Regulation 10, The Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive Systems based on Net Metering) Regulations, 2015: Energy Accounting and Settlement
The Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive Systems based on Net Metering) Regulations, 2015 - Regulation 10
Text of regulation 10
Energy Accounting and Settlement
10. Energy Accounting and Settlement.- (1) The accounting of electricity generated,
consumed and injected by the Rooftop Solar system under these regulations shall become
effective from the date on which the said system is treated as commissioned as per sub
regulation (5) of regulation 7 of these regulations.
(2) Billing shall be done on the basis of the net flows recorded by the Net Meter over
the billing period subject to provisions contained in the sub-regulation (8).
(3) In the event, the eligible consumer exports energy, on net basis, to the distribution
system during a billing period, the energy so exported on net basis, shall be carried forward
in shape of electricity credit to the immediately next billing period, forming part of the
settlement period.
(4) In the event, the eligible consumer imports energy, on net basis and after
adjusting the electricity credits if any, carried forward from the immediately preceding the
billing period, from the distribution system during a billing period, the distribution licensee
shall recover energy charges for such chargeable energy so drawn (i.e.chargeable net
energy) at the applicable rates of energy charges as per sub-regulation (9).
(5) The distribution licensee shall make payment to the eligible consumer, by way of
adjustment in the electricity bills, for the electricity credits, if any, remaining unadjusted at
the end of the settlement period, at the rates mentioned in sub-regulation (9).
(6) There shall be no carry forward of any electricity credit, pertaining to a settlement
period beyond that settlement period.
(7) The distribution licensee shall reflect in the bill the energy units exported or
imported, by the consumer as well as the electricity credits brought/ carried forward or
adjusted as the case may be, during the billing period and the amount payable by the eligible
consumer for each component of tariff (i.e. Energy Charges and Demand Charges etc.).
(8) In case the eligible consumer is under the ambit of time of day tariff, as
determined by the Commission from time to time, the net flows of electricity over the billing
period shall be recorded separately for the respective times of day and the energy accounting
shall be carried out separately for each Time of the Day (ToD) and the net flows during any
time period, including the electricity credit if any, shall not be adjusted against the flows or
the electricity credit, pertaining to any other time of the day even at the stage of settling the
unadjusted electricity credits as per sub-regulation (5).
Provided that in case of consumer availing open access, the energy accounting shall
also be done in accordance with open access regulations on the basis of flows and deviation
Compendium of HPERC Regulations, March 2021 11
for the respective time blocks in which open access is availed and the same shall be duly
accounted for while raising bills.
(9) For the energy to be billed or settled as per the provisions under sub-regulation 4,
5 and 8, the distribution licensee shall raise bills or carry out necessary adjustment, as the
case may be, in the following manner and at the following rates:-
(i) Energy Charges:-
(a) The quantum of energy for which the energy charges are to be recovered by
the distribution licensee for a billing period as per sub-regulation (4) shall be
billed to the consumer at the rate(s) of energy charges, applicable as per the
applicable tariff:
Provided that where different rates of energy charges are applicable
for different times of the day (normal, peak and night hours etc.) as per the
applicable tariff, the energy accounting shall be done separately for each time
of day as per sub-regulation (8) and energy charges shall be recovered at
respective rates for respective quantums of chargeable net energy.
1
[ (b) The distribution licensee shall settle the quantum of energy to be settled for
anytime of the day at the end of the settlement period in accordance with sub-
regulation (5) and (8), in the following manner, namely:—
(i) in cases where the Letter of Approval is issued as per the sub-
regulation (3)of Regulation 7, also duly taking into account the 3rd
proviso to the same, on or before 15.11.2018, the amount payable to
the consumers for such energy shall be worked out at a fixed rate of
Rs. 5.00 per kWh of the energy to be settled in case of consumers
covered under single part tariff and at a fixed rate of Rs. 4.50 per
kVAh in case of consumers covered under two parts tariff:
Provided that if the amount of subsidy or grant or both,
available to eligible consumer under the relevant scheme(s) of the
Government(s) (State or Centre) or their agencies, exceeds 50% of the
normative capital cost of the rooftop solar PV system, the aforesaid
rates of Rs. 5.00 per kWh and Rs.4.50 per kVAh, as applicable, shall
be reduced by 50% and such eligible consumer shall, for such
purposes, be deemed to have availed the total (maximum) subsidy or
grant, or both, as available under such scheme(s) irrespective of the
amount actually availed by him;
1
Subs. sub-clause (b) of clause (i) vide Not. No. HPERC-H(1)-11/2015dated 6
th
November, 2018
published in R.H.P. dated 14
th
November, 2018 at p. 6010-6016 and before its substitution read as under:
“ (b) For the quantum of energy to be settled for any time of the day at the end of the settlement period in accordance
with sub-regulation 5 and 8, the distribution licensee shall pay, byway of adjustment of amount in future
electricity bills, at a fixed rate of Rs. 5.00 per kWh of the energy to be settled in case of consumer covered under
single part tariff and at a fixed rate Rs. 4.50 per kVAh in case of consumer covered under two parts tariff:
Provided that the if the amount of subsidy or grant or both, available to eligible consumer from
Government agencies exceeds 50% of the capital cost of the rooftop solar PV system, the aforesaid rates of Rs.
