Regulation 5, The Himachal Pradesh Electricity Regulatory Commission (Levy and Collection of Fees and Charges by State Load Despatch Centre) Regulations, 2011: Functions of State Load Despatch Centre
The Himachal Pradesh Electricity Regulatory Commission (Levy and Collection of Fees and Charges by State Load Despatch Centre) Regulations, 2011 - Regulation 5
Text of regulation 5
Functions of State Load Despatch Centre
5. Functions of State Load Despatch Centre.- The State Load Despatch Centre shall
be responsible for-
(a) scheduling and despatch of electricity;
(b) carrying out real time operation for control of grid and ensuring reliability;
(c) exercising the supervision and control over the intra-State transmission system;
(d) monitoring grid operations;
(e) keeping account of the electricity transmitted through the grid; and
(f) co-ordinating with the Regional Load Despatch Centre (RLDC).
Previous and next
Questions people ask
Is regulation 5 of the Himachal Pradesh Electricity Regulatory Commission (Levy and Collection of Fees and Charges by State Load Despatch Centre) Regulations, 2011 still in force?
No repeal of the Himachal Pradesh Electricity Regulatory Commission (Levy and Collection of Fees and Charges by State Load Despatch Centre) Regulations, 2011 is recorded.