Rule 95, MP Investment Region Development and Management Rules 2016: Septic Tanks- Where a septic tank is ~sed for sewage disposal, the location, design and construction of the septic tank shall conform to the following requirements
MP Investment Region Development and Management Rules 2016 - Rule 95
Text of rule 95
Septic Tanks- Where a septic tank is ~sed for sewage disposal, the location, design and construction of the septic tank shall conform to the following requirements
95. Septic Tanks- Where a septic tank is ~sed for sewage disposal, the
location, design and construction of the septic tank shall conform to the
following requirements :-
(1) Location of Septic Tanks and Sub-Surface absorption systems
A sub-soil dispersion system shall not be located within 18 meters
from any source of drinking water. It shall also be as removed from
the nearest habitable building as economically fe~ible but not
w1thin 2 meters thereof so that there is no damage to the structures.
(2) Other Requirements -
(a) Dimensions of septic tanks- Septic tanks shall have
minimum width of 7 5 centimetres and minimum depth of
.e
222 (242)
one meter below the surface level and a minimum liquid
capacity of one cubic meter. Length of tanks sh.all be 2 to 4
times the width;
(b) septic tanks may be constructed of brick work /stone
masonry/ concrete or other suitable materials as approved by
the Agency;
(c) under no circumstances should effluent from a septic tank be
allowed into an o~n channel drain or body of water without
adequate treatment;
(d) minimum nominal diameter of pipe used shall be 100
omillimetres. Further at junctions of pipes in manholes,
direction of flow from a branch connectiop should not make
0
an angle exceeding 45 degrees with the direction of flow in
the main pipe; •
(e) the gradients of land drains, under-drainage as well as the
bottom of dispersion trenches and soak ways should be
between 1: 300 and 1: 400;
(f) every septic tank-shall be provided with ventilating pipe of at
least 50 millimetres diameter. The top of the pipe shall he
provided with a suitable case of rr.iosquito proo( wire mesh.
The ventilating pipe shall extend to a height which would
cause no smell nuisance • to any building in the area.
Generally, the ventilating pipe m~y extend to a height of 2
meters when the septic tank is 'located at a distance of 15
meters from the nearest building and to a'height of 2 meters
above the top of the building when it is locat~d closer t}lan 1 S " . . . - .
meters; .
(g) when the disposal of septic tank effluent is to seepage pit, the
seepage pit may be of any suitable shape with the least cross
section dimension of 90 centimetres and not less than 100
centimetres in depth below the invert level of the inlet pipe.
The pit may be lined with stone, ·brick or concrete blocks with
dry open joints which should be backed with at least . 7 .5
centimetres of clean coarse aggregate. The lining above the
inlet level should be finished with mortar. In the case of pits
of large dimensions, the top portion may be • narrowed to
reduce the size of the reinforced cement concrete cover slabs.
Where no lining is used, specially near trees, the entire pit
should be filled with loose stones. A masonry ring may be
constructed at the top of the pit to prevent damage by flooding
C>
96.
222 (243)
of_ the pit by surface run off. The inlet pipe may be taken
down to a depth of 90 centimetres from the top as an anti
mosquito measures; and
(h) when the disposal of septic tank effluent is to a dispersion
trench, the dispersion trench shall be 50 to 100 . centimetres
deep and 30 to 100 centimetres wide excavated to gradient
and shall be provided with 10 to 25 centimetres of washed
gravel or crushed stone. Open joints placed inside the trench
shall be made of unglazed earthenware pipes clay or concretes •
and shall have minimum internal diameter of 75 to 100
millimetres. Each dispersion trench should not be longer than
30meters and trenches should not be placed closer than 1 .8
meters.
Staircase.- (1 )The minimum clear width and maximum riser of Stair cases
. for buildings shall be as given in sub-rule (2) to (4).
(2) Minimum Width: The minimum width of staircase shall be as
follows:-
. (i) Residential buildings (Dwellings)
(ii) hotel buildings.
