LawGrids logoLAWGRIDS.ORG

Annexure, Legal Metrology (General) Rule, 2011: ANNEXURE

Legal Metrology (General) Rule, 2011 - Annexure

Text of annexure

ANNEXURE

ANNEXURE Tests for determination of error of compressed gaseous fuel measuring system fitted with mass flow meter at the time of verification/re-verification. 1. Determine the tare weight of empty Compressed Natural Gas cylinder using weighing instrument of appropriate capacity, with verification scale Interval of 10 g or less. 2. Thereafter the cylinder be connected to the Compressed Gaseous fuel measuring system be filled to the extent of approximately 10 kilogram. 3. From the initial and final weight of the cylinder, the weight of the CNG actually filled in the cylinder (T) is determined. 4. From the initial and the final readings of the measuring system, the CNG filled as indicated by the system (I) be determined. 5. The percentage of error of the measuring system Is given by the formula : 1-T Error in percentage " T xi 00 NINTH SCHEDULE PROCEDURE FOR CARRYING OUT CAUBRATION OF VEHICLE TANKS, ETC, [See Rule 14] PART I CALIBRATION OF VEHICLE TANKS FOR PETROLEUM PRODUCTS AND OTHER LIQUIDS 1, Definitions (a) Vehicle tank-An assembly used for measurement and delivery of liquids comprising a tank which may or may not be sub-divided into compartments, mounted upon a vehicle together with its necessary piping, valves, meters, etc. (b) Compartment-The entire tank, when this Is not sub-divided; otherwise any one of these sub­ divisions of a tank designed to hold liquid. (c) Calibratio?erification and stamping of the capacity of the vehicle tank or its compartments. (d) Dip stick-A square or rectangular metal bar of brass or any other suitable hard material used to determine the depth of the liquid in the tank. (e) Ul/agestick-A T-shaped metal bar of brass or other suitable· material used to determine the depth of the level of liquid from the proof level. (f) Ul/age indicator-A device bolted to the inside of a manhole neck ring with the indicator set to any desired level to which liquid in the tank Is required to be filled. (g) Proof level-Reference level to which all depth measurements shall be related. (h) Dip pipe-A pipe rigidly attached at the top of the tank extending vertically downward up to approximately 15 cm from the bottom of the tank. The pipe shall have perforations at the top above the maximum liquid level. 2. Testing medium (a) Compartment testing--VVater or other appropriate liquid shall be used as a testing medium in determining the capacity of vehicle tank compartment. (b) Meter testing-A vehicle tank meter shall be tested with a liquid of the same character or of approximately the same viscosity as the liquid to be measured through the meter. 3. Equipment and tools The following equipment and tools are required for calibration ,of vehicle tank. (a) Proving measures-When available, shall be checked for accuracy against an appropriate working standard measure. (b) OJ/lbrated bulk meter-An accurate meter fitted with a pre-set valve, air eliminator and strainer, which has been checked for accuracy against an appropriate working . standard measure. (c) A set of standard commercial measures. (d) Other equipment and tools, viz. hose pipe, scriber, punch, try square, tyre pressure gauge, hammer, etc. 4. Calibration procedure (a) Vehicle tanks used as measures shall be calibrated as capacity measures. In the case of meter equipped tanks the meter shall be treated as a separate measuring Instrument for purpose of calibration. (b) The compartment capacity or capacities shall be taken as including the capacities of the delivery lines leading from the emergency, safety or master valve to the outlet va!ve (discharge valve) ['11'1 n-= 30)] 633 provided that in the case of vehicle compartment terminating in a single delivery pipeline fitted with an outlet valve, the compartment capacity or capacities shall be taken as excluding the Capacity of the delivery pipeline. A notice shall be prominently exhibited on the vehicle tank indicating clearly and Indelibly the following :- Marked capacity includes capacity of delivery line; or Marked capacity exdudes capacity of delivery line (as the case may be). The safety or master valve shall be positioned at the lowest point of outlet from the compartment. (c) The proving measure or bulk meter should be mounted on an overhead gantry or a separate framework in a convenient position above a firm and level platform, preferably of concrete on which the vehicle stands during calibration. (d) The vehide shall be placed in a level position before commencing calibration as the accuracy of calibration depends on the level of the tank; the sequence in which compartments are callbrated should be such as to minimise unequal spring deflection on the axles of the vehicle. (e) The front and rear tyres of the vehicle should be at the correct pressures. The tyres should be inspected for wear which should be reasonably even and there should not be excessive difference in the tread between the front set of tyres and the rear set at the time of calibration. (f) The interior of the compartment should be inspected and cleaned where necessary. (g) Before starting calibration, the pipelines, outlet valves and other connections shall be tested against leakage by partially filling and draining each compartment in turn through the outlet valve. During the process sufficient quantity of the testing medium should be introduced inside the compartment to wet the internal surface of the tank and pipelines. (h) After taking the precautions mentioned above, the compartment to be calibrated shall be filled with appropriate proving measures or bulk meters to the marked capacity of the compartment with the delivery lines leading to the outlet valve full or empty as provided In (b) above. The dip/ullage mark shall be taken carefully and the line shall be cut on the dip/ullage stick at right angles to the axis with the help of try-square and scriber. If an ullage indicator is used, It shall be correctly set and sealed. (i) A mark shall also be made on the dipstick to indicate the 'proof level'. In the case of ullage stick, the distance from the ullage point to the T-jolnt shall be marked on the stick. Note: The sequence for calibrating compartments should be sequence of filling them. · The sequence of discharge shall be in the reverse order to that of filling. (J) Each compartment should be left full before proceeding to the next in sequence. 5,. Maximum permissible error (a) Proving measures shall have the following capacities and shall be adjusted within the following permissible errors:- capacitt, Utres Permissible erroc millilitres (±) 50 50 100 100 200 200 500 500 1000 1000 1500 1500 2000 2000 5000 5000 (b) The maximum error for vehicle tank compartments shall be 0.05 per cent in excess of the marked capacity of the compartments. 6. Markings ''.,'{ (a) The vehicle shall have ?'"'brassplate riveted in a prominent position on it ti(receive the Legal MetrologyOfficer's stamps. The brass plate shall bear the followingparticulars: title of Legal Metrology Act, name of owner of vehicle, vehide registration number, and the serial number and capacity of each compartment. Space should be provided on the plate for the Legal Metrology Officer's stamps. A simple design for a plate is shown below. (b) The capacity of the compartment shall be indelibly marked on the manhole cover of the compartment and also painted on each side of the compartment so that it is clearly visible. If there are more than one compartment, then each compartment shall have Its capacity marked separately as above and the compartment numbered serially.The number of the compartment shall also be marked on the discharge valve pertaining to the compartment. (c) The vehicle registration number as well as the capacity of the compartment shall be indelibly .marked on the dip/ullage stick at the top end. If there Is more than one compartment, the different faces of one dip stick may be used for markings and each face shall bear the vehicle number, the serial number of the compartment, the proof and dip lines of that compartment and the capacity of the compartment. 634 THE GAZETTE .QF INDIA: EXTRAORDINARY [PARTII-SEC. 3(i)] .PART II METHOD FOR·.CAUBRATION OF VERTICAL OIL STORAGE TANKS THE LEGAL METROLOGY ACT,.2009 Name of the company : ...