Annexure XI, .lharkhand Building Bye-laws 2016: ANNEXURE-XI
.lharkhand Building Bye-laws 2016 - Annexure XI
Text of annexure XI
ANNEXURE-XI
ANNEXURE-XI
Checklist of Occupancy
between
3. All materials are of specified
brand and grade
B. During Concreting
I. Mixing of concrete has been done
as spcci ficd
2.Slump and other tests carried out
as specified
3.Slump and other tests carried out
as specified
4. Required number of Samples
have been taken for carrying out
slump tests, cube tests etc
C. Post Concretinz
I Concreting has been done as per speci fled line
and level
2 Curing has been done as specified
3 Compaction has been done Properly
4 Remedial measures taken for
removal of defects
3) ANTI TERMITE TREATMENT (ATT)
1 Chemicals for ATT are as per Specifications
2 Chemicals in use are within the expiry date.
3 Sufficient quantities of chemicals are
available at site for A TT.
4 Safety precautions have been taken for
carrying out ATT and storage of Chemicals
5 Record of consumption maintained at site
4) BACKFILLING
I. Filling material/ earth is as ncr soccification
2 Anti-termite treatment has been carried out
before commencement of backfilling
3 Filling has been done in layers of 300 mm,
watered and compacted as oer soecitications
4 Proper compaction method has been adopted
5 Filling has been done to the required levels
5) REINFORCED CEMENT CONCRETE WORKS
A. Pre-concreting
I All specified materials available at site
2 Cement is of the required grade and not more
than three months old.
3 Shuttering checked for Staging & Propping ,
line & level, dimensions cleaning etc and its
oualitv approved
4 Application of oil & grease carried out
5 Mixer/Vibrator as specified
available at site with adequate means to run
them during concreting
6 Cut-out & Sleeves/Inserted
7 Surface of reinforcement is clean
and free from rust
8 Bars have been provided as per
structural drawings
9 Lap length & dowels provided as
ner coda! provisions
10 Pin bars & chairs/cover blocks
provided as per requirements
I I Tying of bars has been done
Correctly
12 Service lines(Electrical, Plumbing, Others) if
any, provided before commencement of
concrete
B. General Arrnnzement
I. Availability/ Arrangement of pumps etc,
proper access & walkway checked
'")
~
- 142 - yl'/_;J.()
2 Adequacy of vibrators/ needle
including diesel vibrator
3 Slump cone & test cubes made
4 Safety and health measure taken
before commencement
C. Durinz Cuncrcrlnz
1 All necessary precaution taken I
before commencement of concreting
2 Samples of taken for slump, cube tests etc for
each batch
3 Proper Compaction done and checks on
Staging & Scaffolding carried out
4 Covering of green concrete carried out
5 Surface finish checked
6 Construction joints provided
0. Post Concreting
I De-shuttering started on Vertical
faces I Other faces carried out as
per coda! provisions
2 Proper curing of concrete carried
Out
3 Lme& Level of surface checked
for correctness
4 Defects, notified and removed
5 Cube and other test results will
be intimated to the engineer in
charge for further action
6) MASONRY, MORTAR AND PLASTER
A. Pre-Masonry Work
I Availability of material as per
daily requirement checked
2 Quality check for bricks/ blocks/sand/ cement
carried out
3 Provisions kept for electrical and
other services
B.During masonry work
I Checking for line/ level/ right
angle carried out
2 Mortar checked for mix proportion
3 Proper raking of joints
4 Seismic bands provided as per
zonal requirements
C. Post masonry
Check cleaning of dead mortar and broken
bricks/ blocks etc.
2 Curing carried out as per requirements
0. Plastering/Pointing
I Mortar for plastering as specified
for each side of wall
2 Quality of cement and sand checked
3 Curing work done as per requirement
4 Preparation of surface
E. During Plnstcrtna
I Mortar mixing in tray
2 Addition of water proofing compound
3 Proper roughing of first coat
4 Check for collection of mortar
Spills
5 Cleaning of dead mortar
6 Check of waviness
7 Check for grooves/ drip moulds
"'
~
- 143 -
//lr?!!-t)
- 144 -
8 Application of cement slurry on
concrete surface
F. After Plastering
I Curing
2 Check for hollowness
3 Check for cracks
4 Check for diagonal
5 Lime wash after 3 days (withins
days in case of neeru application)
6 Safety and health measures
7) WATER PROOFING
I Surface for waterproofing has
been prepared and cleaned
2 Safety measures/ precautions
taken before commencement of
works
3 Specified type of water proofing
Used
4 Specified material used for
waterproofing
5 The material used was as per
specification
6 Work has been carried out as per
specifications by the department/
specialized agency
8) JPS/TILE fLOORING AND DADO
I Layout of floor checked and
proper slopes for draining water
are maintamed specially in bath
room and toilet.
