Regulation 6, The Himachal Pradesh Electricity Regulatory Commission (Levy and Collection of Fees and Charges by State Load Despatch Centre) Regulations, 2011: Duties and obligations of State Load Despatch Centre
The Himachal Pradesh Electricity Regulatory Commission (Levy and Collection of Fees and Charges by State Load Despatch Centre) Regulations, 2011 - Regulation 6
Text of regulation 6
Duties and obligations of State Load Despatch Centre
6. Duties and obligations of State Load Despatch Centre.- (1) The Power System
Operation Company, in discharge of functions, obligations and duties of the State Load
Despatch Centre, shall be guided by the provisions of the Act, rules, regulations and practice
directions issued thereon by the Commission from time to time.
2. The Power System Operation Company, while operating the State Load Despatch
Centre, shall also be guided by the contracts entered into between the licensees/ open access
1
Sub. Clause 28 vide Not No. HPERC-F(1)-3/2018 dated 22
nd
November, 2018 published in the R H.P.
dated 27
th
November, 2018 at p. 6277-6283 and before its substitution read as under:
“ (28) the words and expressions used in these regulations and not defined herein but defined in the Act shall
have the meanings respectively assigned to them under the Act.”
6 Compendium of HPERC Regulations, March 2021
consumers and generating companies or between licensees and open access consumers.
While discharging its duties and obligations, the Power System Operation Company shall
not give any preferential treatment to any of the open access consumers.
3. The Power System Operation Company/ State Load Despatch Centre shall –
(a) comply with the directions of the Regional Load Despatch Centre;
(b) ensure that the directions issued by the Regional Load Despatch Centre to
any transmission licensee or State Transmission Utility or other licensee of
the State or Generating Company or Substations in the State are duly
complied with;
(c) maintain transparency in its functioning and operations ;
(d) collect and maintain data of grid operation and transfer of electricity
through the power system;
(e) prepare energy account including unscheduled inter-change (UI) account;
(f) prepare bills of unscheduled inter-change of electricity and the procedure for
preparation of the same specifying therein the period of bill, mode of
payment, time of payment, surcharge for delayed payment and penalty for
nonpayment of bills; and
(g) perform such duties as specified by the Commission in any other regulation
or otherwise.
(4) The Power System Operation Company operating the State Load Despatch
Centre shall upload on its website as well as submit the following statement or reports to the
Commission:-
(a) Monthly Energy Accounting Statement indicating source-wise input
and the Distribution Company/Open Access Consumer-wise output of
energy; and
(b) the reports on its operation as required by-
(i) the Commission’s Orders on generation tariff and transmission tariff;
and
(ii) any other regulations.
Previous and next
Questions people ask
Is regulation 6 of the Himachal Pradesh Electricity Regulatory Commission (Levy and Collection of Fees and Charges by State Load Despatch Centre) Regulations, 2011 still in force?
No repeal of the Himachal Pradesh Electricity Regulatory Commission (Levy and Collection of Fees and Charges by State Load Despatch Centre) Regulations, 2011 is recorded.