•......... , . Vehicle tank No : :.:·., :.::, , •. -NAME PLATE Space for Legal Metrology Officers stamp Compartment -Capacity L , • (in litres) Compartment Number locatlori':wlththe product to be stored to its working capacity or with water to its equivalent height, and such product or water has been held in the tank for at least 24 hours to allow for settling. · 3. Interrupted measurements If the calibration of a tank is required to be interrupted, It may be resumed with minimum delay, without repetition of work previously completed provided that: (I) there is no major change in equipment and as far as possible, no change in personnel; · (II) all records of work done are complete and legible; and (Ill) same hydrostatic head as before Is :t. Scope maintained in the tank. This Part prescribes methods for calibration of 4. Descriptive data vertical tanks by strapping and Internal (a) complete description data shall be entered measurements. These tanks are meant for bulk on the Tank Measurements Record Form being used. storage of petroleum and liquid petroleum products. A recommended Record Form is shown in Table1. 2. Conditions for measurements (b) Supplemental pencil sketches or notations (a) All data and methods, whereby each completed, identified, dated and signed, shall measurements are obtained, necessary for the form an Important part of field data. These shall be preparation. of calibration tables, shall be in made to Indicate typical horizontal and vertical joints, accordance with sound engineering principles: number of plates per course (ring), locations of (b) When drawings for the tank are available, courses {rings) at which thickness of plates changes, . all measurements shall be compared with those arrangement and size of angles of top and bottom obtainable from the drawings and measurements of shell, location and sizes of pipes and manholes, showingdiscrepancies g'reater than the tolerance dents and bulges in shell plates, direction of lean · specified in9{C), shall.be verified. A slmllarprocess from vertical, method used In by-passing a large of check shall be employedin all cases where reliable obstruction, such as clean-outbox or insulation box information' beyond the measurements taken, is located In the path of a circumferential measurement, available. location of tape path, location and elevation of (c) Measurements shall be taken only after the possible datum plate and all other items of interest tank has been filled at least once at its present and value which will be encountered. TABLE 1 . RECOMMENDED RECORD FORM FOR MEASUREMENTS OF VERTICAL TANKS [Gause 4(a)] Report No . Date ,. , . Tank No '. . (Old Tank No.) · Owner's name . Plant or property name .. Location . Manufactured by . Erected by .. Description .. . · . · ' • · · Prepare Coples Increments 1n : . Fraction to Table form or size desired , , .. Height: Shell ,. _. Gauging : . Type of root, Weight of floating roof ,: .. Tank contents· : Name Avg. liquid temp., °C·.! . Gauge cm or mm innage to shelffloor or outage: · Hydrometer reading at .. .. .. . . .. . .. . . . .. . . .. . .. .. .. .. .. °C Sample temperarure ,GaUQi?greference point to top of top angle _. cm or mm Normal .. Service . Shell circumferences or diameters: A :.: :. D G : : .. B E H . C F ! . ['11'! JI-? 3(i)] · 635 ; DESCRIPTIONS OF SHELL PLATES AND JOINTS Course Thickness Type of Set In or Width of Thickness No. of &posed Inside (Rings) vertical out lap strap of strap joints course course No. Joint (ring) (ring) ·height height 5. ........... ........... ........... .. ......... ........... . .......... """"'" .. ...... ;.... 4. ........... ........... ........... .. ......... ........... .. ......... ........... . .......... 3. ........... ........... ........... ? ........... ........... . .......... ........... .. .......... 2. ........... , ........... ........... ........... . ..................... ........... ........... ., 1. ........... ........... ........... . . " .......... ........... .. ......... .. ......... . .......... . BOTTOM COURSE (RING)SHELL CONNECTIONS: No. I. 2, 3. 4. · Description "'''"·?·!? ? ........ u,, . . , . ...................... Elevation, top of floor to bottom of connection . ,, . ,uu1uu1•;•••••••u•1n,,1,n unuu,,u,•••••••••••"""'' , ._. .. Type of bottom , : , :.·Height or.crown ,,, ' ·. Deadwood·and remarks (Use reverse side If necessary)':· - ",' . . ·, --'---- Description No. : • Size . ·--?'----- .. -- .. -·-----.. ··-" -:: .. ' From Elevation To Thickness .. ,: .,,., . . Measurements by Amount of tank lean from vertical Circumference tape used : ; : . Date checked at : .. · Tank measured by , for " Deadwood and tank bottorri-Use separate sheets: For each pieceor item of deadwood record description, size, number of occurrences, andlocatlon related to other heightmeasured data recorded. . Explanatory·notes (such as type of bottom, height or depth of crown, etc.) (c) All measurements made ·by the tank calibrator shall be recorded on site and shall not be subjected to subsequent correction; • 5. Degree of accuracy In order to obtain maximum obtainable accuracy in calibration tables, adjustments for effects . of. the following variables shall be incorporated in the tables:-. {i) Expansion and contraction of steel tank shell·due to liquid heads, . (ii) Tilt from upright position, and · ;c''(iii)Tank bottoms that are irregular in shape, Note: The degree of accuracy desired or required In the completed calibration table for a specific tank shall be the governing factory In determining the procedure to be followed. 6. Expansion and contraction of steel tank shells due to liquid head and temperature These effects shall be eliminated by strapping · the tank when it is at least two-thirds full with water . ·. or approximately full with the product [See also 2(c)]. -The strapping record shall include water or product level from a known reference point, temperature of the tank contents and that of adjacent air. SECTION I-cALIBRATION BY STRAPPING .7. General (a) This method is based on the measurement of external circumferences which are subsequently corrected to yield the true internal circumstances. {b) Circumferences shall be measured under · conditions of liquid head as given under 2(c) and 6. {c) The stipulated number of external circumference measurements, together with the subsidiary measurements, where necessary, to correct for deviation of the tape from the true circular path shall .be obtained as described under 9. 636 THE GAZETTE OF INDIA: EXTRAORDINARY [PART11-SEC. 3(i)] (d) An internal diameter may be measured at approximately the same height as that at which a circumference has been measured, if verification of that circumferential measurement is desired. (e) It may be necessary in practice to refer all tank dips to a datum point other than the datum point used for the purpose of tank calibration. If so, the difference in level between these datum points shall be determined either by normal surveying methods or by other suitable means. (f) The overall height shall be measured, using dip-tape and dip-weight, from the dipping datum point to the reference point (the dipping reference point) on the dip hatch. This overall height shall be recorded and marked on the tank at the dip hatch. 8. Equipment (a) Steel tapes-Shall comply with the specifications under Part VII of Sixth Schedule. The tape shall be greased well before use. (b) Spring balance-Reading up to 10 kg with · 0.1 kg graduations, for measuring the tension applied to the tape. It Is preferable to have two balances. Spring balance shall comply with specifications given under Heading W of Seventh Schedule. (c) Step-overs-The step-over Is a frame holding two scribing points rigidly and at such a distance apart as meets the conditions of use laid down under 9(d). The frame may be constructed of wood; it should be painted if required. This Is used to correct deviation of the tape from Its normal circular path, namely passing over fittings or joints between plates. (d) Dip-tape and dtp-weight--COmplylng with the specifications given under Part IX of Sixth Schedule. (e) Loops and cords-One or more metal loops which can slide freely on the tape and to which are attached two cords each of sufficient length to reach from the top of the tanks to the ground. The tape is positioned and Its tension evenly distributed by passing these loops around the tank. (f) Accessory equipment (i) Rope (ii) Hooks (iii) Safety belts (iv) Ladders · (g) Miscellaneous equipment (i) · Steel rule (ii) Spirit level (iii) Awl and scriber (iv) Marking crayon (v) Record paper (vi) Plumb line (vii) Dumpy level (viii) Positive displacement bulk meter 9. Circumference measurements A. Strapping levels Circumference shall be measured by a minimum of two strappings per course (ring) at the following levels :- (a) FQr riveted tanks: (I) At 7 per cent to 10 