Annexure, Legal Metrology (General) Rule, 2011: ANNEXURE
Legal Metrology (General) Rule, 2011 - Annexure
Text of annexure
ANNEXURE
ANNEXURE
Tests for determination of error of compressed
gaseous fuel measuring system fitted with mass flow
meter at the time of verification/re-verification.
1. Determine the tare weight of empty
Compressed Natural Gas cylinder using
weighing instrument of appropriate
capacity, with verification scale Interval of
10 g or less.
2. Thereafter the cylinder be connected to the
Compressed Gaseous fuel measuring
system be filled to the extent of
approximately 10 kilogram.
3. From the initial and final weight of the
cylinder, the weight of the CNG actually
filled in the cylinder (T) is determined.
4. From the initial and the final readings of
the measuring system, the CNG filled as
indicated by the system (I) be determined.
5. The percentage of error of the measuring
system Is given by the formula :
1-T
Error in percentage " T
xi 00
NINTH SCHEDULE
PROCEDURE FOR CARRYING OUT
CAUBRATION OF VEHICLE TANKS, ETC,
[See Rule 14]
PART I
CALIBRATION OF VEHICLE TANKS FOR
PETROLEUM PRODUCTS AND OTHER
LIQUIDS
1, Definitions
(a) Vehicle tank-An assembly used for
measurement and delivery of liquids comprising a
tank which may or may not be sub-divided into
compartments, mounted upon a vehicle together with
its necessary piping, valves, meters, etc.
(b) Compartment-The entire tank, when this
Is not sub-divided; otherwise any one of these sub
divisions of a tank designed to hold liquid.
(c) Calibratio?erification and stamping of the
capacity of the vehicle tank or its compartments.
(d) Dip stick-A square or rectangular metal
bar of brass or any other suitable hard material used
to determine the depth of the liquid in the tank.
(e) Ul/agestick-A T-shaped metal bar of brass
or other suitable· material used to determine the
depth of the level of liquid from the proof level.
(f) Ul/age indicator-A device bolted to the
inside of a manhole neck ring with the indicator set
to any desired level to which liquid in the tank Is
required to be filled.
(g) Proof level-Reference level to which all
depth measurements shall be related.
(h) Dip pipe-A pipe rigidly attached at the top
of the tank extending vertically downward up to
approximately 15 cm from the bottom of the tank.
The pipe shall have perforations at the top above
the maximum liquid level.
2. Testing medium
(a) Compartment testing--VVater or other
appropriate liquid shall be used as a testing medium
in determining the capacity of vehicle tank
compartment.
(b) Meter testing-A vehicle tank meter shall
be tested with a liquid of the same character or of
approximately the same viscosity as the liquid to be
measured through the meter.
3. Equipment and tools
The following equipment and tools are required
for calibration ,of vehicle tank.
(a) Proving measures-When available, shall
be checked for accuracy against an
appropriate working standard measure.
(b) OJ/lbrated bulk meter-An accurate meter
fitted with a pre-set valve, air eliminator
and strainer, which has been checked for
accuracy against an appropriate working
.
standard measure.
(c) A set of standard commercial measures.
(d) Other equipment and tools, viz. hose pipe,
scriber, punch, try square, tyre pressure
gauge, hammer, etc.
4. Calibration procedure
(a) Vehicle tanks used as measures shall be
calibrated as capacity measures. In the case of meter
equipped tanks the meter shall be treated as a separate
measuring Instrument for purpose of calibration.
(b) The compartment capacity or capacities
shall be taken as including the capacities of the
delivery lines leading from the emergency, safety or
master valve to the outlet va!ve (discharge valve)
['11'1 n-= 30)] 633
provided that in the case of vehicle compartment
terminating in a single delivery pipeline fitted with
an outlet valve, the compartment capacity or
capacities shall be taken as excluding the Capacity
of the delivery pipeline. A notice shall be prominently
exhibited on the vehicle tank indicating clearly and
Indelibly the following :-
Marked capacity includes capacity of delivery
line; or
Marked capacity exdudes capacity of delivery
line (as the case may be).
The safety or master valve shall be positioned
at the lowest point of outlet from the compartment.
(c) The proving measure or bulk meter should
be mounted on an overhead gantry or a separate
framework in a convenient position above a firm and
level platform, preferably of concrete on which the
vehicle stands during calibration.
(d) The vehide shall be placed in a level position
before commencing calibration as the accuracy of
calibration depends on the level of the tank; the
sequence in which compartments are callbrated
should be such as to minimise unequal spring
deflection on the axles of the vehicle.
(e) The front and rear tyres of the vehicle should
be at the correct pressures. The tyres should be
inspected for wear which should be reasonably even
and there should not be excessive difference in the
tread between the front set of tyres and the rear set
at the time of calibration.
(f) The interior of the compartment should be
inspected and cleaned where necessary.
(g) Before starting calibration, the pipelines,
outlet valves and other connections shall be tested
against leakage by partially filling and draining each
compartment in turn through the outlet valve. During
the process sufficient quantity of the testing medium
should be introduced inside the compartment to wet
the internal surface of the tank and pipelines.
(h) After taking the precautions mentioned
above, the compartment to be calibrated shall be
filled with appropriate proving measures or bulk
meters to the marked capacity of the compartment
with the delivery lines leading to the outlet valve full
or empty as provided In (b) above. The dip/ullage
mark shall be taken carefully and the line shall be
cut on the dip/ullage stick at right angles to the axis
with the help of try-square and scriber. If an ullage
indicator is used, It shall be correctly set and sealed.
(i) A mark shall also be made on the dipstick to
indicate the 'proof level'. In the case of ullage stick,
the distance from the ullage point to the T-jolnt shall
be marked on the stick.
Note: The sequence for calibrating
compartments should be sequence of filling them. ·
The sequence of discharge shall be in the reverse
order to that of filling.
(J) Each compartment should be left full before
proceeding to the next in sequence.
5,. Maximum permissible error
(a) Proving measures shall have the following
capacities and shall be adjusted within the following
permissible errors:-
capacitt, Utres Permissible erroc millilitres (±)
50 50
100 100
200 200
500 500
1000 1000
1500 1500
2000 2000
5000 5000
(b) The maximum error for vehicle tank
compartments shall be 0.05 per cent in excess of
the marked capacity of the compartments.
6. Markings ''.,'{
(a) The vehicle shall have ?'"'brassplate riveted
in a prominent position on it ti(receive the Legal
MetrologyOfficer's stamps. The brass plate shall bear
the followingparticulars: title of Legal Metrology Act,
name of owner of vehicle, vehide registration number,
and the serial number and capacity of each
compartment. Space should be provided on the plate
for the Legal Metrology Officer's stamps. A simple
design for a plate is shown below.
(b) The capacity of the compartment shall be
indelibly marked on the manhole cover of the
compartment and also painted on each side of the
compartment so that it is clearly visible. If there are
more than one compartment, then each compartment
shall have Its capacity marked separately as above
and the compartment numbered serially.The number
of the compartment shall also be marked on the
discharge valve pertaining to the compartment.
(c) The vehicle registration number as well as
the capacity of the compartment shall be indelibly
.marked on the dip/ullage stick at the top end. If
there Is more than one compartment, the different
faces of one dip stick may be used for markings and
each face shall bear the vehicle number, the serial
number of the compartment, the proof and dip lines
of that compartment and the capacity of the
compartment.
634 THE GAZETTE .QF INDIA: EXTRAORDINARY [PARTII-SEC. 3(i)]
.PART II
METHOD FOR·.CAUBRATION OF VERTICAL
OIL STORAGE TANKS
THE LEGAL METROLOGY ACT,.2009
Name of the company : ...•......... , .
Vehicle tank No : :.:·., :.::, , •.
-NAME PLATE
Space for
Legal Metrology
Officers stamp
Compartment
-Capacity
L , • (in litres)
Compartment
Number
locatlori':wlththe product to be stored to its working
capacity or with water to its equivalent height, and
such product or water has been held in the tank for
at least 24 hours to allow for settling.
· 3. Interrupted measurements
If the calibration of a tank is required to be
interrupted, It may be resumed with minimum delay,
without repetition of work previously completed
provided that:
(I) there is no major change in equipment and
as far as possible, no change in personnel;
· (II) all records of work done are complete and
legible; and
(Ill) same hydrostatic head as before Is
:t. Scope maintained in the tank.