(iii) Assembly buildings like auditorium,
theatres, cinemas and other public
buildings less than 24 mtrs. in height
(iv) Educational buildings-
0.90 meters
l.50meters
I.SO meters
( a) " up toi24 'm in height 1.50 meters
(b) more than 24 m in height 2.00 meters
(v) Institutional buildings
(a) tip to 10 beds 1.50 meters
(b) more than 10 beds 2.00 meters
( vi) AU other buildings 1.50 meters
(3) The landing width shall be a minimum of twice the tread plus
25centimeters.
(4) Minimum Tread. The minimum width of tread without nosing shall
be 25 centimetres for residentiaL buildings. The minimum width of
tread for other buildings shall be 30 centimetre.
(5) Maximum Riser-The maximum height of risers shall be 17
centimetres for residential buildings and 15 centimetres for other
buildings and these shall be limited to 15 numbers per flight. •
(6) Head Room. The minimum head-room in a passage under the
()
222 (244)
landing• of a staircase shall be 2.20 meters. The minimum clear
head-room in any staircase shall be 2.20 meters ...
97. Roofs -(I) The roof of a building shall be so constructed or framed as to
permit effective drainage . of the rain water there from by means of .
sufficient rain-water pipes of adequate size, wherever required, so •
arranged, jointed and fixed as to ensure that the rain-water is carried
away from the building without causing dampness in any part of the
walls or foundations of the building or those of an adjacent building. •
(2) The Agency may require rain-water pipe·s to be connected to a
drain or sewer or a covered channel beneath the public footpath or
in any other approved manner.
(3) Rain-water pipes shall be affixed to the outside of the external
walls of the building or in recesses or chases cut or formed in .such
external walls or in such other manner ao may be approved by the 1
Agency.
( 4) Rain/Roof water harvesting method shall have to be provided on
=> all type of buildings having plot size more than 140 Square m~ter
as per the options mentioned in APPENDIX- A-13, A-14 & A-15.
(5) In the scheme area along wit~ the composite building permission, a
·-security deposit as mentioned below shall be deposited by the
. applicant based on the area of the plot to ensure roof top/ pebble
bed / service well/ water harvesting:-
S.No. Area of the plot (Sqmt.) Rate (Rs.)
1. 0 to 1,000 . 25,000/- ·:>
'2. 1,001 to 6,000 50,000/-
3. Above 6,000 1,00,000/-
After the completion of building the applicant shall inform the building
officer regarding the implementation of water harvesting. After physical
verification if it is found that rain water harvesting system is installed
·effectively, in. that case the above security deposit shall be returned to the ·
applicant.
(V) Lighting and Ventilation
98. Lighting and Ventilation of Rooms -( 1) Every room shall, for the
admission of light and air, have one or more openings, such as windows
and ventilators opening directly to the external air or into an open
verandah.
1={~ ~, ~ 14 1=fri:r 2016 222 (245)
(2) Where the light and ventilation requirements are not met through
day lighting and natural ventilation, the same shall be ensured
through artificial lighting and mechanical ventilation as per PART
VIII- Building Services Section 1. Lighting and Ventilation of
the. Code as revised from time to time.
(3) Notwithstanding the area of openings mentioned under sub-rue (2),
the minimum aggregate area (see Notes 1 to 3) of such openings
excluding doors inclusive of frames shall not be less than one-tenth
of the floor area~
Note 1: If a window is partly fixed, the open-able area shall be
counted.
Note 2: No portion of a room shall be assumed to be lighted, if it is
more· than:7 .5 meters away from the opening.
Note 3.- Area of openings as given in this sub-rule shall be increased.
by 25 percent in case of a kitchen.
(VI) Lift.
Previous and next
← Rule 94Boundary Wall-The requirements of boundary wall are given belowRule 99 →·Provision of Lifts
All provisions of MP Investment Region Development and Management Rules 2016