, will be kept as specified in the approved plan and
it will not be converted into any other use except the purpose for which it is approved. If
any structural modification or usage differs from the approved plan, the competent
authority is at liberty at any time to remove any structural modification or usage and the
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 81
expenses incurred by the competent authority is recoverable from me for non-compliance of
their request or order.
4. I/We (Land Owner or Power of Attorney Holder or Builder or Promoter) further
assure that I will not convert any place of the construction in contravention to the approved
plan, especially in respect of car parking as specified in the sanctioned plan. At any time in
future, I will not convert the car parking on stilts by covering them fully, and use the car
parking space for any other purposes. If any construction work in car parking place,
converting them either as a flat or for any other purpose, is done either by me or by my
successor or by any other person to whom the said construction is transferred in future,
without getting appropriate order for doing so from the competent authority, the Authority
is at liberty at any time to take any action to remove any structural modification or usage
and the expenses incurred by the Authority is recoverable from me/my successor or from
any other person to whom the said construction is transferred in future.
5. I/We (Land Owner or Power of Attorney Holder or Builder or Promoter) hereby
undertake that, I am, jointly and severally responsible with the Land Owner/Power of
Attorney Holder/Builder/Promoter to carry out the developments in accordance with the
permission granted and also for payment of Development Charges, Security Deposit,
Scrutiny Fee and for all other charges levied from time to time by the Authority and also
liable for penal provisions for developments made in contravention of the Development
Regulations and these presents.
6. I/We (Land Owner or Power of Attorney Holder or Builder or Promoter) assure
that I/We will pay the premium FSI charges as applicable in case the FSI area exceeds the
permissible FSI as per Development Regulations.
7. I/We (Land Owner or Power of Attorney Holder or Builder or Promoter) assure
that I / We shall gift the OSR area as applicable or pay the equivalent land cost in lieu of
OSR area as per Development Regulations.
8. I/We (Land Owner or Power of Attorney Holder or Builder or Promoter) assure
that I / We shall gift the Street Alignment Portion / Road Widening Portion / Link Road as
per the provisions in the Development Regulations to the Authority / Localbody before issue
of Planning Permission.
9. I/We (Land Owner or Power of Attorney Holder or Builder or Promoter) hereby
solemnly affirm and declare that I / We are the absolute owner / owners / Power of
Attorney Agent / Lease Holder of the said property and it is not covered under the Land
Ceiling and Land Acquisition (in respect of Land Acquisition Act, 1894, The Right to Fair
Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement
(Amendment) Ordinance, 2015, Land Reforms Act, 1961 and Land Ceiling Act, 1978) and I
/ We shall be liable for all future consequences in case of land falling under Land Ceiling,
Land Reforms or Land Acquisition.
10. I / We (Land Owner or Power of Attorney Holder or Builder or Promoter) have
engaged the following as the consultant for the proposed development:
Consultant Name and
Address
Registration No. E-Mail
ID & Mobile No.
Signature
Architect / L.S.
Structural
Engineer
Geo-Tech Expert
Site Supervision
Engineer
82 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
This is to certify that I the Architect / LS of the site has inspected the site at
S.No. / R.S.No. / T.S.No. Block No. Village Taluk
I, the Architect / Licensed Surveyor certify that
The ………………………..Road abutting the site under reference is public
(maintained by the Local Body) and its width actually measures ………m in front of the site
and qualifying width of …..m is available for a length of 250m / 500m as shown in the Road
width sketch enclosed mentioning width of the road at regular interval of 25 m mentioning
the landmark of the stretch where width has been measured.
I have personally verified the site measurements on ground and dimensions given in
the plan correspond with the actual on the ground.
The residuary plot details including structures thereon evidenced by documents
correspond with the actual on the ground.
Distance between the site and nearby waterbody, if any, is _____ m.
Distance between the site and quarry / crusher, if any, within 500m is ------ m
Distance between the site and burial ground , if any, within a distance of 30 m
from a place declared and used as a burning or burial place / ground is -----m
The Street Alignment Portion / Road Widening Portion / OSR Area shown in the Site
Plan tallies to the dimensions in the ground condition.
The site approval for Non High Rise Buildings / High rise building is enclosed (in
such cases item No.1 to 7 does not arise).
The building plans prepared and submitted herewith satisfy the relevant provisions
of development regulations vide planning parameters compliance statement.
The site lies vacant (or) not.
The depth of the plot with reference to road level is _______ m.
HT / LT line passes through the site : Yes / No
(If yes, to be shown in the site plan)
Topo Plan furnished showing the surrounding developments for a radius of 500 m
correspond with the actual on the ground.
The coverage of the building mentioned in the Plan is correct.
In case of non-issuance of NOC, I shall obtain NOC / remarks from the department’s
concerned before commencement of the construction and comply the conditions stipulated
by the concerned NOC /Remarks issuing Department during the construction and submit
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 83
the NOC / remarks along with certificate from the concerned agencies on fulfillment of the
NOC conditions at the time of applying for Completion Certificate.
I the Architect / LS to inform competent authoritybefore the commencement of
crucial stages of construction viz.
Earth work for foundation
Foundation concreting
Laying the roof of basement floor
Laying the roof at each floor level
After completing the finishing work
(White washing, colouring, fixing, water supply, drainage or other sanitary fitments)
and before obtaining regular connection for water supply / electricity.
I the Architect / LS also undertake to communicate to …………………………
(competent authority)Certificate to the effect that the construction is in conformity with the
plan approved by competent authorityat the crucial stages mentioned above.
If any deviation to the approved plan is proposed to be made, I the Architect / LS
shall obtain prior approval of the Chennai Metropolitan Development Authority
I the Architect / LS shall intimate ………………………….(competent
authority)immediately if for any reasons association with the project ceases
The above information furnished is correct. If any information furnished is found
wrong, I am aware that action shall be initiated against me and I shall not be henceforth
allowed to sign in the Plans for the Planning Permission Applications processed by GCC,
Local Body, CMDA and DTCP. To this effect an Undertaking shall be obtained from
Architect / Licensed Surveyor and owner.
SIGNATURE OF THE ARCHITECT /ENGINEER
We (Owner / Builder / Structural Engineer / Architect / Geo-Tech Expert)
certify that the structural plans of the building meet the structural safety requirements for
all situations including natural disasters, as applicable, as stipulated under Part 6
Structural Design of the National Building Code of India and other relevant Codes; T he
design has been done after detailed soil test and we are satisfied as to the adequacy of soil
test carried out and the information given therein is factually correct to the best of our
knowledge and understanding.
T he site is fit for the proposed construction, it has been tested vide soil test report.
No......................... dt..................... done by ...................................
We (Owner / Builder / Structural Engineer / Architect / Site Engineer) certify that
the development, erection, re-erection or making alteration in the building shall be carried
out under our supervision and we certify that all the materials (type and grade) and the
workmanship of the work shall be generally in accordance with the general and detailed
specifications, as per NBC standards and to meet out the structural design of the proposed
building.
We (Owner / Builder / Structural Engineer / Architect / Site Engineer) undertake
not to continue construction without any supervis ion by the our Site Engineer and submit
the report to the local body.
I (Landowner / Builder ) certify to engage the above mentioned Engineers for the
active period of building execution and I hereby assure to give Revised Certificate in case of
any change of Engineer, I shall ensure no work is taken up in this period till required
Engineers are engaged by me.
In case construction work is entrusted by a Builders Agreement to a 3rd Party, I
(Land Owner or Power of Attorney Holder or Builder or Promoter)shall undertake to include
these conditions as part of the agreement.
84 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
Applicable incase of existing building within the site
I (Structural Engineer / Architect / Site Engineer) hereby certify that the
development, erection, re-erection or for making alteration in the building has been carried
out under our supervision and we certify that all the materials (type and grade) and the
workmanship of the work was in accordance with the general and detailed specifications, as
per NBC standards and met out the structural design of the constructed building. The
construction was made under the supervision of Site Engineer and submitted the report to
the local body periodically.
I (Owner / Builder / Structural Engineer / Architect) hereby certify that the
building, has been designed by me ………………………………………………and the Structural
Design was made by Thiru ……………………………………………………………… to the
approved plans sanctioned in the Planning Permission No. ………………………… dated
…………………… and the Building Permit No………………………………
dated………………………….. The Building has been constructed and completed under my
guidance and supervision as per the structural design furnished by the Structural Engineer
engaged by us. I also assure and undertake that, I have signed in the plan and in “as on
site” plan and the same is structurally safe and fit for occupancy based on my personal
assessment and certification of the Structural Engineer engaged by us.
This deed of undertaking is executed by us on the…………………….day
of…………………………………….20………….with the full knowledge of the contents of this
document.
Consultant Name and
Address
Registration No. E-Mail ID &
Mobile No.
Signature
Owner of the
land / Power of
Attorney Holder /
Lease Holder
Architect / L.S.
Structural
Engineer
Geo-Tech Expert
Site Supervision
Engineer
DEPONENT
Witnesses:
1.
2.
Duly attested by the
SEAL Notary Public
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 85
Planning Permission Application is processed based on the compliance to land use
provisions in the respective development plan in force and the Tamil Nadu Combined
Development and Building Rules;
Compliance to the Provisions of other relevant Act and Rules with respect to
construction is the responsibility of the applicant or owner and the competent authority is
not responsible for any lapse;
Planning Permission for buildings is issued in accordance with the provisions of the
Town and Country Planning Act, 1971. and the rules made there under.
Issuance of Planning Permission by competent authority under the statutory
provisions does not confirm any ownership or title over the property, in favour of the
applicant. Before issuing Planning Permission for any development, competent authority in
this regard, checks only the aspect of applicant’s right over the site under reference to make
the development thereon based on the copies of the documents (such as Sale Deed, Patta,
Lease Deed, Gift Deed etc., and GPA) furnished by the applicant along with his /her
application to prove the same. Thus, competent authority primarily considers only the
aspect whether the applicant prima facie has a right to carry out development on the site
under reference.
Any person who acquires interest in the property shall ensure independently about
the ownership and the applicant’s right before acquiring the same. Further, if any
individual claim right (or) title over the property he / she / they shall have to prove it before
the appropriate or competent Court to decide on the ownership or get the matter settled in
the Court of Law and competent authority is not the statuary authority to decide on this
matter.