This Part prescribes methods for calibration of 4. Descriptive data
vertical tanks by strapping and Internal
(a) complete description data shall be entered
measurements. These tanks are meant for bulk
on the Tank Measurements Record Form being used.
storage of petroleum and liquid petroleum products.
A recommended Record Form is shown in Table1.
2. Conditions for measurements
(b) Supplemental pencil sketches or notations
(a) All data and methods, whereby each completed, identified, dated and signed, shall
measurements are obtained, necessary for the form an Important part of field data. These shall be
preparation. of calibration tables, shall be in made to Indicate typical horizontal and vertical joints,
accordance with sound engineering principles: number of plates per course (ring), locations of
(b) When drawings for the tank are available, courses {rings) at which thickness of plates changes,
.
all measurements shall be compared with those arrangement and size of angles of top and bottom
obtainable from the drawings and measurements of shell, location and sizes of pipes and manholes,
showingdiscrepancies g'reater than the tolerance dents and bulges in shell plates, direction of lean ·
specified in9{C), shall.be verified. A slmllarprocess from vertical, method used In by-passing a large
of check shall be employedin all cases where reliable obstruction, such as clean-outbox or insulation box
information' beyond the measurements taken, is located In the path of a circumferential measurement,
available. location of tape path, location and elevation of
(c) Measurements shall be taken only after the possible datum plate and all other items of interest
tank has been filled at least once at its present and value which will be encountered.
TABLE 1
.
RECOMMENDED RECORD FORM FOR MEASUREMENTS OF VERTICAL TANKS [Gause 4(a)]
Report No
.
Date ,.
, .
Tank No '.
.
(Old Tank No.) ·
Owner's name .
Plant or property name ..
Location .
Manufactured by .
Erected by ..
Description ..
.
·
.
· '
•
· ·
Prepare Coples Increments 1n : .
Fraction to Table form or size desired , , ..
Height: Shell ,. _.
Gauging :
.
Type of root, Weight of floating roof ,: ..
Tank contents· : Name Avg. liquid temp., °C·.!
.
Gauge cm or mm innage to shelffloor or outage: ·
Hydrometer reading at
.. .. .. . . .. . .. . . . .. . . .. . .. .. .. .. ..
°C Sample temperarure
,GaUQi?greference point to top of top angle _.
cm or mm Normal
..
Service .
Shell circumferences or diameters:
A :.: :. D G : :
..
B E H
.
C F !
.
['11'! JI-? 3(i)] · 635
;
DESCRIPTIONS OF SHELL PLATES AND JOINTS
Course Thickness Type of Set In or Width of Thickness No. of &posed Inside
(Rings) vertical out lap strap of strap joints course course
No. Joint (ring) (ring)
·height height
5.
........... ........... ........... .. ......... ........... . .......... """"'" .. ...... ;....
4.
........... ........... ........... .. ......... ........... .. ......... ........... . ..........
3.
........... ........... ........... ? ........... ........... . .......... ........... .. ..........
2.
...........
,
........... ........... ........... . ..................... ........... ...........
.,
1.
........... ........... ...........
. . " .......... ........... .. ......... .. ......... . ..........
.
BOTTOM COURSE (RING)SHELL CONNECTIONS:
No.
I.
2,
3.
4.
· Description
"'''"·?·!? ?
........ u,, .
. , .
......................
Elevation, top of floor to
bottom of connection
. ,, .
,uu1uu1•;•••••••u•1n,,1,n
unuu,,u,•••••••••••"""''
,
._. ..
Type of bottom , : , :.·Height or.crown
,,,
' ·.
Deadwood·and remarks (Use reverse side If necessary)':·
- ",'
. .
·,
--'----
Description No. : • Size
.
·--?'----- .. -- .. -·-----..
··-"
-::
..
'
From
Elevation
To
Thickness
..
,: .,,., .
.
Measurements by Amount of tank
lean from vertical
Circumference tape used : ; :
.
Date checked at :
..
· Tank measured by ,
for
"
Deadwood and tank bottorri-Use separate
sheets: For each pieceor item of deadwood record
description, size, number of occurrences, andlocatlon
related to other heightmeasured data recorded.
.
Explanatory·notes (such as type of bottom,
height or depth of crown, etc.)
(c) All measurements made ·by the tank
calibrator shall be recorded on site and shall not be
subjected to subsequent correction;
•
5. Degree of accuracy
In order to obtain maximum obtainable
accuracy in calibration tables, adjustments for effects
.
of. the following variables shall be incorporated in
the tables:-.
{i) Expansion and contraction of steel tank
shell·due to liquid heads,
.
(ii) Tilt from upright position, and
· ;c''(iii)Tank bottoms that are irregular in shape,
Note: The degree of accuracy desired or
required In the completed calibration table for a
specific tank shall be the governing factory In
determining the procedure to be followed.
6. Expansion and contraction of steel tank
shells due to liquid head and temperature
These effects shall be eliminated by strapping
· the tank when it is at least two-thirds full with water
.
·. or approximately full with the product [See also 2(c)].
-The strapping record shall include water or product
level from a known reference point, temperature of
the tank contents and that of adjacent air.
SECTION I-cALIBRATION BY STRAPPING
.7. General
(a) This method is based on the measurement
of external circumferences which are subsequently
corrected to yield the true internal circumstances.
{b) Circumferences shall be measured under
· conditions of liquid head as given under 2(c) and 6.
{c) The stipulated number of external
circumference measurements, together with the
subsidiary measurements, where necessary, to
correct for deviation of the tape from the true circular
path shall .be obtained as described under 9.
636 THE GAZETTE OF INDIA: EXTRAORDINARY [PART11-SEC. 3(i)]
(d) An internal diameter may be measured at
approximately the same height as that at which a
circumference has been measured, if verification of
that circumferential measurement is desired.
(e) It may be necessary in practice to refer all
tank dips to a datum point other than the datum
point used for the purpose of tank calibration. If so,
the difference in level between these datum points
shall be determined either by normal surveying
methods or by other suitable means.
(f) The overall height shall be measured, using
dip-tape and dip-weight, from the dipping datum
point to the reference point (the dipping reference
point) on the dip hatch. This overall height shall be
recorded and marked on the tank at the dip hatch.
8. Equipment
(a) Steel tapes-Shall comply with the
specifications under Part VII of Sixth Schedule. The
tape shall be greased well before use.
(b) Spring balance-Reading up to 10 kg with
·
0.1 kg graduations, for measuring the tension applied
to the tape. It Is preferable to have two balances.
Spring balance shall comply with specifications given
under Heading W of Seventh Schedule.
(c) Step-overs-The step-over Is a frame
holding two scribing points rigidly and at such a
distance apart as meets the conditions of use laid
down under 9(d). The frame may be constructed of
wood; it should be painted if required. This Is used
to correct deviation of the tape from Its normal
circular path, namely passing over fittings or joints
between plates.
(d) Dip-tape and dtp-weight--COmplylng with
the specifications given under Part IX of Sixth
Schedule.
(e) Loops and cords-One or more metal loops
which can slide freely on the tape and to which are
attached two cords each of sufficient length to reach
from the top of the tanks to the ground. The tape is
positioned and Its tension evenly distributed by
passing these loops around the tank.
(f) Accessory equipment
(i) Rope
(ii) Hooks
(iii) Safety belts
(iv) Ladders
·
(g) Miscellaneous equipment
(i) · Steel rule
(ii) Spirit level
(iii) Awl and scriber
(iv) Marking crayon
(v) Record paper
(vi) Plumb line
(vii) Dumpy level
(viii) Positive displacement bulk meter
9. Circumference measurements
A. Strapping levels
Circumference shall be measured by a minimum
of two strappings per course (ring) at the following
levels :-
(a) FQr riveted tanks:
(I) At 7 per cent to 10 per cent of the
height of exposed portion of each
course (ring) above the level of the top
of the bottom angle iron of the tank
and above the upper edge of each
horizontal overlap between courses
(rings) (see A of Figure 56), and
(II) at 7 per cent to 10 per cent of exposed
portion of each course (ring) below the
lower edge of each horizontal overlap
between courses (ring) and below the
level of the lowest part of the top angle
Iron of the tank (see B of Figure 56).
(b) FQr welded tanks :
(I) Two levels (see A and B of Figure 57),
the upper and the lower levels, at the
top and bottom of courses (rings) shall
be 20 per cent of the height of the
exposed portion of the respective
course (ring) away from the angle Irons
or seams.