per cent of the height of exposed portion of each course (ring) above the level of the top of the bottom angle iron of the tank and above the upper edge of each horizontal overlap between courses (rings) (see A of Figure 56), and (II) at 7 per cent to 10 per cent of exposed portion of each course (ring) below the lower edge of each horizontal overlap between courses (ring) and below the level of the lowest part of the top angle Iron of the tank (see B of Figure 56). (b) FQr welded tanks : (I) Two levels (see A and B of Figure 57), the upper and the lower levels, at the top and bottom of courses (rings) shall be 20 per cent of the height of the exposed portion of the respective course (ring) away from the angle Irons or seams. (II) Circumferential tape parts, having been located at elevations as under (a) above shall be examined for obstructions and type of vertical joints. Projections of dirt and scale shall be removed along each path. (Ill) Occasionally, some feature of construction such as manhole or Insulation box, may make It Impracticable to use a circumference evaluation at the prescribed location. If the obstruction can be spanned by a stepover then the circumference shall be measured at the prescribed elevation, using a suitable method given under 9( d), If the obstruction cannot be conveniently spanned by a· step-over, then a substitute path located nearer to the centre of the course (ring) may be chosen. The strapping record shall include the 637 "1 · 81 e, ? : - .t Flg:1 RIVETED equipment required. If the tape is not In close contact with the surface of the tank throughout Its whole path owing to the vertical joints a stepover shall be applied so that a correction may be calculated to adjust the gross difference for this effect. this path to allow the circumference to be measured in sections. The scribed lines shall be drawn in the middle circumferential third of any plate at such distances as will ensure that the whole of the length of the tape used is under the observation of one or other of the calibrators. Subject to the conditions under 9(a)(III) and 9(a)(iv) the external circumference of the tank is then the sum of the lengths between the scribed lines. (iii) If the tape to be used can encircle the tank completely, then after the level of the tape path has been chosen, the tape is passed around the circumference and held so that the first graduated centimetre lies within A B, ? . I-- ' I . A A? B, e. ? - ! : . - location of the substitute path and reason for the departure. (iv) The type and characteristics of vertical joints shall be determined by close examination in order to establish the method of measurement and B. Strapping procedure (i) The tank shall be strapped by either of the methods described under (II) and (iii) below. In either case a tension of 4.5 ± 0.5 kg shall be applied to the tape and, if necessary transmitted throughout Its length by suitable means, namely by means of metal loops sliding freely on the tape, the loops being passed around the tank by operators with the aid of light chain or cords. The tape path shall be parallel with the circumferential seams of the tank. (ii) If the tape to be used is not long enough to encircle the tank completely, then after the level of the tape path has been chosen, fine lines shall be scribed perpendicular to Fig: 2 LOCATION OF MEASUREMENTS OF WELDED TANKS [ 'WT l[-1jj1Js 3 ( i)) 638 THE· GAZETTE. OF JNDIA: EXTRAORDINARY (PARTII-SEC. 3(i)] FIGURE-3 STEP-OVER the middle circumferential third of anyplate. The other end of the tape shall be brought alongsicle:,The tension is then applied through the spring balance and .transmitted throughout the length of the tape. (iv) After a.circumference has·been measured [see (Ill) abovejthe tape shall be shifted a little· around the tank, brought to level and tension .. as above, and .the reading repeated. The final reading shall 'be the arithmetic average of the.readlnqs, C. Tolerances Measurements,shall,be read to the nearest 1 mm and within the following tolerances when readinqsare taken at the same point:- D. Step-overs: (i) If the tape crosses obstructions, such as projections deformities, fittings or lapped joints, It will deviate from a true circular path and an erroneous circumferential measurement will result. In order to avoid such errors a 'step-over' is used to measure the correction to be applied for such obstructions. (ii) Construction-A step-over is a frame rigidly holding two scribing points, and of such dimensions that the points may be applied to the tape well clear of the obstruction and of its effects on the tape path, while the frame Itself does not touch either the obstruction or the tank shell. Rigidity of construction Is essential; suitable designs are illustrated In Figure 3 (iii} Use of step-overs (a) For obstructions, the strapping tape shall be stretched as if in measurement of a circumference on the tank which Is being calibrated, but not within 30 cm of any horizontal seam. The scribing points shall then be applied to the tape near the middle of a plate where the tape is fullyin contact with the tank surface. The length between the points, as measured on the curved tape, is then read off as closely as possible, fractions of tape divisions being estimated. The readings shall be repeated on a minimum of two and maximum of four plates equally spaced around the circumference, and the average of the results taken, as the step-over will vary with the tank diameter and the course concerned since they are made on surface differently curved. (b) With the tape still in position and under the tension used in strapping, the step­ over shall be applied to the tape on either side of each obstruction lying on the tape path, and readings shall be taken of the lengths of tapes included between the scribing points. All step· over readings shall be recorded for subsequent use in calculation. (c) ca re shall be taken in placing the instrument in a truly level position at each obstruction to avoid distortions In circumferential path. In the case of a step--over of relatively long space, the use of a spirit level is recommended as an aid in determining its correct position before scribed marks are struck off on the places. (cl} When the butt-strap or lap joints, or tank shell, include rivets or other features which exert uneven effects on the resultant avoid between tape and tank from joint to joint, then a step· over will be required. The span of the Instrument should be measured prior to use in accordance with (a) above. The two legs shall be separated by a distance sufficient to span each void between tape and shell encountered. The legs shall be of sufficient length to prevent contact between the Tolerance :l:2mm ±4mm ±6mm :I: 8mm :I: 10 mm Circumference Up to 30 metres Over 30 and up to 50 metres Over 50 and up to 70 metres Over 70 and up to 90 metres Over 90 metres ['11'1 II-"!l!1% 3(i)] · 639 interconnecting member and the tank plate or obstruction. Stretch the tape over the joints and place the step-over in position at each location of void between tape and shell, completely spanning the void so that the scribing points contact the shell at an edge of the tape. The length of tape encompassed by the scribing points, with the tape maintained In proper position and tension, should be estimated to the nearest 0.5 mm. At each step-over location, therefore, the difference between the length of tape encompassed by the scribing points and the known span of the Instruments is the effect of the void, at that point, on the circumference as measured. The sum of such difference In any given path, subtracted from the measured circumference, will give the corrected circumference. 10. Shell plate thickness (a) Where the type of construction leaves the plate edges exposed, a minimum of four thickness measurements shall be made on each course (ring) at points approximately equally spaced about the circumference. The arithmetical average of the measurements for each course (ring) shall be recorded; all thickness measurements, properly identified,shall be noted on supplemental data sheet which shall form a part of the measurements record. Care shall be taken to avoid plate thickness measurements at locations where edges have been distorted by caulking. (b) Where plate edges are concealed by the type of construction, the strapping record shall be marked 'not obtainable at tank'. Alternately, plate thickness measurement may be obtained as described under (c) below. (c) Plate thickness measurements obtained before or during construction, and recorded on a properly identified strapping record may be acceptable. In the absence of any direct measurements of plate thickness obtained and recorded before or during construction either those shown on the fabricator's drawings may be accepted and so identified in the calculation records or any other practicable method may be used for measurements of plate thickness. 