LawGrids logoLAWGRIDS.ORG

Regulation 5, Rooftop Solar Grid Interactive Systems Based on Net-Metering Regulations, 2015 (No Amendment): Capacity Targets for Distribution Licensee

Rooftop Solar Grid Interactive Systems Based on Net-Metering Regulations, 2015 (No Amendment) - Regulation 5

Text of regulation 5

Capacity Targets for Distribution Licensee

5. Capacity Targets for Distribution Licensee.— 5.1 The distribution licensee shall provide net metering arrangement to eligible consumers as long as the total capacity (in MW) does not exceed the target capacity determined by the Commission; Provided a maximum cumulative capacity of 10MW shall be allowed to eligible consumers under net metering, on yearly basis, in the area of supply of the distribution licensee; Provided that the cumulative capacity to be allowed at a particular distribution transformer shall not exceed 15% of the capacity of the distribution transformer; 4 BIHAR GAZETTE (EXTRA) 7TH JULY 2015 5.2 The distribution licensee shall update distribution transformer level capacity available for connecting rooftop solar systems under net metering arrangement on yearly basis and shall provide the information on its website as well as to the Commission.

Previous and next

All provisions of Rooftop Solar Grid Interactive Systems Based on Net-Metering Regulations, 2015 (No Amendment)

Questions people ask

Is regulation 5 of Rooftop Solar Grid Interactive Systems Based on Net-Metering Regulations, 2015 (No Amendment) still in force?

No repeal of Rooftop Solar Grid Interactive Systems Based on Net-Metering Regulations, 2015 (No Amendment) is recorded.