Regulation 26, Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017: Technology specific parameters for Biomass Power Projects based on Rankine Cycle Technology. I. Technology Aspect
Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 - Regulation 26
Text of regulation 26
Technology specific parameters for Biomass Power Projects based on Rankine Cycle Technology. I. Technology Aspect
26. Technology specific parameters for Biomass Power Projects
based on Rankine Cycle Technology.
I. Technology Aspect.—The norms for tariff determination specified
hereunder are for biomass power projects based on Rankine cycle technology
application using water cooled condenser.
II. Capital Cost.—The normative capital cost for FY 2017-18 for
Biomass Projects shall be as under:
Biomass Rankine Cycle Projects
Capital Cost
(FY 2017-18)
(Rs. lakhs/MW)
Project [other than rice straw and juliflora
(plantation) based project] with water cooled
condenser
559.03
Project [other than rice straw and
Juliflora(plantation) based project] with air cooled
condenser
600.44
For rice straw and juliflora (plantation) based
project with water cooled condenser
610.80
For rice straw and juliflora(plantation) based
project with air cooled condenser
652.20
III. Capital Cost Indexation Mechanism.—The Capital Cost for
Biomass Power Projects based on Rankine Cycle Technology as specified for
first year of the control period will remain valid for the entire duration of the
control period unless reviewed earlier by the Commission.
IV. Plant Load Factor
(1) Threshold Plant Load Factor for determining fixed charge
component of Tariff shall be:
a) During Stabilisation: 60%
b) During the remaining period of the first year (after
stabilization): 70%
c) From 2nd Year onwards: 80 %
(2) The stabilisation period shall not be more than 6 months from the
date of commissioning of the project.
V. Auxiliary Consumption.—The auxiliary power consumption
factor shall be as follows:-
a) For the project using water cooled condenser:
i. During first year of operation : 11%
ii. From 2nd year onwards : 10%
b) For the project using air cooled condenser:
i. During first year of operation : 13%
ii. From 2nd year onwards : 12%
VI. Station Heat Rate.—The Station Heat Rate for biomass power
projects shall be :
a) For projects using travelling grate boilers : 4200 kCal/kWh
b) For projects using AFBC boilers : 4125 kCal/ kWh
VII. Operation and Maintenance Expenses
(1) Normative O&M expenses for the first year of the Control period
(i.e. FY 2017-18 shall be Rs. 40 Lakh per MW.
12 BIHAR GAZETTE (EXTRA) 24TH OCTOBER 2017
(2) Normative O&M expenses allowed at the commencement of the
Control Period (i.e. FY 2017-18) under these Regulations shall be
escalated at the rate of 5.72% per annum.
VIII. Fuel Mix
(1) The biomass power plant shall be designed in such a way that it
uses different types of non-fossil fuels available within the
vicinity of biomass power project such as crop residues, agro-
industrial residues, forest residues etc. and other biomass fuels
as may be approved by MNRE.
(2) The Biomass Power Generating Companies shall ensure fuel
management plan to ensure adequate availability of fuel to meet
the respective project requirements.
IX. Use of Fossil Fuel.—The use of fossil fuels shall not be allowed.
Provided that for the biomass power projects commissioned on or before
the date of publication of these Regulations in official Gazette, the use of fossil
fuels to the extent of 15% in terms of calorific value on annual basis shall be
allowed for the tariff period from the date of commissioning.
X. Monitoring Mechanism for the use of fossil fuel
(1) The Project developer shall furnish a monthly fuel usage
statement and monthly fuel procurement statement duly certified
by Chartered Accountant to the beneficiary (with a copy to
appropriate agency appointed by the Commission for the purpose
of monitoring the fossil and non-fossil fuel consumption) for each
month, along with the monthly energy bill. The statement shall
cover details such as -
a) Quantity of fuel (in Tonnes) for each fuel type (biomass fuels
and fossil fuels) consumed and procured during the month
for power generation purposes,
b) Cumulative quantity (in Tonnes) of each fuel type consumed
and procured till the end of that month during the year,
c) Actual (gross and net) energy generation (denominated in
units) during the month,
d) Cumulative actual (gross and net) energy generation
(denominated in units) until the end of that month during
the year,
e) Opening fuel stock quantity (in tonnes),
f) Receipt of fuel quantity (in tonnes) at the power plant site
and
g) Closing fuel stock quantity (in tonnes) for each fuel type
(biomass fuels and fossil fuels) available at the power plant
site.
(2) Non-compliance with the condition of fossil fuel usage by the
project developer, during any financial year, shall result in
withdrawal of applicability of tariff as per these Regulations for
such biomass based power project.
XI. Calorific Value.—The Calorific Value of the biomass fuel used for the
purpose of determination of tariff shall be at 3174 kCal/kg.
XII. Fuel Cost for FY 2017-18.—Biomass fuel price during first year of
the Control Period (i.e. FY 2017-18) shall be Rs. 3073.05/MT .For each
subsequent year of the Tariff Period, the normative escalation factor of 5% per
annum shall be applicable at the option of the biomass project developer or
shall be as decided by the Commission.
13
BIHAR GAZETTE (EXTRA), 24TH OCTOBER 2017
Previous and next
Questions people ask
Is regulation 26 of Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 still in force?
No repeal of Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 is recorded.