11. Vertical measurements (a) A tape shall be suspended internally along the wall of the shell from the top curb angle to the bottom course (ring) and the height of the course (ring) measured to the nearest millimetre. The difference In height between the datum plate at which dip is taken and the bottom 'course (ring) shall be measured and the headings of the course (ring) height shall be transferred to the datum plate by applying the correction (see Figure 'I). Example: In Figure 'I, the difference between bottom course (ring) and datum plate is 152-150.5 cm = 1. 5 cm. Applying this correction the corrected height of the course (ring) at B--307.5 cm C-468.5 cm lr-623.5 cm E-798.5 cm • .. Bottom course (ring) Figure 4 (b) When it is inconvenient to measure the course (ring) heights internally, then they shall be computed from external measurements, due allowance being made for the effect of horizontal seam overlaps. The heights obtained shall be the vertical distances, measured to the nearest 5 mm, between successive edges of the courses (rings) as exposed Internally in the tank. For this purpose, In the cases of lap joints, it will be necessary to determine the width of lap in each course (ring). (c) If necessary, heights at more than one vertical around the tank may be taken, and for each course (ring), an average of the results obtained. 12. Deadwood (a) Any fitting which adds to or subtracts from the capacity of the tank is called deadwood. Deadwood shall be accurately accounted for, as to size and location to the nearest millimetre in order to perrnit,- (i) adequate allowance for volumes of liquid displaced or admitted by the various parts; and 640 THE GAZETTE OF INDIA : EXTRAORDINARY [PARTll SEC. 3(i)] (ii) adequate allocation of the effects at various elevations withln'.the tank. (b) Deadwood-should be measured, If possible, within the tank. Dlmensions·.shown on the builder's drawings may be accepted if actual measurement is impracticable. (c) Measurements.of deadwood should show the lowest and highest'levels, measured from the tank bottom adjacent tothe shell, at which deadwood affects the capaclty.of.thetank:Measurements should be in increments .which .permit allowance for its varying effect ontank capacity at various elevations. (d) Large deadwood •of :irregular shape may. have to be measured in separate sections suitably chosen. (e) Work sheets on which details of deadwood are sketched, dimensioned and located,· should be clearly identified and should become part of the strapping record. (f) For variable deadwood, such as nozzles and manholes, encountered in the bottom one or two courses (rings) of the tanks, an average deadwood correction shall be made. 13. Tank bottoms (a) Flat type: (i) Tank bottoms which are flat and stable under varying liquid loads will have no effect on tank capacity depressed on the basis of geometric principles. (ii) Wh_ere tank bottom conditions of · irregularity, slope and instablllty exist, and where correct capacities cannot be determined conveniently from linear measurements alone, It shall be necessary to resort either to liquid calibration to floor survey. (iii) Liquid calibration-The procedure in carrying out the liquid calibration is to fill into the tank quantities of known volume of water or other non-volatile liquid until the datum point Is just covered and the total quantity recorded. Additional quantities shall then be added until the highest point of the bottom is just covered. This may be done in one or more stages as desired and the dip reading and quantity at each stage recorded. It is convenient for dip readings to be taken at intervals of approximately 3 cm, the successive intervals not necessarily being identical. (a) This liquid may conveniently be measured Into the tank by a positive displacement meter which should be previously calibrated for the liquid and rate of flow to be used. Alternatively, an accurately calibrated measure or tank may be used. (Iv)Volumes for the tank calibration table above this elevation shall be computed from linear measurements. (v) Floor survey-The floor survey consists In recording levelsofthefloorby means of a dumpy level with the help of the spirit levels, the cross sections and the longitudinal sections of the entire floor may be computed. The levels when · plotted will define the profile and the geometric pattern of the bottom of the tank. Thus the capacity of the tank may be calculated. (vi) During the tank bottom calibration the difference in height between the datum plate and the bottom of the bottom course (ring) should be recorded, wherever possible. (b) Conical, hemispherical, semi-ellipsoidal and spherical segment: Tank bottoms conforming to geometrical shapes have volumes which may either be computed from linear measurements or measurements by liquid calibration by Incremental filling or by floor survey, as desired. Any appreciable differences In shape affecting the volume, such as knuckle, radii, etc., shall be measured and recorded in sufficient detail to permit computation of the true volume. 14. Measurement or tilt (a) Measurements shall be taken to determine the amount, If any, by which the tank is tilted. This can conveniently be done by suspending a plumb line from the top angle and measuring the offset at the bottom angle (see Figure S). Alternatively, if the tank bottom Is being calibrated by floor survey with a dumpy level as in 13(a )(v), the tilt can be estimated by taking reading along the periphery of the tank bottom. Also, if a liquid calibration of the bottoms is being made as outlined in 13(a)(III), the tilt can be determined by taking measurements from the surface of the liquid to the bottom of the tank. In any of these methods, a sufficient number of measurements . .•.. L 1 [ 'lflT II -11i"G 3 (i ) ] shall be taken at different points on the circumference to determine the maximum offset. •• -·-e " • -·--- .... .. i--. Figure S 15. Floating-roof tanks (a) All calibration measurements shall be made exactly as for tanks with fixed roofs. (b) Liquid calibration for floating-roof displacement- (i) Corrections for floating-roof displacement arising from the weight of the roof and the deadwood associated with it shall be allowed for in the calibration measurement. (ii) If the weight of the floating-roof is accurately known, correction for the displaced liquid may be applied knowing density and temperature of the tank contents, at the time of determining the actual Inventory. (c) Alternatively, displacement due to the floating-roof and deadwood may be determined by admitting oil to the tank until the dip reading is just below the lowest point of the roof. Known quantities accurately determined (for example by flow meter or delivery from a portable tank or measure which has been accurately calibrated) are then admitted to the tank and the corresponding dip readings recorded at a number of suitable intervals until the point is reached when the roof just becomes oil borne. Record the density and temperature of oil used: (i) It is advisable to use a liquid of nearly the same density as that for which the tank is intended. If this Is not practical, water may be used and suitable corrections applied. (II) During liquid calibration any space under the roof that will trap gas should be vented to the atmosphere. (Ill) Before liquid calibration the height of the lowest joint of the roof with reference to datum point should be recorded, wherever possible. (iv) To assess the point at which roof becomes oil borne the following procedure may be followed :- "With the roof resulting fully on Its supports, paint four short horizontal white lines about 3 cm wide on the tank sides in such a position that, viewed from some definite point, their lower edges are just above four similar lines marked on the roof edges or shoes. Then slowly pump oil into the tank; when all roof markings are seen to have moved upwards, regard the roof as ell borne, and take the dip reading of the oil at this level." Alternatively, from some chosen viewpoint on the dipping platform, note the position of the roof against rivet heads on vertical seam or other markings on the tank walls Instead of paint marks. In both cases · extend the points of reference round the greater part of the tank interior, and see movement relatiVe to all points. (d) Weightfloating-The floating weight of the entire roof shall include weight of roof plus half the weight of the rolling ladder and other hinged and flexibility supported accessories that are carried up and down In the tank with the roof. These are calculated by the tank fabricator and given on the drawing and on the roof name-plate. (e) Deadwood: (I) Fixed deadwood shall be measured as described in 12. The drain lines and other accessories attached to the underside of the roof shall be treated as fixed deadwood In the position they occupy when the roof is at rest on Its supports. (II) When all or part of the weight of the roof is resting on its supports, the roof Itself is deadwood and as the liquid · level rises around the roof its geometric shape will determine how it should be 642 THE GAZETTE· OF. INDIA :-EXTRAORDINARY [PARTII-SEC. 3(i)] deducted. The geometric shape should be taken from the fabricator's drawings or measured in-the.field With the aid of an,englneer's level.whlletheroot-ls restlng:onits supports. 