86 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
Annexure – IV
[See rule 38 (4) and 39 (8)]
Parking Requirements
(a) For the use of the occupants and of persons visiting the premises for the purposes of
profession, trade, business, recreation or any other activity parking spaces
and parking facilities shall be provided within the site to the satisfaction of the
Competent Authority and conforming to the standards specified below.
(b) The portion of the site affected by street alignment shall not be reserved for parking.
PART-I
(1) Residential
(A) Corporation or Municipal Areas (B) Panchayat Areas
Dwelling Unit
with
Number of Parking
Spaces
Dwelling Unit
with
Number of Parking
Spaces
Floor area upto
25 sq.m Nil Floor area upto
50 sq.m Nil
Floor area above
25 sq.m and
upto 50 sq.m
1 Two Wheeler space
Floor area above
50 sq.m and
upto 75 sq.m
1 Two Wheeler space
Floor area above
50 sq.m and
upto 75 sq.m
1 car space for every 2
dwelling units and 1
Two Wheeler space for
every dwelling unit
Floor area above
75 sq.m and
upto 100 sq.m
1 car space for every 2
dwelling units and 1
Two Wheeler space for
every dwelling unit
Floor area above
75 sq.m
1 car space for every 75
sq.m
Floor area above
100 sq.m
1 car space for every
100 sq.m
Visitors Parking:
In addition to the parking spaces specified above, parking spaces for visitors shall be
provided to the extent of 10% of the number stipulated above rounded to the nearest whole
number where number of dwelling units exceeds six.
Note: 1.In cases where the number of car parking spaces required in an ordinary
residential building does not exceed 3 in number, separate driveway or aisle is not
necessary.
2. In cases of flatted residential development where the number of car spaces
required for a dwelling unit does not exceed 2 in number separate aisle is not
necessary for the second car space required for that dwelling unit.
(2) Shops/Shopping Centres/Departmental Stores/Super Markets
(A) Corporation or Municipal Areas (B) Panchayat Areas
Floor Area Number of Parking
Spaces Floor Area Number of Parking Spaces
Upto 50
sq.m
Nil Upto 75 sq.m Nil
Above 50
sq.m
1 car space and 1 Two
wheeler space for every 50
sq.m or part thereof
excluding the first 50 sq.m
Above 75
sq. m
1 car space and 1 Two wheeler
space for every 75 sq.m or part
thereof excluding the first 75
sq.m
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 87
(3) Automobile Showrooms
1 car space for every 100 sq.m of gross area including the office area, service area, wash
area, etc. This space is exclusive of the space provided for the display of new vehicles but
inclusive of the space required for parking of service vehicles.
(4) Government Offices
Floor Area Number of Parking Spaces
Upto 500 sq.m
1 car space for every 150 sq.m or part
thereof and 1 Two Wheeler space for every
25 sq.m or part thereof.
Above 500 sq.m
1 car space for every 100 sq.m or part
thereof and 1 Two Wheeler space for every
25 sq.m or part thereof
Visitors Parking:
In addition to the parking spaces specified above, parking spaces for visitors shall be
provided to the extent of 10% of the number stipulated above subject to a minimum of 1
car space and 1 Two Wheeler space.
(5) Other Offices including regional offices of banks, etc.
(A) Corporation or Municipal Areas (B) Panchayat Areas
1 car space for every 100sq.m of floor area
or part thereof and 1 two wheeler space for
every 25sqm of floor area or part thereof
1 car space for every 100sq.m of floor area
or part thereof and 1 two wheeler space for
every 25sqm of floor area or part thereof
Visitors Parking:
In addition to the parking spaces specified above, parking spaces for visitors shall be
provided to the extent of 10% of the number stipulated above subject to a minimum of 1
car space and 1 Two wheeler space.
(6) Banks – service branches
(A) Corporation Limit, Municipalities, (B) Panchayat Areas
1 car space for every 75sqm of floor area or
part thereof and 1 two wheeler space for
every 25sq.m of floor area or part thereof.
1 car space for every 125sq..m of floor area
or part thereof and 1 two wheeler space for
every 25sqm of floor area or part thereof
(7) ATM Centres
1 car space for every 25sqm of floor area or part thereof
(8) Post Offices, Telegraph Offices, Telephone Offices and Similar establishments
(A) Corporation/ Municipal Areas (B) Panchayat Areas
1 car space for every 150sq.m of floor area
or part thereof and 1 two-wheeler space for
every 50sq.m of floor area or part thereof.
1 car space for every 250sq.m of floor area
or part thereof and 1 two wheeler space for
every 100sq.m of floor area or part thereof
88 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
(9) IT Offices, IT Enabled Services, Bio Informatics Centres
1 car space for every 50sq.m of floor area or part thereof and 1 two-wheeler space for every
25sq.m of floor area or part thereof.
(10) Restaurants and Hotels
(a) Restaurants, Fast Food outlets
(A) Corporation or Municipal Areas (B) Panchayat Areas
1 car space for every 50sq.m of floor area or
part thereof and 1 two wheeler space for
every 25sq.m of floor area or part thereof
1 car space for every 100sq.m of floor area
or part thereof and 1 two wheeler space for
every 50sq.m of floor area or part thereof
(b) Starred Hotels, Major Hotels and Lodges with more than 50 rooms in CMA
1 car space for every 4-guest rooms and for the non-room area, 1 car space for every
100sq.m of floor area or part thereof and 1 two wheeler space for every 50sq.m of floor
area or part thereof. For restaurants in these hotels – same as that specified for
restaurants specified above.
(c) Unstarred Hotels, other Hotels & Lodges
1 car space for every 10-guest rooms and for the non-room area, 1 car space for every
100sq.m of floor area or part thereof and 1 two wheeler space for every 50sq.m of floor
area or part thereof. For restaurants in these hotels – same as that specified for
restaurants specified above.
(11) Hostels
1 Two Wheeler for every 10 rooms
(12) Auditorium, Kalyana Mandapams, Cinema Halls
(A) Corporation/ Municipal Areas (B) Panchayat Areas
1 car space and 1 two wheeler space for the
every 20sq.m of Auditorium/Kalyana
Mandapam area or part thereof
1 car space and 1 two wheeler space for the
every 50sq.m of Auditorium/Kalyana
Mandapam area or part thereof
(13) Educational Institutions
(a) Government Schools or Local Body schools
(A) Corporation/ Municipal Areas (B) Panchayat Areas
1 car space for every 500sq.m of class room
area or part thereof and 1 two wheeler
space for every 50sq.m of class room or
part thereof and one cycle space for every
10sq.m of class room area or part thereof.
1 two-wheeler space for every 50sq.m of
class room area or part thereof and one
cycle space for every 5sq.m of class room
area or part thereof.
(b) Private Schools
(A) Corporation or Municipal Areas (B) Panchayat Areas
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 89
1 car space for every 100sq.m of class room
area or part thereof and 1 two wheeler
space for every 50sq.m of class room or
part thereof and one cycle space for every
10sq.m of class room area or part thereof.
1 car space for every 300sq.m of class room
area or part thereof and 1 two-wheeler
space for every 50sq.m of class room area
or part thereof and one cycle space for every
5sq.m. of class room area or part thereof.
Note: 50% of the car spaces specified above shall be provided in the front area abutting
the road so
as to act as a recessed parking area for the vehicles coming for drop/pick up for
students.
(c) Colleges
1 car space for every 100sq.m of class room area or part thereof and 1 two-wheeler
space for every 50sq.m of class room area or part thereof.
(d) Tutorial/Parallel colleges
1 car space for every 200sq.m of class room area or part thereof and 1 two-wheeler
space for every 50sq.m of class room area or part thereof.
(e) Software/Hardware and other training institutes
1 car space for every 100sq.m of floor area or part thereof and 1 two-wheeler space
for every 30sqm of floor area or part thereof.
(14) Hospitals and Nursing Homes
(A) Corporation or Municipal Areas (B) Panchayat Areas
Floor Area Number of Spaces Number of Spaces
Upto
3000sqm
1 car space and 1 Two wheeler space
for every 50sq.m or part thereof
1 car space and 1 Two wheeler space
for every 100sq.m or part thereof
Above
3000sqm
1 car space and 1 Two wheeler space
for every 75sq.m or part thereof
1 car space and 1 Two wheeler space
for every 150sq.m or part thereof
(15) Health Clubs and Recreational Centres.
(A) Corporation or Municipal Areas (B) Panchayat Areas
1 car space and 1 Two wheeler space for
every 50sq.m of floor area or part thereof
1 car space and 1 Two wheeler space for
every 75sq.m of floor area or part thereof
(16) Recreational Clubs
(A) Corporation or Municipal Areas (B) Panchayat Areas
1 car space for every 75sq.m of floor area or
part thereof
1 car space for every 100sq.m of floor area
or part thereof.
(17) Industries
(a) Manufacturing industries, service industries, biotechnology industries
1 car space for every 100sq.m of office floor area or part thereof and 1 two wheeler space
and 1 cycle space for every 50sq.m of workshop floor area or part thereof and 1 lorry
space for every 500sqm or workshop floor area or part thereof
(b) Cottage Industries
1 car space for every 100sq.m of office floor area or part thereof and 1 two-wheeler space
and 1 cycle space for every 50sq.m of workshop floor area or part thereof.
90 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
(c) Garments / Packaging Industries
1 car space for every 200sq.m of office floor area or part thereof and 1 two-wheeler space
and 1 cycle space for every 50sq.m of workshop floor area or part thereof.
(d) Electrical and Electronic Industries including Computer hardware industries
1 car space for every 100sq.m of office floor area or part thereof and 1 two-wheeler space
and 1 cycle space for every 50sq.m of workshop floor area or part thereof.
(e) IT Industries, Software, Bio Informatics Industries
1 car space for every 50sq.m of floor area or part thereof and 1 two-wheeler space for
every 25sq.m of floor area or part thereof.
(18) Godowns, Ware Houses & Wholesale Stores, etc.