(II) Circumferential tape parts, having been
located at elevations as under (a)
above shall be examined for
obstructions and type of vertical joints.
Projections of dirt and scale shall be
removed along each path.
(Ill) Occasionally, some feature of
construction such as manhole or
Insulation box, may make It
Impracticable to use a circumference
evaluation at the prescribed location.
If the obstruction can be spanned by a
stepover then the circumference shall
be measured at the prescribed
elevation, using a suitable method
given under 9( d), If the obstruction
cannot be conveniently spanned by a·
step-over, then a substitute path
located nearer to the centre of the
course (ring) may be chosen. The
strapping record shall include the
637
"1 ·
81
e,
?
:
-
.t
Flg:1
RIVETED
equipment required. If the tape is not
In close contact with the surface of the
tank throughout Its whole path owing
to the vertical joints a stepover shall
be applied so that a correction may be
calculated to adjust the gross difference
for this effect.
this path to allow the circumference to be
measured in sections. The scribed lines shall
be drawn in the middle circumferential third
of any plate at such distances as will ensure
that the whole of the length of the tape
used is under the observation of one or
other of the calibrators. Subject to the
conditions under 9(a)(III) and 9(a)(iv) the
external circumference of the tank is then
the sum of the lengths between the scribed
lines.
(iii) If the tape to be used can encircle the tank
completely, then after the level of the tape
path has been chosen, the tape is passed
around the circumference and held so that
the first graduated centimetre lies within
A
B,
?
.
I--
'
I .
A
A?
B,
e.
?
-
!
:
.
-
location of the substitute path and
reason for the departure.
(iv) The type and characteristics of vertical
joints shall be determined by close
examination in order to establish the
method of measurement and
B. Strapping procedure
(i) The tank shall be strapped by either of the
methods described under (II) and (iii)
below. In either case a tension of 4.5 ± 0.5
kg shall be applied to the tape and, if
necessary transmitted throughout Its length
by suitable means, namely by means of
metal loops sliding freely on the tape, the
loops being passed around the tank by
operators with the aid of light chain or
cords. The tape path shall be parallel with
the circumferential seams of the tank.
(ii) If the tape to be used is not long enough
to encircle the tank completely, then after
the level of the tape path has been chosen,
fine lines shall be scribed perpendicular to
Fig: 2
LOCATION OF MEASUREMENTS OF WELDED TANKS
[ 'WT l[-1jj1Js 3 ( i))
638 THE· GAZETTE. OF JNDIA: EXTRAORDINARY (PARTII-SEC. 3(i)]
FIGURE-3
STEP-OVER
the middle circumferential third of anyplate.
The other end of the tape shall be brought
alongsicle:,The tension is then applied
through the spring balance and .transmitted
throughout the length of the tape.
(iv) After a.circumference has·been measured
[see (Ill) abovejthe tape shall be shifted
a little· around the tank, brought to level
and tension
..
as above, and .the reading
repeated. The final reading shall 'be the
arithmetic average of the.readlnqs,
C. Tolerances
Measurements,shall,be read to the nearest 1
mm and within the following tolerances when
readinqsare taken at the same point:-
D. Step-overs:
(i) If the tape crosses obstructions, such as
projections deformities, fittings or lapped
joints, It will deviate from a true circular
path and an erroneous circumferential
measurement will result. In order to avoid
such errors a 'step-over' is used to measure
the correction to be applied for such
obstructions.
(ii) Construction-A step-over is a frame rigidly
holding two scribing points, and of such
dimensions that the points may be applied
to the tape well clear of the obstruction
and of its effects on the tape path, while
the frame Itself does not touch either the
obstruction or the tank shell. Rigidity of
construction Is essential; suitable designs
are illustrated In Figure 3
(iii} Use of step-overs
(a) For obstructions, the strapping tape
shall be stretched as if in measurement
of a circumference on the tank which
Is being calibrated, but not within
30 cm of any horizontal seam. The
scribing points shall then be applied to
the tape near the middle of a plate
where the tape is fullyin contact with
the tank surface. The length between
the points, as measured on the curved
tape, is then read off as closely as
possible, fractions of tape divisions
being estimated. The readings shall be
repeated on a minimum of two and
maximum of four plates equally spaced
around the circumference, and the
average of the results taken, as the
step-over will vary with the tank
diameter and the course concerned
since they are made on surface
differently curved.
(b) With the tape still in position and under
the tension used in strapping, the step
over shall be applied to the tape on
either side of each obstruction lying on
the tape path, and readings shall be
taken of the lengths of tapes included
between the scribing points. All step·
over readings shall be recorded for
subsequent use in calculation.
(c) ca re shall be taken in placing the
instrument in a truly level position at
each obstruction to avoid distortions In
circumferential path. In the case of a
step--over of relatively long space, the
use of a spirit level is recommended as
an aid in determining its correct
position before scribed marks are struck
off on the places.
(cl} When the butt-strap or lap joints, or
tank shell, include rivets or other
features which exert uneven effects on
the resultant avoid between tape and
tank from joint to joint, then a step·
over will be required. The span of the
Instrument should be measured prior
to use in accordance with (a) above.
The two legs shall be separated by a
distance sufficient to span each void
between tape and shell encountered.
The legs shall be of sufficient length to
prevent contact between the
Tolerance
:l:2mm
±4mm
±6mm
:I: 8mm
:I: 10 mm
Circumference
Up to 30 metres
Over 30 and up to 50 metres
Over 50 and up to 70 metres
Over 70 and up to 90 metres
Over 90 metres
['11'1 II-"!l!1% 3(i)] · 639
interconnecting member and the tank
plate or obstruction. Stretch the tape
over the joints and place the step-over
in position at each location of void
between tape and shell, completely
spanning the void so that the scribing
points contact the shell at an edge of
the tape. The length of tape
encompassed by the scribing points,
with the tape maintained In proper
position and tension, should be
estimated to the nearest 0.5 mm. At
each step-over location, therefore, the
difference between the length of tape
encompassed by the scribing points
and the known span of the Instruments
is the effect of the void, at that point,
on the circumference as measured. The
sum of such difference In any given
path, subtracted from the measured
circumference, will give the corrected
circumference.
10. Shell plate thickness
(a) Where the type of construction leaves the
plate edges exposed, a minimum of four thickness
measurements shall be made on each course (ring)
at points approximately equally spaced about the
circumference. The arithmetical average of the
measurements for each course (ring) shall be
recorded; all thickness measurements, properly
identified,shall be noted on supplemental data sheet
which shall form a part of the measurements record.
Care shall be taken to avoid plate thickness
measurements at locations where edges have been
distorted by caulking.
(b) Where plate edges are concealed by the
type of construction, the strapping record shall be
marked 'not obtainable at tank'. Alternately, plate
thickness measurement may be obtained as
described under (c) below.
(c) Plate thickness measurements obtained
before or during construction, and recorded on a
properly identified strapping record may be
acceptable. In the absence of any direct
measurements of plate thickness obtained and
recorded before or during construction either those
shown on the fabricator's drawings may be accepted
and so identified in the calculation records or any
other practicable method may be used for
measurements of plate thickness.
11. Vertical measurements
(a) A tape shall be suspended internally along
the wall of the shell from the top curb angle to the
bottom course (ring) and the height of the course
(ring) measured to the nearest millimetre. The
difference In height between the datum plate at which
dip is taken and the bottom 'course (ring) shall be
measured and the headings of the course (ring)
height shall be transferred to the datum plate by
applying the correction (see Figure 'I).
Example: In Figure 'I, the difference between
bottom course (ring) and datum plate is 152-150.5
cm = 1. 5 cm. Applying this correction the corrected
height of the course (ring) at
B--307.5 cm C-468.5 cm lr-623.5 cm E-798.5 cm
•
..
Bottom course (ring)
Figure 4
(b) When it is inconvenient to measure the
course (ring) heights internally, then they shall be
computed from external measurements, due
allowance being made for the effect of horizontal
seam overlaps. The heights obtained shall be the
vertical distances, measured to the nearest 5 mm,
between successive edges of the courses (rings) as
exposed Internally in the tank. For this purpose, In
the cases of lap joints, it will be necessary to
determine the width of lap in each course (ring).
(c) If necessary, heights at more than one
vertical around the tank may be taken, and for each
course (ring), an average of the results obtained.
