Appendix A-6, MP Investment Region Development and Management Rules 2016: APPENDIX A-6
MP Investment Region Development and Management Rules 2016 - Appendix A-6
Text of appendix A-6
APPENDIX A-6
APPENDIX A-6
[See rule 21]
FORMATOFPROVIDINGS'IRUCfURALENGINEERINGDESIGNFOR
REINFORCEDOONCRE1ESIRUCTUREFORAPROJECf
(INEAR1HQUAKEPRONEAREAS)
1. Nam.e and Address of the : ....................................................................... .
S tructu.ral Engineer. . ....................................................................... .
2. License No. : ........................................................................ .
3. Job Description : ........................................................................ .
4. Job Location : ........................................................................ .
5. Name and Address of the : ........................................................................ .
Owner/ Client
6. Architectural Reference .
•••••••••••••••••••••••••••••••••••••••••••••••••• ♦ Go ♦♦ ••••••••••••••••••••
Drawings
The design parameters given in the following codes me/us in preparing
structural design and drawings for the job mentioned above.
IS Codes of Practice-
1. IS 456-2000 Indian Standard for Plain and Reinforced Concrete.
2. IS 875-1978 Design Loads (Other than Earthquake).
3. IS 1893-2012 Indian Standard for Earthquake Resistance Design of
Structure.
Signature of Structural Engineer.
License No:
Date : ................................. · ............... .
222 (276) lf~ ~, ~ 14 1TT'i=f 2016
Previous and next
All provisions of MP Investment Region Development and Management Rules 2016
Questions people ask
Is appendix A-6 of MP Investment Region Development and Management Rules 2016 still in force?
No repeal of MP Investment Region Development and Management Rules 2016 is recorded.