2 Thickness bases at GL checked of
different floor
3 Check for proper back filling
under floor done
4 Metal/glass strips laid properly in
IPS flooring
5 Curing of IPS Flooring done as
per requirements
6 Dado provided as per required
height
I
7 Cleaning and finishing done
9) PLlJMBING & WATER SUPPLY
I GI/Cl/1-IDPE pipes etc. confirms
to relevant IS codes
2 Pipes of required diameter and
their fittings used
3 Plumbing and Water Supply work
earned out through a licensed
plumber
4 Works clone as per specification
- 145 -
5 Plumbing and Water Supply
works tested on completion -
6 Defects rec ti ficd
10) INTERNAL ELECTRICAL WORKS
A.GENERAL
I Layout plans: howing the
po ition of L.T Panels/
distribution board, lighting
fixture , lighting distribution,
cheme, receptacles, etc available
before commencement of work
2 All the following items are as per
specification and or approved
makes
LT Panels/ Distribution Board
Lighting Fixtures
onduits, including accessorie
Receptacles
Junction Boxes
Cables/Wire
Anv other item
8. SURFACE CONDUIT WIRING I
CONCEALED CONDUIT WIRING
I Conduit and accessories are
of specified make, gauge and
diameter
2 Proper installation of all conduit
wiring and concealed wiring.
C. CHECK LIST FOR EARTHING
I Earth electrode provided as
specified.
B. SURFACE CONDUIT WIRING I CONCEALED CONDUIT WIRING
I Conduit and accessories are
of pecified make, gauge and
diameter
2 Proper installation of all conduit
wiring and concealed wiring.
C. CHECK LIST FOR EARTHING
I Earth electrode provided a
specified
B. SURFACE CONDUIT WIRING I CONCEALED CONDUIT WIRJNG
l Conduit and accessories are
of specified make, gauge and
diameter
2 Proper instnllntion of all conduit
wiring and concealed wiring.
C. CHECK LIST FOR EARTHING
I Earth electrode provided as
specified.
CHECK LIST FOR EXTERNAL ELECTRICAL WORKS
A. CHECK LIST FOR O.H. LINES
I Poles used arc of approved make
as specified and conform to
relevant BIS codes
2 Test certificate as applicable.
3 Pole embedded below ground
level as specified.
4 Metallic poles are adequately
earthed with specified size of
earth conductor.
·'
r
- 146 -
5 Strays struts, insulators,
conductors used conform to
relevant BIS Code.,
6 Earth wire conductor used as
specified
7 Lightning arrestors used as
specified
B. CABLE LA YING
l Trenches of specified dimensions
excavated and prepared
2 Required quantity of sand
cushioning provided; cable laid;
another layer of sand and brick
protective covering provided.
Refilling done earth ramming
and dressing done
3 Cables entry point in building or
crossing roads path protected by
providing Hume pipes or PVC
pipe
4 Cable tested before and after
laying and before emerging
C. CHECK LIST FOR EARTHING
I Earth electrode provided as
specified
2 Types and size of main/ sub main
and circuit earthing conductors
provided as specified.
11) DRAINAGE WORKS
I Excavation for drains carried out
as per the approved lay-out
2 Bed Concrete laid as per
specifications with proper slopes
and cuttings
3 All pipes procured and laid as per
requirement
4 Jointing of pipes done as per
specifications
5 Manholes provided as per design
6 Materials for construction of
manhole as specified
7 End of the pipes plugged
8 Drainage line tested before
nutting to use
13) OTHERS
I Whether the provision for adequate
ventilation and natural lighting has been made
as per National Building code?
2 Whether facility for storage in
terms of Almirah/ Shelves I Lofts
I Platform has been made ?
3 Whether Sanitary fittings have
been provided? -
')
~~ r71~0
-147-
Area Development Authority, Gram Panchayat areas covered under Development Plan or Planning
1
~ o \ 'I, ff' -£')_.__-/
~ ~
I/We hereby apply for permission to undertake development of land in respect of plot
No.(CS) Plot No(MSP) Village/Mauza Khata o ..
under Municipal Corporation/Municipal Council/Nagar Panchayat/Municipality/Notified Area
Committee/ Regional Development Authorities/Industrial Area Development Authorities/Mineral
Madam/Sir,
To
Email id ..
Tel o/ Mobile No .
Signature of Authorised Person
Date .. (in Block letters)
Regd o . 1 ame and address
for office use only From
APPLICATION FOR DEVELOPMENT /RE-DEVELOPMENT OF LAND
FOR OBTAINNG DEVELOPMENT PERMIT
Application No ..