12. Deadwood
(a) Any fitting which adds to or subtracts from
the capacity of the tank is called deadwood.
Deadwood shall be accurately accounted for, as to
size and location to the nearest millimetre in order
to perrnit,-
(i) adequate allowance for volumes of
liquid displaced or admitted by the
various parts; and
640 THE GAZETTE OF INDIA : EXTRAORDINARY [PARTll SEC. 3(i)]
(ii) adequate allocation of the effects at
various elevations withln'.the tank.
(b) Deadwood-should be measured, If possible,
within the tank. Dlmensions·.shown on the builder's
drawings may be accepted if actual measurement is
impracticable.
(c) Measurements.of deadwood should show
the lowest and highest'levels, measured from the
tank bottom adjacent tothe shell, at which deadwood
affects the capaclty.of.thetank:Measurements should
be in increments .which .permit allowance for its
varying effect ontank capacity at various elevations.
(d) Large deadwood •of :irregular shape may.
have to be measured in separate sections suitably
chosen.
(e) Work sheets on which details of deadwood
are sketched, dimensioned and located,· should be
clearly identified and should become part of the
strapping record.
(f) For variable deadwood, such as nozzles and
manholes, encountered in the bottom one or two
courses (rings) of the tanks, an average deadwood
correction shall be made.
13. Tank bottoms
(a) Flat type:
(i) Tank bottoms which are flat and stable
under varying liquid loads will have no
effect on tank capacity depressed on
the basis of geometric principles.
(ii) Wh_ere tank bottom conditions of
· irregularity, slope and instablllty exist,
and where correct capacities cannot be
determined conveniently from linear
measurements alone, It shall be
necessary to resort either to liquid
calibration to floor survey.
(iii) Liquid calibration-The procedure in
carrying out the liquid calibration is to
fill into the tank quantities of known
volume of water or other non-volatile
liquid until the datum point Is just
covered and the total quantity
recorded. Additional quantities shall
then be added until the highest point
of the bottom is just covered. This may
be done in one or more stages as
desired and the dip reading and
quantity at each stage recorded. It is
convenient for dip readings to be taken
at intervals of approximately 3 cm, the
successive intervals not necessarily
being identical.
(a) This liquid may conveniently be measured
Into the tank by a positive displacement
meter which should be previously calibrated
for the liquid and rate of flow to be used.
Alternatively, an accurately calibrated
measure or tank may be used.
(Iv)Volumes for the tank calibration table
above this elevation shall be computed
from linear measurements.
(v) Floor survey-The floor survey consists
In recording levelsofthefloorby means
of a dumpy level with the help of the
spirit levels, the cross sections and the
longitudinal sections of the entire floor
may be computed. The levels when
·
plotted will define the profile and the
geometric pattern of the bottom of the
tank. Thus the capacity of the tank may
be calculated.
(vi) During the tank bottom calibration the
difference in height between the datum
plate and the bottom of the bottom
course (ring) should be recorded,
wherever possible.
(b) Conical, hemispherical, semi-ellipsoidal and
spherical segment:
Tank bottoms conforming to geometrical
shapes have volumes which may either be
computed from linear measurements or
measurements by liquid calibration by
Incremental filling or by floor survey, as
desired. Any appreciable differences In
shape affecting the volume, such as
knuckle, radii, etc., shall be measured and
recorded in sufficient detail to permit
computation of the true volume.
14. Measurement or tilt
(a) Measurements shall be taken to determine
the amount, If any, by which the tank is tilted. This
can conveniently be done by suspending a plumb
line from the top angle and measuring the offset at
the bottom angle (see Figure S). Alternatively, if the
tank bottom Is being calibrated by floor survey with
a dumpy level as in 13(a )(v), the tilt can be estimated
by taking reading along the periphery of the tank
bottom. Also, if a liquid calibration of the bottoms is
being made as outlined in 13(a)(III), the tilt can be
determined by taking measurements from the surface
of the liquid to the bottom of the tank. In any of
these methods, a sufficient number of measurements
. .•.. L 1
[ 'lflT II -11i"G 3 (i ) ]
shall be taken at different points on the circumference
to determine the maximum offset.
••
-·-e
"
•
-·--- ....
.. i--.
Figure S
15. Floating-roof tanks
(a) All calibration measurements shall be made
exactly as for tanks with fixed roofs.
(b) Liquid calibration for floating-roof
displacement-
(i) Corrections for floating-roof
displacement arising from the weight
of the roof and the deadwood
associated with it shall be allowed for
in the calibration measurement.
(ii) If the weight of the floating-roof is
accurately known, correction for the
displaced liquid may be applied
knowing density and temperature of
the tank contents, at the time of
determining the actual Inventory.
(c) Alternatively, displacement due to the
floating-roof and deadwood may be
determined by admitting oil to the tank until
the dip reading is just below the lowest
point of the roof. Known quantities
accurately determined (for example by flow
meter or delivery from a portable tank or
measure which has been accurately
calibrated) are then admitted to the tank
and the corresponding dip readings
recorded at a number of suitable intervals
until the point is reached when the roof
just becomes oil borne. Record the density
and temperature of oil used:
(i) It is advisable to use a liquid of nearly
the same density as that for which the
tank is intended. If this Is not practical,
water may be used and suitable
corrections applied.
(II) During liquid calibration any space
under the roof that will trap gas should
be vented to the atmosphere.
(Ill) Before liquid calibration the height of
the lowest joint of the roof with
reference to datum point should be
recorded, wherever possible.
(iv) To assess the point at which roof
becomes oil borne the following
procedure may be followed :-
"With the roof resulting fully on Its
supports, paint four short horizontal
white lines about 3 cm wide on the tank
sides in such a position that, viewed
from some definite point, their lower
edges are just above four similar lines
marked on the roof edges or shoes.
Then slowly pump oil into the tank;
when all roof markings are seen to have
moved upwards, regard the roof as ell
borne, and take the dip reading of the
oil at this level."
Alternatively, from some chosen viewpoint
on the dipping platform, note the position
of the roof against rivet heads on vertical
seam or other markings on the tank walls
Instead of paint marks. In both cases
· extend the points of reference round the
greater part of the tank interior, and see
movement relatiVe to all points.
(d) Weightfloating-The floating weight of the
entire roof shall include weight of roof plus
half the weight of the rolling ladder and
other hinged and flexibility supported
accessories that are carried up and down
In the tank with the roof. These are
calculated by the tank fabricator and given
on the drawing and on the roof name-plate.
(e) Deadwood:
(I) Fixed deadwood shall be measured as
described in 12. The drain lines and
other accessories attached to the
underside of the roof shall be treated
as fixed deadwood In the position they
occupy when the roof is at rest on Its
supports.
(II) When all or part of the weight of the
roof is resting on its supports, the roof
Itself is deadwood and as the liquid
· level rises around the roof its geometric
shape will determine how it should be
642 THE GAZETTE· OF. INDIA :-EXTRAORDINARY [PARTII-SEC. 3(i)]
deducted. The geometric shape should
be taken from the fabricator's drawings
or measured in-the.field With the aid of
an,englneer's level.whlletheroot-ls
restlng:onits supports.
16. Variable volumecoofs
·(a) Roofs such -as lifter, flexible·membrane,
breather orballoon, · may require .speclal
deadwood measurements· for roof .parts
that aressornetlrnes sub,merged. When
these parts.ssuch .. as,columns, are fixed
relative:;to· the· tank .shell, they should be
·
measured as-deadwood 'in the-usual way.
When these parts move with 'the roof and
hang down.lnto.the liquid, they should be
deducted;as fixed deadwood with the roof
in the 'lowest .posltlon. oetans may be
secured :from the .fabricator or measured
in the field.
(b) Some variable volume roofs have flexible
members ,which may float on the surface
when the membrane is deflated and the
liquid level Is high. The floating weight of
the membrane displaces a small volume of
liquid. Data on the floating weight should
be secured from the fabricator and
supplemented, if necessary, by field
observation and measurement.
(c) Some variable volume roofs have llquidseal
troughs or other appurtenances which
makes the upper outside part of the shell
inaccessible for outside circumference
measurements. Liquid calibration of this
portion of the shell may be made, or (i)
theoretical dimensions may be taken from
the fabricator's drawings, or (II}the highest
·
measurable circumferential measurement
may be used as a basis for the portion of
the tank that cannot be measured. When
the method (I) or (ii) is used, It shall be so
indicated on the calibration table.