5.00 per kWh and Rs. 4.50 per kVAh, as applicable, shall be reduced by 50%;
Provided further that the Commission may, by order, revise the aforesaid rates of Rs. 5.00 per kWh
and Rs. 4.50 per kVAh, as and when it finds it expedient to do so;
Provided further that in the event of revision of such rates as per the second proviso to this sub-
regulation, such revised rates shall be applicable only for such cases in which letter of approval is yet to be
issued in accordance with the provisions contained in the regulation 7.”
12 Compendium of HPERC Regulations, March 2021
(ii) in cases where the Letter of Approval is issued as per the sub-
regulation (3) of Regulation 7, also duly taking into account the 3rd
proviso to the same, after 15- 11-2018—
(a) in case of the domestic supply consumers, the amount payable to the
consumers for such energy shall be worked out at the rate(s)
determined by the Commission from time to time by considering the
subsidy available to such consumers (in percentage) under the
relevant scheme(s) of Government(s) (State or Centre) or their
agency(ies), appropriate financial and technical parameters alongwith
other terms and conditions; and
(b) in case of consumers, other than domestic supply consumers, the
distribution licensee shall settle such energy at the end of the
settlement period at zero rate i.e. without any payment for the same.]
(ii) Demand Charges:-
The licensee shall recover the demand charges, including the additional
demand charges for peak load hours and the contract demand violation
charges, from the consumer as per the provisions of applicable tariff:
Provided that actual net demand of power, drawn from the distribution
system, during any demand period (time block of 30 months or any other
time block as per the tariff order) shall be considered as the actual demand of
the consumer in that demand
period;
Provided further that average demand for any time of day block of the
billing period shall also be worked out on the basis of the net import, if any,
of energy by the eligible consumer during the billing period (but without
adjustment of electricity credits) from the distribution system in respect of
respective times of the day over the billing period.
1
[(iii) Other charges:—
(a) Any other charges as per the applicable tariff shall be charged to the
consumer at par with other consumers of similar category who are not
generating any Rooftop Solar PV power under this scheme.
(b) In cases where the consumer is getting supply at a voltage lower than the
standard supply voltage specified in the Supply Code, the Low Voltage
Supply Surcharge (LVSS) shall be charged as per the rate(s) approved in
the tariff orders issued by the Commission from time to time on the sum
total of the solar generation and the total consumption of the consumer in
eachbilling month; and]
1
Subs. vide Not. No. HPERC-H(1)-11/2015dated 6th November, 2018 published in R.H.P. dated 14th
November, 2018 at p. 6010-6016 and before its substitution read as under:
“(iii) Other charges:-
Any other charges as per the applicable tariff shall be charged to the consumer at par with other
consumers of similar category who are not generating any Roof Top Solar PV power under this
scheme.”
Compendium of HPERC Regulations, March 2021 13
(iv) The licensee shall not be required to pay any charges to the eligible consumer
for any deemed generation in case non-evacuation of power due to non-
availability of grid or any such reason.
(v) In case the applicable tariff provides for billing on kVAh basis, the net import
or export of energy and electricity credits etc. shall also be accounted in
kVAh.
(vi) The distribution licensee shall, in addition to applicable tariff, also be
eligible to raise invoice for any other charges as allowed by the Commission.
(10). The distribution licensee shall also take the readings of solar meter for
recording total solar power generated by Solar PV system of consumer for its Renewable
Power Purchase Obligation (RPPO)
1
[; the words, and also for computing the energy
consumption of the consumer.]
(11). All the rules, regulations and conditions, applicable to the consumers of the
distribution licensee for the applicable category, shall also be applicable to the eligible
consumer.
Previous and next
Questions people ask
Is regulation 10 of the Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive Systems based on Net Metering) Regulations, 2015 still in force?
No repeal of the Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive Systems based on Net Metering) Regulations, 2015 is recorded.