(a) Godown, Warehouses, Freight Stations, Containerisation Units
If the area is open, 1 lorry space for every 300sq.m of plot area or part thereof
If the area is covered, 1 lorry space for every 300sq.m of covered area or part thereof.
(b) Cold Storage
1 lorry space for every 500sqm of floor area or part thereof.
(19) Religious Buildings
(A) Corporation/ Municipal Areas (B) Panchayat Areas
1 car space for every 100sq.m of floor area
or part thereof and 1 two wheeler space for
every 50sqm of floor area or part thereof
1 car space for every 250sq.m of floor area
or part thereof and 1 two wheeler space for
every 100sqm of floor area or part thereof
General Note
Where the prescriptions are based on the total Floor Space Index (FSI) area, the number
of car/two wheeler parking spaces required shall be calculated for 75% of the total plinth
area in the buildings.
In cases of residential developments, the number of car/two wheeler parking spaces
required for a dwelling shall be based on the size of the dwelling unit, excluding the
common areas like common corridors, staircases, etc.
PART – II
Off Street Parking Standards
(A) Stall Size:
The dimension of the parking stall for different kind of vehicles shall be:
Vehicle Type Breadth (m) Length (m)
Car 2.5 5.0
Two Wheelers 1.0 1.8
LCV 3.5 7.0
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 91
Lorry/Bus 3.5 10.0
Articulated Vehicles [Container Vehicles] 3.5 16.0
The stall dimensions mentioned above shall be clear of any structural members. Where a
stall is adjacent to a large element such as a wall, minimum stall width shall be 2.7m for
parallel parking and where cars cannot be parked by reversing, minimum stall length shall
be 7.2m.
(B) Parking for Special (physically challenged) persons
For Buildings having more than 2 floors 10% of the required car/two wheelers parking
spaces subject to minimum of 2 car spaces and 2 two-wheeler spaces shall be reserved for
the physically handicapped persons near the entrance. This is to provide an exclusive
reservation of car parking for physically handicapped and also to provide them easy access
to the lift and staircase.
(C) Driveway and Aisle Widths
Driveway:
The driveway width shall be 3.0m for one-way movement and 6.0m for two-way movement.
Aisle Widths:
Aisle is a access lane leading to/abutting the individual parking lot within a parking facility.
The aisle widths for different types of parking shall be:
Vehicle Type Parallel Parking All angles up to 600 Angles above 600 &
Perpendicular parking
Two Wheeler 1.5m 1.5m 1.5m
Car 3.0m 3.0m 4.5m.
LCV/Truck/Bus 7.0m 7.0m 10.0m
The width of the driveway and the aisle shall be free from kerb and other encumbrances.
(D) Width Entry and Exit Gates
The width of entry or exit gates shall be a minimum of 3.0m
(E) Gradient
Slope of parking spaces shall be not more than 4% in any direction.
(F) Turning Radius
Sufficient turning radius shall be provided for adequate manoeuvring of vehicle
(G) Ramps
The minimum clear width of the ramps shall be 3.0 m for one-way movement and
6.0m for two-way movement. Gradient shall not be steeper than 1 in 8.
(H) Headroom
The clear headroom (between floor and beam bottom) shall be minimum 2.2metres
those parts of a building intended to be used for parking of wheeled vehicles and also for all
approaching parts like ramp, covered access, etc.
92 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
PART – III
Standards for Multi Level Parking Lots
(A) Location of Multi Level Parking Lots
Structures exclusively for multi level parking shall abut on a road of minimum 7.2m
in width where the height is upto 18.30m and road of minimum 18.0m in width where its
height exceeds 18.30m. As proposed there will not be any FSI/coverage restriction for such
multi level parking lots.
For automated/mechanically-operated parking the Competent Authority not
withstanding anything containing in the rules subject to such conditions as may be
decided by the Competent Authority may permit parking lots/structures taking into
account safety and environmental aspects.
(B) Setbacks
The setbacks all round and spacing between blocks within the site for multi level
parking structures up to 18.30m high shall be a minimum if 4.0m, irrespective of the area
of location of the multi level parking structure. Where the height of the building exceeds
18.30m, the building shall conform to the norms laid in the rules for High rise building
except in respect of the plot coverage and FSI requirements.
(C) Width of Entry and Exit
The width of entry or exit gates shall be a minimum of 4.5m. The entry or exit gate
shall be located away from junctions. In cases of large sites with frontage along road
exceeds 50 m; additional entry exit may be permitted.
(D) Other Requirements:
(i) Parapet/Protection Frame - All floors above ground floor shall have a RCC
parapet/protection frame of height not less than 1.0m
(ii) Ventilation - In case of parking on ground floor, all sides shall be left open for
ventilation and lighting. In case of all floors above ground floor, adequate
natural ventilation and lighting should be provided. In case of basement or sub
basement parking, adequate mechanical ventilation and adequate lighting
should be provided.
(iii) Where car/two wheeler lifts are proposed/provided there shall be at least one
ramp to standards from the parking floors to the ground level.
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 93
Annexure – V
[See rule 36]
List of cottage Industries
(1) Areca nut cutting
(2) Appalam Manufacturing
(3) Bee-Keeping (Agriculture) Honey and Bee’s wax
(4) Bakery - Biscuits, Cakes
(5) Blanco Cakes and Bee’s wax
(6) Confectionary – Sweets
(7) Coffee roasting and grinding
(8) Dehydrated fruits and vegetables, dried fruits and dried vegetables
(9) Fruit canning
(10) Jaggery manufacture, Gur-making from sugarcane, date palm of Palmyra and
coconut tree, handmade sugar, sugar candy
(11) Jam, jellies and preserves
(12) Syrups, aerated water, ice making
(13) Vermicelli manufacture
(14) Apparel and ready-made clothing (including sarees, dhoties)
(15) Artificial flowers
(16) Alce fibre extraction - Palmyra, coconut fibres
(17) Banian manufacture
(18) Blanket weaving
(19) Block engraving for cloth printing
(20) Brush manufacture
(21) Button making out of mother of pearl, horns, brass and tin
(22) Calico printing
(23) Canvas shoes manufacture
(24) Embroidery, knitting, crochets and needle work
(25) Hosiery (with hand and power)
(26) Laundry and cleaning clothes
(27) Leather goods making, boots, shoes, chappals, slippers, bed straps.
(28) Ornaments and jewellery (including bangles, combs).
(29) Ornamental Leather craft, money-purses handbags.
(30) Weaving cotton, wool, tusser, jute, matka, silk
(31) Spinning cotton wool in charkas
(32) Tailoring
(33) Woolen fabrics and woolen goods
(34) Wool clipping and grading
(35) Fly shuttles, looms making
(36) Ribbon manufacture
(37) Cane furniture (also cane and basket ware, matting)
(38) Cement ware works.
94 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
(39) Coir, coir making, rope
(40) Candle sticks manufacture
(41) Agarbathi making
(42) Manufacture of Cardboard and cardboard boxes
(43) Clay modeling, paper mache works
(44) Crayons
(45) Engraving on metals
(46) Enamellings
(47) Handmade paper and pulp paper cutting and paper fans
(48) Inks, inkpads (for rubber stamps)
(49) Lapidaries work
(50) Musical instruments – stringed or reed
(51) Painting on blanks and glass
(52) Perfumery – essential oils and scents
(53) Pith works – pith hat, garlands, and flower
(54) Printing and allied trade – book binding, block making
(55) Soap making
(56) Koraimats, plates, baskets, handbags, window screen
(57) Palmyra leaf – fancy and utility articles midribs
(58) Palmyra fibre – brush making
(59) Palmyra rafters and stems – furniture, cots, weaving of cots and seating from stem
strips
(60) Wood turners industry, other wood works
(61) Fibre and fibre products
(62) Icons
(63) Match sticks manufacture (– manufacture of splints with wood only)
(64) Fountain pen manufacture
(65) Minor Radio parts manufacture
(66) Braided cord manufacture
(67) Storing of articles in Frigidaire
(68) Toys
(69) Slips
(70) Decorticating dhal by hand grinding
(71) Twisting and throwing of silks and cotton yarns
(72) Twisting and winding of silk thread, cotton thread, artificial yarns
(73) Wax costing on paper and cloth.
Note: - Category of Industries modified time to time by Tamil Nadu Pollution Control Board will be
applicable.
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 95
Annexure – VI
[See rule 36]
Industries classified as “Green”
(1) Washing of used sand by hydraulic discharge
(2) Atta – chakkies
(3) Rice Mills
(4) Ice Boxes
(5) Dhal mills
(6) Groundnut decorticating (dry)
(7) Chilling
(8) Tailoring and garment making
(9) Cotton and woolen hosiery
(10) Apparel making
(11) Handloom weaving
(12) Shoe lace manufacturing
(13) Gold and silver thread and saree work
(14) Gold and silver smithy
(15) Leather foot wear and leather products excluding tanning and hide processing
(16) Musical instruments manufacturing
(17) Sports goods
(18) Bamboo and cane products only dry operations
(19) Cardboard box and paper products (paper and pulp manufacture excluded)
(20) Insulation and other coated papers (paper and pulp manufacture excluded)
(21) Scientific and mathematical instruments
(22) Furniture (wooden and steel)
(23) Assembly of domestic electrical appliances
(24) Radio assembling
(25) Fountain pens
(26) Polythene, plastic and PVC goods through extraction/moulding
(27) Rope (Cotton and Plastic)
(28) Carpet weaving
(29) Assembly of Air coolers, conditioners
96 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
(30) Assembly of by-cycles, baby carriages and other small non-motorised vehicles.
(31) Electronic equipment (assembly)
(32) Toys
(33) Candles
(34) Carpentry excluding saw-mill
(35) Cold storages (small scale)
(36) Oil ginning/expelling (No hydrogenation and no refining)
(37) Jobbing and machining
(38) Manufacture of steel, trunks and suitcases
(39) Paper pins and ‘U’ clips
(40) Block making and card printing
(41) Optical frames
(42) Tyres retreading
(43) Power looms and handlooms (without dying and bleaching)
(44) Printing press
(45) Garment stitching, tailoring
(46) Thermometer making
(47) Foot wears (rubber)
(48) Plastic processed goods
(49) Medical and surgical instruments
(50) Electronic and Electrical goods
(51) Rubber Goods industries
(52) Factory product, Biscuits and confectionaries
(53) Instant tea/Coffee processing
(54) Malted food
Note: - Category of Industries modified time to time by Tamil Nadu Pollution Control Board will be
applicable.
