Regulation 10, The Himachal Pradesh Electricity Regulatory Commission (Recovery of Expenditure for Supply of Electricity ) Regulations, 2012: Restoration of Supply after Permanent Disconnection
The Himachal Pradesh Electricity Regulatory Commission (Recovery of Expenditure for Supply of Electricity ) Regulations, 2012 - Regulation 10
Text of regulation 10
Restoration of Supply after Permanent Disconnection
10. Restoration of Supply after Permanent Disconnection.- In case the supply to a
premises having permanent connection of electricity has been permanently disconnected in
accordance with the provisions of the Supply Code and the original consumer or some
other person applies for a connection at such premises, the distribution licensee shall
provide supply within the time allowed for a new connection after recovery of expenses
applicable for new connections under these Regulations :
Provided that if the service line to such premises has not been removed or used for
release of other connections and is in a good condition and also has sufficient spare
capacity, after meeting the requirements of all the connections released or committed to be
released through the same service line and redundancy of about 30% of the total capacity
of such line, to cater to the connected load or contract demand applied for by such
applicant, the cost of service line under regulation 4 shall not be recovered and the
connection shall be released at the earliest subject to other conditions applicable for release
of new connections:
Provided further that in case of such applicants, the amounts worked out under
regulation 5 and other Regulations of the Commission shall be recoverable in the same
manner as applicable for new connections:
1
[Provided further that if –
1 Subs. vide ‘Not. No. HPERC/419 dated 21st September, 2015 published in the R H.P. dated 22nd September, 2015 at p.3899-
3901and before its substitution it stood as under:-
”Provided further that if –
(i) the application for such new connection is for a similar connected load or contract demand and supply voltage, as had been sanctioned for
the original connection;
(ii) the application from the new applicant is received simultaneously or within 60 days from the date on which the original connection was
permanently disconnected;
(iii) the provisions of sub-regulation (3) of regulation 5 are not attracted; and
(iv) the applicant clears all outstanding dues, if any, against such previous connection which has been permanently disconnected;
the amount of infrastructural development charges and other costs payable by the applicant for the connected load or contract demand
applied for, as per the provisions of regulation 5 shall be reduced by 90% of the amount of the infrastructural development charges
worked out at the normative rates under sub-regulation (2) of regulation 5 for the connected load/ contract demand originally sanctioned
or for the same applied for by the new applicant, whichever of the two is lower:
Provided further that if-
(i) the application from the new applicant is received after a period of 60 days from the date on which original connection is permanently
disconnected; and
(ii) all other conditions, other than condition (ii) as per the third proviso to this regulation are fulfilled:
12 Compendium of HPERC Regulations, March 2020
(i) the application for such new connection is for a similar connected load or
contract demand and supply voltage, as had been sanctioned for the original
connection;
(ii)
1
[**********************]
(iii) the provisions of sub-regulation (3) of regulation 5 are not attracted;
2
[***]
3[(iv) the applicant clears all outstanding dues, if any, against the original connection
as well as against all such previous connections which existed from time to
time at the premises for which new connection is being sought, also including
those relating to the infrastructure development charges, for such original
connection which was permanently disconnected; and]
4
[(v) the applicant has not permanently surrendered his contract demand/
connected load as per the provisions of sub-clause(ii) of clause (b) of sub-
regulation(1) of regulation (7).]
the amount of infrastructural development charges and other costs payable by the
applicant for the connected load or contract demand applied for, as per the
provisions of regulation 5 shall be reduced by 100% of the amount of the
infrastructural development charges worked out at the normative rates, as
applicable at the time of receipt of application for new connection, under sub-
regulation (2) of regulation 5 for the connected load/contract demand originally
sanctioned or for the same applied for by the new applicant, whichever of the two
is lower:
5
[ **************************************************************]
the percentage rate of such rebate as per the third proviso of this regulation shall be reduced by 5% for every period of 30 days or
part thereof after the expiry of initial period of 60 days:
Explanation.- If the application for the new connection is received by the licensee on or after 61
st
day but upto and inclusive of 90
th
day from
the date of permanent disconnection, the rebate under the fourth proviso to this regulation shall be allowed @ 85% of infrastructural development
charges worked out at the normative rate as per sub-regulation (2) of regulation 5 for the connected load/contract demand originally
sanctioned or for the same applied for by the new applicant, which ever of the two is lower, and so on for every subsequent block of 30
days till such time the rate of rebate becomes zero:”
1
Omitted clause (ii) vide ‘Not. No. HPERC/419 dated 5
th
September, 2018, published in the R H.P.
dated 7
th
September, 2018 at p. 4503-4504 and before its omitted it stood as under:-
“the application from the new applicant is received simultaneously or within 365 days from the date on which the original
connection was permanently disconnected;”
2
Ommitted item (iii) for word “and” and end of item (iv) ins. “and” vide ‘Not. No. HPERC/419
dated 23
rd
January, 2017 published in the R H.P. dated 6
th
February, 2017 at p. 6943-6945.
3
Subs. vide ‘Not. No. HPERC/419 dated 22
nd
July, 2018 published in the R H.P. dated 7
th
September, 2018 at p. 4503-4504 and before its substitution it stood as under:-
“the applicant clears all outstanding dues, if any, against such previous connection, also including these relating to the
infrastructure development charges, for such original connection which has been permanently disconnected; 3[and]”
4
Ins. item (v) in third proviso vide Not. HPERC/419 dated 23
rd
January, 2017 published in the R.H.P.
dated 6
th
Feburary, 2017 at p. 6943-6945
5 Omitted fourth proviso vide ‘Not. No. HPERC/419 dated 22
nd
July, 2018 published in the R H.P. dated
7
th
September, 2018 at p. 4503-4504 and before its omitted it stood as under:-
“Provided further that if-
(i) the application from the new applicant is received after a period of 365 days from the date on which original connection
is permanently disconnected; and
(ii) all other conditions, other than condition (ii) as per the third proviso to this regulation are fulfilled:
the percentage rate of such rebate as per the third proviso of this regulation shall be reduced by 5% for every period of
90 days or part thereof after the expiry of initial period of 365 days:
Compendium of HPERC Regulations, March 2021 13
Provided further that the rebate admissible as per the
1
[third proviso] to this
regulation shall be applicable only on the amount of infrastructural development charges
worked out at normative rates under sub-regulation (2) of regulation 5 and not on any other
charges/costs as may be recoverable in accordance with the second proviso to this
regulation.
2[Explanations:
(a) The term original connection used in this regulation means the connection as it
existed immediately before the permanent disconnection and the sanctioned
connected load/contract demand as per the latest status existing immediately
prior to permanent disconnection shall be considered as the connected load/
contract demand of the original connection for such purposes. However, the
temporary reduction to the extent 50% of such contract demand, if any, under the
provisions of the Tariff Order shall not be considered for the purpose;
(b) The condition specified under Clause (iv) of the third proviso to this regulation,
being a part of package offer in such cases, shall override the general provision
under the existing last sentence of sub-para 5.2.13 of the Himachal Pradesh
Electricity Supply Code, 2009.]
Previous and next
Questions people ask
Is regulation 10 of the Himachal Pradesh Electricity Regulatory Commission (Recovery of Expenditure for Supply of Electricity ) Regulations, 2012 still in force?
No repeal of the Himachal Pradesh Electricity Regulatory Commission (Recovery of Expenditure for Supply of Electricity ) Regulations, 2012 is recorded.