FORMAT FOR PROJECT CONCEPT NOTE
FORMAT FOR PROJECT CONCEPT NOTE
(see regulation 7)
Sl. No. Parameters. Response.
1. General
1.1 Name of the Project
1.2 Project Id number (if already assigned)
1.3 Sector
1.4 Implementing Agency, Government
Department
1.5 Previous phases, if any
1.6 Project development in public or
Public-Private Partnership mode
2. Project Description
2.1 Brief description of the project
2.2 Justification for the project
2.3 Target population
2.4 Project land available with
Government
Yes/ No
2.5 Land acquisition required, if any. Yes/ No
2.6 Rehabilitation and Resettlement, if
any
Yes/ No
2.7 Would the project require a
transaction advisor?
Yes/ No
2.8 Basic design / components developed Yes/ No
2.9 Preliminary studies undertaken Yes/ No
2.10 Feasibility studies undertaken Yes/ No
2.11 Statutory clearances required Yes/ No
2.12 Statutory clearances obtained Yes/ No
2.13 Project implementation schedule
prepared
Yes/ No
2.14 Assessment on possible risks and
challenges
Yes/ No
2.15 REOI floated? Yes/ No
2.16 Will the project have future phases? Yes/ No
2.17 Does the project have linkages with
similar projects?
Yes/ No
13
Sl. No. Parameters. Response.
2.18 Whether similar projects undertaken
previously?
Yes/ No
2.19 Would the project generate direct
employment?
Yes/ No
2.20 Would the project generate in-direct
employment?
Yes/ No
2.21 Does the project have the capacity to
kick-off continuous and
comprehensive development of the
location?
Yes/ No
3. Brief Project Description
3.1 The engineering and technical aspects
of the Project
3.2 The operational aspects of the Project
3.3 Preliminary assessment of all likely
technical and operational risks
3.4 Socio-Economic assessment and
analysis
3.5 Environmental assessment scoping
4 Financials
4.1 Estimated total project cost with
break-up / phasing of investment
Sources of financing: (if available)
4.2 For Public Sector Mode
a Internal resources of Public Agency
b Budgetary support
c Support from any other agency
d Project Based Loans
4.3 For Public-Private Partnership Mode
a Resources to be raised by the
Concessionaire
b Equity
c Debt
d Public Financial Support the project
may need
Rs.
e Form of Public Financial Support-
please detail (Refer Rule)
f Source of Public Financial Support Yes / No
g Govt. of India VGF – is project eligible Yes / No
14
Sl. No. Parameters. Response.
h State support envisaged and reason? Yes / No
i Extent and Sources of State Support
Sponsoring Agency’s internal
resources
Other budgetary resources
TNIDF
j Form of state support (please specify)
k Is it an annuity-based project? Yes/ No
l Financial IRR
m Economic RR
4.4 Will the project have predetermined
user charges/ tariffs
Yes/ No
4.5 The cost recovery/income generation
assumptions of the Project
4.6 Likely interest of private entities in the
Project
4.7 Possible financial risks
4.8 Identification of likely economic
benefits generated by the Project
5 Next Steps:
5.1 Further steps needed to complete
project preparation (Please detail:
preparation of detailed project study;
other market/financial/legal studies;
preparation of tender documents
including RFQ, RFP, DCA etc.)
5.2 Resources required to complete the
project preparation process (Please
detail: need to engage consultants
including transaction advisors)
5.3 Is financing needed from TN Project
Preparation Fund? If so has an
application been made?
5.4 Parties responsible for completing next
steps
5.5 Roles and responsibilities of involved
parties
5.6 Time frame required for completing
project preparation
* * *
15
16
Previous and next
All provisions of TAMIL NADU INFRASTRUCTURE DEVELOPMENT BOARD REGULATIONS 2013
Questions people ask
Is form AT FOR PROJECT CONCEPT NOTE of TAMIL NADU INFRASTRUCTURE DEVELOPMENT BOARD REGULATIONS 2013 still in force?
No repeal of TAMIL NADU INFRASTRUCTURE DEVELOPMENT BOARD REGULATIONS 2013 is recorded.