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 97
Annexure – VII
[See rule 36]
Industries classified as “Orange”
(1) Manufacture of mirror from sheet glass and photo framing
(2) Surgical gauzes and bandages
(3) Wires, Pipes, Extruded shapes from metals
(4) Automobiles servicing and repair stations
(5) Ice cream
(6) Mineralised water and soft drinks bottling plants
(7) Steel furniture, fasteners, etc.
(8) Fragrance, flavours and food additives
(9) Aerated water/soft drinks
(10) Light Engineering industry excluding fabrication & forging
(11) Plastic industries like injection moulding
(12) Readymade garment industries
(13) Flour Mills upto 20 horse powers
(14) Designing of fabrics
(15) Washing of fabrics
(16) Trimming, Cutting, Using and blanching of fruits and vegetables
(17) Washing of equipments and regular food washing using cooling water
(18) Separated milk and whey
(19) Steeping and processing of grain
(20) Bleaching
(21) Degreasing
(22) Phosphating
(23) Dying and Printing
(24) Cooking of fibres, digesting
(25) Juicing of sugarcane, extraction of sugar
(26) Filtration, Centrifugation, Distillation of edible oils
(27) Pulping and fermenting of coffee beans
(28) Electroplating, Galvanizing
(29) Cotton spinning and weaving
98 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
(30) Polishing
(31) Surface quoting
(32) Granite Industry except quarrying
(33) Formulations of pharmaceuticals
(34) Dyeing and printing (small units)
(35) Laboratory ware
(36) Wire drawing (cold process) and bailing straps
(37) Potassium permanganates
(38) Textile industry
(39) Dyes and Dyestuff
(40) DM plant exceeding 20 kilo litres per day capacity
Note: - Category of Industries modified time to time by Tamil Nadu Pollution Control Board will be
applicable.
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 99
Annexure – VIII
[See rule 36]
List of Industries Permissible in Special and Hazardous Industries Zone
All Industries classified as “RED” by TNPCB i.e.,
(1) Lime Manufacture
(2) Ceramics
(3) Sanitary wares
(4) Tyres and Tubes
(5) Refuse incineration
(6) Large flour mills
(7) Vegetable oils including solvent extracted oils
(8) Soap with/without steam boiling process and synthetic detergent formulations
(9) Steam generating plants
(10) Manufacture of machineries and machine tools and equipments
(11) Manufacture of office and household equipments and appliances involving use of
fossils fuel combustion
(12) Industrial gases (only nitrogen, oxygen and O2)
(13) Miscellaneous glass wears without involving use of fossil fuel combustion
(14) Optical glass
(15) Petroleum, storage and transfer facility
(16) Surgical and medical products including prophylactic and latex products
(17) Manufacture of power driven pumps, compressors, and Refrigeration units, fire
fighting equipments, etc.
(18) Acetylene (synthetic)
(19) Glue and gelatin
(20) Metallic sodium
(21) Photographic films, papers and photographic chemicals
(22) Plant nutrients (manure)
(23) Ferrous and non-ferrous metals extraction, refining, casting/forging, alloy making
processing, etc.
(24) Dry coal processing / mineral processing, industries like sintering, beneficiation,
pelletisation, etc.
(25) Phosphate rock processing plants.
(26) Cement plants with horizontal rotary kilns
100 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
(27) Glass and Glass products involving use of coal
(28) Petroleum refinery
(29) Petro-chemical industries
(30) Manufacture of lubricating oils and greases
(31) Synthetic rubber manufacture
(32) Coal, oil, nuclear and wood based thermal power plants
(33) Vanaspathi hydrogenated, vegetable oils/industrial purposes
(34) Sugar Mills (white and khandasari)
(35) Craft paper mills
(36) Coke oven by-products and coal tar – distillation products
(37) Alkalis
(38) Caustic soda
(39) Potash
(40) Electro thermal product (artificial abrasives, calcium carbide, etc.)
(41) Phosphorus and its compounds
(42) Acids and their salts (organic and inorganic)
(43) Nitrogen compound (cyanides, cynamides and other nitrogen compounds)
(44) Explosives (including Industrial explosives, detonators and fuses)
(45) Phthalic an hydrides
(46) Process involving chlorinated hydro carbon
(47) Chlorine, fluorine, aromine, iodine and their compounds
(48) Fertilizer industries
(49) Paper board and straw board
(50) Synthetic fibres
(51) Insecticides, fungicides, herbicides and pesticides (basic manufacture and
formulation)
(52) Basic drugs
(53) Alcohol (industrial or potable)
(54) Leather industry including tanning and processing
(55) Coke making, coal liquefaction and fuel gas making industries
(56) Fibre glass production and processing
(57) Refractory
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 101
(58) Manufacture of pulp - wood pulp, mechanical or chemical (including dissolving pulp)
and/paper making.
(59) Pigment dyes and their intermediates.
(60) Industrial carbons (including graphite, electrodes, anodes, midget electrons,
graphite, blocks, crucibles, gas carbons activated, carbon synthetic diamonds,
carbon black, black, lamp etc.)
(61) Electro chemicals (other than those covered under alkali group)
(62) Paints, enamels and varnishes
(63) Ploy propylene
(64) Poly vinyl chloride
(65) Chlorates, per chlorates and peroxides
(66) Polishes
(67) Synthetic resin and plastic products
Note: - Category of Industries modified time to time by Tamil Nadu Pollution Control Board will be
applicable.
102 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
Annexure - IX
[See rule 35 (23)]
Regulations for Special Provisions for Hospital Buildings.
(1) Ramps of minimum width 2.4 m and maximum slope of 1:12 shall be provided in all
Hospital Buildings with Ground Floor/Stilt Floor +First Floor and above and floor
area exceeding 300 sq.m. in each floor.
(2) Set back space alround the building with access for fire fighting vehicles to operate,
as already laid down in the Development Regulations shall be provided as given
below:
(i) For buildings less than 18.30 metres height, 6.0 metres wide set back alround.
(ii) For buildings between 18.30 metres and 30.0 metres height, 7.0 metres set
back alround.
(iii) Set back area should be free of any obstruction, such as fountains, statues,
flower pots, decorative idols, ramps etc., to facilitate movement of vehicle and
people during emergency.
(3) Minimum of two large 'louvered windows' (with adequate safety provision) shall be
provided in each floor for easy evacuation of persons, wherever the building is fully
glazed.
(4) Fire Lifts with alternate power supply outside the building shall be provided.
(5) Fire fighting training shall be given for selected employees in each hospital. The
Hospital Authorities shall approach the Directorate of Fire & Rescue Service
Department (DF&RS) for imparting such training.
(6) Regular mock drills shall be conducted once in every six months with the help of
DF&RS to ensure effective functioning of all safe guards built for fire and life safety.
(7) All Government/Private Hospitals shall display in suitable places, within the
premises, declaration enlisting the fire safety measures and escape routes provided
in the hospital. This declaration should be displayed on a board in Tamil and
English.
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 103
Annexure – X
[See rule 54 (2) (b)]
Sanitation requirements
The requirement for fitments for drainage and sanitation in the use of buildings other
than residential shall be in accordance with tables below
Table: 1. Sanitation requirements for shops and Commercial Offices
Sl.
No.
Sanitary Unit/
Fittings
For Personnel
1. Water closet One for every 25 persons or part thereof, exceeding 15 (including
employees and customers).
For female personnel 1 for every 15 persons or part thereof,
exceeding 10.
2. Drinking Water
Fountain
One for every 100 persons with a minimum of one on each floor.
3. Wash Basin One for every 25 persons or part thereof.
4. Urinals Nil up to 6 persons
1 for 7-20 persons
2 for 21-45 persons
3 for 40-70 persons
4 for 71-100 persons
From 101 to 200 add at the rate of 3%;
For over 200 persons add at the rate of 2.5%.
5. Cleaners’ Sink One per floor minimum, preferably in or adjacent to sanitary rooms.
Note: Number of customers for the purpose of the above calculation shall be the average
number of persons in the premises for a time interval of one hour during the peak
period. For male-female calculation a ratio of 1: 1 may be assumed.
Table:2 Sanitation Requirements for Hotels
Individual guest rooms shall have attached toilets. In addition, the following shall also be
provided.
Sl.
No. Sanitary Unit For Residential
Public staff
For non residential Staff
For male For female
1. Water Closet
(W.C.)
One per 8 Persons
omitting occupants
of the attached
water closet
minimum of 2 if
both sexes are
lodged
1 for 1-15 persons
2 for 16-35 persons
3 for 36-65 persons
4 for 66-100 persons
1 for 1-12 persons
2 for13-25 persons
3 for 26-40 persons
4 for 41-57 persons
5 for 58-77 persons
6 for 78-100 persons
Add 1 for every 6
persons or part thereof
104 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
2. Ablution Taps One in each W.C One in each W.C One in each W.C.
3. Urinals Nil Nil up to 6 persons
1 for 7-20 persons
2 for 21-45 persons
3 for 40-70 persons
4 for 71-100 persons
Nil
4. Wash Basins One per 10 persons 1 for 15 persons
2 for 16-35 persons
3 for 36-65 persons
4 for 66-100 persons
1 for 1-12 persons
2 for 13-25 persons
3 for 26-40 persons
4 for 41-57 persons
for 58-77 persons
6 for 78-100 persons
5. Baths One per 10 persons Nil Nil
6. Cleaner’s
sinks
One per 10
persons.
Less occupants of
room with bath in
suite
Nil Nil
7. Kitchen Sink One in each Kitchen One in each Kitchen One in each Kitchen
Note: i) It may be assumed that the two-thirds of the number are males and one- third
females
ii) One water tap with drainage arrangements shall be provided for every 50 persons
or part there of in the vicinity of water closet and urinals.
Table:3 Sanitation Requirements For Public halls
Sl.