SECTION II: CALIBRATION BY INTERNAL
MEASUREMENT
17. General
(a) This method Is based on the measurement
·
of internal diameters.
(b) Diameters shall be measured only after the
tank has been filled at least once at its
present locations with the product to its
working capacity or with water to its
equivalent height, and such product or
water has been held in the tank for at least
24 hours to allow for setting,
, .• ,_,_ .• ,,, • •·tt?·-•crr,• , .. ,.,., .. ,..,. ?-• ···- ?-, -?-?·
.(c) The stipulated number of internal diameters
shall be obtained as described under
19(a}(iv).
(d) Where practicable, an external
circumference shall be measured at
approximately the same height as that at
which a set of diameters of which a
verification is desired, has been taken. The
resulting internal diameters shall be
compared, and If a discrepancy is found,
ttie measurements shall be verified.
(e) It may be necessary In practice to refer all
tank dips to a datum point other than the·
datum point used for the purpose of tank
calibration. If so, the difference in levels
between these datum points shall be
determined either by normal surveying
methods or by other suitable means.
(f) The overall height shall be measured using
dip-tape and dip-weight from the dipping
datum point mentioned In (e) above to the
reference point (the dipping reference
point) on the dip hatch. This overall height
shall be recorded and marked on the tank
at the dip hatch.
18. Equipment
(a} Steel tape-Complying with the
specification given under Part VII of Sixth
Schedule. The tape shall be greased well
before use.
(b) Dynamometer-This is used for applying
tension to the steel tape.
(c) Other equipment as referred to under 8.
19, Diameter measurements
(a) Procedure:
(I} All diameter measurement shall be
made with a tension of 4.5 ± 0.5 kg
.
applied to the tape as indicated by the
dynamometer.
(ii) All tape measurements shall be
recorded as read, that is without
Including the length of the
dynamometer.
(Ill) The dynamometer length at 4.5 kg shall
be taken accurately before it is put Into
commission, and subsequent checked
before and after calibration of each
tank, the final check being made before
leaving the site.
(Iv) The measurements shall be taken
between diametrically opposite points
['WT II-- 3(i)] 643
at the following levels on each course
(ring), the minimum number allowable
at each level being two on each course
(ring), at right angles to each other:-
(a) For riveted tanks (see Figure 1)
(1) at 10 per cent of the height of
exposed portion of each course
(ring) about the level of the top of
the bottom angle iron of the tank
and above the upper edge of each
horizontal overlap between courses
(rings); and
(2) at 10 per cent of the height of
exposed portion of each course
(ring) below the level of the lower
edge of each horizontal over-lap
between courses (rings) and below
the level of the lowest part of the
top angle iron of the tank;
(b) For welded tanks (see Figure 2)
Two levels, the upper and the lower
levels, at the top and the bottom of
courses (rings), shall be 20 per cent of
the height of the exposed portion of
the respective course (ring) away from
the angle irons or seams;
(c) All tanks
No measurement shall be taken nearer
than 30 cm to any vertical seam.
(v) If for any reason it is impracticable to take
measurements at the positions described
above, then the diameters shall be taken
.
as close to the proper position as
practicable, but not nearer the horizontal
seams than Is specified under (b) above.
(vi) The levels at which measurements have
been taken shall be recorded together
with reasons for abandoning the
prescribed level.
(vii) Measurements shall be taken with the zero
end of the steel tape attached to the
dynamometer, one operator placing the
dynamometer on the predetermined point
and the second operator placing the rule
end-on to a point diametrically opposite.
The tape with the graduated side wholly
upwards Is then pulled along the rule until
the requisite tension is registered by the
sounding of the buzzer in the
dvnarncmeter, The relative position of
tape and rule is maintained by a firm grip
until the rule is removed from the side of
the tank and the measurement read on
the tape at the end of the rule which was
previously in contact with the tank side.
The operation shali be repeated at the
various positions at which measurements
are required throughout the tank. The
measurements shall be recorded clearly
In white chalk on the steel plates in such
a manner as to Indicate the positions at
which they were taken.
(viii) Each measurement of diameter shall be
recorded to the nearest mm.
(b) All other measurement shall be followed
In accordance with section I.
PART III
METHOD FOR COMPUTATION OF CAPACITY
TABLES FOR VERTICAL OIL STORAGE TANKS
1. Scope
This method prescribes the methods of
computation on capacity tables for vertical storage
tanks Intended for bulk storage of petroleum and
liquid petroleum products.
2. General
(a) The calculations shall be made In
accordance with the accepted mathematical
principles.
(b) At the head of each capacity table it shall
be clearly stated that the dip/capacity
relationship applies only to dips taken at ·
one specified point. This point shall be
clearly marked on the tank, and the height
of the dipping reference point shall be
recorded at the head of the capacity table.
3. Form of tank tables
Provided that tank tables have been prepared
in accordance with the principles laid down in this
standard, the form in which the table is set out will
not alter the accuracy of the figures obtained from
it, but the following principles shall be applied In
preparing the tank tables:-
(!) The Intervals of dip at which the tables are
set out shall not be so great that
Interpolation for Intermediate dips Is
difficult. It is convenient to set out tables
at Intervals of dip not greater than 5 cm,
for then a small proportional parts table,
calculated on the average content of tank
per unit depth, may be used for calculating
the litres corresponding to inter-decimal
dips. In the case of lap joints, however, the
proportional parts table should be set out
for every course (ring). Levels affected by
bottom irregularities and deadwood shall
644 THE .GAZETTE OF INDIA: EXTRAORDINARY [PARTII-SEC. 3(i)]
not be included in. calculating the average
capacity per unit. depth used for the
proportional parts table:
..
and. this table:shall
not be applied in interpolations at these.levels.
(ii) The tables-may be setout morefully; this
may be justifiable-in some:cases where the
greatest speed in calculation iS desired, but
it shall be remembered.that e.tabteset out
on a sigglesheet of paper, is often quicker
In use.than one .whlch -occupies several
pages.
(iii) It should be remembered that, at .best, no
oil measurement .can be -relied upon to
nearer that one partiinJ0,000. Commercial
tables should never be set out to show any
fractions ota litre, and minor discrepancies
within this•limitshall be disregarded.
(iv) In genera!, therefore, it is recommended
that tables.should be set out to show litres
at intervals -of 5 cm in dip with a
proportional parts table for Intermediate
dips, the satter being set out against
millimetres.
(v) A recommended format of a calibration
chart for butt welded tanks Is given in
Table 2.
SECTION I : STRAPPING METHOD
4. Corrections to be applied to measured
circumferences
(a) Step overs:
(i) For each obstruction the excess or
deficiency of the tape measurement
spanning the obstruction as compared
with the step-over interval for the course
(ring) concerned shall be subtracted from
or added to the circumference figure
obtained by strapping, and the result shall
be taken as the corrected circumference,
free from error due to the displacement
of the tape from its proper path by the
obstruction concerned.
(ii) Step-over correction shall be Included for
all vertical seams where it Is detectable
In the case of vertical seams provided that
the tape path used and entirely clear of
rivet heads, an average step-over
correction may be determined for each
course (ring) and multiplied by the
number of seams per course (ring) to
obtain the total correction to be applied
to the measured circumference of that
course (ring) to compensate for such
overlaps.
(Ill) For single obstructions, only step-over
corrections 2 mm or over shall be included.
(iv) The use of the step-over corrects
circumferences for the effect on them of
vertical seam overlaps but does not
correct the tank tables for the effect as
deadwood of internal projections of the
seam edges. These shall be computed and
accounted for as deadwood.
(v) Bychoosing tape courses In order to avoid
appurtenances, use of step-overs €ould
be eliminated to a great extent.
(b) Plate thickness
Plate thickness measured shall be recorded
to the nearest 0.1 mm.
(c) Temperature correction
Where the strapping and dipping tapes are
calibrated at 20° C, and the tank table is to
be corrected for use with the shell at 15°C,
from each measured circumference shall
be subtracted 0.000 09 times the measured
circumference, before the figure is taken
Into further calculation.
5. Calculations
(a) The mean external circumference of any
course (ring) shall be the average of the
circumferences measured on it and
corrected to the nearest 0.1 mm.
(b) The mean internal circumference of the
course (ring) shall then be calculated from
the mean external circumference of the
course (ring) by subtracting from the latter
2 11 times the plate thickness in metres.
