Computation of Capacity Charge and Energy Charge
26. Computation of Capacity Charge and Energy Charge .- (1) The fixed cost of a
hydro generating station shall be computed on annual basis, based on norms specified
under these regulations, and recovered on monthly basis under capacity charge (inclusive
of incentive) and energy charge, which shall be payable by the beneficiaries in proportion
to their respective allocation in the saleable capacity of the generating station, that is to
say, in the capacity excluding the free power to the State:
Provided that during the period between the date of commercial operation of the
first unit of the generating station and the date of commercial operation of the generating
station, the annual fixed cost shall provisionally be worked out based on the latest estimate
of the completion cost for the generating station, for the purpose of determining the
capacity charge and energy charge payment during such period.
Compendium of HPERC Regulations, March 2021 23
(2) The capacity charge (inclusive of incentive) payable to a hydro generating
station for a calendar month shall be -
AFC x 0.5 x NDM / NDY x (PAFM / NAPAF) (in Rupees)
Where,
AFC = Annual fixed cost specified for the year, in Rupees.
NAPAF = Normative plant availability factor in percentage
NDM = Number of days in the month
NDY = Number of days in the year
PAFM = Plant availability factor achieved during the month, in percentage
(3) The PAFM shall be computed in accordance with the following formula:-
PAFM = 10000 x i=1∑
N
DCi/ f {N x IC x (100 - AUX)} %
Where,
AUX = Normative auxiliary energy consumption in percentage
DCi = Declared capacity (in ex-bus MW) for the ith day of the month which the station can
deliver for at least three (3) hours, as certified by the State Load Dispatch Centre after the
day is over.
IC = Installed capacity (in MW) of the complete generating station
N = Number of days in the month.
(4) The energy charge shall be payable by every beneficiary for the total energy
scheduled to be supplied to the beneficiary, excluding free energy, if any, during the
calendar month, on ex power plant basis, at the computed energy charge rate. Total Energy
charge payable to the generating company for a month shall be -
(Energy charge rate in Rs. /kWh) x {Scheduled energy (ex-bus) for the month in kWh} x
(100 – FEHS) / 100.
(5) Energy charge rate (ECR) in Rupees per kWh on ex-power plant basis, for a
hydro generating station, shall be determined up to three decimal places based on the
following formula, subject to the provisions of sub-regulation:-
ECR = AFC x 0.5 x 10 / {DE x (100 – AUX) x (100 – FEHS)}
Where,
DE = Annual design energy specified for the hydro generating station, in MWh, subject to
the provisions of sub- regulations
FEHS = Free energy for State, in per cent, as defined in regulation.
(6) In case actual total energy generated by a hydro generating station during a year
is less than the design energy for reasons beyond the control of the generating company,
the following treatment shall be applied, on a rolling basis, :-
(a) in case the energy shortfall occurs within ten years from the date of
commercial operation of a generating station, the ECR for the year following
the year of energy shortfall shall be computed based on the formula specified
in sub-regulation of this regulation with the modification that the DE for the
year shall be considered as equal to the actual energy generated during the year
24 Compendium of HPERC Regulations, March 2021
of the shortfall, till the energy charge shortfall of the previous year has been
made up, after which normal ECR shall be applicable;
(b) in case the energy shortfall occurs after ten years from the date of commercial
operation of a generating station, the following shall apply:-
(i) Suppose the specified annual design energy for the station is DE MWh, and
the actual energy generated during the concerned (first) and the following
(second) financial years is A1 and A2 MWh respectively, A1 being less
than DE. Then, the design energy to be considered in the formula in sub-
regulation of this regulation for calculating the ECR for the third financial
year shall be moderated as (A1 + A2 – DE) MWh, subject to a maximum of
DE MWh and a minimum of A1 MWh;
(ii) Actual energy generated (e.g. A1, A2) shall be arrived at by multiplying the
net metered energy sent out from the station by 100 / (100 – AUX).
(7) In case the energy charge rate (ECR) for a hydro generating station, as
computed in sub-regulation of this regulation, exceeds
1
[one rupee fifteen paise] per kWh,
and the actual saleable energy in a year exceeds {DE x (100 – AUX) x (100 – FEHS) /
10000} MWh, the Energy charge for the energy in excess of the above shall be billed at
1
[one rupee fifteen paise] per kWh only:
Provided that in a year following a year in which total energy generated was less
than the design energy for reasons beyond the control of the generating company, the
energy charge rate shall be reduced to
1
[one rupee fifteen paise] per kWh after the energy
charge shortfall of the previous year has been made up.
(8) The State Load Despatch Centre shall finalise the schedules for the hydro
generating stations, in consultation with the beneficiaries, for optimal utilization of all the
energy declared to be available, which shall be scheduled for all beneficiaries in proportion
to their respective allocations in the generating station.
Previous and next
Questions people ask
Is regulation 26 of the Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2011 still in force?
No repeal of the Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2011 is recorded.