No. Sanitary Unit For Male For Female
1. Water Closet One per 100 persons upto
400 persons; for over 400
add at the rate of one per
250 persons or part thereof.
Two for 10 persons upto 200
persons; over 200 add at the
rate of one per 100 persons or
part thereof.
2. Ablution Taps One in each W.C. One in each W.C.
3. Urinals One for 50 persons or part
thereof.
Nil, upto 6 persons
1 for 7-20 persons
2 for 21-45 persons
3 for 46-70 persons
4 for 71-100 persons
4. Wash Basins One per W.C. and urinal
provided
One per W.C. provided
5 Kitchen Sink One in each kitchen One in each kitchen
6. Bath (shower) One per 10 persons
7. Cleaner’s sinks One per 30 Bed rooms (one
per floor mimimum)
Note: i) It may be assumed that the two-thirds of the number are males and one- third
females
ii) One water tap with drainage arrangements shall be provided for every 50 persons
or part thereof in the vicinity of water closet and urinals.
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 105
Table:4 Sanitation Requirements for Educational Occupancy
Sl.
No.
Sanitary Unit Boarding Institutions Other educational Institutions
Boys Girls Boys Girls
1. Water Closet
(W.C.)
One for 8
boys or part
thereof
One for 6
girls or part
thereof
One for 40 boys or
part thereof
One for 25
girls or part
thereof
2. Ablution Taps One in each
W.C.
One in each
W.C.
One in each W.C. One in each
W.C.
3. Urinals One per every
25 pupils or
part thereof
-- One per every 20
pupils or part
thereof
--
4. Wash Basins One for every
8 pupils or
part thereof
One for every
6 pupils or
part thereof
One for every 40
pupils or part
thereof
One for
every 40
pupils or
part thereof
5. Baths One for every
8 pupils or
part thereof
One for every
6 pupils or
part thereof
-- --
6. Drinking Water
Fountains
One for every
50 pupils or
part thereof
One for every
50 pupils or
part thereof
One for every 50
pupils or part
thereof
One for
every 50
pupils or
part thereof
7. Cleaner’s Sink One per Floor
minimum
One per Floor
minimum
One per Floor
minimum
One per
Floor
minimum
Table:5 Sanitation Requirements for Nursery Schools
Sl. No. Sanitary Unit Requirement
1. Water Closet One for 15 boys, one for 6 girls
2. Ablution Taps One in each W.C.
3. Urinals one for 12 boys
4. Wash Basins One for every 15 pupils or part thereof
5. Baths One bath sink per 40 pupils
6. Drinking Water Fountains One for every 50 pupils or part thereof
7. Cleaner’s Sink One per floor minimum
Note: 1. One water tap with draining arrangements shall be provided for every 50 persons
or part thereof, in the vicinity of water closets and urinal.
2. For teaching staff, the schedule of sanitary units to be provided shall be the same
as in case of office buildings (Table 1).
106 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
Table:6 Sanitation Requirements for Governmental and Public Business Occupancy
and Offices
Sl. No. Sanitary Unit For Male Personnel For female Personnel
1. Water Closet (W.C.) One for 25 persons or
part thereof
One for 15 persons or part
thereof
2. Ablution taps One in each W.C. One in each W.C.
3. Urinals Nil upto 6 persons
1 for 7-20 persons
2 for 21-45 persons
3 for 46-70 persons
4 for 71-100 persons
From 101 to 200 add at
the rate of 3%;
For over 200 persons
add at the rate of 2.5%.
--
4. Wash Basins One for every 25 persons
or part thereof
One for every 25 persons or
part thereof
5. Drinking water
fountains
One for every 100
persons with a minimum
of one on each floor
One for every 100 persons
with a minimum of one on
each floor
6. Cleaner’s Sinks One per floor minimum;
preferably in or adjacent
to sanitary rooms.
--
7. Executive Room /
Conference Hall
Toilet Suite (1 WC, 1 washbasin, optional shower for 24
hr usage)
Unit could be common for Male / Female or separate
depending on the number of user of each facility
Note: One water tap with drainage arrangements shall be provided for every 50 persons or
part thereof in the vicinity of water closet and urinals.
Table: 7 Sanitation Requirements for Residences
Sl.
No.
Sanitary Unit Dwelling with
individual
conveniences
Dwelling without individual
conveniences
1. Bath Room One provided
with water tap
One for every two tenement
2. Water Closet (W.C.) One One for every two tenement
3. Sink (or Nahani) in the Floor One --
4. Water Tap One One with drainage arrangement in
each tenement
One in common bath rooms and
common water closet.
Note: Where only one water closet is provided in a dwelling, the bath and water closet shall
be separately accommodated.
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 107
Table:8 Sanitation Requirements for Assembly Occupancy Buildings (Cinema,
Theaters, Auditoria. etc.)
Sl.
No.
Sanitary
Unit
For Public For Staff
Male Female Male Female
1. Water
Closet
One for 100
persons upto 400
persons. For over
400 persons, add
at the rate of 1 per
250 persons or part
thereof
Two per 100
persons upto 200
persons. For over
200 persons add
at the rate of 1
per 100 persons
or part thereof
One for 15
persons.
Two for 16-35
persons
One for 1-12
persons.
Two for 13-
25 persons
add at the
rate of 1 per
6 persons or
part thereof
2. Ablution
Taps
One in each W.C. One in each W.C. One in each
WC
One in each
WC
3. Urinals One for 50 persons
or part thereof
_____ Nil upto
6 persons
One for 7-20
persons
Two for 21-45
persons
_____
4. Wash
Basins
One for every 200
persons or part
thereof
One for every 200
persons or part
thereof
One for 1-15
persons
Two for 16-35
One for 1-12
persons
Two for 13-
25 persons
5. Drinking
Water
Fountain
One per 100 persons or part thereof
6. Cleaner’s
sink
One per floor
7. Shower /
Bathing
As per trade requirement
Note: - i) One water tap with draining arrangements shall be provided for every 50 persons
or part
thereof in the vicinity of water closets and urinals.
ii) It may be assumed that two thirds of the numbers are males and one third
females.
108 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
Table:9 Sanitation Requirements for Assembly Buildings (Art, Galleries, Libraries and
Museums)
Sl.
No.
Sanitary
Unit
For Public For Staff
Male Female Male Female
1. Water
Closet
(W.C.)
One for 200
persons upto 400
persons. For over
200 persons, add
at the rate of 1
per 250 persons
or part thereof
One per 100
persons upto 200
persons. For over
200 persons, add
at the rate of 1
per 150 persons
or part thereof
One for 1-15
persons.
Two for 16-
35 persons
One for 1-12
persons.
Two for 13-25
persons, add at
the rate of 1 per
6 persons or
part thereof
2. Ablution
Taps
One in each W.C. One in each W.C. One in each
W.C
One in each
W.C
3. Urinals One for 50
persons or part
thereof
-- Nil upto
persons
One for 7-20
persons
Two for 21-
45 persons
--
4. Wash
Basins
One for every 200
persons or part
thereof. For over
400 persons, add
at the rate of 1
per 250 persons
or part thereof.
One for every 200
persons or part
thereof. For over
200 persons, add
at the rate of 1
per 150 persons
or part thereof
One for 1-15
persons
Two for 16-
35
One for 1-12
persons
Two for 13-25
persons
5. Cleaner’s
Sink
One per floor, minimum
6. Drinking
Water
Fountain
One per 100 persons or part thereof
7. Shower/
Bath
As per each kitchen
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 109
Table :10 Sanitation Requirements for Restaurants
Sl.
No. Sanitary Unit
For Public For Staff
Male Female Male Female
1. Water Closet
(W.C.)
One per 50
seats upto 200
seats. For over
200 seats, add
at the rate of 1
per 100 seats
or part thereof
One per 50
seats upto 200
seats. For over
200 seats, add
at the rate of 1
per 100 seats
or part thereof
1 for 15
persons.
2 for 16-35
persons.
3 for 36-65
persons.
4 for 66-100
persons.
1 per 1-12
persons.
2 for 13-25
persons.
3 for 26-40
persons.
4 for 41-57
persons.
5 for 58-77
persons.
6for 78-100.
persons.
2. Ablution Taps One in each
W.C.
One in each
W.C.
One in each
W.C.
One in each W.C.
3. Urinals One for 50
persons or part
thereof
-- Nil upto 6
persons.
1 for 7-20
persons.
2 for 21-45
persons.
3 for 46-70
persons.
4 for 71-100
persons.
--
4. Wash Basins One for every water closet
5. Kitchen Sinks
& Dish
Washer
One per each Kitchen
6. Service Sink One in the restaurant
110 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
Table:11 Sanitation Requirements for Factories
Sl.
No. Sanitary Unit For Male Personnel For female Personnel
1. Water Closet 1 for 15 persons
2 for 16-35 persons
3 for 36-65 persons.
4 for 66-100 persons.
For 101 to 200 persons
add at rate of 3%.
From over 200 persons,
add at the rate of 2.5%.
1 for 1-12 persons
1 for 13-25 persons.
2 for 26-40 persons.
3 for 41-57 persons.
4 for 58-77 persons.
5 for 78-100 persons.
For 101 to 200 persons, add at the rate
of 5%. From over 200 persons add at
the rate of 4%.
2. Ablution Taps One in each W.C One in each W.C.
3. Urinals Nil upto 6 persons
1 for 7-20 persons
2 for 21-45 persons
3 for 46-70 persons
4 for 71-100 persons
From 101 to 200 persons
add at the rate of 3%; for
over 200 persons add at
the rate of 2.5%.
--
4. Washing Taps
with draining
arrangement
One for every 25 persons or part thereof
5. Drinking
Water
Fountains
One for every 100 persons with a minimum of one on each floor
6. Baths
Preferably
Showers
As required for particular trade or occupation
7. Emergency
shower and
eye wash
fountain
1 per every shop floor per 500 persons
Note:
i) For many trades of a dirty or dangerous character, more extensive provisions are
required.
ii) One water tap with draining arrangement shall be provided for every 50 persons or
part thereof in the vicinity of water closet and urinal
iii) Crèches where provided shall be fitted with water closets (One for 10 persons or part
thereof), wash basins (1 for 15 persons or part thereof) and drinking water tap with
drinking arrangement for every 50 persons or part thereof.
