Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 - Regulation 26

Text of regulation 26

Technology specific parameters for Biomass Power Projects based on Rankine Cycle Technology. I. Technology Aspect

26. Technology specific parameters for Biomass Power Projects based on Rankine Cycle Technology. I. Technology Aspect.—The norms for tariff determination specified hereunder are for biomass power projects based on Rankine cycle technology application using water cooled condenser. II. Capital Cost.—The normative capital cost for FY 2017-18 for Biomass Projects shall be as under: Biomass Rankine Cycle Projects Capital Cost (FY 2017-18) (Rs. lakhs/MW) Project [other than rice straw and juliflora (plantation) based project] with water cooled condenser 559.03 Project [other than rice straw and Juliflora(plantation) based project] with air cooled condenser 600.44 For rice straw and juliflora (plantation) based project with water cooled condenser 610.80 For rice straw and juliflora(plantation) based project with air cooled condenser 652.20 III. Capital Cost Indexation Mechanism.—The Capital Cost for Biomass Power Projects based on Rankine Cycle Technology as specified for first year of the control period will remain valid for the entire duration of the control period unless reviewed earlier by the Commission. IV. Plant Load Factor (1) Threshold Plant Load Factor for determining fixed charge component of Tariff shall be: a) During Stabilisation: 60% b) During the remaining period of the first year (after stabilization): 70% c) From 2nd Year onwards: 80 % (2) The stabilisation period shall not be more than 6 months from the date of commissioning of the project. V. Auxiliary Consumption.—The auxiliary power consumption factor shall be as follows:- a) For the project using water cooled condenser: i. During first year of operation : 11% ii. From 2nd year onwards : 10% b) For the project using air cooled condenser: i. During first year of operation : 13% ii. From 2nd year onwards : 12% VI. Station Heat Rate.—The Station Heat Rate for biomass power projects shall be : a) For projects using travelling grate boilers : 4200 kCal/kWh b) For projects using AFBC boilers : 4125 kCal/ kWh VII. Operation and Maintenance Expenses (1) Normative O&M expenses for the first year of the Control period (i.e. FY 2017-18 shall be Rs. 40 Lakh per MW. 12 BIHAR GAZETTE (EXTRA) 24TH OCTOBER 2017 (2) Normative O&M expenses allowed at the commencement of the Control Period (i.e. FY 2017-18) under these Regulations shall be escalated at the rate of 5.72% per annum. VIII. Fuel Mix (1) The biomass power plant shall be designed in such a way that it uses different types of non-fossil fuels available within the vicinity of biomass power project such as crop residues, agro- industrial residues, forest residues etc. and other biomass fuels as may be approved by MNRE. (2) The Biomass Power Generating Companies shall ensure fuel management plan to ensure adequate availability of fuel to meet the respective project requirements. IX. Use of Fossil Fuel.—The use of fossil fuels shall not be allowed. Provided that for the biomass power projects commissioned on or before the date of publication of these Regulations in official Gazette, the use of fossil fuels to the extent of 15% in terms of calorific value on annual basis shall be allowed for the tariff period from the date of commissioning. X. Monitoring Mechanism for the use of fossil fuel (1) The Project developer shall furnish a monthly fuel usage statement and monthly fuel procurement statement duly certified by Chartered Accountant to the beneficiary (with a copy to appropriate agency appointed by the Commission for the purpose of monitoring the fossil and non-fossil fuel consumption) for each month, along with the monthly energy bill. The statement shall cover details such as - a) Quantity of fuel (in Tonnes) for each fuel type (biomass fuels and fossil fuels) consumed and procured during the month for power generation purposes, b) Cumulative quantity (in Tonnes) of each fuel type consumed and procured till the end of that month during the year, c) Actual (gross and net) energy generation (denominated in units) during the month, d) Cumulative actual (gross and net) energy generation (denominated in units) until the end of that month during the year, e) Opening fuel stock quantity (in tonnes), f) Receipt of fuel quantity (in tonnes) at the power plant site and g) Closing fuel stock quantity (in tonnes) for each fuel type (biomass fuels and fossil fuels) available at the power plant site. (2) Non-compliance with the condition of fossil fuel usage by the project developer, during any financial year, shall result in withdrawal of applicability of tariff as per these Regulations for such biomass based power project. XI. Calorific Value.—The Calorific Value of the biomass fuel used for the purpose of determination of tariff shall be at 3174 kCal/kg. XII. Fuel Cost for FY 2017-18.—Biomass fuel price during first year of the Control Period (i.e. FY 2017-18) shall be Rs. 3073.05/MT .For each subsequent year of the Tariff Period, the normative escalation factor of 5% per annum shall be applicable at the option of the biomass project developer or shall be as decided by the Commission. 13 BIHAR GAZETTE (EXTRA), 24TH OCTOBER 2017

Previous and next

All provisions of Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017

Questions people ask

Is regulation 26 of Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 still in force?

No repeal of Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 is recorded.