16. Variable volumecoofs ·(a) Roofs such -as lifter, flexible·membrane, breather orballoon, · may require .speclal deadwood measurements· for roof .parts that aressornetlrnes sub,merged. When these parts.ssuch .. as,columns, are fixed relative:;to· the· tank .shell, they should be · measured as-deadwood 'in the-usual way. When these parts move with 'the roof and hang down.lnto.the liquid, they should be deducted;as fixed deadwood with the roof in the 'lowest .posltlon. oetans may be secured :from the .fabricator or measured in the field. (b) Some variable volume roofs have flexible members ,which may float on the surface when the membrane is deflated and the liquid level Is high. The floating weight of the membrane displaces a small volume of liquid. Data on the floating weight should be secured from the fabricator and supplemented, if necessary, by field observation and measurement. (c) Some variable volume roofs have llquidseal troughs or other appurtenances which makes the upper outside part of the shell inaccessible for outside circumference measurements. Liquid calibration of this portion of the shell may be made, or (i) theoretical dimensions may be taken from the fabricator's drawings, or (II}the highest · measurable circumferential measurement may be used as a basis for the portion of the tank that cannot be measured. When the method (I) or (ii) is used, It shall be so indicated on the calibration table. SECTION II: CALIBRATION BY INTERNAL MEASUREMENT 17. General (a) This method Is based on the measurement · of internal diameters. (b) Diameters shall be measured only after the tank has been filled at least once at its present locations with the product to its working capacity or with water to its equivalent height, and such product or water has been held in the tank for at least 24 hours to allow for setting, , .• ,_,_ .• ,,, • •·tt?·-•crr,• , .. ,.,., .. ,..,. ?-• ···- ?-, -?-?· .(c) The stipulated number of internal diameters shall be obtained as described under 19(a}(iv). (d) Where practicable, an external circumference shall be measured at approximately the same height as that at which a set of diameters of which a verification is desired, has been taken. The resulting internal diameters shall be compared, and If a discrepancy is found, ttie measurements shall be verified. (e) It may be necessary In practice to refer all tank dips to a datum point other than the· datum point used for the purpose of tank calibration. If so, the difference in levels between these datum points shall be determined either by normal surveying methods or by other suitable means. (f) The overall height shall be measured using dip-tape and dip-weight from the dipping datum point mentioned In (e) above to the reference point (the dipping reference point) on the dip hatch. This overall height shall be recorded and marked on the tank at the dip hatch. 18. Equipment (a} Steel tape-Complying with the specification given under Part VII of Sixth Schedule. The tape shall be greased well before use. (b) Dynamometer-This is used for applying tension to the steel tape. (c) Other equipment as referred to under 8. 19, Diameter measurements (a) Procedure: (I} All diameter measurement shall be made with a tension of 4.5 ± 0.5 kg . applied to the tape as indicated by the dynamometer. (ii) All tape measurements shall be recorded as read, that is without Including the length of the dynamometer. (Ill) The dynamometer length at 4.5 kg shall be taken accurately before it is put Into commission, and subsequent checked before and after calibration of each tank, the final check being made before leaving the site. (Iv) The measurements shall be taken between diametrically opposite points ['WT II-- 3(i)] 643 at the following levels on each course (ring), the minimum number allowable at each level being two on each course (ring), at right angles to each other:- (a) For riveted tanks (see Figure 1) (1) at 10 per cent of the height of exposed portion of each course (ring) about the level of the top of the bottom angle iron of the tank and above the upper edge of each horizontal overlap between courses (rings); and (2) at 10 per cent of the height of exposed portion of each course (ring) below the level of the lower edge of each horizontal over-lap between courses (rings) and below the level of the lowest part of the top angle iron of the tank; (b) For welded tanks (see Figure 2) Two levels, the upper and the lower levels, at the top and the bottom of courses (rings), shall be 20 per cent of the height of the exposed portion of the respective course (ring) away from the angle irons or seams; (c) All tanks No measurement shall be taken nearer than 30 cm to any vertical seam. (v) If for any reason it is impracticable to take measurements at the positions described above, then the diameters shall be taken . as close to the proper position as practicable, but not nearer the horizontal seams than Is specified under (b) above. (vi) The levels at which measurements have been taken shall be recorded together with reasons for abandoning the prescribed level. (vii) Measurements shall be taken with the zero end of the steel tape attached to the dynamometer, one operator placing the dynamometer on the predetermined point and the second operator placing the rule end-on to a point diametrically opposite. The tape with the graduated side wholly upwards Is then pulled along the rule until the requisite tension is registered by the sounding of the buzzer in the dvnarncmeter, The relative position of tape and rule is maintained by a firm grip until the rule is removed from the side of the tank and the measurement read on the tape at the end of the rule which was previously in contact with the tank side. The operation shali be repeated at the various positions at which measurements are required throughout the tank. The measurements shall be recorded clearly In white chalk on the steel plates in such a manner as to Indicate the positions at which they were taken. (viii) Each measurement of diameter shall be recorded to the nearest mm. (b) All other measurement shall be followed In accordance with section I. PART III METHOD FOR COMPUTATION OF CAPACITY TABLES FOR VERTICAL OIL STORAGE TANKS 1. Scope This method prescribes the methods of computation on capacity tables for vertical storage tanks Intended for bulk storage of petroleum and liquid petroleum products. 2. General (a) The calculations shall be made In accordance with the accepted mathematical principles. (b) At the head of each capacity table it shall be clearly stated that the dip/capacity relationship applies only to dips taken at · one specified point. This point shall be clearly marked on the tank, and the height of the dipping reference point shall be recorded at the head of the capacity table. 