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 111
Table -12 Sanitary Requirements for Large Stations and Airports
Sl. No. Place W.C. for Males W.C. for Females Urinals for Males
only
1. Junction Stations,
Intermediate
Stations and
Substations
3 for first 1000
persons, add 1 for
subsequent 1000
persons or part
thereof.
8 for first 1000
persons, add 1 for
every additional
1000 persons or
part thereof.
4 for every 1000
person,
add 1 for every
additional 1000
persons or part
thereof.
2. Terminal Stations
and Bus Terminals
4 for first
1000
persons and 1
for
every additional
1000 persons or
part
thereof.
10 for every
1000 person and 1
for every
additional 1000
persons or
part thereof.
6 for every 1000
person and 1 for
every
additional 1000
persons or part
thereof.
3. Domestic Airports
2*
4*
1 per 40 persons or
part
Minimum.
For 200 persons 5 16 thereof.
For 400 persons 9 30
For 600 persons 12 40
For 800 persons 16 52
For 1000 persons 18 58
4. International
Airports
6
20
1 per 40 persons or
part
For 200 persons thereof.
For 600 persons 12 40
For 1000 persons 18 58
Note:
Provision for wash basins, baths including shower stalls, shall be in accordance
with part ix section 2- Drainage and Sanitation of National Building Code of India.
* At least one Indian style water closet shall be provided in each toilet. Assume 60 %
males and 40% females in any area. At least 50 % of female WCs may be Indian
pan and 50% EWC.
112 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
Table13 General Standards/Guidelines for Public Toilets in Public Area
Public Toilet On roads and for open areas: At every 1 km, including in parks,
plaza, open air theatre,
swimming area, car parks, fuel stations. Toilets shall be disabled-friendly
and in 50-50 ratio (M/F). Provision may be made as for Public Rooms
(Table 4.10 Contd)
Signage Signboards on main streets shall give directions and mention the distance
to reach the nearest
public convenience. Toilets shall have multi-lingual signage for the
convenience of visitors. Helpline number shall be pasted on all toilets for
complaints/queries.
Modes Pay and use or free. In pay and use toilets entry is allowed on payment to
the attendant or by
inserting coin and user gets 15 minutes.
Maintenance/
Cleaning
The toilet should have both men and women attendants. Alternatively
automatic cleaning
cycle covering flush, toilet bowl, seat, hand wash basin, disinfecting of
floor and complete drying after each use can be adopted, which takes 40
seconds.
Public toilet shall be open 24 hours.
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 113
Annexure – XI
[See rule 51]
Structural Design and Safety
Indian Standards to be taken into consideration for structural design of foundations,
elements of masonry, timber, plain concrete, reinforced concrete, pre-stressed concrete and
structural steel are given below:
For General Structural Safety
(1) IS: 456:2000 “Code of Practice for Plain and Reinforced Concrete”
(2) IS: 800-1984 “Code of Practice for General Construction in Steel”
(3) IS: 801-1975 “Code of Practice for Use of Cold Formal Light Gauge Steel
Structural Members in General Building Construction”
(4) IS 875 (Part 2):1987 “Design loads (other than earthquake) for buildings and
structures Part2 Imposed Loads”
(5) IS 875 (Part 3):1987 “Design loads (other than earthquake) for buildings and
structures Part 3 Wind Loads”
(6) IS 875 (Part 4):1987 “Design loads (other than earthquake) for buildings and
structures Part 4 Snow Loads”
(7) IS 875 (Part 5):1987 “Design loads (other than earthquake) for buildings and
structures Part 5 special loads and load combination”
(8) IS: 883:1994 “Code of Practice for Design of Structural Timber in Building”
(9) IS: 1904:1986 “Code of Practice for Structural Safety of Buildings: Foundation”
(10) IS1905:1987 “Code of Practice for Structural Safety of Buildings: Masonry Walls”
(11) IS 2911 (Part 1): Section 1:2010 “Code of Practice for Design and Construction of
Pile Foundation Section 1
Part 1: Section 2 Bored Cast-in-situ Piles
Part 1: Section 3 Driven Precast Concrete Piles
Part 1: Section 4: 1984 Bored precast Concrete Piles
Part 2: 1980 Timber Piles
Part 3 1980: Under Reamed Piles
Part 4 1985: Load Test on Piles”
For Cyclone/Wind Storm Protection
(12) IS 875 (3)-1987 "Code of Practice for Design Loads (other than Earthquake) for
Buildings and Structures, Part 3, Wind Loads"
(13) Guidelines (Based on IS 875 (3)-1987) for improving the Cyclonic Resistance of
Low rise houses and other building
For Earthquake Protection
(14) IS: 1893-2002 "Criteria for Earthquake Resistant Design of Structures (Fifth
Revision)"
114 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
(15) IS: 13920-1993 "Ductile Detailing of Reinforced Concrete Structures subjected to
Seismic Forces - Code of Practice"
(16) IS: 4326-1993 "Earthquake Resistant Design and Construction of Buildings -
Code of Practice (Second Revision)"
(17) IS: 13828-1993 "Improving Earthquake Resistance of Low Strength Masonry
Buildings - Guidelines"
(18) IS: 13827-1993 "Improving Earthquake Resistance of Earthen Buildings -
Guidelines",
(19) IS: 13935-1993 "Repair and Seismic Strengthening of Buildings -Guidelines"
(20) The repair of structures should be undertaken as per IS:15988
For Protection of Landslide Hazard
(21) IS 14458 (Part 1): 1998 Guidelines for retaining wall for hill area: Part 1
Selection of type of wall.
(22) IS 14458 (Part 2): 1997 Guidelines for retaining wall for hill area: Part 2 Design
of retaining/breast walls
(23) IS 14458 (Part 3): 1998 Guidelines for retaining wall for hill area: Part 3
Construction of dry stone walls
(24) IS 14496 (Part 2): 1998 Guidelines for preparation of landslide – Hazard zonation
maps in mountainous terrains: Part 2 Macro-zonation
Note: Whenever an Indian Standard including those referred in the National Building
Code or Bureau of Indian Standards is referred, the latest revision and additions
of the same shall be followed except specific criteria, if any, mentioned above
against that code.
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 115
Annexure – XII
[See rule 51 (8)]
Protection against Natural Hazards
1. Protection from Earthquakes
(1) In those areas where there are no dangers of soil liquefaction or settlements or
landslides, all building structures and infrastructures should be designed using
the relevant Indian Standards as provided in these rules and the National
Building Code.
(2) Soils subjected to liquefaction potential under earthquake shaking shall be
improved by compaction to desired relative densities, so as to prevent the
possibility of liquefaction.
(3) Buildings and structures shall be founded on deep bearing piles going to non-
liquefiable dense layers.
(4) Steep slopes shall be made more stable by terracing and construction of
retaining walls and breast walls, and by ensuring good drainage of water so that
the saturation of the hill-slope is avoided.
(5) Any other appropriate engineering intervention that may be required to save the
buildings, structures, or infrastructure from the fury of the earthquake shall be
made.
2. Protection from Cyclonic Wind Damage / Flooding /Tsunami
(1) Buildings, structures and infrastructures in the cyclone prone areas shall be
designed according to the Indian Standards and Guidelines as provided in these
rules and the National Building Code.
(2) Light utility structures used for electrical transmission and distribution and
towers for communications, Chimneystacks of industrial structures require
special design considerations against the cyclonic wind pressures, suctions and
uplifts.
(3) In case the buildings, structures and infrastructures are founded on marine
clay deposits it will be advisable to adopt either under-reamed or long piles
which shall penetrate the marine clay layer and rest on dense sand stratum, or
individual column footing with a reinforced concrete beam located at the level of
the ground, or a continuous reinforced concrete strip footing, using a very low
bearing pressure.
(4) Wherever, the topsoil could become slushy due to flooding, the top layer of 30
cm depth of soil shall not be considered for providing lateral stability.
(5) In storm surge prone areas, it will be preferable to construct the community
structures, like schools, cyclone shelters, etc. by raising the level of the ground
protected by provision of retaining walls at sufficient distance away from the
building, taken to such depth that no erosion takes place due to receding storm
surge. Alternatively, construct the community structures on stilts with no
masonry or bracing up to the probable maximum surge level.
(6) Protection of areas from floods may require one or more of the following actions:
(a) Raising the site above the high flood level.
(b) Construction or improvement of drainage paths to effectively drain the water
from the site area
(c) Construction of buildings and structures on deep foundations going below
the depth of scour or on stilts with deep enough foundations under water.
116 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
Annexure – XIII
[See rule 23]
Registration, Qualification and Duties and Responsibilities of Architects, Engineers,
Structural Engineers, Construction Engineers, Quality Auditors, Geo-Technical
Engineer, Town Planners and Developers
(1) Registered Architect (RA)
(a) Registration
On the basis of their academic qualifications and experience, Architects shall be
“Registered” in two “Grades”. (The purpose is not to licence to practice, but to
register such professionals to help to achieve compliance of these rules for the
development or construction by the owners or developers). The eligibility criteria for
registration in each “Grade” and the “Scope of Work” which can be entrusted to the
Architects of each “Grade” are given below.
i) Architect Grade-I
Scope of work: To prepare plans, designs and drawings for any type of
buildings or developments including High rise buildings and
layout developments
Eligibility: The person with B.Arch or equivalent degree with minimum
2 years experience (after obtaining the degree) in professional
work shall have registered with Council of Architects under
the provisions of the Architects Act, 1972.