(c) The open capacity of each course {ring),
that is, its capacity without allowing for
deadwood shall be calculated as if the
course (ring) were a true cylinder of the
mean internal circumference determined as
under (b) above. This rule shall apply to
vertical cylinders of In-and-out, telescopic
or shingled construction.
(d) The open capacity of each course (ring) In
litres per centimetre of height shall be
obtained by using either the following
formula or any other mathematically
equivalent process:-
Open capacity in litres per centimetre
C2Xl00D0
=
4 n Xl000.028
or 0.795 752 x c2
where-
C = the mean internal circumference In
metres and p = 3.14158
["11'1JI-? 3(i)] 645
(e) For tanks which are inclined to the vertical,
these formulae shall be modified as given
in clause 11.
(f) Specimen calculations are given in clause
12.
SECTION II : INTERNAL MEASUREMENT METHOD
6. Corrections to be applied to diameter
measurements
(a) Deductions shall be made from the average
tape readings obtained in measuring
diameters to allow for the effect of sag.
The correction Z for sag expressed in metre
is given by the formula :
z =
W'S'
= KS'
24P1
where
P = pull on tape in kg,
S = span of tape i.e., outside circumference
of the tank in m,
W = weight of tape in kg/m, and
K = w2124p2= constant
Example : For a tape 10 mm wide and 0.25
mm thick, made of steel of density 7.850 kg/m3,
values of K to give the correction in centimetres when
the tape is stretched with fiat side horizontal, will
be:
p K
4.4 kg 8.29 x 10-S
4.5 kg 7.92 x 10-S
4.6 kg 7.58 X 10-5
The above formula gives practically the same
results as the equation of the catenary and is less
cumbersome.
(b) To the average diameter of each course
(ring), corrected for sag, add the length of the
dynamometer when registering a pull of 4.5 kg.
(c) Corrections for the effect of stretch are
unnecessary because the tension applied is that at
which the tape is standardized.
(d) Corrections for temperature shall be made
as specified in 7(c).
7. Calculations
(a) The mean diameter measurement will
consist of the average, of the separate tape readings
corrected for sag, plus the length of the
dynamometer.
(b) The procedure shall, therefore, be :
(i) Average the tape readings obtained for
each course (ring), by dividing the sum of
all these readings on the course (ring) by
their number. Round off this average to the
nearest 0.1 mm
(II) Correct the mean result of (i) for sag as
specified in 6(a).
(Iii)Add to the result of (ii) the dynamometer
length as specified In 6 clause (b).
(c) Where the measuring and dipping tapes
are calibrated at 20°C, and the tank table is to be
correct for use with the shell at 15°C, multiply the
result obtained in (b)(iii) above by (1-0.000 09),
before the figure is taken Into further calculation.
Round off this figure to the nearest 0.1 mm.
(d) calculate the open capacity of each course
(ring) that is its capacity without allowing for
deadwood, as if the course (ring) were a true cylinder
of the mean Internal diameter determined under (b)
above. This rule shall apply to vertical cylinders of
in-and-out telescopic or shingled construction.
(e) The open capacity of each course (ring) In
litre per centimetre of height shall be obtained by
using the following formula or by any other
mathematically equivalent process:
D'X 11
· or 0.000785 376 x D2
1000.028X4
where
D = the mean internal diameter in
· centimetres.
(f) For tanks which are inclined to the vertical,
modify these formulae as given In 11.
(g) When the level or levels from which oil
depths will be measured differ from the datum level
from which the tank table is first prepared, correction
for difference shall be made in the final table.
(h) Specimen calculations are given in clause 13.
s. Deadwood
(a) The open capacity of each course (ring)
shall be adjusted for any deadwood it contains.
(b) The total volume of each piece of deadwood
shall be calculated to the nearest litre. In this context,
the term 'piece of deadwood' shall include such Items
as the rivet heads in one line around the tank, taken
collectively, as a single 'piece' of deadwood.
(c) The effect of small pieces of deadwood may
be neglected provided that (i) the total effect of any
such neglect shall not lead to error in the tank tables
exceeding 0.005 per cent of the total capacity of the
course (ring) in which the deadwood occurs, and (II)
any deadwood so neglected is distributed evenly, or
substantially so, over the whole height of the course
?--
_L_
-
646 THE GAZETTE OF INDIA : EXTRAORDINARY [PARTII-SEC. 3(i)]
(ring), in calculating the table; howevetlt shall be
permlssible to lndude the effect of any. deadwood,
however small.
9. Tank bottoms
(a) When the tank bottom is .substantially
horizontal, for example, when the tank Is carried on
a level concrete raft orsteel structure, then bottom
Irregularities can. be n?lected.
(b) When thetank bottom· has been calibrated
by measuring ln:sultable known .volumes of •liquid,
the tank table for these levels shaltbe prepared from
these measurements on .sound mathematical
principles. The highest level and capacity shown in
the tank bottom.calibration table so prepared shall
then be the datum level and capacity from which is
to be constructed.jrhe rest of the table should be
prepared by calculation as described In this section.
10. Floating roof,tank
(a) Except for.the following modifications, tables
shall be prepared In accordance with Section I and
Section II :
(i) Allowance for deadwood shall be made as
described in dause 8.
(ii) The drain line and other accessories
attached to the underside of the roof shall
be included as fixed deadwood in the
position they occupy when the roof is at
rest on its supports. The position of these
accessories should be specified In the
calibration table.
(iii) Two levels shall be defined, both an exact
number of centimetre above the datum
point from which dip readings will be taken.
The first level, designated A, shall be not
less than 4 an and not more than 6 cm
below the lowest point of the roof plates
.·
when the roof Is at rest. The second level,
designated B, shall be not less than 4 cm
and not more than 6 cm above the free oil
surface when the roof is at its lowest oil
bome position.
(iv) The floating weight of the entire roof shall
include weight of roof plus half the weight of
the rolllng ladder and other hinged and
flexiblysupported accessories that are carried
·
up and down in the tank with the roof.
The displaced volume due to roof weight
can be easily calculated from :
.
?oofweight in kg/ Density of stock in kg
· per litre at tank temperature
·, ?
.
·:":",iThe displacement, minus the volume of
·'' ·
..
deadwood already accounted for in (ii)
above, shall be considered as an item of
deadwood applicable to all levels above B.
It shall either be entered as such on a
supplementary table or taken into account
In the preparation of the final table as a
deduction for deadwood at all levels above
B. For levels between A and B, the
proportion of roof displacement to be taken
Into account as deadwood may be
calculated from the dimensions of the
floating roof. These partial displacements
shall either be entered as such In the
supplementary table as applicable for levels
between A and B, or taken into account In
preparation of final table. Alternatively
where measured quantities of oil have been
admitted to the tank and corresponding
levels of the free oil surface determined by
dipping, the necessary adjustments to the
tank capacity within the range of the levels
A and B may be computed from this data.
The part of the table between levels A and
level B shall be marked 'not accurate'.
(v) It is considered impracticable to allow In
the tank table, for the effects of extraneous
matter retained by the roof, varying friction
of the roof shoes and varying immersion of
roof supports.
11. Computation of contena of tanks inclined
to the vertical
[See clauses S(e) and 7{f}j
(a) Tunks iflclinedto the vertical :
(i) Capacity as determined in S(e) and 7(e)
applies to tanks which are vertical. For tanks
Inclined to the vertical at an angle •, the
open capacity in litres per centimetre of
vertical height, is given by :-
0. 795 752 x c2 x sec e
Where C = the mean Internal
circumference in metres.
OR
0.000785 376X o2 x Sec 0
where
D = the mean internal diameter in
centimetres.
Sece may be ignored for angles of tilt up to
1 In 50, this representing a maximum error
of 0.02 per cent.
(Ii) The· correction specified above shall be
applied before the corrections for
deadwood are made.
