Regulation 10, The Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2011: True Up
The Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2011 - Regulation 10
Text of regulation 10
True Up
[10. True Up .- (1) The true up across various controllable parameters shall be
conducted by the Commission, for the previous years for which the actual/audited accounts
are made available by the Transmission Licensee, at the times and as per principles stated
below:-
(a) at the times -
(i) for the previous years of the previous control period:- along with the petition
for determination of ARR cum transmission tariff for the control period;
(ii) for the previous years of the control period and for the previous control
period:- along with the mid-term performance review during the control
period;
(iii) for the control period true up:- along with the mid-term performance review
of the next control period;
(b) as per principles -
(i) the Commission shall review actual capital investment vis-à-vis approved
capital investment;
1
Subs. vide Not. no. HPERC/F(5)(3)(1)(Trans) dated 1
st
November,2013 published in the R H.P.
dated 4
th
November, 2013 at p. 4608 to 4616. Before its substitution reg. 10 read as under:
“10. True Up
(1) The true up across various controllable parameters shall be conducted as per principles stated below:
(a) any surplus and deficit on account of O&M expenses shall be to the account of the transmission licensee and
shall not be trued up in ARR; and
(b) at the end of the control period –
(i) the Commission shall review actual capital investment vis-à-vis approved capital investment;
(2) depreciation and financing cost, which includes cost of debt including working capital (interest), cost of equity
(return) shall be trued up on the basis of actual/audited information and prudence check by the
Commission.Notwithstanding anything contained in these regulations, the gains or losses in the controllable
items of ARR on account of force majeure factors shall be passed on as an additional charge or rebate in ARR
over such period as may be laid down in the order of the Commission.”
Compendium of HPERC Regulations, March 2021 11
(ii) depreciation and financing cost, which includes cost of debt including
working capital (interest), cost of equity (return) shall be trued up on the
basis of actual/audited information and prudence check by the Commission;
(iii) any surplus and deficit on account of O&M expenses shall be to the
account of the Transmission Licensee and shall not be trued up in ARR; and
(2) The gain or loss on account of other controllable factors, unless otherwise
specifically provided by the Commission shall be to the account of the Transmission
Licensee.
(3) Notwithstanding anything contained in these regulations, the gains or losses in
the controllable items of ARR on account of force majeure, change in law and change in
taxes and duties shall be passed on as an additional charge or rebate in ARR over such
period as may be laid down in the order of the Commission.]
1[10-A. Carrying Cost.—The transmission licensee, for the approved true-up of any year
over and above that approved in the Tariff Order for that year, shall be entitled to a carrying
cost at one (1) Year weighted average State Bank of India (SBI) MCLR/any replacement
thereof as notified by RBI for the time being in effect applicable for one (1) Year period of the
relevant Year plus 300 basis points and for any true-up resulting in less than that approved in
the Tariff Order for that year, the carrying cost shall be recovered at the same rate.]
Previous and next
Questions people ask
Is regulation 10 of the Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2011 still in force?
No repeal of the Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2011 is recorded.