Rule 94, MP Investment Region Development and Management Rules 2016: Boundary Wall-The requirements of boundary wall are given below
MP Investment Region Development and Management Rules 2016 - Rule 94
Text of rule 94
Boundary Wall-The requirements of boundary wall are given below
94. Boundary Wall-The requirements of boundary wall are given below:-
0
(a) The max~mum height of the compound wall shall be 1.5 ~eters for
all the activities except industries for which max. height shall be
permissible upto the . height of 2 mtrs. above the center line of the
front street unless the Agency permits a higher wall.
(b) The rear and side compound walls shall not have a height more
than 3 meters above the central line of the service road in case it
exists otherwise it shall be not more than 2 meters. It shall be
" measured above the central line of the front street. In case of a
comei: plot the height of the boundary wall abutting on the side road
shall also not be more than 2.0 meters • •
• ( c) the provisions of (a) and (b) are not applicable to boundary walls of
jails, .. eleqric . sub-stations, transf onner Btations, institutional
buildfogs, like sanatori1, hospitals, in_dustrial buildi:{lgs like work- ,
shops, factories and educational buildings like schools, colleges,
0
including the hostels and other uses of public utility undertaking,
where height as required, may be permitted by the Agency.
Previous and next
← Rule 91GarageRule 95 →Septic Tanks- Where a septic tank is ~sed for sewage disposal, the location, design and construction of the septic tank shall conform to the following requirements
All provisions of MP Investment Region Development and Management Rules 2016