3. Form of tank tables Provided that tank tables have been prepared in accordance with the principles laid down in this standard, the form in which the table is set out will not alter the accuracy of the figures obtained from it, but the following principles shall be applied In preparing the tank tables:- (!) The Intervals of dip at which the tables are set out shall not be so great that Interpolation for Intermediate dips Is difficult. It is convenient to set out tables at Intervals of dip not greater than 5 cm, for then a small proportional parts table, calculated on the average content of tank per unit depth, may be used for calculating the litres corresponding to inter-decimal dips. In the case of lap joints, however, the proportional parts table should be set out for every course (ring). Levels affected by bottom irregularities and deadwood shall 644 THE .GAZETTE OF INDIA: EXTRAORDINARY [PARTII-SEC. 3(i)] not be included in. calculating the average capacity per unit. depth used for the proportional parts table: .. and. this table:shall not be applied in interpolations at these.levels. (ii) The tables-may be setout morefully; this may be justifiable-in some:cases where the greatest speed in calculation iS desired, but it shall be remembered.that e.tabteset out on a sigglesheet of paper, is often quicker In use.than one .whlch -occupies several pages. (iii) It should be remembered that, at .best, no oil measurement .can be -relied upon to nearer that one partiinJ0,000. Commercial tables should never be set out to show any fractions ota litre, and minor discrepancies within this•limitshall be disregarded. (iv) In genera!, therefore, it is recommended that tables.should be set out to show litres at intervals -of 5 cm in dip with a proportional parts table for Intermediate dips, the satter being set out against millimetres. (v) A recommended format of a calibration chart for butt welded tanks Is given in Table 2. SECTION I : STRAPPING METHOD 4. Corrections to be applied to measured circumferences (a) Step overs: (i) For each obstruction the excess or deficiency of the tape measurement spanning the obstruction as compared with the step-over interval for the course (ring) concerned shall be subtracted from or added to the circumference figure obtained by strapping, and the result shall be taken as the corrected circumference, free from error due to the displacement of the tape from its proper path by the obstruction concerned. (ii) Step-over correction shall be Included for all vertical seams where it Is detectable In the case of vertical seams provided that the tape path used and entirely clear of rivet heads, an average step-over correction may be determined for each course (ring) and multiplied by the number of seams per course (ring) to obtain the total correction to be applied to the measured circumference of that course (ring) to compensate for such overlaps. (Ill) For single obstructions, only step-over corrections 2 mm or over shall be included. (iv) The use of the step-over corrects circumferences for the effect on them of vertical seam overlaps but does not correct the tank tables for the effect as deadwood of internal projections of the seam edges. These shall be computed and accounted for as deadwood. (v) Bychoosing tape courses In order to avoid appurtenances, use of step-overs €ould be eliminated to a great extent. (b) Plate thickness Plate thickness measured shall be recorded to the nearest 0.1 mm. (c) Temperature correction Where the strapping and dipping tapes are calibrated at 20° C, and the tank table is to be corrected for use with the shell at 15°C, from each measured circumference shall be subtracted 0.000 09 times the measured circumference, before the figure is taken Into further calculation. 5. Calculations (a) The mean external circumference of any course (ring) shall be the average of the circumferences measured on it and corrected to the nearest 0.1 mm. (b) The mean internal circumference of the course (ring) shall then be calculated from the mean external circumference of the course (ring) by subtracting from the latter 2 11 times the plate thickness in metres. (c) The open capacity of each course {ring), that is, its capacity without allowing for deadwood shall be calculated as if the course (ring) were a true cylinder of the mean internal circumference determined as under (b) above. This rule shall apply to vertical cylinders of In-and-out, telescopic or shingled construction. (d) The open capacity of each course (ring) In litres per centimetre of height shall be obtained by using either the following formula or any other mathematically equivalent process:- Open capacity in litres per centimetre C2Xl00D0 = 4 n Xl000.028 or 0.795 752 x c2 where- C = the mean internal circumference In metres and p = 3.14158 ["11'1JI-? 3(i)] 645 (e) For tanks which are inclined to the vertical, these formulae shall be modified as given in clause 11. (f) Specimen calculations are given in clause 12. SECTION II : INTERNAL MEASUREMENT METHOD 6. Corrections to be applied to diameter measurements (a) Deductions shall be made from the average tape readings obtained in measuring diameters to allow for the effect of sag. The correction Z for sag expressed in metre is given by the formula : z = W'S' = KS' 24P1 where P = pull on tape in kg, S = span of tape i.e., outside circumference of the tank in m, W = weight of tape in kg/m, and K = w2124p2= constant Example : For a tape 10 mm wide and 0.25 mm thick, made of steel of density 7.850 kg/m3, values of K to give the correction in centimetres when the tape is stretched with fiat side horizontal, will be: p K 4.4 kg 8.29 x 10-S 4.5 kg 7.92 x 10-S 4.6 kg 7.58 X 10-5 The above formula gives practically the same results as the equation of the catenary and is less cumbersome. (b) To the average diameter of each course (ring), corrected for sag, add the length of the dynamometer when registering a pull of 4.5 kg. (c) Corrections for the effect of stretch are unnecessary because the tension applied is that at which the tape is standardized. (d) Corrections for temperature shall be made as specified in 7(c). 7. Calculations (a) The mean diameter measurement will consist of the average, of the separate tape readings corrected for sag, plus the length of the dynamometer. (b) The procedure shall, therefore, be : (i) Average the tape readings obtained for each course (ring), by dividing the sum of all these readings on the course (ring) by their number. Round off this average to the nearest 0.1 mm (II) Correct the mean result of (i) for sag as specified in 6(a). (Iii)Add to the result of (ii) the dynamometer length as specified In 6 clause (b). (c) Where the measuring and dipping tapes are calibrated at 20°C, and the tank table is to be correct for use with the shell at 15°C, multiply the result obtained in (b)(iii) above by (1-0.000 09), before the figure is taken Into further calculation. Round off this figure to the nearest 0.1 mm. (d) calculate the open capacity of each course (ring) that is its capacity without allowing for deadwood, as if the course (ring) were a true cylinder of the mean Internal diameter determined under (b) above. This rule shall apply to vertical cylinders of in-and-out telescopic or shingled construction. (e) The open capacity of each course (ring) In litre per centimetre of height shall be obtained by using the following formula or by any other mathematically equivalent process: D'X 11 · or 0.000785 376 x D2 1000.028X4 where D = the mean internal diameter in · centimetres. (f) For tanks which are inclined to the vertical, modify these formulae as given In 11. (g) When the level or levels from which oil depths will be measured differ from the datum level from which the tank table is first prepared, correction for difference shall be made in the final table. (h) Specimen calculations are given in clause 13. s. Deadwood (a) The open capacity of each course (ring) shall be adjusted for any deadwood it contains. (b) The total volume of each piece of deadwood shall be calculated to the nearest litre. In this context, the term 'piece of deadwood' shall include such Items as the rivet heads in one line around the tank, taken collectively, as a single 'piece' of deadwood. (c) The effect of small pieces of deadwood may be neglected provided that (i) the total effect of any such neglect shall not lead to error in the tank tables exceeding 0.005 per cent of the total capacity of the course (ring) in which the deadwood occurs, and (II) any deadwood so neglected is distributed evenly, or substantially so, over the whole height of the course ?-- _L_ - 646 THE GAZETTE OF INDIA : EXTRAORDINARY [PARTII-SEC. 3(i)] (ring), in calculating the table; howevetlt shall be permlssible to lndude the effect of any. deadwood, however small. 9. Tank bottoms (a) When the tank bottom is .substantially horizontal, for example, when the tank Is carried on a level concrete raft orsteel structure, then bottom Irregularities can. be n?lected. (b) When thetank bottom· has been calibrated by measuring ln:sultable known .volumes of •liquid, the tank table for these levels shaltbe prepared from these measurements on .sound mathematical principles. The highest level and capacity shown in the tank bottom.calibration table so prepared shall then be the datum level and capacity from which is to be constructed.jrhe rest of the table should be prepared by calculation as described In this section. 