Principles for operationalising deviation settlement mechanism
5. Principles for operationalising deviation settlement mechanism.—The framework for
Deviation Settlement Mechanism shall cover the following key design parameters:—
(a) Scheduling period;
(b) Premise for least cost despatch;
(c) Operating range of frequency;
(d) Consolidated scheduling of all the State Entities at the State periphery;
(e) Deviation;
(f) Settlement period;
(g) Measurement unit for State Deviation Pool;
(h) Deviation Pool Price Vector;
(i) Deviation Volume Limit;
(j) Premise for allocation of losses;
(k) Submission of data by the generating station not considered as the State Entities;
(l) Procurement of URS in the interest of the State Grid;
(m) Congestion Charges; and
(n) Downloading/recording of SEMs and timely communication of data to the
SLDC:—
(A) Scheduling Period.—The scheduling period shall comprise of 96 time blocks,
each of 15-minute duration starting from 00:00 hours (IST) ending with 24:00 hours (IST).
The first time block of scheduling period shall commence from 00:00 hours (IST) to 00:15
hours (IST), second time block of scheduling period shall commence from 00:15 hours (IST)
to 00:30 hours (IST) and so on:
6 Compendium of HPERC Regulations, March 2021
Provided that from the date to be notified by it, the Commission may revise the
scheduling period to 288 time blocks, each of 5-minute duration starting from 00:00 hours
(IST) ending with 24:00 hours (IST). Accordingly, the Interface Metering, Energy
Accounting and Deviation Settlement should be capable to undertake transactions with 5-
minute duration. All future resource planning, IT and communication system requirement
and infrastructure development shall be undertaken to cater to this requirement.
(B) Premise for least cost dispatch.—Based on the availability schedule
forecasted by generating stations (Sellers) and load requirement forecasted by Buyers, the
SLDC shall draw up the least cost despatch schedule on Day Ahead basis for the State
Entities in accordance with the merit order principles as applicable, or approved by State
Commission, from time to time:
Provided that wheeling transactions of captive users and open access consumers shall
be despatched as contracted subject only to transmission and Distribution system constraints
and system emergency conditions.
(C) Operating Range of frequency.— (i) The normal operating range for average
grid frequency for time block shall be in line with range stipulated under Grid Code from
time to time (viz. 49.90 Hz to 50.05 Hz). While normal operating range of average frequency
as per Grid Code has been stipulated as 49.90 Hz to 50.05 Hz, the deviation price vector has
been specified under Regulation 7 and 9 for frequency range of
1
[49.85 Hz] to 50.05 Hz;
(ii) no over-drawal or under-injection shall be allowed when grid frequency is below
1[49.85 Hz] and no under-drawal or over-injection shall be allowed when grid frequency is
above 50.05 Hz; and
(iii) during the time blocks when frequency is
1
[49.85 Hz] and above but below
50.05 Hz, the variation to the extent of +/- 12 % shall be permissible for the purpose of
additional deviation charges, subject to payment of deviation charges:
2
[xxxxxxxxxxxxxxxxxxxxx]
(D) Consolidated scheduling of all the State Entities at the State periphery.—The
injection/drawal schedules of the State Entities, other than the distribution licensee, shall be
prepared with reference to their respective injection/drawal points in the State and shall, for
1
Sub. in regulation 5 in sub-regualtion (C) in clauses (i), (ii) & (iii) for words and figures
“49.70 Hz” for vide not. No. HPERC/428 dated 29th June, 2019, published in R.H.P. dated 3rd July, 2019 at p. 3131-
3137.
2 Ommitted “proviso alongwith Explanation” for vide not. No. HPERC/428 dated 29th June, 2019,
published in R.H.P. dated 3rd July, 2019 at p. 3131-3137before its the omission read as under:
“Provided that in case of,—
(a) over drawal/under injection by a State Entity during 12 such time blocks, immediately
preceding any given time, in which the frequency remained less than 49.9 Hz; or
(b) under drawal/over injection by a State Entity during 12 such time blocks, immediately
preceding any given time, in which the frequency was more than 49.9 Hz;
such State Entity shall take immediate steps, to reverse the sign of deviation and in case of
repeated failures by any State Entity to reverse the sign of deviation, the SLDC may also issue
appropriate directions to such State Entities, apart from taking suitable remedial measures to
avoid such situations.