And
The evidence for registration of Architects with the council of Architects and
subsequent renewal have to be produced.
ii) Architect Grade-II
Scope of work: To prepare plans, designs and drawings for small
developments stated in clause (1) (a) of Rule 35
Eligibility: Diploma in Architecture with 5 years experience (after
obtaining the Diploma) in professional work.
b) Duties and responsibilities
i. He shall be responsible for making adequate arrangements to ensure not only
that the work is executed as per the approved plans but also is in conformity
with the stipulations of the NBC for safe and sound construction and smooth
functioning of the services provided in the building and for making adequate
provisions for services and equipments and protection from fire hazards as per
NBC.
ii. He shall on behalf of the owner obtain and submit the progress certificates,
completion report and other details required for occupancy certificate and any
other report as required under the rule and obtain the same and keep it ready
in the site for inspection by the competent authorities.
iii. He is solely responsible for obtaining the certificates required under this rule
from the registered professionals.
iv. In the event of any deviations he is the solely responsible to bring it to the
notice of the competent authority
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 117
v. If the services of the registered architect on record are terminated he shall
immediately inform the competent authority about his termination and the
stage of work at which his services have been terminated. The registered
architect appointed as replacement of the preceding architect shall inform
about his appointment on the job and inform the competent authority of any
deviation that might have occurred on the site with reference to the approved
plan and the stage at which he is taking over the charge.
vi. The registered architect appointed shall inform the competent authority
immediately on termination of the services of the registered structural engineer
on record , registered construction engineer on record , or any change of owner
or registered developer.
vii. He shall instruct the concerned person or agency that adequate provisions are
made for ensuring the safety of workers and others during excavation,
construction and erection.
viii. He shall instruct the concerned person or agency that adequate provisions are
made for providing safe and adequate temporary structures required for
construction and development
ix. He should inform in the progress report about satisfactory working conditions
for the workers as per the various acts in force and binding on the employers
of workers,
x. If there are deviations to approved plan or unauthorized additional
construction, the same has to be intimated immediately
xi. He should provide all certificates and reports as required under these rules
(2) Registered Engineer (RE)
a) Registration
On the basis of their academic qualifications and experience, Engineers shall be
“Registered” in three “Grades”. The eligibility criteria for registration in each “Grade”
and the “Scope of Work” which can be entrusted to the Engineer of each “Grade” are
given below.
i) Grade-I
Scope of work: To prepare plans, designs and drawings for any type of
buildings or developments including High rise buildings and
layout developments;
Eligibility: B. E. Civil or equivalent degree or A.M.I.E. with minimum 10
years experience (after obtaining the degree) in professional
work.
ii) Grade-II
(i) Scope of work: To prepare plans, designs and drawings for Non High rise building
(i.e. upto 18.30m. in height) and layout developments on lands upto 10 hect. in
extent.
Eligibility: B. E. Civil or equivalent degree with minimum 5 years
experience (after obtaining the degree) in professional work.
118 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
iii) Grade-III
Scope of work: To prepare plans, designs and drawings for small
developments stated in clause (1) (a) rule 35 and excluding the
above mentioned structures for Grade-I and Grade-II and
layout developments on lands upto 5 hect. in extent.
Eligibility: i) Diploma in Civil Engineering with 5 years experience (after
obtaining the diploma) in professional work, or
(ii) B. E. Civil or equivalent degree with minimum 3 years
experience (after obtaining the degree) in professional work,
b) Duties and responsibilities
i. He shall be responsible for making adequate arrangements to ensure not only
that the work is executed as per the approved plans but also is in conformity
with the stipulations of the NBC for safe and sound construction and smooth
functioning of the services provided in the building and for making adequate
provisions for services and equipments and protection from fire hazards as per
NBC.
ii. He shall be responsible to see that the structure serviceable for its intended
uses.
iii. To inspect the building construction work periodically and maintain such
records as cube strength, steel test certificate, etc. as envisaged in NBC. He is
responsible for quality of material and execution.
iv. He shall on behalf of the owner obtain and submit the progress certificates,
completion report and other details required for occupancy certificate and any
other report as required under the rule and obtain the same and keep it ready
in the site for inspection by competent authorities.
v. He is solely responsible for obtaining the certificates required under this rule
from the registered professionals
vi. In the event of any deviations he is the solely responsible to bring it to the notice
of the competent authority.
vii. In the event of any deviations he is the solely responsible to bring it to the notice
of the competent authority.
viii. If the services of the registered engineer on record are terminated, he shall
immediately inform the competent authority about his termination and the
stage of work at which his services have been terminated. The registered
engineer appointed as replacement of the preceding engineer shall inform about
his appointment on the job and inform the competent authority of any deviation
that might have occurred on the site with reference to the approved plan and
the stage at which he is taking over the charge.
ix. If there are deviations to approved plan or unauthorized additional construction,
the same has to be intimated immediately.
x. The registered engineer appointed shall inform the competent authority
immediately on termination of the services of the registered structural engineer
on record , registered construction engineer on record , or any change of owner
or registered developer.
xi. He shall instruct the concerned person or agency that adequate provisions are
made for ensuring the safety of workers and others during excavation,
construction and erection and that the employment of workers are made
satisfying the statutory Acts
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 119
xii. He shall instruct the concerned person or agency that adequate provisions are
made for providing safe and adequate temporary structures required for
construction and development
xiii. He should inform in the progress report about satisfactory working conditions
for the workers as per the various acts in force and binding on the employers of
workers,
xiv. To provide all certificates and reports as required under this rule.
(3) Registered Structural Engineer (RSE)
(a) Registration
On the basis of their academic qualifications and experience, Structural Engineers shall
be “Registered” in two “Grades”. The eligibility criteria for registration in each “Grade”
and the “Scope of Work” which can be entrusted to the Structural Engineer of each
“Grade” are given below.
i) Grade-I
Scope of work: To prepare structural design and structural drawings for any type of
buildings including High rise buildings
Eligibility: M. E., or equivalent degree in structures or Earthquake Engineering
or Ph.D. in the subject with minimum 5 years of experience (after
obtaining the degree) in structural design work at a responsible
position as a structural designer.
Note: The experience as stated above shall be under a Structural Engineer on
Record. (This requirement shall be waived for the first ten years of the
notification of these Rules)
ii) Grade-II
Scope of work: To prepare structural design and structural drawings for small
developments stated in clause (1) rule 35 and excluding the above
mentioned structures for Grade-I
Eligibility: (ii) B. E. Civil or equivalent degree with minimum 3 years experience
(after obtaining the degree) in structural design work at a responsible
position as a structural engineer, or
(iii) M.E. or equivalent degree in Structures/ Earthquake
Engineering or Ph.D. in the subject with minimum 1 years of
experience (after obtaining the degree) in structural design work at a
responsible position as a structural engineer .
Note: The experience as stated above shall be under a Structural
Engineer on Record. (This requirement shall be waived for the first
ten years of the notification of these Rules)
(b) Duties and responsibilities:
i. To prepare a report on the structural design and to prescribe the method and
techniques of its execution as per relevant IS specifications and NBC.
120 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
In the case of High rise buildings.
(a) To get required soil (geo-technical) investigation done from an approved
laboratory and submit the report concerning the same in prescribed format
to the competent authority.
(b) To get the structural Design checked through third party verification and
submit a certificate concerning the same to the competent authority.
ii. To prepare and submit design basis report
iii. To prepare a detailed report on structural drawings and specifications for
execution indicating thereon design live loads, safe soil baring capacity,
specification of materials, assumption made in the design, special precautions
to be taken by contractor or builder to suit the designs and assumptions etc.
iv. To supply copies of structural drawings to the Registered Construction Engineer
on Record (CER) and the site supervisor and keep it ready for inspection of the
competent authority during progress certification.
v. To ensure that the structural components are executed without any deviation of
the submitted structural drawing.
vi to inspect the work at all important stages and certify the work being executed
for structural safety and over all structural soundness of the building and as
per the original structural drawings and furnish a copy of the certificate to
Registered Architect or Registered Engineer for submission to the competent
authority periodically along with progress report, structural inspection report
and completion report.
vii. To advice the owner or developer or architect or engineer for arranging for tests
purpose and their report for soil, building material etc., for his evaluation and
design consideration.
viii. To review field test result at progressive stages as per NBC and submit the
same to the competent authority. He shall also inform the competent authority
if any deviations in quality of materials or execution.
ix. to inform the Registered Architect or Registered Engineer of any structural
deviations noticed by him during the progress of work, who in turn will inform
the same to the competent authority
x To inform in writing the competent authority within 7 days if for any reason he is
relieved of appointment or responsibilities as the registered structural
engineer(RSE) for the development.
xi. Not to provide services to further or advance work of any type of development
that does not comply with these rules or is unauthorised as per these rules.
xii. If there are deviations to approved plan or unauthorized additional construction,
the same has to be intimated immediately to Registered Architect or Registered
Engineer who will inturn will inform the same to the competent authority
xiii. To provide all certificates and reports as required under this rule.
(4) Registered Construction Engineer (RCE)
a) Registration
The requirements for registration shall be:
(i) B.E. Civil or equivalent degree or A.M.I.E. with five years experience (after
obtaining the degree) in construction , or
(ii) Diploma in Civil Engineering with seven years experience (after obtaining the
diploma) in construction, or
(iii) B. Arch or equivalent with 5 years of experience (after obtaining the degree) in
construction registered with Council of Architects under the provision of Architects
Act
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 121
Note: The experience as stated above shall be under one or more Construction Engineer
on Record of one or more reputed construction companies. Such company or
companies established within or outside the area of jurisdiction of the competent
authority shall be of minimum ten years of standing.
b) Duties and responsibilities
All construction works (except the small developments defined in the clause (1) (a)
rule 35) shall be carried out under the supervision of a CER.
i. To adhere strictly to the structural drawings, specifications and written
instructions of the Registered Structural Engineer on Record and Registered
Architect on Record or Registered Engineer on Record
ii. To ensure that the structural components are executed without any deviation
of the submitted structural drawing.
iii. To follow the provisions of NBC. or I.S. specifications as regards materials,
components, quality control and the process of construction.
iv. He shall be responsible to see that the structure serviceable for its intended
uses.
v. To inspect the building construction work periodically and maintain such
records as cube strength, steel test certificate, etc. as envisaged in NBC and
submit the reports to Registered Architect or Registered Engineer. The same
has to be kept in the site for inspection by the competent authority.
vi. He is responsible for quality of material and execution.
vii. To provide for safety of workers and others during excavation, construction and
erection.
viii. To provide safe and adequate temporary structures required for construction
and erection.
ix. To bring to the notice of the registered Structural Engineer on record and
Registered Architect on record or Registered Engineer on record any situation of
circumstances which in his opinion are liable to endanger the safety of the
structure. The Registered Architect or Registered Engineer will in turn intimate
to the competent authority
x. To deposit with the Registered Architect or Registered Engineer for submission
to the competent authority one set of working drawings of the works executed
along with the progress certificates before proceeding with the next stage of the
work.
xi. He/she shall be in overall charge of the site and responsible for overall
supervision of the work.
xii. He/she shall ensure that all the work under his charge is carried out in
conformity with the approved drawings and as per the details and specifications
supplied by the registered Architect on record or Registered Engineer on record.
xiii. He/she shall take adequate measures to ensure that no damage is caused to the
work under construction and adjoining properties.
xiv. He/she shall also ensure that no undue inconvenience is caused in the course
of his/her work to the people in the neighborhood.
xv. He shall also ensure that no nuisance is caused to traffic & neighboring people
by way of noise, dust, smell, vibration etc. in the course of his/her work. If there
are deviations to approved plan/unauthorized additional construction, the same
has to be intimated to Registered Architect or Registered Engineer who will in
turn will inform the same to the competent authority
122 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
xvi. To provide all certificates and reports as required under this rule.