10. Floating roof,tank (a) Except for.the following modifications, tables shall be prepared In accordance with Section I and Section II : (i) Allowance for deadwood shall be made as described in dause 8. (ii) The drain line and other accessories attached to the underside of the roof shall be included as fixed deadwood in the position they occupy when the roof is at rest on its supports. The position of these accessories should be specified In the calibration table. (iii) Two levels shall be defined, both an exact number of centimetre above the datum point from which dip readings will be taken. The first level, designated A, shall be not less than 4 an and not more than 6 cm below the lowest point of the roof plates .· when the roof Is at rest. The second level, designated B, shall be not less than 4 cm and not more than 6 cm above the free oil surface when the roof is at its lowest oil bome position. (iv) The floating weight of the entire roof shall include weight of roof plus half the weight of the rolllng ladder and other hinged and flexiblysupported accessories that are carried · up and down in the tank with the roof. The displaced volume due to roof weight can be easily calculated from : . ?oofweight in kg/ Density of stock in kg · per litre at tank temperature ·, ? . ·:":",iThe displacement, minus the volume of ·'' · .. deadwood already accounted for in (ii) above, shall be considered as an item of deadwood applicable to all levels above B. It shall either be entered as such on a supplementary table or taken into account In the preparation of the final table as a deduction for deadwood at all levels above B. For levels between A and B, the proportion of roof displacement to be taken Into account as deadwood may be calculated from the dimensions of the floating roof. These partial displacements shall either be entered as such In the supplementary table as applicable for levels between A and B, or taken into account In preparation of final table. Alternatively where measured quantities of oil have been admitted to the tank and corresponding levels of the free oil surface determined by dipping, the necessary adjustments to the tank capacity within the range of the levels A and B may be computed from this data. The part of the table between levels A and level B shall be marked 'not accurate'. (v) It is considered impracticable to allow In the tank table, for the effects of extraneous matter retained by the roof, varying friction of the roof shoes and varying immersion of roof supports. 11. Computation of contena of tanks inclined to the vertical [See clauses S(e) and 7{f}j (a) Tunks iflclinedto the vertical : (i) Capacity as determined in S(e) and 7(e) applies to tanks which are vertical. For tanks Inclined to the vertical at an angle •, the open capacity in litres per centimetre of vertical height, is given by :- 0. 795 752 x c2 x sec e Where C = the mean Internal circumference in metres. OR 0.000785 376X o2 x Sec 0 where D = the mean internal diameter in centimetres. Sece may be ignored for angles of tilt up to 1 In 50, this representing a maximum error of 0.02 per cent. (Ii) The· correction specified above shall be applied before the corrections for deadwood are made. ['WT II-? 3(i)J 'IT«r q;r uaft1i[ : :mir,mui 647 [See clause S{fJj 12. Example for strapping method (a) Data obtained by strapping Course (ring) Measured Stepover Plate thickness Internal heights of courses No. external corrections (rings) circumferences metres metres mm Individual Cumulative an cm 8 Top 113.040 0.002 7 8 Middle 113.086 0.002 7 187.0 1475.0 8 Bottom 113.085 0.002 7 7 Top 113.127 0.002 7 7 Middle 113.133 0.002 7 179.0 1288.0 7 Bottom 113.130 0.002 7 6 Top 113.090 0.003 10 6 Middle 113.096 0.003 10 190.0 1109.0 6 Bottom 113.092 0.003 10 5 Top 113.152 0.004 13 5 Middle 113.160 0.004 13 179.0 919.0 S Bottom 113.155 0.004 13 4 Top 113.085 0.010 13 4 Middle 113.092 0.010 13 191.0 740.0 4 Bottom 113.090 0.010 13 3 Top 113.175 3.010 16 3 Middle 113.176 0.010 16 178.0 549.0 3 Bottom 113.170 0.010 16 2 Top 113.077 0.013 18 2 Middle 113.081 0.013 18 191.0 371.0 2 Bottom 113.075 0.013 18 1 Top 113.187 0.015 20 1 Middle 113.189 0.015 20 180.0 180.0 1 Bottom . 113.175 0.015 20 Total deadwood in courses litres . THE:GAZETTE .OF JNDIA:'EXTRAORDINARY ,350 ·38.889 ,508 -9.961 2336 ·35.938 nil nil nil nil nil nil nil nil -195 ·1.021 ·259 ·1.455 ·309 -1.618 ·145 -1.986 ·59 -1.054 ·36 -7.200 nil nil 648 (b) Additional data (i) Deadwood Course Applicable height (ring) cm No. --··· 8 1466 to 1475 8 1415 to 1<!66 8 1350 to 1415 8 1288 to 1350 7 1109 to 1288 6 919 to 109 5 740 to 919 4 549 to 740 3 371 to 549 2. 180 to 371 1 107 to 180 1 51 to 107 1 46 to 51 1 o to 46 litres Deadwood 1/cm [PARTII-SEC. 3(i)] ·3194 -195 -259 -309 -122 (ii) Tape calibration temperature (iii) Condition of tank at time of strapping : Water in tank to depth of Water temperature Density of water at 20°C (c) calculation of corrected internal circumferences course (ring) Measured external circumference at 20°C Correction for calibration temperature of tape calculated external circumference at 15°C Step-over correction Correction for plate thickness 7 x 21t = 7x6.2832 mm Corrected internal circumference (calculation for other courses may be done in a similar way) 20°C 1400 cm 20°C 1 000 kg/I No. 8 top 113.040 Om -.0.0010 2 m 113.029 8 m ·0.002 Om -0.044 Om 112.983 8 m - - * ['WT n-= 3(ill '1ml siJ Uo!'f:l : mll"IR"T 649 · The corrected Internal circumferences for the remaining measurements given above are shown below. (d) calculatlon of open capacity of courses (rings) Course (ring) No. Corrected internal Mean internal Open capacity pf course (ring) circumference circumference m m I/cm litres 8 Top 112.983 8 8 Middle 113.029 8 113.014 10 163.48 1 900.571 8 Bottom 113.029 8 7 Top 113.070 8. 7 Middle 113.076 8 113.073 8 10174.22 1 821.185 7 Bottom 113.073 8 6 Top 113.014 0 6 Middle 113.020 0 113.016 4 10 163.95 1 931.150 6 Bottom 113.016 0 5 Top 113.056 1 5 Middle 113.064 1 113.059 8 10 171.70 1820.734 5 Bottom 113.059 1 4 Top 112.983 1 4 Middle 112.990 1 112.987 1 10 158.62 1940.2% 4 Bottom 112.988 1 3 Top 113.054 3 3 Middle 113.005 3 113.053 0 10 170.48 1 810.345 3 Bottom 113.049 3 2 Top 112.940 7 2 Middle 112.944 7 112.941 4 10 150.41 1938.428 2 Bottom 112.938 7 1 Top 113.036 1 1 Middle 113.038 1 113.032 8 10 166.84 1 830.031 1 Bottom 113.024 1 Total 14 993.040 (e) calculation of net capacity or courses (rings) Oil dip Open capacity Deadwood Net capacity cm I/cm I/cm I/cm Oto 46 10 166.84 NII 10 166.84 46 to 51 10 166.84 • 7.20 10 159.64 51 to 107 10 166.84 + 1.05 10 167.89 107 to 180 10 166.84 -1.99 10 164.85 180 to 371 10 150.41 -1.62 10 148.79 371 to 549 10 170.48 ·1.46 10 169.02 549 to 740 10 158.62 -1.02 10 159.60 740 to 919 10 171.70 nil 10 171.70 919 to 1109 10 163.95 nil 10 163.95 1109 to 1288 10 174.22 nil 10 174.22 1288 to 1350 10 163.48 nil 10 163.48 1350 to 1415 10 163.48 ·35.94 10 127.54 1415 to 1466 10 163.48 -9.96 10 153.52 1466 to 1475 10 163.48 -38.89 10 124.54 -.i...-.....- • - 650 .. THE GAZETTE OFdNDIA :,EXTRAORDINARY [PARTII-SEC. 3(i)] 13. Examplefor internal measurement method · [See dause 7(h}] (a} Data obtained by internal measurement- :(i) ::ln'this example.It ls assumed that the same tank as in 12 has been calibrated by internal :measurement. 'The means of each course (ring) of the tape measurements of the internal diameters are as In col. ·2 of the table In (d) below : Dynamometer-.iergth at a:tension·of 4.5 kg•= 21.30 cm (b) Additional data (i) All course (ring)' height deadwood, etc., are the same as in 12. (c) Sag.correction (i) ··For a·tension of 4,5,kg,.the·sag·correction for course (ring) No. 1 is: 7.89 x 10,5 {35.7878)3= 3.61 cm. (d): calculation -, of-corrected internal diameter course (ring) No. 1 Mean-tape reading for diameter 3 578.78 cm Sag.correction J deduct) 3.61 cm Corrected tape reading 3 575.17 cm Dynamometer length (add) 21.30 cm Measured internal diameter at 20°C 3 596.47 cm Corr.ection .for calibration temperature of tape (deduct) 0.32 cm Corrected internal diameter at 15°C 3 596.15 cm The corresponding tape readings and corrected internal diameters calculated as shown above, for ail courses (rings) are tabulated below : Course Mean tape reading Mean tape reading for Mean Interns! diameter (ring) diameter corrected for sag and corrected for tape calibration No. dynamometer temperature cm cm cm 8 3 579.75 3 597.44 3 597.12 7 3 580.92 3 598.61 3 598.29 6 3 578.90 3 596.59 3 596.27 5 3 580.12 3 597.81 3 597.49 4 3 577.50 3 595.20 3 594.88 3 3 579.47 3 597.26 3 596.84 2 3 576.95 3 593.65 3 593.33 1 3 578.78 3 596.47 3 596.15 (e) Calculation of open capacity of courses (rings) Course Open capacity of course (ring) Open capacity of course (ring) (ring) No. I/cm litres 8 10 162.17 1 900 326 7 10 168.79 1 820 213 6 10 157.37 1 929 900 5 10 164.27 1 819 404 4 10 149.52 1 938 558 3 10 160.59 1 808 585 2 10 140.77 1 936 887 1 10 156.69 1 828 204 Total : 14 982 077 [ "l1'T II -1§i115 3 ( n ] 651 . I (f) calculation of net capacity of course (ring) Oil dip(cm) Open capacity (f/cm) Deadwood (fjcm) Net capadty (I/cm) 0 to 46 10 156.69 nil 10 156.69 46 to 51 10 156.69 -7.20 10 149.49 51 to 107 10 156.69 + 1.05 10 157.74 107 to 180 10 156.69 . 