Explanation.—The period of 12 time blocks shall be counted after ignoring the time blocks in which
the frequency is beyond the limits stipulated in item (i) or (ii), as the case may be.”
Compendium of HPERC Regulations, March 2021 7
the purposes like preparation of consolidated schedule for the State as a whole, accounting,
computation and recovery of various charges under these regulations etc., be projected to the
State periphery by loading applicable transmission and distributed losses of the STU and
distribution licensee, as applicable:
Provided that in cases involving sale of energy by the generating stations directly
connected to the distribution system of the distribution licensee to the retail consumers of
distribution licensee procuring power from such generating stations through intra-State open
access without involving STU system under the normal scheme of flows, the transmission
losses of the STU shall not be loaded to their respective injection/drawal schedules for
projecting the same to the State periphery:
Provided further that the distribution licensee shall give its net schedule w.r.t. the
STU periphery which shall be projected to the State periphery by loading the transmission
losses of the STU:
Provided further that all the charges specified in these regulations shall be levied
based on the data at State periphery.
(E) Deviation.— For the purposes of Deviation settlement amongst State Entities, the
SLDC shall work out the 'Deviation Pool Accounts' comprising over- drawal/under-drawal
and over-injection/under-injection for each State Entity corresponding to each Scheduling
period in accordance with the principle that the deviation in a time-block for a Seller means
its total actual injection minus its total scheduled generation and for a Buyer means its total
actual drawal minus its total scheduled drawal.
(F) Settlement Period.—Preparation and settlement of 'Deviation Pool Accounts'
shall be undertaken on weekly basis coinciding with mechanism followed for regional
energy accounts. The SLDC shall also prepare and issue detailed statements as per
Regulation 12 alongwith such accounts.
(G) Measurement Unit for Deviation Pool Account.—The measurement unit for
Deviation Pool Volume (Over-drawal/under-drawal and Over-injection/under-injection)
preparation shall be kiloWatt hours (kWh). Measurement unit for Deviation Pool Value
(Payable and Receivable) preparation shall be Indian Rupees (INR). The decimal component
of the energy unit (kWh) and amount (INR) shall be rounded off to nearest integer value.
(H) Deviation Pool Price Vector.—The charges for Deviation shall be in
accordance with the Deviation Price Vector specified in regulation 7 or as may be
subsequently notified by the Commission from time to time.
(I) Deviation Volume Limit.—In order to ensure grid discipline and grid
security, conditions for Deviation Volume Limit and consequences for exceeding such
Deviation Volume Limit by way of levy of Additional Deviation Charges, as specified under
Regulations 8 and 9, shall be applicable. Similarly, additional charges for deviation as
specified in sub-regulations (2) and (3) of regulation 9 shall also be applicable.
8 Compendium of HPERC Regulations, March 2021
1
[(IA) Additional Charges For Sustained Deviation: In addition to the charges/
additional charges as per regulations 7, 8 and 9, the State Entity shall also be liable to pay
the additional charges, in case of violation of the requirements in relation to sustained
deviations, as specified in regulation 9A ;]
(J) Premise for allocation of losses.—For the purpose of Deviation Pool
accounting, intra-State transmission system losses and distribution losses, as approved by the
Commission, shall be applicable to the State Entities using State network on their actual
drawal/injection:
Provided that the State Load Despatch Centre shall maintain account of actual intra-
State transmission system loss for each time block and publish reconciliation statement of 52
weekly average loss vis-à-vis approved loss by the Commission on its website.
(K) Submission of data by generating stations.—Such generating stations as are
selling entire saleable energy to the distribution licensee and are not considered as separate
State Entities in view of explanation under regulation 4, shall submit their
projections/estimates and other online and offline data as may be required by the ALDC so
as to enable the ALDC to prepare consolidated schedule of the distribution licensee and also
to keep SLDC updated on the information relating to the distribution licensee, including
such generating stations.
