Regulation 6, Rooftop Solar Grid Interactive Systems Based on Net-Metering Regulations, 2015 (No Amendment): Eligible Consumer and Individual Project Capacity
Rooftop Solar Grid Interactive Systems Based on Net-Metering Regulations, 2015 (No Amendment) - Regulation 6
Text of regulation 6
Eligible Consumer and Individual Project Capacity
6. Eligible Consumer and Individual Project Capacity.—
6.1 All eligible consumers of electricity in the area of supply of the distribution
licensee can participate in the solar rooftop net metering arrangement
(reference to sub clause 2.1(j) of these Regulations).
6.2 The maximum rooftop solar system capacity to be installed at any eligible
consumer premises shall be governed by the eligibility of interconnection
with the grid for that eligible consumer. The maximum capacity of an
individual rooftop PV system would be equal to the sanctioned load of the
consumer. The installation of Net metered rooftop solar systems on consumer
premises will utilize the same service line and installation for injection of
excess power into the grid, which is currently being used by the consumer for
drawal of power from the distribution licensee. Provided that the maximum
installed capacity shall not exceed 1MW.
Previous and next
Questions people ask
Is regulation 6 of Rooftop Solar Grid Interactive Systems Based on Net-Metering Regulations, 2015 (No Amendment) still in force?
No repeal of Rooftop Solar Grid Interactive Systems Based on Net-Metering Regulations, 2015 (No Amendment) is recorded.