1.99 10 154.70 180 to 371 10 140.77 • 1.62 10 139.15 371 to 549 10 160.59 -1.46 10 159.13 549 to 740 10 149.52 -1.02 . 10 148.50 740 to 919 10 164.27 nil 10 164.27 919 to 1109 10 157.37 rin 10 157.37 1109 to 1288 10 168.79 nil 10 168.79 1288 to 1350 10 162.17 nil 10 162.17 1350 to 1415 10 162.17 • 35.94 10 126.23 1 415 to 1 466 10 162.17 • 9.96 10 152.21 1 466 to 1475 10 162.17 • 38.89 10 123.28 TABLE 2 [See Clause 3(a)/{v)J RECOMMENDED FORMAT OF A CALIBRATION CHART FOR BUTT WELDED TANKS Proportional parts mm litres cm litres cm litres 1 00 200 2 05 05 3 10 10 4 15 15 5 20 20 6 25 25 7 30 30 8 35 35 9 40 40 10 45 45 11 50 250 12 55 55 13 60 60 14 65 65 I I I I f ' I L------------- Tank No ...................... Code ........................... Type ........................... Diameter or Circumference ............. Height. ........................ cm /ftres cm litres cm litres cm litres cm litres cm litres 400 600 800 1000 1200 1400 05 05 05 05 05 05 10 10 10 10 10 10 15 15 15 15 15 15 20 20 20 20 20 20 25 25 25 25 25 25 30 30 30 30 30 30 35 35 35 35 35 35 40 40 40 40 40 40 45 45 45 45 45 45 450 650 850 1050 1250 1450 55 55 55 55 55 55 60 60 60 60 60 60 65 65 65 65 65 65 ---- - - -·-- -- --- - a ------------·- ------1 652 THE GAZETTE OF· INDIA : EXTRAORDINARY [PART11---'-SEC.3(i)] mm litres cm titres , .. cm litres cm litres cmltttes cm litres cm litres cm litres cm litres 15 70 · 70 70 70 70 70 70 70 16 75 75 75 75 75 75 75 75 17 80 80 80 .80 80 80 80 80 18 85 -85 ·as .85 85 85 85 85 19 90 90 90 90 90 90 90 90 20 95 95 95 .95 95 - 95 95 95 21 100 .. 300 500 700 900 1100 1300 1500 22 05 05 05 OS 05 OS 05 05 23 10 10 10 10 10 10 10 10 24 15 .15 15 15 15 15 15 15 25 20 20 20 20 20 20 20 20 26 25 25 2.5 25 25 25 25 25 27 30 30 30 30 30 30 30 30 28 35 35 35 35 35 35 35 35 29 40 40 40 40 40 40 40 40 30 45 45 45 45 · 45 45 45 45 31 150 350 550 750 950 1150 1350 1550 32 55 55 55 55 55 55 55 55 33 60 60 60 60 60 60 60 60 34 65 65 65 65 65 65 65 65 35 70 70 70 70 70 70 70 70 36 75 75 75 75 75 75 75 75 37 80 80 80 80 80 80 80 .80 38 85 85 85 85 85 85 BS BS 39 90 90 90 90 90 90 90 90 40 95 95 95 95 95 95 95 95 41 42 43 44 45 46 Data regarding strapping, dimensions, etc. 47 48 Approved Signature Date 49 c= ·-- - --- -------------- -- -·--··--··'··-·-···'·--·- .. (,;rrr II-? 3(i)J 653 TENTH SCHEDULE APPUCATION FORM FOR REGISTRATION OF IMPORTER OF WEIGHTS AND MEASURES [See Rule 15] To The Director of Legal Metrology, Government of India, New Delhi. Sir, I/We* hereby apply for registration of my/our* name(s) as importer of weights and/or measures. Particulars with regard to items specified In the table below are given against each such item. The registration fee of Rs has been paid in the treasury at.. vlde Chalan No . ......................... dated enclosed. 1. Name and full address : 2. Whether Individual/undivided Hindu family/registered firm : 3. Income-tax registration No. (If any): 4. Date of registration as manufacturer/dealer; registration No. and name of registering authority : 5. Date & No. of the licence to carry on the business of weights and measures; the name of authority by whom the licence was issued/renewed : (a) buying and selling, or (b) manufacturing. 6. Item(s) of weights and measures in relation to which the applicant has been registered as manufacturer and/or dealer : 7. Items of weights and measures for which application Is being made for registration as Importer: 8. Items, If any, imported during the period of two years Immediately preceding the year in which the application Is made : 9. Remarks: Signature *Delete which Is not applicable. ELEVENTH SCHEDULE REGISTER TO BE MAINTAINED BY THE MANUFACTURERS OF WEIGHTS AND MEASURES [See Rule 24] 1. Name and address of the manufacturer .. 2. Description of the weight or measure .. 3. (i) No. of the manufacturing licence . (ii) Date on which the licence was issued .. (iii) Period of validity of the licence .. 4. Particulars of order, if any, suspending or revoking the licence .. SI. Month Unsold stock Quantity Total Sold within the State Sold outside the State Total Balance Re? No. from previous manufactured 3+4 sold 5-11 manes. month during the 6+9 month No. Despatch Name No. Despatch of voucher of of voucher items , No; and the items No. and sold Date State sold Date 1 2 3 4 5 6 7 8 9 10 11 12 13 654 THE GAZETTE OF INDIA : EXTRAORDINARY [PARTII-SEC. 3(i)] REGISTER TO BE MAINTAINED BY THE REPAIRERS IN RESPECT OF WEIGHTS OR MEASURES RECEIVED FROM OTHER STATES . I [See Rule 24] Name·and address of the repairer ....................... Licence No. : .................... Date of licensing : ............ SI. No. Date State Items & Receipt Amount of Amount of Total amount Date Re- from :their Nos. No.& repairing verification charged of marks which -booked date of charges fee return received . for repair Issue to the to the user ·user 1 2 3 4 5 6 7 8 9 10 REGISTER TO BE MAINTAINED BY DEALERS IN WEIGHTS AND MEASURES (See Rule 24] 1. Name and ·address of the dealer .. 2. Description of the weight or measure . 3. (i) Licence No . (ii) Date on which the licence was issued : .. (iii) Period of validity of the licence .. 4. Particulars of order, if any, suspending or revoking the licence ................................................. 5. Category of weight or measure (Category A or 6) ................................................................... (CategoryA or B) SI. Month Unsold Brought Brought Total Sold within the State Sold outside the State Total Balance Re· No. stock within from 3+4 sold 6-12 marks from the outside +5 7+9 previous State the month duMng State the duMng month the month I No. Despatch No. Despatch Name of voucher of voucher of the Iitems No. and Items No. and state sold Date sold Date 2 3 5 6 7 8 9 10 11 12 13 14 1. Approval of model 2. Verification and stamping of any Type of Weights and Measures: TWELFTH SCHEDULE SCALE OF FEE (See Rule 25] At the rates specified in the Legal Metrology (Approval of Model) Rules, 2011 subject to the condition that total fee so charged ls not more than Rs. 10,000/· Weights and Measures specified in the Legal Metrology (General) Rules, 2011 at total fee so charged is not more than Rs. 5,000/· ------, [ 'Tf1T ll-11!"6 3 ( i)] 655 1 2 3 4 5 6 7 8 9 10 11 12 13 14 3. Issue of a copy of any document not being a document of a confidential nature 4. Registration/Renewal of regist­ ration of any person as an importer. 5. Application fee for preferring any appeal under the Act to the Director/Controller 6. Application fee for preferring any appeal under the Act to the Central/State Government At the rate of Rs. 10 for every 100 words or part thereof. Rs. 500.00 Rs. 100.00 Rs. 200.00 THIRTEENTH SCHEDULE Format for nomination of the Director by the Company [See Rule 29) Notice is hereby given that Shrl/Smt{Ms Director of the (name and address of the company) has been nominated by the company by a Resolution passed at their meeting held on at to be incharge of, and be responsible · for the conduct of business of the company or any establishment/branch/unit thereof and authorized to exercise all such powers and take all such steps as may be necessary or expedent to prevent the commission any offence by the said company under the Legal MetrologyAct, 2009. Shri/Smt/Ms ,., Designation has accepted the said nomination and copy of said acceptance Is enclosed herewith. A certified copy of the said Resolution is also enclosed. Place: .. Date : . Managing Director/Secretary of (name of the company) Note : Score out the portion which is not applicable. [File No. WM-9(6)/2010-pt.J RAKESH KACKER,Special Secy. Printed by the Manager, Government of India Press, Ring Road, Mayapuri,New Delhi-! l0064 and Published by the Controller of Publications, Delhi- 110054.

Previous and next

All provisions of Legal Metrology (General) Rule, 2011

Questions people ask

Is annexure of Legal Metrology (General) Rule, 2011 still in force?

No repeal of Legal Metrology (General) Rule, 2011 is recorded.