(5) Registered Quality Auditor (RQA)
a) Registration
The requirements for registration shall be:
(i) B.E. Civil or equivalent degree with five years experience (after obtaining the
degree) in testing of building materials including concrete and/or experience in
quality control work with a reputed construction agency.
(ii) M.E. (Civil) or equivalent with two years experience (after obtaining the
degree) stated above.
Note: The experience as stated above shall be under one or more registered
quality auditors/ under one or more reputed construction companies or
agencies. Such companies or agencies established within or outside the area of
jurisdiction of the competent authority shall be of minimum ten years of
standing.
b) Duties and responsibilities
(i) The construction work of a High rise building executed by CER shall be under
an independent quality inspection programme prepared and implemented under
the supervision of an independent QAR.
(ii) At the time of seeking permission from competent authority for starting
construction of a High rise building of special structures CER shall submit an
undertaking from QAR that:
a) The QAR is agreeable to accept the assignment to implement the quality
inspection programme, and that the appointed QAR is acceptable to the
Owner/Developer.
b) The QAR will get all the testing of building materials, concrete etc. done by
an independent approved testing laboratory.
iii).During construction of a High rise building the QAR shall carry out necessary
testing of materials as well as non-destructive testing of structural components with
the help of approved testing laboratory and submit to the CER, Registered Architect /
Registered Engineer and the owner/developer, the reports as per quality inspection
programme.
(iv.)Upon completion of the construction of High rise building or the special
structure the QAR shall submit the report and certificate in the prescribed format
based on the quality inspection programme. This report and certificate will be
submitted to the CER, Registered Architect/Registered Engineer and the
owner/developer for final submission to the competent authority to provide all
certificates and reports as required under this rule.
(6) Registered Geo-Technical Engineer (RGTE)
a) Registration
For foundation work, the requirements for registration Geo-technical Engineer on
Record
shall be:
(i) M.E. (or equivalent) in Geo-technical Engineering with minimum 5 years of
experience(after obtaining the degree)
(ii) The experience as stated above shall be under one or more Geo-technical
Engineer or agency. Such agencies established within of outside the area of
jurisdiction of the competent authority shall be of minimum ten years of
standing.
(iii) The Geo-technical Engineer shall state the Laboratory he will be using.
b) Duties and Responsibilities:
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 123
All High Rise Buildings shall have, for foundation work, the services of a Registered
Geo-technical Engineer on Record.
i To carry out soil investigation at proposed locations as per specifications of
Registered Structural Engineer on Record (SER)
ii To recommend various type foundation for proposed structure and loading
with supporting calculations
iii To enable SER to take site decision in case strata different investigation
report is met with.
iv To list out precautionary measures so that there is no damage to adjacent
property.
(7) Registered Town Planner
a) Registration
For layout developments /subdivisions, the requirements for registration Town
Planner shall be:
Masters degree in Town and Country Planning or in Urban Planning or in City
Planning or in Regional Planning or in Housing or an equivalent degree with
minimum 2 years experience (after obtaining the degree), or
A.I.T.P. with minimum 2 years experience (after passing the
examination/becoming the member)
b) Duties and Responsibilities:
i. Preparation of plans for land subdivisions/layouts,
ii. He shall be responsible for making adequate arrangements to ensure not only
that the work is executed as per the approved plan but also is in conformity
with the stipulations / conditions of approval. He shall inform the competent
authority of any deviation with reference to the approved plan.
iii. If the services of the Registered Town Planner are terminated he shall
immediately inform the competent authority about his termination. The
Registered Town Planner appointed as replacement of the preceding Town
Planner shall inform about his appointment on the job and inform the
competent authority of any deviation that might have occurred on that site with
reference to the approved plan and the stage at which he is taking over the
change.
iv. The Registered Town Planner shall inform the competent authority immediately
any change of owner or developer before getting permission for sub division /
layout under these rules.
v. He shall instruct the concerned person/agency that adequate provisions are
made for ensuring the safety of workers and others during the layout
development.
vi. to provide all certificates and reports as required under this rule.
(8) Registered Landscape Architect
a) Registration
For the work related to landscape design for building/ layout development for land
extending 5 hectares and above, the requirements of registration of landscape architect
shall be Bachelor or Master’s Degree in landscape architecture or equivalent from
recognized Indian or Foreign Universities.
b) Duties and Responsibilities
i. Preparation of landscape designs for buildings/ layout developments
ii. Shall be responsible for the maintenance of the natural eco system
iii. shall inform the competent authority if there are any intervention to the natural
scape
124 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
iv. He shall be responsible for making adequate arrangements to ensure not only
that the work is executed as per the approved plan but also is in conformity
with the stipulations / conditions of approval.
v. If the service of the Registered Landscape Architect is terminated he shall
immediately inform the competent authority about his termination. The
Registered Landscape Architect appointed as replacement of the preceding
Landscape Architect shall inform about his appointment on the job and inform
the competent authority of any deviation that might have occurred on that site
with reference to the approved plan and the stage at which he is taking over the
change.
vi. The Registered Landscape Architect shall inform the competent authority
immediately any change of owner or developer before getting permission for sub
division / layout under these rules.
(9) Registered Developer
a) Registration
i. Generally the person / firm who apply to register as developer shall have
experience in the field of construction or real estate development.
ii. The developer have to be an IT Assessee.
b) Duties and responsibilities
The responsibilities of developers shall be:
i. To obtain planning permission from Competent Authority and building
permission from the Executive Authority of Local body prior to
commencement of construction / development
ii. To appoint Registered Architect / Registered Engineer/Construction Engineer
and Registered Structural Engineer and other required professionals stated in
these rules
iii. The appointment of the Registered Architect/ Registered Engineer /Registered
Construction Engineer/ Registered Structural Engineer shall mean that he (the
Developer) has authorised the Registered Architect / Registered Engineer to do
all things necessary and to take all adequate measures for preparing the design,
drawings and specifications for the project and to appoint on his behalf
appropriate persons to act as CER, required for the proper execution of the
project and to retain on behalf of the owner any other specialist or expert
required on the work of the project, in consultation with the developer.
iv. To obtain and submit to the competent authority, along with application for
building permission the required certificates/report/ undertakings ,each
progress report through Registered Architect/Registered Engineer and
application for occupancy certificate.
v. To obtain at relevant stages certificates from them, for submission to the
competent authority, through Registered Architect/Registered Engineer that in
designing the building/ development and providing detailed drawings and
specifications for it they have complied with requirements as laid out in these
rules
vi. To obtain and adhere to the quality assurance procedure prepared by the CER.
vii. To adequately enable the CER to carry out his responsibilities.
viii. To certify along with the CER that construction/ development has been carried
out as per the design, detailed drawings and specifications provided by the
Registered Architect on Record/ Registered Engineer on Record and Registered
Structural Engineer on Record.
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 125
ix. To regularly submit progress reports and certificates through Registered
Architect/Registered Engineer as required by the competent authority.
x. To inform in writing the competent authority within 7 days, if for any reason he
ceases to be the developer or is relieved of his responsibilities as the developer.
xi. To inform in writing to the competent authority within 7 days, if for any reason
any of the registered professionals appointed by him have been relieved of their
responsibilities or have resigned.
xii. He shall not cause or allow any deviations from the approved drawings in the
course of the execution of the project against the instruction of Registered
Architect on Record / Registered Engineer on Record / Registered Construction
Engineer on Record / Registered Structural Engineer on Record and shall bear
all responsibilities for any irregularity committed in the use and function of the
building or its parts for which the approval has been obtained.
xiii. He shall not commence the use of building or shall not give the possession to
occupy the building to any one before obtaining the completion certificate or
occupancy certificate as applicable from the competent authority.
xiv. He shall provide adequate safety measures for structural stability and protection
against fire hazards likely from installation of services like electrical installation,
plumbing, drainage, sanitation, water supply etc. wherever required under the
rules.
xv. He shall make available copies of titles for the land, approved plans and all
certificates issued by the competent authority under these rules to the
prospective purchasers of the premises.
xvi. He should inform in the progress report about satisfactory working conditions
for the workers as per the various acts in force and binding on the employers of
workers,
xvii. He shall instruct the concerned person/agency that adequate provisions are
made for ensuring the safety of workers and others during excavation,
construction and erection and that the employment of workers are made
satisfying the statutory Acts
xviii. If there are deviation to approved plan/unauthorized additional construction,
the same has to be intimated immediately to the competent authority and
Registered Architect /Registered Engineer.
xix. He shall be responsible to see that the structure serviceable for its intended
uses.
xx. To provide all certificates and reports as required under this rule.
126 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
Annexure – XIV
[See rule 51 (3)]
Previous and next
All provisions of Tamil Nadu Combined Development and Building Rules, 2019
Questions people ask
Is form C of Tamil Nadu Combined Development and Building Rules, 2019 still in force?
No repeal of Tamil Nadu Combined Development and Building Rules, 2019 is recorded.