(L) Procurement of URS in the interest of the State Grid.—In the event of
sudden fall in availability of one or more State Entities by more than 20 MW for any
individual State Entity, if the concerned the State Entity generator has not already initiated
any steps, or is not entitled, to revise his schedule, the SLDC may, in the interest of grid
security, procure, under intimation to such State Entity(ies), URS from the concerned
generating stations for such time blocks as it may feel appropriate duly keeping in view the
main objectives that no energy cuts should be imposed in the State, as far as possible, and
also that the grid parameters must be maintained within the permissible limits:
Provided that the SLDC shall, within 90 days of notification of these regulations,
develop an uniform procedure, keeping in view the various possible situations under which
URS are to be arranged and also incorporating the broad principles which shall be followed
by it while procuring URS for any State Entity(ies):
Provided further that in the uniform procedure to be developed by the SLDC, it may
also spell out the broad situations under which it may procure URS even for the individual
State Entities whose cases fall in availability does not exceed 20 MW:
Provided further that till such time such uniform procedure is evolved, the SLDC
shall procure URS only after,—
1
Ins. sub-regualtion (IA) for vide not. No. HPERC/428 dated 29
th
June, 2019, published in R.H.P.
dated 3
rd
July, 2019 at p. 3131-3137.
Compendium of HPERC Regulations, March 2021 9
(i) prior consultation with the concerned State Entity in cases where the rate of
URS at State periphery is equal to or less than
1
[800 Paise/kWh]; and
(i) obtaining the consent of concerned State Entity in cases where the rate of
URS at State periphery exceeds
1
[800 Paise/kWh]:
Provided further that while procuring URS on behalf of more than one State Entity,
the SLDC shall duly indicate the share (quantum and rate) of each such State Entity at the
time of such procurement and shall also subsequently reflect the same in the weekly/
monthly accounts statement showing the share of each State Entity in the quantum of URS
procured by it:
Provided further that the SLDC shall also, apportion, within 5 days from the date of
issue of monthly accounts, whether provisional or final or revised, by NRPC for any month,
the total energy booked for the State amongst concerned State Entities on the aforesaid lines:
Provided further that the distribution licensee, or any other State Entity, may also, of
its own, procure URS under intimation to the SLDC and in that event the SLDC shall duly
apportion such URS to that State Entity.
(M) Congestion Charges.—If any, congestion charges are payable/receivable by
the Himachal Pradesh depending upon the real time behaviour of the State in line with the
Central Electricity Regulatory Commission (Measures to relieve congestion in real time
operation) Regulations, 2009, the SLDC shall reflect the amount of congestion charges in
the weekly accounts statement showing the share of each State Entity on the basis of
deviation by each user calculated for each time block:
Provided that the SLDC shall apportion congestion charges within three days from
the date of issuance of Congestion Charges Account from NRPC and each State Entity shall
pay the amount indicated in the account within 7 (seven) days of issuance of such account
by the SLDC. Any delays in payment shall be dealt as per regulation 14.
(N) Downloading/recording of SEMs and timely communication of data to the
SLDC.—Meter data downloading/reading of the interface Special Energy Meters (SEMs), or
any other meters as appropriate, as required by the SLDC, shall be taken by the authorized
officers of the transmission licensee or the distribution licensee, as the case may be, on
weekly basis (on every Monday for preceding week (00:00 Hrs of Monday to 24.00 Hrs of
Sunday) and shall supply the same to the SLDC by Tuesday. Any change in multiplication
factor or CT/PT ratio setting shall also be recorded. The downloaded data in the electronic
form and hardcopy printout alongwith a statement of consumption as recorded by the Main,
Check SEMs and, in case of the consumers of the distribution licensee, the ToD meter also,
duly authenticated by the concerned Sr. Executive Engineer of the concerned licensees, shall
be sent to the SLDC for preparation of Intra State Deviation Settlement account of the State
Entities:
Provided that in cases where the State Entity, other than the transmission licensee/the
distribution licensee, expresses its intention to associate itself in the process of
downloading/reading of SEMs, the authorised representative of such State Entity shall also
be associated in the process:
1
Sub. for sub-regualtion (L) in clauses (i) & (ii) for words and figures “824.04 paise/kwH” for
vide not. No. HPERC/428 dated 29th June, 2019, published in R.H.P. dated 3rd July, 2019 at p. 3131-3137.
10 Compendium of HPERC Regulations, March 2021
Provided further that if the representative of the concerned State Entity does not turn
up at the scheduled time of downloading/taking such readings of SEMs, the authorised
officer of the transmission licensee/the distribution licensee, as the case may be, shall
download/take the readings and submit the same to the SLDC under intimation to the
concerned State Entity:
Provided further that the SLDC may issue, on the need based, detailed instructions in
this regard to all the State Entities.
Previous and next
Questions people ask
Is regulation 5 of the Himachal Pradesh Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2018 still in force?
No repeal of the Himachal Pradesh Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2018 is recorded.