['WT II-? 3(i)J 'IT«r q;r uaft1i[ : :mir,mui 647
[See clause S{fJj
12. Example for strapping method
(a) Data obtained by strapping
Course (ring) Measured Stepover Plate thickness Internal heights of courses
No. external corrections (rings)
circumferences metres
metres mm Individual Cumulative
an cm
8 Top 113.040 0.002 7
8 Middle 113.086 0.002 7 187.0 1475.0
8 Bottom 113.085 0.002 7
7 Top 113.127 0.002 7
7 Middle 113.133 0.002 7 179.0 1288.0
7 Bottom 113.130 0.002 7
6 Top 113.090 0.003 10
6 Middle 113.096 0.003 10 190.0 1109.0
6 Bottom 113.092 0.003 10
5 Top 113.152 0.004 13
5 Middle 113.160 0.004 13 179.0 919.0
S Bottom 113.155 0.004 13
4 Top 113.085 0.010 13
4 Middle 113.092 0.010 13 191.0 740.0
4 Bottom 113.090 0.010 13
3 Top 113.175 3.010 16
3 Middle 113.176 0.010 16 178.0 549.0
3 Bottom 113.170 0.010 16
2 Top 113.077 0.013 18
2 Middle 113.081 0.013 18 191.0 371.0
2 Bottom 113.075 0.013 18
1 Top 113.187 0.015 20
1 Middle 113.189 0.015 20 180.0 180.0
1 Bottom
.
113.175 0.015 20
Total deadwood in
courses litres
. THE:GAZETTE .OF JNDIA:'EXTRAORDINARY
,350 ·38.889
,508 -9.961
2336 ·35.938
nil nil
nil nil
nil nil
nil nil
-195 ·1.021
·259 ·1.455
·309 -1.618
·145 -1.986
·59 -1.054
·36 -7.200
nil nil
648
(b) Additional data
(i) Deadwood
Course Applicable height
(ring) cm
No.
--···
8 1466 to 1475
8 1415 to 1<!66
8 1350 to 1415
8 1288 to 1350
7 1109 to 1288
6 919 to 109
5 740 to 919
4 549 to 740
3 371 to 549
2. 180 to 371
1 107 to 180
1 51 to 107
1 46 to 51
1 o to 46
litres
Deadwood
1/cm
[PARTII-SEC. 3(i)]
·3194
-195
-259
-309
-122
(ii) Tape calibration temperature
(iii) Condition of tank at time of strapping :
Water in tank to depth of
Water temperature
Density of water at 20°C
(c) calculation of corrected internal circumferences course (ring)
Measured external circumference at 20°C
Correction for calibration temperature of tape
calculated external circumference at 15°C
Step-over correction
Correction for plate thickness
7 x 21t = 7x6.2832 mm
Corrected internal circumference
(calculation for other courses may be done in a similar way)
20°C
1400 cm
20°C
1 000 kg/I
No. 8 top
113.040 Om
-.0.0010 2 m
113.029 8 m
·0.002 Om
-0.044 Om
112.983 8 m
- -
*
['WT n-= 3(ill '1ml siJ Uo!'f:l : mll"IR"T 649
· The corrected Internal circumferences for the remaining measurements given above are shown below.
(d) calculatlon of open capacity of courses (rings)
Course (ring) No. Corrected internal Mean internal Open capacity pf course (ring)
circumference circumference
m m I/cm litres
8 Top 112.983 8
8 Middle 113.029 8 113.014 10 163.48 1 900.571
8 Bottom 113.029 8
7 Top 113.070 8.
7 Middle 113.076 8 113.073 8 10174.22 1 821.185
7 Bottom 113.073 8
6 Top 113.014 0
6 Middle 113.020 0 113.016 4 10 163.95 1 931.150
6 Bottom 113.016 0
5 Top 113.056 1
5 Middle 113.064 1 113.059 8 10 171.70 1820.734
5 Bottom 113.059 1
4 Top 112.983 1
4 Middle 112.990 1 112.987 1 10 158.62 1940.2%
4 Bottom 112.988 1
3 Top 113.054 3
3 Middle 113.005 3 113.053 0 10 170.48 1 810.345
3 Bottom 113.049 3
2 Top 112.940 7
2 Middle 112.944 7 112.941 4 10 150.41 1938.428
2 Bottom 112.938 7
1 Top 113.036 1
1 Middle 113.038 1 113.032 8 10 166.84 1 830.031
1 Bottom 113.024 1
Total 14 993.040
(e) calculation of net capacity or courses (rings)
Oil dip Open capacity Deadwood Net capacity
cm I/cm I/cm I/cm
Oto 46 10 166.84 NII 10 166.84
46 to 51 10 166.84 • 7.20 10 159.64
51 to 107 10 166.84 + 1.05 10 167.89
107 to 180 10 166.84 -1.99 10 164.85
180 to 371 10 150.41 -1.62 10 148.79
371 to 549 10 170.48 ·1.46 10 169.02
549 to 740 10 158.62 -1.02 10 159.60
740 to 919 10 171.70 nil 10 171.70
919 to 1109 10 163.95 nil 10 163.95
1109 to 1288 10 174.22 nil 10 174.22
1288 to 1350 10 163.48 nil 10 163.48
1350 to 1415 10 163.48 ·35.94 10 127.54
1415 to 1466 10 163.48 -9.96 10 153.52
1466 to 1475 10 163.48 -38.89 10 124.54
-.i...-.....-
• -
650 .. THE GAZETTE OFdNDIA :,EXTRAORDINARY [PARTII-SEC. 3(i)]
13. Examplefor internal measurement method · [See dause 7(h}]
(a} Data obtained by internal measurement-
:(i) ::ln'this example.It ls assumed that the same tank as in 12 has been calibrated by internal
:measurement. 'The means of each course (ring) of the tape measurements of the
internal diameters are as In col. ·2 of the table In (d) below :
Dynamometer-.iergth at a:tension·of 4.5 kg•= 21.30 cm
(b) Additional data
(i) All course (ring)' height deadwood, etc., are the same as in 12.
(c) Sag.correction
(i) ··For a·tension of 4,5,kg,.the·sag·correction for course (ring) No. 1 is:
7.89 x 10,5 {35.7878)3= 3.61 cm.
(d): calculation
-,
of-corrected internal diameter course (ring) No. 1
Mean-tape reading for diameter 3 578.78 cm
Sag.correction J deduct) 3.61 cm
Corrected tape reading 3 575.17 cm
Dynamometer length (add) 21.30 cm
Measured internal diameter at 20°C 3 596.47 cm
Corr.ection .for calibration temperature of tape (deduct) 0.32 cm
Corrected internal diameter at 15°C 3 596.15 cm
The corresponding tape readings and corrected internal diameters calculated as shown above, for
ail courses (rings) are tabulated below :
Course Mean tape reading Mean tape reading for Mean Interns! diameter
(ring) diameter corrected for sag and corrected for tape calibration
No. dynamometer temperature
cm cm cm
8 3 579.75 3 597.44 3 597.12
7 3 580.92 3 598.61 3 598.29
6 3 578.90 3 596.59 3 596.27
5 3 580.12 3 597.81 3 597.49
4 3 577.50 3 595.20 3 594.88
3 3 579.47 3 597.26 3 596.84
2 3 576.95 3 593.65 3 593.33
1 3 578.78 3 596.47 3 596.15
(e) Calculation of open capacity of courses (rings)
Course Open capacity of course (ring) Open capacity of course (ring)
(ring) No. I/cm litres
8 10 162.17 1 900 326
7 10 168.79 1 820 213
6 10 157.37 1 929 900
5 10 164.27 1 819 404
4 10 149.52 1 938 558
3 10 160.59 1 808 585
2 10 140.77 1 936 887
1 10 156.69 1 828 204
Total : 14 982 077
[ "l1'T II -1§i115 3 ( n ] 651
. I
(f) calculation of net capacity of course (ring)
Oil dip(cm) Open capacity (f/cm) Deadwood (fjcm) Net capadty (I/cm)
0 to 46 10 156.69 nil 10 156.69
46 to 51 10 156.69 -7.20 10 149.49
51 to 107 10 156.69 + 1.05 10 157.74
107 to 180 10 156.69 . 1.99 10 154.70
180 to 371 10 140.77 • 1.62 10 139.15
371 to 549 10 160.59 -1.46 10 159.13
549 to 740 10 149.52 -1.02
.
10 148.50
740 to 919 10 164.27 nil 10 164.27
919 to 1109 10 157.37 rin 10 157.37
1109 to 1288 10 168.79 nil 10 168.79
1288 to 1350 10 162.17 nil 10 162.17
1350 to 1415 10 162.17 • 35.94 10 126.23
1 415 to 1 466 10 162.17 • 9.96 10 152.21
1 466 to 1475 10 162.17 • 38.89 10 123.28
TABLE 2
[See Clause 3(a)/{v)J
RECOMMENDED FORMAT OF A CALIBRATION CHART FOR BUTT WELDED TANKS
Proportional parts
mm litres cm litres cm litres
1 00 200
2 05 05
3 10 10
4 15 15
5 20 20
6 25 25
7 30 30
8 35 35
9 40 40
10 45 45
11 50 250
12 55 55
13 60 60
14 65 65
I
I
I
I
f
'
I
L-------------
Tank No
......................
Code
...........................
Type ...........................
Diameter or
Circumference
.............
Height. ........................
cm /ftres cm litres cm litres cm litres cm litres cm litres
400 600 800 1000 1200 1400
05 05 05 05 05 05
10 10 10 10 10 10
15 15 15 15 15 15
20 20 20 20 20 20
25 25 25 25 25 25
30 30 30 30 30 30
35 35 35 35 35 35
40 40 40 40 40 40
45 45 45 45 45 45
450 650 850 1050 1250 1450
55 55 55 55 55 55
60 60 60 60 60 60
65 65 65 65 65 65
---- -
- -·-- -- --- -
a
------------·- ------1
652 THE GAZETTE OF· INDIA : EXTRAORDINARY [PART11---'-SEC.3(i)]
mm litres cm titres ,
..
cm litres cm litres cmltttes cm litres cm litres cm litres cm litres
15 70 · 70 70 70 70 70 70 70
16 75 75 75 75 75 75 75 75
17 80 80 80 .80 80 80 80 80
18 85 -85 ·as .85 85 85 85 85
19 90 90 90 90 90 90 90 90
20 95 95 95 .95 95 - 95 95 95
21 100
..
300 500 700 900 1100 1300 1500
22 05 05 05 OS 05 OS 05 05
23 10 10 10 10 10 10 10 10
24 15 .15 15 15 15 15 15 15
25 20 20 20 20 20 20 20 20
26 25 25 2.5 25 25 25 25 25
27 30 30 30 30 30 30 30 30
28 35 35 35 35 35 35 35 35
29 40 40 40 40 40 40 40 40
30 45 45 45 45 · 45 45 45 45
31 150 350 550 750 950 1150 1350 1550
32 55 55 55 55 55 55 55 55
33 60 60 60 60 60 60 60 60
34 65 65 65 65 65 65 65 65
35 70 70 70 70 70 70 70 70
36 75 75 75 75 75 75 75 75
37 80 80 80 80 80 80 80 .80
38 85 85 85 85 85 85 BS BS
39 90 90 90 90 90 90 90 90
40 95 95 95 95 95 95 95 95
41
42
43
44
45
46 Data regarding strapping, dimensions, etc.
47
48 Approved Signature Date
49
c= ·--
-
--- -------------- --
-·--··--··'··-·-···'·--·- ..
(,;rrr II-? 3(i)J 653
TENTH SCHEDULE
APPUCATION FORM FOR REGISTRATION OF IMPORTER OF WEIGHTS AND MEASURES
[See Rule 15]
To
The Director of Legal Metrology,
Government of India,
New Delhi.
Sir,
I/We* hereby apply for registration of my/our* name(s) as importer of weights and/or measures.
Particulars with regard to items specified In the table below are given against each such item. The
registration fee of Rs has been paid in the treasury at.. vlde Chalan No
.
.........................
dated enclosed.
1. Name and full address :
2. Whether Individual/undivided Hindu family/registered firm :
3. Income-tax registration No. (If any):
4. Date of registration as manufacturer/dealer; registration No. and name of registering authority :
5. Date & No. of the licence to carry on the business of weights and measures; the name of authority by
whom the licence was issued/renewed :
(a) buying and selling, or
(b) manufacturing.
6. Item(s) of weights and measures in relation to which the applicant has been registered as manufacturer
and/or dealer :
7. Items of weights and measures for which application Is being made for registration as Importer:
8. Items, If any, imported during the period of two years Immediately preceding the year in which the
application Is made :
9. Remarks:
Signature
*Delete which Is not applicable.
ELEVENTH SCHEDULE
REGISTER TO BE MAINTAINED BY THE MANUFACTURERS OF WEIGHTS AND MEASURES
[See Rule 24]
1. Name and address of the manufacturer
..
2. Description of the weight or measure ..
3. (i) No. of the manufacturing licence .
(ii) Date on which the licence was issued
..
(iii) Period of validity of the licence ..
4. Particulars of order, if any, suspending or revoking the licence
..
SI. Month Unsold stock Quantity Total Sold within the State Sold outside the State Total Balance Re?
No. from previous manufactured 3+4 sold 5-11 manes.
month during the 6+9
month
No. Despatch Name No. Despatch
of voucher of of voucher
items
,
No; and the items No. and
sold Date State sold Date
1 2 3 4 5 6 7 8 9 10 11 12 13
654 THE GAZETTE OF INDIA : EXTRAORDINARY [PARTII-SEC. 3(i)]
REGISTER TO BE MAINTAINED BY THE REPAIRERS IN RESPECT OF WEIGHTS OR MEASURES
RECEIVED FROM OTHER STATES
.
I
[See Rule 24]
Name·and address of the repairer ....................... Licence No. :
....................
Date of licensing :
............
SI. No. Date State Items & Receipt Amount of Amount of Total amount Date Re-
from :their Nos. No.& repairing verification charged of marks
which -booked date of charges fee return
received
.
for repair Issue to the
to the user
·user
1 2 3 4 5 6 7 8 9 10
REGISTER TO BE MAINTAINED BY DEALERS IN WEIGHTS AND MEASURES
(See Rule 24]
1. Name and ·address of the dealer
..
2. Description of the weight or measure
.
3. (i) Licence No
.
(ii) Date on which the licence was issued :
..
(iii) Period of validity of the licence
..
4. Particulars of order, if any, suspending or revoking the licence
.................................................
5. Category of weight or measure (Category A or 6) ...................................................................
(CategoryA or B)
SI. Month Unsold Brought Brought Total Sold within the State Sold outside the State Total Balance Re·
No. stock within from 3+4 sold 6-12 marks
from the outside +5 7+9
previous State the
month duMng State
the duMng
month the
month I
No. Despatch No. Despatch Name
of voucher of voucher of the Iitems No. and Items No. and state
sold Date sold Date
2 3 5 6 7 8 9 10 11 12 13 14
1. Approval of model
2. Verification and stamping of any
Type of Weights and Measures:
TWELFTH SCHEDULE
SCALE OF FEE
(See Rule 25]
At the rates specified in the Legal Metrology (Approval
of Model) Rules, 2011 subject to the condition that
total fee so charged ls not more than Rs. 10,000/·
Weights and Measures specified in the Legal Metrology
(General) Rules, 2011
at total fee so charged is not more than Rs. 5,000/·
------,
[ 'Tf1T ll-11!"6 3 ( i)] 655
1 2 3 4 5 6 7 8 9 10 11 12 13 14
3. Issue of a copy of any document
not being a document of a
confidential nature
4. Registration/Renewal of regist
ration of any person as an
importer.
5. Application fee for preferring any
appeal under the Act to
the Director/Controller
6. Application fee for preferring
any appeal under the Act to the
Central/State Government
At the rate of Rs. 10 for every 100 words or
part thereof.
Rs. 500.00
Rs. 100.00
Rs. 200.00
THIRTEENTH SCHEDULE
Format for nomination of the Director by the Company
[See Rule 29)
Notice is hereby given that Shrl/Smt{Ms Director of
the (name and address of the company) has been nominated by the company by a Resolution
passed at their meeting held on at to be incharge of, and be responsible
· for the conduct of business of the company or any establishment/branch/unit thereof and authorized to
exercise all such powers and take all such steps as may be necessary or expedent to prevent the commission
any offence by the said company under the Legal MetrologyAct, 2009.
Shri/Smt/Ms ,., Designation has accepted the said
nomination and copy of said acceptance Is enclosed herewith.
A certified copy of the said Resolution is also enclosed.
Place:
..
Date : .
Managing Director/Secretary of
(name of the company)
Note : Score out the portion which is not applicable.
[File No. WM-9(6)/2010-pt.J
RAKESH KACKER,Special Secy.
Printed by the Manager, Government of India Press, Ring Road, Mayapuri,New Delhi-! l0064
and Published by the Controller of Publications, Delhi- 110054.
Previous and next
Questions people ask
Is annexure of Legal Metrology (General) Rule, 2011 still in force?
No repeal of Legal Metrology (General) Rule, 2011 is recorded.